The Puketiro Wind Farm was a renewable energy project proposed for land owned by the Greater Wellington Regional Council (GWRC) in the Puketiro Forest near Pauatahanui, north of Wellington, New Zealand. However, the project did not subsequently proceed.

The project was originally proposed by the Greater Wellington Regional Council (GWRC) in June 2005. [1] After a tender process in 2006, RES NZ Ltd was selected to develop the project. [2] [3]

It was planned for approximately 40 wind turbines with a capacity of up to 130 MW. [4] Wide public consultation was undertaken during early development of the project. 1300 submissions were received, with over 90% in favour. [5] Nonetheless, a group of residents (Pauatahanui Futures Society Inc.) sought an injunction in May 2008 to stop the wind farm from proceeding. [6] In September 2008 the GWRC withdrew permission for the three turbines that were to be installed in Battle Hill Farm Forest Park, [7] and subsequently banned all turbines from the park. [8] As of June 2011 the project was not expected to proceed. [9]

The New Zealand Ministry for Culture and Heritage gives a translation of "view from the hill" for Puketiro. [10]

See also

Related Research Articles

Meridian Energy Limited is a New Zealand electricity generator and retailer. The company generates the largest proportion of New Zealand's electricity, generating 35 percent of the country's electricity in the year ending December 2014, and is the fourth largest retailer, with 14 percent of market share in terms of customers as of December 2015.

<span class="mw-page-title-main">Public transport in the Wellington Region</span> Overview of public transport in Wellington, New Zealand

The Wellington Region has a well developed public transport system, the most used in New Zealand. It consists of electric and diesel buses, commuter trains, ferries and a funicular. It also included trams until 1964 and trolleybuses until 2017.

The Transmission Gully Motorway is a 27-kilometre-long (17-mile), four-lane motorway north of Wellington, New Zealand; it is part of the State Highway 1 route. Construction began on 8 September 2014 and completion was originally scheduled for April 2020, but contractual negotiations as well as difficulties resulting from the COVID-19 pandemic caused delays. The motorway was officially opened on 30 March 2022 and opened to public traffic the following day.

<span class="mw-page-title-main">Wind power in New Zealand</span> Overview of wind power in New Zealand

Wind power constitutes a small but growing proportion of New Zealand's electricity. As of December 2020, wind power accounts for 690 MW of installed capacity and over 5 percent of electricity generated in the country.

<span class="mw-page-title-main">Waitahora Wind Farm</span> Abandoned renewable energy project

The Waitahora Wind Farm was a proposed renewable energy project in New Zealand planned by Contact Energy but which has now been abandoned without construction beginning. This development was proposed to be located on the Puketoi Range which forms one side of the picturesque Waitahora Valley, near Dannevirke in Southern Hawke’s Bay.

Turitea Wind Farm is a 222-megawatt wind farm near Turitea, Palmerston North, New Zealand. The farm is owned and operated by Mercury Energy.

Project Hayes was a controversial wind farm proposed for the Lammermoor Range of Otago, New Zealand. The project was developed by Meridian Energy from 2006 to 2012 at a cost of $8.9 million.

<span class="mw-page-title-main">New Zealand FP class electric multiple unit</span> Class of rail units in New Zealand

The New Zealand FP/FT "Matangi" class is a class of electric multiple units used on the suburban rail network of New Zealand's capital city, Wellington. The class, consisting of an FP power car and an FT trailer car, operates services on all electrified lines of the network which comprise the Kapiti, Hutt Valley, Melling and Johnsonville lines. The units are owned by Greater Wellington Rail Ltd, a subsidiary of the Greater Wellington Regional Council (GWRC), and have been operated by Transdev Wellington under contract to the GWRC since 2016. They were previously operated by Tranz Metro, a former division of KiwiRail.

Long Gully Wind Farm was a proposed wind farm in Wellington, New Zealand. Long Gully is an area adjacent to Zealandia.

<span class="mw-page-title-main">Project West Wind</span>

West Wind is a wind farm located at Terawhiti Station and Mākara, west of Wellington, New Zealand.

Mill Creek Wind Farm is a wind farm in the Ohariu Valley near Wellington, New Zealand.

The Kaiwera Downs Wind Farm is a wind farm under construction in the Southland region of New Zealand. It is consented to have a maximum capacity of 240MW and use up 83 turbines. Originally proposed by Trustpower, it will now be owned and operated by Mercury Energy. The 10 turbine, 43MW stage 1 of the project is under construction.

<span class="mw-page-title-main">Battle Hill Farm Forest Park</span>

Battle Hill Farm Forest Park is a regional park near Paekākāriki, in the Kāpiti Coast District and Wellington Region of New Zealand's lower North Island.

<span class="mw-page-title-main">Kaitoke Regional Park</span> Regional park in the Wellington Region

Kaitoke Regional Park is regional park located at Kaitoke, northeast of Upper Hutt, in the Wellington Region of New Zealand's southern North Island. It is administered by Wellington Regional Council, alongside the adjacent regional park of Hutt Water Collection Area.

Project Huriwaka is a proposed wind farm located on the Hihitahi Plateau between Waiouru and Taihape, New Zealand. The project was originally developed and consented by Meridian Energy, but the consents were allowed to lapse. In May 2023 the rights to develop the project were acquired by Manawa Energy.

Project Hurunui is a proposed wind farm located between Omihi and Greta Valley in north Canterbury, New Zealand. Meridian Energy is developing the wind farm, which is planned to produce up to 75.9 MW from 2014.

The Castle Hill Wind Farm is a proposed wind farm being developed by Genesis Energy. It will have up to 286 wind turbines with potential output of up to 858 MW, depending on what model(s) of wind turbines are selected. The project is estimated to cost more than $1.6 billion and will be New Zealand's largest wind farm.

The Waipipi Wind Farm is a wind powered electricity generation project in New Zealand owned and operated by Mercury NZ Ltd. This site is located between Patea and Waverley in South Taranaki. The wind farm consists of 31 wind turbines over 980 hectares, generating up to 133 MW at a cost of approximately $277 million. The 4.3 MW machines are the largest wind turbines installed in New Zealand.

The Puketoi Wind Farm is a proposed wind farm project in the Tararua District of New Zealand. The project is planned by Mercury Energy.

References

  1. "Wind farm with 22-turbines planned near Wellington". New Zealand Herald. 27 June 2005. Retrieved 27 June 2021.
  2. "Puketiro wind farm development". Greater Wellington Regional Council. Sep 2007. Archived from the original on 2008-10-14. Retrieved 2009-01-15.
  3. "RES Enters NZ Wind Market with Proposed Wind Farm". Renewable Energy World. 5 December 2006. Retrieved 27 June 2021.
  4. "Puketiro Wind Farm". RES. Archived from the original on 12 October 2010. Retrieved 15 January 2009.
  5. "Wind farm 'visible from Island Bay to Waikanae'". Dominion-Post. 25 November 2007. Retrieved 27 June 2021.
  6. Michael Kopp (13 May 2008). "Residents seek injunction to halt Puketiro wind farm". Dominion Post. Retrieved 27 June 2021.
  7. "Puketiro wind farm proposal changed". Scoop. 29 September 2008. Retrieved 27 June 2021.
  8. Kerry Williamson (23 January 2009). "Wind turbine ban for Battle Hill". Dominion Post. Retrieved 27 June 2021.
  9. Kris Dando (28 June 2011). "Wind farm guidelines set by Porirua council". Stuff. Retrieved 27 June 2021.
  10. "1000 Māori place names". New Zealand Ministry for Culture and Heritage. 6 August 2019.