Orange Line (VTA)

Last updated

Orange Line
VTA-Orange-icon.svg
VTA Light Rail train at Milpitas station.jpg
A VTA light rail train at Milpitas station
Overview
Locale Santa Clara County, California
Cities: Mountain View, Sunnyvale, Santa Clara, San Jose, and Milpitas
Termini
Stations26
Service
Type Light rail
System VTA light rail
Operator(s) Santa Clara Valley Transportation Authority
Rolling stock Kinki Sharyo light rail vehicles (low floor)
Technical
Line length15.8 miles (25.4 km)
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Electrification Overhead lines, 750 V DC
Highest elevationat grade, elevated, underground
Route map
Orange Line (VTA) Orange Line highlighted in orange
BSicon CONTg.svg
BSicon mvINT-KINTa +saffron.svg
Mountain View
Caltrain roundel.svg BSicon PARKING.svg
BSicon cRP4q.svg
BSicon mvSKRZ-G4u +saffron.svg
BSicon cRP4q.svg
BSicon exSTR.svg
BSicon CONT3+g.svg
BSicon eBHF saffron.svg
closed
2015
BSicon v-STR saffron.svg
BSicon exvSHI2l-.svg
BSicon BHF saffron.svg
Whisman
BSicon PARKING.svg
BSicon emPSLre saffron+.svg
SP siding [1]
BSicon BHF saffron.svg
Middlefield
BSicon exCONTgq.svg
BSicon emABZgr saffron+.svg
SP to Moffett Federal Airfield [1]
BSicon cRP4q.svg
BSicon SKRZ-G4u saffron.svg
BSicon cRP4q.svg
BSicon BHF saffron.svg
Bayshore/NASA
BSicon emABZgnl saffron+.svg
BSicon exnCONTfq.svg
SP to Moffett Federal Airfield [1]
BSicon STR saffron+GRZq.svg
BSicon BHF saffron.svg
Moffett Park
BSicon PARKING.svg
BSicon BHF saffron.svg
Lockheed Martin
BSicon BHF saffron.svg
Borregas
BSicon BHF saffron.svg
Crossman
BSicon cRP4q.svg
BSicon SKRZ-G4o saffron.svg
BSicon cRP4q.svg
BSicon BHF saffron.svg
Fair Oaks
BSicon BHF saffron.svg
Vienna
BSicon BHF saffron.svg
Reamwood
BSicon STR saffron+GRZq.svg
BSicon PSLm saffron.svg
BSicon mINTa lime~saffron+saffron.svg
Old Ironsides
BSicon STADIUM.svg
BSicon mBHF lime~saffron.svg
Great America
BSicon lCONTg@Gq.svg
BSicon HUB2.svg
BSicon INTq.svg
BSicon HUBc3.svg
BSicon mKRZo lime~saffron+.svg
BSicon CONTfq.svg
Great America (Amtrak/ACE)
BSicon HUBc1.svg
BSicon HUB4.svg
BSicon mINT lime~saffron.svg
Lick Mill
BSicon LOGO Amtrak2.svg ACE arrows.svg
BSicon GRZq.svg
BSicon mWBRUCKE1 lime~saffron.svg
BSicon mINT lime~saffron.svg
Champion
BSicon mCONTgq deepsky~lime.svg
BSicon STRr lime.svg
BSicon STR+r deepsky.svg
BSicon STR(l) saffron.svg
BSicon STRr(r) lime.svg
BSicon STR saffron.svg
BSicon mINTe deepsky~saffron+saffron.svg
Baypointe
BSicon PSLm saffron.svg
BSicon BHF saffron.svg
Cisco Way
BSicon GRZq.svg
BSicon WBRUCKE1 saffron.svg
BSicon BHF saffron.svg
Alder
BSicon PARKING.svg
BSicon cRP4q.svg
BSicon SKRZ-G4o saffron.svg
BSicon cRP4q.svg
BSicon hBHFa saffron.svg
Great Mall
BSicon PARKING.svg
BSicon utCONTgq.svg
BSicon HUBc2.svg
BSicon mhKRZt saffron+u.svg
BSicon HUB3.svg
BSicon utINTq.svg
BSicon utdCONTfq.svg
Bart-logo.svg
BSicon HUB1.svg
BSicon hINT saffron.svg
BSicon HUBc4.svg
Milpitas Gnome-searchtool.svg
Bart-logo.svg BSicon PARKING.svg
BSicon GRZq.svg
BSicon hSTRe@f saffron.svg
BSicon BHF saffron.svg
Cropley
BSicon cRP4q.svg
BSicon SKRZ-G4u saffron.svg
BSicon cRP4q.svg
BSicon BHF saffron.svg
Hostetter
BSicon PARKING.svg
BSicon BHF saffron.svg
Berryessa
BSicon BHF saffron.svg
Penitencia Creek
BSicon PARKING.svg
BSicon BHF saffron.svg
McKee
BSicon KBHFxe saffron.svg
Alum Rock
BSicon PARKING.svg
BSicon exhBHFae saffron.svg
(2029)
BSicon exKBHFe saffron.svg
(2029)
BSicon mSTRq lime~saffron.svg
Multiple services sharing track

Wheelchair symbol.svg All stations are accessible

The Orange Line is a light rail line in Santa Clara County, California, and part of the VTA light rail system. It serves 26 stations in the cities of Mountain View, Sunnyvale, Santa Clara, Milpitas, and San Jose, traveling between Downtown Mountain View and Alum Rock stations, stopping at Ames Research Center, Great America, and Levi's Stadium along the way. The line connects to Caltrain at Mountain View and to the Bay Area Rapid Transit (BART) system at Milpitas station. The line runs for 20 hours per day on weekdays, with headways of 15 minutes for most of the day. On weekends, the train runs at 20-minute headways for most of the day. After around 8 pm on weekdays and weekends trains run at 30-minute headways.

Contents

Route description

From west to east, the Orange Line starts from Downtown Mountain View station, travels northeast, passing under U.S. Route 101 at Ellis Street, following Mathilda Avenue to Java Drive, briefly travels south crossing State Route 237 and turning east on Tasman Drive, traveling through Sunnyvale, Santa Clara, and North San Jose. Tasman Drive becomes Great Mall Parkway in Milpitas and eventually becomes Capitol Avenue in East San Jose. For the rest of the trip, the line follows Great Mall Parkway and Capitol Avenue until it reaches its eastern terminus at Alum Rock station.

Construction history

The route that the Orange Line now runs on was constructed through three different expansion projects: the original Guadalupe line, the Tasman West extension, and the Tasman East extension.

Guadalupe line

The trackway between Old Ironsides station and First Street is part of the Guadalupe line, the first light rail line constructed in Santa Clara county. The Guadalupe line opened for revenue service on December 10, 1987, originally running from Old Ironsides station to Civic Center station in San Jose. Champion station was not part of the original line; it was added as intermediate stop as part of the Tasman West project. [2] [3]

Tasman West extension

The Tasman West extension project was constructed with funds from the 1996 Measure B sales tax measure. Champion station was the first to open as an infill stop along the existing Guadalupe line trackway, opening March 24, 1997. [4] On December 17, 1999, 7.6 miles (12.2 km) of trackway and 12 new light rail stations added between the existing Old Ironsides station and the new Downtown Mountain View station. On the same day, Baypointe station opened just east of the intersection of 1st and Tasman.

Tasman East/Capitol extension

The first phase of the Tasman East extension opened in May 2001 between Baypointe and Alder stations. [5] [6]

On June 24, 2004, the 8.3-mile (13.4-km) Tasman East/Capitol extension was opened, incorporating 8 new stations. This extension runs from Alder station east along the Great Mall Parkway in Milpitas, then into East San Jose on Capitol Avenue to Alum Rock Transit Center on Alum Rock Avenue. This extension brings service to the Great Mall of the Bay Area in Milpitas. The total cost of this extension was $432.9 million. [6]

Light Rail Efficiency Project

In 2014, a new storage track and crossover was constructed between Old Ironsides and Reamwood as part of improvements to support events at Levi's Stadium and the future Silicon Valley BART extension. [7]

To provide better headways and service reliability, a second track was constructed between Whisman and Downtown Mountain View. Work began in summer 2014 and was completed in late 2015. Evelyn Station was permanently closed in mid-March 2015 as part of track construction. [8]

2019 reconfiguration

Ahead of the opening of the Silicon Valley BART extension to Milpitas station and Berryessa/North San José, the Orange Line was created. Starting in early 2019, station signage was changed reflect the new configuration, displaying line colors rather than terminus icons. [9]

Station stops

StationTransfer to
Mountain View
  • Caltrain roundel.svg Caltrain: Express, Local, Limited, Weekend Local
  • VTA Bus: 21, 40, 51, 52
  • Mountain View Shuttle: Grey Route, Red Route
  • MVgo Shuttle: East Bayshore, West Bayshore
  • Caltrain Shuttle: Duane Avenue
  • Park and ride
Evelyn (closed)
Whisman Park and ride
Middlefield
  • VTA Bus: 21
  • MVgo Shuttle: East Whisman
Bayshore/NASA
Moffett Park Park and ride
Lockheed Martin
Borregas
  • VTA Bus: 56, Express  121
  • ACE Shuttle: Red
Crossman
  • VTA Bus: 56, Express  121
  • ACE Shuttle: Red
Fair Oaks
  • VTA Bus: 56
Vienna
Reamwood
  • VTA Bus: 55
Old Ironsides
Great America
Lick Mill
Champion
Baypointe
Cisco Way
Alder
  • VTA Bus: 47
  • ACE Shuttle: Purple
  • Park and ride
Great Mall
  • VTA Bus: 66
  • Park and ride
Milpitas
Cropley
Hostetter
  • VTA Bus: 70
  • Park and ride
Berryessa
  • VTA Bus: 61
Penitencia Creek Park and ride
McKee
Alum Rock
  • VTA Bus: 23, 25, Rapid  522
  • Park and ride

Capitol Expressway extension

Orange Line (VTA)
Transparent.svg
Transparent.svg
2km
1.2miles
11
Transparent square.svg
Transparent square.svg
10
9
Transparent square.svg
Transparent square.svg
8
7
6
5
4
Transparent square.svg
Transparent square.svg
3
2
Proposed stations for Capitol Expressway Light Rail Extension 
  •  Existing stations 
  •  Stations under construction 
  •  Proposed new stations 
  •  Proposed infill station 
1
Alum Rock
2
Story
3
Ocala/Cunningham
4
Eastridge Transit Center
5
Nieman
6
Silver Creek
7
McLaughlin
8
Senter
9
Monterey (transfer to Caltrain Capitol station)
10
Vista Park
11
Capitol

VTA has proposed a future extension to this line which would extend the line 2.4 miles (3.9 km) south along the median of the Capitol Expressway from its current eastern terminus at the Alum Rock Transit Center to the Eastridge Transit Center with one intermediate stop at Story Road. The project has been under study since the early 2000s and is part of a larger project to transform the Capitol Expressway into a major transit corridor. The Eastridge Transit Center, which was completed in 2015, was designed to accommodate a future light rail station. Bus Rapid Transit stations were also added along Capitol Expressway in 2017 for the Rapid 522 route which parallels this corridor. The extension will have elevated crossings at Capitol Avenue, Story Road, and Tully Road. Major construction is expected to begin in Fall 2021 and projected to be complete in Summer 2026. The $468 million project will be primarily funded by local sales taxes. [10]

An earlier version of the project also included a station at Ocala, but it was eliminated in 2014. [11] [12] However, Ocala is served by a Bus Rapid Transit station along the parallel Rapid 522 route.

The final approved and funded project is a small portion of a much more ambitious project studied in 2005 that would have extended the line in a hook shape, along the Capitol Expressway, past the Caltrain Capitol station to connect with the Blue Line's Capitol Station at Route 87. As seen in the map, the originally proposed extension would have also included stations at Nieman Boulevard, McLaughlin Avenue, Senter Road, Monterey Road, and Vista Park Drive, with potential infill station at Silver Creek Road. [13] :1–8,3–11

References

  1. 1 2 3 "Rail Guide". rail.guide.
  2. Robinson, Bert (December 11, 1987). "All Aboard - It's Off and Rolling". San Jose Mercury News. et al. Sec A:1.
  3. Grant, Joanne (November 6, 1987). "Mishap Won't Delay Light Rail". San Jose Mercury News. Sec B:3.
  4. Barnacle, Betty (March 24, 1997). "Light Rail Opens New Stop; First Station on Tasman Line to Serve North S.J. High-Tech Firms". San Jose Mercury News. Sec B:1.
  5. "VTA Facts: Light Rail System" (PDF). Santa Clara Valley Transportation Authority. November 30, 2006. Archived from the original (PDF) on July 4, 2008. Retrieved August 27, 2008.
  6. 1 2 "Tasman East/Capitol Project Description". Completed projects. Santa Clara Valley Transportation Authority. May 12, 2008. Archived from the original on June 5, 2011. Retrieved November 16, 2008.
  7. "Light Rail Efficiency". Light Rail Efficiency. Santa Clara Valley Transportation Authority. Archived from the original on June 29, 2015. Retrieved May 13, 2015.
  8. "Mountain View Double Track". Mountain View Double Track. Santa Clara Valley Transportation Authority. Archived from the original on May 6, 2015. Retrieved May 13, 2015.
  9. "Downtown Mountain View station". Mapillary. February 27, 2019. Retrieved March 4, 2019.
  10. "Eastridge to BART Regional Connector-Capitol Expressway Light Rail Project | VTA". www.vta.org. Retrieved April 21, 2021.
  11. "Capitol Expressway Light Rail to Eastridge". Santa Clara Valley Transportation Authority. June 2013. Archived from the original on March 2, 2019. Retrieved March 1, 2019.
  12. Jaworski, Christine (May 29, 2018). "Notice of Preparation of a Draft Second Supplemental Environmental Impact Report for the Eastridge to BART Regional Connector: Capitol Expressway Light Rail Project" (PDF). Santa Clara Valley Transportation Authority. Retrieved March 2, 2019.
  13. Capitol Expressway Corridor: Final Environmental Impact Report (Report). Vol. 1. Santa Clara Valley Transportation Authority. April 2005. Archived from the original on November 7, 2014. Retrieved March 1, 2019.
Template:Attached KML/Orange Line (VTA)
KML is not from Wikidata