Nexen Building, Calgary

Last updated

Nexen Building
Frozen Calgary (Nexen Building).jpg
Nexen Building, Calgary
General information
StatusVacant [1]
TypeOffice
LocationCalgary, Alberta, Canada
Coordinates 51°02′47″N114°04′46″W / 51.04639°N 114.07944°W / 51.04639; -114.07944
Completed1982
Cost$121,931,465[ citation needed ]
Height
Roof152 m (499 ft) [2]
Technical details
Floor count37
Floor area55,855 m2 (601,220 sq ft) [3]
Design and construction
Architect(s)CPV Group Architects and Engineers
Main contractorCANA Construction Company

801 Seventh Avenue S.W., commonly known as the Nexen Building, is a high rise office building in downtown Calgary, Alberta, Canada. [4]

Contents

It is a 37-storey skyscraper, with a height of 153 m (502 ft). [2] It was designed by CPV Group Architects and Engineers Ltd and built by CANA Construction Company Limited. The late-modernist building was completed in 1982.

The Nexen Building employs a composite stub-girder steel-frame floor system, [5] originally developed in part by Joseph Colaco. [6]

It is unique in that it is one of the few buildings in Calgary that do not follow the traditional grid pattern of the downtown core. Instead of facing south–north, or east–west, it stands diagonally.

Tenants

The original tenant of the Nexen Building was the NOVA Corporation. [7] In 2000, the building became Nexen's headquarters. [7] Nexen was purchased by Chinese state-owned CNOOC in 2013 and reduced its workforce over time. [7] [8]

Nexen moved from the Nexen Building in 2019, instead subleasing 8 floors of The Bow from Cenovus, leaving the Nexen Building the largest-ever completely vacant building in downtown Calgary. [9] [1]

See also

Related Research Articles

<span class="mw-page-title-main">Calgary Public Library</span> Public library system in Calgary, Canada

The Calgary Public Library (CPL) is a distributed library system featuring 21 branch locations including the Central Library. As of 2012, it is the second most used system in Canada and the sixth most used library system in North America. This is despite the fact that the Calgary Public Library has one of the lowest per capita funding in the country, receiving as little as half the money of other Canadian public libraries.

<span class="mw-page-title-main">Plus 15</span> Pedestrian skywalk system in Calgary, Alberta, Canada

The Plus 15 or +15 is a skyway network in Calgary, Alberta, Canada. It is the world's most extensive pedestrian skywalk system, with a total length of 16 kilometres and 86 bridges connecting 130 buildings, as of 2022. Calgary often has severe winters and the walkways allow people to get around the city's downtown more quickly and comfortably. The busiest parts of the network saw over 20,000 pedestrians per day in a 2018 count.

<span class="mw-page-title-main">Suncor Energy Centre</span> 181,000-square-metre (1,950,000 sq ft) project composed of two office towers

The Suncor Energy Centre, formerly the Petro-Canada Centre, is a 181,000-square-metre (1,950,000 sq ft) project composed of two granite and reflective glass-clad office towers of 32 floors and 52 floors, in the office core of downtown Calgary, Alberta. The Council on Tall Buildings and Urban Habitat lists the west tower, as the 23rd tallest building in Canada and the 6th tallest skyscraper outside of Toronto, as of 2023. The west tower overtook the Calgary Tower as the tallest free-standing structure in Calgary from its completion in 1984, until being surpassed by the neighbouring Bow in 2010. The office towers encompass 158,000 m2 (1,700,000 sq ft) of rentable office space with the complex also containing 23,000 m2 (250,000 sq ft) of retail and underground parking area. A glass-enclosed walkway provides shelter and easy access to the surrounding buildings.

<span class="mw-page-title-main">CNOOC Petroleum North America</span> Chinese oil and gas company, Alberta, Canada-based subsidiary of CNOOC

CNOOC Petroleum North America ULC, formerly known as Nexen, is a Canadian oil and gas company based in Calgary, Alberta.

<span class="mw-page-title-main">Downtown Calgary</span> Neighbourhood in Calgary, Alberta, Canada

Downtown Calgary is a dense urban district in central Calgary, Alberta. It contains the second largest concentration of head offices in Canada, despite only being the country's fourth largest city in terms of population. The downtown is divided into several residential, commercial, corporate, and mixed-use neighbourhoods, including the Financial District (CBD), Eau Claire, Chinatown, East Village, Beltline, and the West End.

<span class="mw-page-title-main">Imperial Oil Building</span>

The Imperial Oil Building, now known as Imperial Plaza, is a skyscraper located at 111 St. Clair Avenue West in Toronto, Ontario, Canada. The 21-storey building was completed in 1957 as the headquarters of Imperial Oil, Canada's largest oil company. The building's design had previously been rejected for a proposed new Toronto City Hall. After several decades of use as the head office of Imperial Oil, the building was sold in 2010 and converted into a condominium apartment building.

<span class="mw-page-title-main">The Bow (skyscraper)</span> 1,700,000 sq ft office building in downtown Calgary, Alberta, Canada

The Bow is a 158,000-square-metre (1,700,000 sq ft) skyscraper in downtown Calgary, Alberta, Canada. The 236 metre (774 ft) building was the tallest in Calgary between July 8, 2010, when it surpassed the Suncor Energy Centre, and May 11, 2016, when it was exceeded by Brookfield Place. The Bow is currently the second tallest office tower in Calgary and the third tallest in Canada outside Toronto. The Bow is also considered the start of redevelopment in Calgary's Downtown East Village. It was completed in 2012 and was ranked among the top 10 architectural projects in the world of that year according to Azure magazine. It was built for oil and gas company Encana, and was the headquarters of its successors Ovintiv and Cenovus.

<span class="mw-page-title-main">Aura (Toronto)</span> Mixed-use skyscraper completed in 2014 in Toronto, Ontario, Canada

Aura is a mixed-use skyscraper completed in 2014 in Toronto, Ontario, Canada. It is the final phase of a series of condominium buildings near College Park in Toronto's Downtown Yonge district. It is part of the Residences of College Park project. Construction lasted from 2010 to 2014. With 79 floors, as of 2018 it is the tallest residential building in Canada and the 38th tallest residential building in the world.

<span class="mw-page-title-main">Allen Center</span> Skyscraper complex in Houston, Texas

The Allen Center is a mixed-use skyscraper complex in Downtown Houston, Texas, United States. It consists of three buildings, One Allen Center, Two Allen Center, Three Allen Center. The complex has about 3,000,000 square feet (280,000 m2) of space.

<span class="mw-page-title-main">Canadian petroleum companies</span>

Although there are numerous oil companies operating in Canada, as of 2009, the majority of production, refining and marketing was done by fewer than 20 of them. According to the 2013 edition of Forbes Global 2000, canoils.com and any other list that emphasizes market capitalization and revenue when sizing up companies, as of March 31, 2014 these are the largest Canada-based oil and gas companies.

8 Spruce Street, previously known as the Beekman Tower and New York by Gehry, is a residential skyscraper on Spruce Street in the Financial District of Manhattan is New York City. Designed by architect Frank Gehry + Gehry Partners LLP and developed by Forest City Ratner, the building rises 870 feet with 76 stories. WSP Cantor Seinuk was the lead structural engineer, Jaros, Baum & Bolles provided MEP engineering, and Kreisler Borg Florman was construction manager. 8 Spruce Street was the tallest residential tower in the Western Hemisphere at the time of opening in February 2011.

<span class="mw-page-title-main">Shell Centre (Calgary)</span> Office Tower in Calgary, Alberta

Shell Centre is a 33-storey, 140 m (460 ft) office tower in Calgary, Alberta, Canada. At completion in 1977, Shell Centre was the fourth tallest building in Calgary, behind Dome Tower, Bow Valley Square Two, and Stephen Avenue Place.

<span class="mw-page-title-main">Union Bank Building</span> Skyscraper in the Exchange District of Winnipeg, Manitoba, Canada

The Union Bank Building, located in the Exchange District of Winnipeg, Manitoba, is the first skyscraper in Canada, once forming the northern end of Main Street's prestigious Banker's Row. It was designated a National Historic Site of Canada in 1997.

<span class="mw-page-title-main">Brookfield Place (Calgary)</span> Skyscraper located in downtown Calgary, Alberta, Canada

Brookfield Place is a skyscraper located in downtown Calgary, Alberta, Canada. The complex is home to Brookfield Place East, a 56-storey 247 m (810 ft) office tower, which, upon its completion in 2017, became the tallest building in Calgary, exceeding The Bow. Its anchor tenant is the oil and gas company Cenovus.

<span class="mw-page-title-main">Telus Sky</span> Skyscraper in Calgary, Alberta, Canada

Telus Sky, is a 60-storey, 222.3 m (729 ft) mixed-use skyscraper in downtown Calgary, Alberta, Canada. At completion in 2019, the structure building became the third-tallest building in Calgary behind Brookfield Place East and The Bow. As of July 2020, Telus Sky is the 18th tallest building in Canada, though several buildings in Toronto exceeding its height are under construction including The One.

<span class="mw-page-title-main">55 Hudson Yards</span> Office skyscraper in Manhattan, New York

55 Hudson Yards is a skyscraper in Hudson Yards, Manhattan, New York City, just outside the Hudson Yards Redevelopment Project. It and 50 Hudson Yards will add a combined 4 million square feet (370,000 m2) of space to the Hudson Yards project, even though the two buildings are located outside the redevelopment site itself.

<span class="mw-page-title-main">Stub-girder system</span>

A stub-girder system is a model of steel frame structures consisting of beams and decking, originally developed in the early 1970s in part by Joseph Colaco of Ellisor Engineers Inc..

<span class="mw-page-title-main">Calgary Central Library</span> Public library in Calgary, Alberta, Canada

The Calgary Central Library, also known as the Calgary New Central Library (NCL), is a public library in Calgary, Alberta, Canada, and the flagship branch of the Calgary Public Library system. The building is located in the Downtown East Village neighbourhood and opened on November 1, 2018, replacing an earlier central branch built in the 1960s in Downtown Calgary.

<span class="mw-page-title-main">Rainier Square Tower</span> High-rise office and residential building in Seattle, Washington, United States

Rainier Square Tower is a mixed-use skyscraper in the Metropolitan Tract of downtown Seattle, Washington. The 850-foot (260 m) tall, 58-story tower is located at Union Street between 4th and 5th Avenues adjacent to the existing Rainier Tower; it is the second-tallest building in Seattle. The $600 million project was completed in 2020, and is the tallest building constructed in the city since the construction of the Columbia Center in 1985.

References

  1. 1 2 Toneguzzi, Mario (February 24, 2020). "Calgary's 600,000-sq.-ft. Nexen Building sits vacant". Calgary: Real Estate News Exchange (RENX). Archived from the original on March 5, 2020. Retrieved May 4, 2020.
  2. 1 2 Emporis. Nexen Building [usurped]
  3. "Nexen Building". Skyscraper Center. CTBUH. Retrieved September 27, 2017.
  4. "Four downtown Calgary office buildings, including old Nexen tower, sit empty". CBC News. February 25, 2020. Retrieved April 8, 2020.
  5. Stringer, David C. "Staggered Truss and Stub Girder Framing Systems in Western Canada Archived 2011-07-06 at the Wayback Machine ". Technical paper published by the Canadian Steel Construction Council. 1982. Retrieved on January 20, 2009.
  6. Colaco, Joseph P. "A Stub-Girder System for High-Rise Buildings [ permanent dead link ]". Technical paper presented at the AISC National Engineering Conference, New York. May 1972. Retrieved on January 20, 2009.
  7. 1 2 3 Jones, Jeffrey (July 26, 2020). "Ghost Tower: Inside the nasty legal battle that's kept a Calgary skyscraper empty" . The Globe and Mail. Retrieved February 6, 2021.
  8. Morgan, Geoffrey (June 6, 2019). "CNOOC's Canadian unit laying off 100 people". Financial Post. Archived from the original on June 10, 2019. Retrieved February 6, 2021.
  9. Hudes, Sammy (October 1, 2018). "Nexen moving into Bow Tower, subleasing eight floors from Cenovus". The Calgary Herald. Archived from the original on November 26, 2019. Retrieved January 26, 2020.