North Shore Connector

Last updated

Map highlighting the North Shore Connector. Allegheny Station and North Side Station were newly constructed as part of the Connector project, while Gateway Station was completely reconstructed. North Shore Connector.svg
Map highlighting the North Shore Connector. Allegheny Station and North Side Station were newly constructed as part of the Connector project, while Gateway Station was completely reconstructed.
North Shore Connector Tunnel
North Shore Connector (31473443622).jpg
Overview
Line
Location Pittsburgh
Coordinates 40°26′41″N80°00′22″W / 40.4446°N 80.006°W / 40.4446; -80.006
System Pittsburgh Light Rail
Crosses Allegheny River
Operation
Work begunJanuary 2008 (2008-01)[ citation needed ]
OpenedMarch 25, 2012 (2012-03-25)[ citation needed ]
Operator Port Authority of Allegheny County
Technical
Length2,240 feet (680 m) [1]
Line length1.2 miles (1.9 km)[ citation needed ]
No. of tracks 2
Track gauge 5 ft 2+12 in (1,588 mm)

The North Shore Connector is a light-rail extension opened in 2012 in Pittsburgh, Pennsylvania. The connector extends the Pittsburgh Light Rail system from its previous terminus at Gateway Center Station in the Central Business District to the new North Side Station and Allegheny Station on the North Shore by way of a tunnel under the Allegheny River. The Connector extends the light rail system's "Free Fare Zone", enabling passengers to ride to and from Pittsburgh's rapidly growing North Shore neighborhood for free.

Contents

Planned since the late 1990s, the North Shore Connector received federal funding on February 6, 2004 and had crews complete the initial bore under the river on July 10, 2008. The Connector had a "soft opening" on Friday, March 23, 2012, with regular service beginning March 25, 2012. [2] The final cost of the project was $523.4 million. [3]

Areas and attractions served

Allegheny station, serving Acrisure Stadium and Carnegie Science Center. Notice the Pittsburgh Steelers banner prominently displayed. Pittsburghlightrail1.jpg
Allegheny station, serving Acrisure Stadium and Carnegie Science Center. Notice the Pittsburgh Steelers banner prominently displayed.

The North Shore neighborhood of Pittsburgh evolved from a "sea of asphalt" in the 1990s to a bustling extension of the central business district reflecting approximately one billion dollars of investment and construction in the first decade of the 2000s. [4] [5] The North Shore Connector links Pittsburgh's previously 25-mile light rail network to the new businesses and attractions of the North Shore, serving commuters, visitors, and sports event attendees alike. [6]

The North Side Station serves PNC Park (1.75 million annual fans) and the Community College of Allegheny County (7,200 students). The Allegheny Station serves residents in Allegheny West and Manchester, as well as visitors to Acrisure Stadium (500,000 annual fans, excluding concerts), the Carnegie Science Center (700,000 annual visitors), Children's Museum of Pittsburgh (250,000 annual visitors) and the Rivers Casino. [7] [8] During weekdays, downtown-destined vehicle commuters use the Connector by parking in one of the many North Shore parking facilities and completing their commute on the Connector. [9]

Other businesses and attractions served include the Del Monte corporate headquarters (600 employees), Equitable Resources (450 employees), the SpringHill Suites Marriott Hotel and other nearby hotels, Stage AE North Shore Amphitheater (Indoor rock club plus outdoor amphitheater with lawn for 5,500 visitors opening December 2010), the Andy Warhol Museum (90,000 visitors), and many other night spots and restaurants. [8]

Reception

Gateway Center Station construction in August 2011. New Gateway Center Station.jpg
Gateway Center Station construction in August 2011.

The North Shore Connector project attracted considerable controversy on both the local and national level. The points of contention included whether the North Shore Connector was the best way to extend Pittsburgh's light rail network; whether the North Shore Connector would prove to be competitive with existing roads, bridges, and trails in attracting commuters; and whether the project's long-term benefits to the region would justify its cost. Its supporters argued that any enhancement of public transportation infrastructure in the region should be welcome if it decreases regional reliance on automobiles, especially given the uncertainty of future fuel prices and the paucity of parking in the central business district, while opponents have argued that the project's small scope and large budget constitute a waste of government spending.

Locally, it was argued that the Pittsburgh Light Rail network probably deserved to be expanded, but that the most logical extension would be an eastward one, not a northward one. [5] [10] The "Spine Line", a proposed eastward extension reaching from the Central Business District to Oakland, was abandoned in part due to its prohibitive projected cost of over $1 billion and its estimated 15-year planning and construction schedule. [5] The North Shore Connector, by comparison, could be built quickly and with a substantially smaller budget. As one local columnist wrote, "People argue the T line should have gone to Oakland first, and they're right...The North Shore Connector is our consolation prize." [10]

On the national level, the project attracted controversy due to its cost and its use of federal funding. The project's original budget was estimated at $350 million, [11] but it increased to $435 million by 2006, [12] and to more than $550 million by 2009, [11] later revised down to $528.8 million in 2010. [4] (The final cost was $523.4 million.) Eighty percent of the funding was provided by the U.S. federal government. [12]

The North Shore Connector was ranked #3 in the nation among stimulus-funded projects purported to waste taxpayer money in a report by Senators John McCain and Tom Coburn. The "Summertime Blues" report, their third in a series, identified 100 projects throughout the country that received money from the $787 billion American Recovery and Reinvestment Act, signed into law in 2009 by President Barack Obama, which the senators classified as wasteful government spending. According to McCain, the Connector was an example of stimulus dollars spent to fund projects with "questionable goals," or those that were "being mismanaged or were poorly planned." Meanwhile, Coburn reminded the media that the initial budget was approximately $390 million, but "quickly ballooned" to a cost of $553 million. [13] [14]

In 2009 then-Governor Ed Rendell, a Democrat, called the tunnel "a tragic mistake" and expressed his wish that the project had never been started. He further stated his belief that the money given to the state from the American Recovery and Reinvestment Act should have been applied to the transportation needs of the state "in a more beneficial fashion". [15] Supporters of the North Shore Connector argued that the stimulus funds provided stability to the local construction industry while enhancing the public transportation infrastructure of the city, and one columnist noted that "[i]f the federal government didn't build [the North Shore Connector] here, it would have built something equally expensive somewhere else." [10]

Indeed, the federal government itself has been criticized heavily for its role in Western Pennsylvania's transportation funding situation; in 2010, it forbade the state's plan for a balanced transportation budget, which would have involved converting Interstate 80 into a toll road. The killed plan would have accounted not only for transit budgets, but also for funding of significant road and bridge infrastructure, which will now face an additional 5,200 Pittsburgh-area cars because of the federally forced transit cuts, according to one analyst.

In 2010, the Pittsburgh Tribune-Review expressed its opposition to the North Shore project, noting that there were already four bridges capable of transporting people from the Downtown area to the city's North Shore and North Side. The Tribune-Review further stated that PNC Park is already accessible to Pittsburgh Pirates fans via the Roberto Clemente Bridge, while the Pittsburgh Steelers have sold out Heinz Field for years without the project's help. [16]

These critiques do not take into account the fact that any northward expansion of Pittsburgh's light rail network would require that the Allegheny river be crossed in some fashion, and the light rail cars could not pass over the existing bridges. The engineers who planned the project concluded that a tunnel, rather than a new or retrofitted bridge, would be the most cost-effective solution to this issue. [10] In addition, in December 2010, the Steelers began examining the possibility of increasing the capacity of Heinz Field by "several thousand" seats. The president of Alco Parking, Merrill Stabile, noted that the North Shore lacks the parking capacity to serve additional fans, and that the North Shore Connector could help alleviate the congestion by "making it easier for fans to park Downtown". [17]

Supporters have argued that the North Shore Connector will not only ease weekend congestion on the North Shore, but will also ease weekday congestion in the Central Business district. On weekdays, commuters will be able to ride the light rail from the North Shore to the central business district by parking in one of the underutilized parking lots or garages of the North Shore. [17] Buses serving the region north of Pittsburgh could make terminal stops at the North Shore light rail stations rather than driving into the central business district, further decreasing congestion on the city streets"a gift to all rush-hour commuters". [10] Better enhancing the North Shore Connector's ability to attract commuters was a three-year deal sponsored by the Pittsburgh Steelers, the Rivers Casino, Alco Parking, and the Pittsburgh Stadium Authority to make rides between the North Shore and the Central Business District completely free. [2]

One positive aspect of the project highlighted by its supporters is that it makes any future northward expansions of the light rail network significantly easier, because the problem of crossing the Allegheny River has already been solved. More generally, the project reflects a regional commitment not to neglect public transportation infrastructure in favor of a purely automobile-based transportation system, with one columnist noting that "[a] light-rail line that stretches from the South Hills to the North Side is going to look much better when gas shoots back over $4 a gallon...Regions that offer residents varied transportation options will be the ones that succeed in this century." [10]

Related Research Articles

<span class="mw-page-title-main">Big Dig</span> 1991–2007 megaproject in Boston, Massachusetts

The Big Dig was a megaproject in Boston that rerouted the then elevated Central Artery of Interstate 93 that cut across Boston into the O'Neill Tunnel and built the Ted Williams Tunnel to extend Interstate 90 to Logan International Airport. Those two projects were the origin of the official name, the Central Artery/Tunnel Project. Additionally, the project constructed the Zakim Bunker Hill Bridge over the Charles River, created the Rose Kennedy Greenway in the space vacated by the previous I-93 elevated roadway, and funded more than a dozen projects to improve the region's public transportation system. Planning for the project began in 1982; the construction work was carried out between 1991 and 2006; and the project concluded on December 31, 2007. The project's general contractor was Bechtel and Parsons Brinckerhoff was the engineer, who worked as a consortium, both overseen by the Massachusetts Highway Department.

<span class="mw-page-title-main">NJ Transit</span> Public transportation system

New Jersey Transit Corporation, branded as NJ Transit or NJTransit and often shortened to NJT, is a state-owned public transportation system that serves the U.S. state of New Jersey and portions of the state of New York and Pennsylvania. It operates bus, light rail, and commuter rail services throughout the state, connecting to major commercial and employment centers both within the state and in its two adjacent major cities, New York City and Philadelphia. In 2022, the system had a ridership of 175,960,600.

<span class="mw-page-title-main">Downtown Pittsburgh</span> Neighborhood in Allegheny County, Pennsylvania, United States

Downtown Pittsburgh, colloquially referred to as the Golden Triangle, and officially the Central Business District, is the urban downtown center of Pittsburgh, Pennsylvania, United States. It is located at the confluence of the Allegheny River and the Monongahela River whose joining forms the Ohio River. The triangle is bounded by the two rivers.

<span class="mw-page-title-main">Transportation in New York City</span> Overview of urban transportation network

The transportation system of New York City is a network of complex infrastructural systems. New York City, being the most populous city in the United States, has a transportation system which includes one of the largest and busiest subway systems in the world; the world's first mechanically ventilated vehicular tunnel; and an aerial tramway. New York City is home to an extensive bus system in each of the five boroughs; citywide and Staten Island ferry systems; and numerous yellow taxis and boro taxis throughout the city. Private cars are less used compared to other cities in the rest of the United States.

<span class="mw-page-title-main">Pittsburgh Regional Transit</span> Public transit agency in Pennsylvania, US

Pittsburgh Regional Transit is the second-largest public transit agency in Pennsylvania and the 20th-largest in the United States. The state-funded agency is based in Pittsburgh and is overseen by a CEO and a board of unpaid volunteer directors, some of whom are appointed by the county executive and approved by the county council; and one each by the majority and minority leaders by each political party. After operating as the Port Authority of Allegheny County for most of its history, the agency rebranded under its current name in June 2022. In 2022, the system had a ridership of 35,976,700.

<span class="mw-page-title-main">Oak Point Link</span> Freight rail line in New York City

The Oak Point Link, also known as the South Bronx–Oak Point Link, is a 1.9-mile (3.1 km) long railroad line in the Bronx, New York City, United States, along the east bank of the Harlem River. It connects the Metro-North Railroad's Hudson Line with the Harlem River Intermodal Yard and the CSX Transportation Oak Point Yard at the north end of the Hell Gate Bridge.

<span class="mw-page-title-main">North Shore (Pittsburgh)</span> Neighborhood of Pittsburgh in Allegheny County, Pennsylvania, United States

North Shore is a neighborhood in Pittsburgh's North Side. Its zip code is 15212.

<span class="mw-page-title-main">Transportation in Pittsburgh</span> Transportation in Pittsburgh, Pennsylvania, United States

Transportation in Pittsburgh, Pennsylvania is different than in many other major American cities. A large metropolitan area that is surrounded by rivers and hills, Pittsburgh has an infrastructure system that has been built out over the years to include roads, tunnels, bridges, railroads, inclines, bike paths, and stairways; however, the hills and rivers still form many barriers to transportation within the city.

<span class="mw-page-title-main">Newburyport/Rockport Line</span> Commuter rail service in Massachusetts, US

The Newburyport/Rockport Line is a branch of the MBTA Commuter Rail system, running northeast from downtown Boston, Massachusetts towards Cape Ann and the Merrimack Valley, serving the North Shore. The first leg, operating via the Eastern Route of the former Boston and Maine Railroad, serves Chelsea, Lynn, Swampscott, Salem, and Beverly. From there, a northern branch continues via the Eastern Route to serve Hamilton, Ipswich, Rowley, and Newburyport, while other trains operate east from Beverly via the Gloucester Branch, serving Manchester, Gloucester, and Rockport. A bicycle coach is offered on the Rockport branch during the summer. With over 11,000 daily riders in October 2022, the line is the second-busiest on the system.

<span class="mw-page-title-main">Pittsburgh Light Rail</span> Light rail system in Pittsburgh, Pennsylvania

The Pittsburgh Light Rail is a 26.2-mile (42.2 km) light rail system in Pittsburgh, Pennsylvania, and surrounding suburbs. It operates as a deep-level subway in Downtown Pittsburgh, but runs mostly at-grade in the suburbs south of the city. The system is largely linear in a north-south direction, with one terminus near Pittsburgh's central business district and two termini in the South Hills. The system is owned and operated by Pittsburgh Regional Transit. The T is one of the surviving first-generation streetcar systems in North America, with the oldest portions of the network dating back to 1903 and the Pittsburgh Railways. It is also one of only three light rail systems in the United States that continues to use the broad 5 ft 2+12 in Pennsylvania Trolley Gauge on its lines instead of the 4 ft 8+12 instandard gauge. In 2022, the system had a ridership of 2,429,500.

<span class="mw-page-title-main">Port Perry Branch</span>

The Port Perry Branch is a rail line owned and operated by the Norfolk Southern Railway in the U.S. state of Pennsylvania. The line runs from the Pittsburgh Line in North Versailles Township southwest through the Port Perry Tunnel and across the Monongahela River on the PRR Port Perry Bridge to the Mon Line in Duquesne along a former Pennsylvania Railroad line.

<span class="mw-page-title-main">Red Line (Pittsburgh)</span>

The Red Line is a line on the Pittsburgh Light Rail system that runs between South Hills Village and Downtown Pittsburgh via the Beechview neighborhood. The companion route, the Blue Line, branches off north of Martin Villa – which closed in 2012 – and runs through Overbrook. In March 2007, the closure of the Palm Garden Bridge for refurbishment suspended the Red Line for five months; it resumed service in September.

<span class="mw-page-title-main">Wabash Tunnel</span> Tunnel in Pittsburgh, Pennsylvania, U.S.

The Wabash Tunnel is a former railway tunnel and presently an automobile tunnel through Mt. Washington in the city of Pittsburgh, Pennsylvania, United States. Constructed early in the 20th century by railroad magnate George J. Gould for the Wabash Railroad, it was closed to trains and cars between 1946 and 2004.

<span class="mw-page-title-main">Transportation in Hampton Roads</span>

Historically, the harbor was the key to the Hampton Roads area's growth, both on land and in water-related activities and events. Ironically, the harbor and its tributary waterways were both important transportation conduits and obstacles to other land-based commerce and travel. For hundreds of years, state and community leaders have worked to develop solutions to accommodate both.

Access to the Region's Core (ARC) was a proposed commuter-rail project to increase passenger service capacity on New Jersey Transit (NJT) between Secaucus Junction in New Jersey and Manhattan in New York City. New infrastructure would have included new trackage, a new rail yard, and a tunnel under the Hudson River. A new station adjacent to New York Penn Station was to be constructed as running more trains into the current station was deemed unfeasible. An estimated budget for the project was $8.7 billion. Construction began in mid-2009 and the project was slated for completion in 2018, but it was cancelled in October 2010 by Chris Christie, the governor of New Jersey, who cited the possibility of cost overruns and the state's lack of funds. Six hundred million dollars had been spent on the project. The decision remains controversial.

<span class="mw-page-title-main">Brown Line (Pittsburgh)</span>

The Brown Line was a branch of the Pittsburgh Light Rail system that ran from South Hills Junction over Mount Washington and across the Monongahela River to downtown Pittsburgh, terminating at Wood Street. It included the steepest grade of any section of the Pittsburgh light rail system, of approximately 10 percent.

<span class="mw-page-title-main">PATrain</span> Commuter rail In Pittsburgh, Pennsylvania

The PATrain, also known as Mon Valley Commuter Rail, was a commuter rail service owned by the Port Authority of Allegheny County in the Monongahela Valley in the US state of Pennsylvania. Service began in 1975 when the Port Authority assumed ownership of the Pittsburgh–McKeesport–Versailles commuter trains operated by the Baltimore and Ohio Railroad (B&O) with the support of PennDOT. The Port Authority discontinued the service in 1989.

<span class="mw-page-title-main">Transit Expressway Revenue Line</span> Proposed people mover rapid transit system

The Transit Expressway Revenue Line (TERL), commonly known as Skybus, was a proposed people mover rapid transit system developed by Westinghouse for the city of Pittsburgh, Pennsylvania during the 1960s–1970s. In contrast to the traditional streetcars then in use, the technology used a dedicated elevated concrete track and rubber-tired driverless cars. A demonstrator was built and operated in the South Hills area but political opposition killed the deployment of a larger system.

<span class="mw-page-title-main">North Side station (Pittsburgh Regional Transit)</span> Pittsburgh light rail station

North Side station is a station on Pittsburgh Regional Transit's light rail network, located in Pittsburgh, Pennsylvania. The stop serves the North Shore neighborhood and other adjacent neighborhoods. Among the locations within walking distance are: PNC Park, the Pittsburgh Pirates baseball stadium; the Andy Warhol Museum; the Children's Museum of Pittsburgh; the National Aviary; and Allegheny Center.

<span class="mw-page-title-main">Lackawanna Cut-Off Restoration Project</span> American railway infrastructure project

The Lackawanna Cut-Off Restoration Project is a New Jersey Transit and Amtrak effort to restore passenger service to the Lackawanna Cut-Off in northwest New Jersey.

References

  1. "North Shore Connector - Light Rail/Subway Expansion | SAI Consulting Engineers". Archived from the original on January 18, 2017. Retrieved January 16, 2017.
  2. 1 2 Born, Molly (March 24, 2012). "North Shore Connector set to go after 18 years and $523 million". Pittsburgh Post-Gazette . Retrieved March 24, 2012.
  3. Schmitz, Jon (March 12, 2012). "Trains ready to roll under the river to North Shore". Pittsburgh Post-Gazette . Retrieved March 21, 2012.
  4. 1 2 Schmitz, Jon (November 26, 2010). "North Shore Connector said to be on schedule and under budget". Pittsburgh Post-Gazette . Retrieved January 22, 2011.
  5. 1 2 3 O'Neill, Brian (June 8, 2008). "North Shore Connector, you're looking good". Pittsburgh Post-Gazette . Retrieved January 22, 2011.
  6. Fontaine, Tom (May 16, 2012). "Connector boosts Port Authority ridership". Pittsburgh Tribune-Review . Retrieved June 2, 2012.
  7. "Archived copy" (PDF). Archived from the original (PDF) on July 12, 2010. Retrieved February 21, 2009.{{cite web}}: CS1 maint: archived copy as title (link)
  8. 1 2 County, Port Authority of Allegheny. "Port Authority of Allegheny County > Home". www.portauthority.org.
  9. North Shore Connector Brings Down Parking Rates, filed by John Shumway of CBS Pittsburgh/KDKA. Published March 26, 2012.
  10. 1 2 3 4 5 6 O'Neill, Brian (August 5, 2010). "Subway tunnel is hardly a money pit". Pittsburgh Post-Gazette . Retrieved January 22, 2011.
  11. 1 2 "How did Port Authority get into this deep, expensive hole of river tunnel?". www.post-gazette.com.
  12. 1 2 "U.S. gives green light to tunnel under river". www.post-gazette.com.
  13. ""North Shore Connector No. 3 on wasteful spending list - Pittsburgh Tribune-Review, August 4, 2010". pittsburghlive.com.
  14. "Pierce Arrow serves up great music, comedy and a warm Christmas show". Tulsa Beacon. February 27, 2020.
  15. "Rendell: T work 'tragic mistake' - Pittsburgh Tribune-Review, February 19, 2009". pittsburghlive.com.
  16. ""That Hole in the Water - Pittsburgh Tribune-Review, August 8, 2010". pittsburghlive.com.
  17. 1 2 Lord, Rich (December 28, 2010). "Steelers look to add seats to Heinz Field". Pittsburgh Post-Gazette . Retrieved January 22, 2011.