Railway electrification in Poland

Last updated

The PKP class EU07 is a popular electric locomotive on Polish railroads, used by national and private carriers. Visible on the picture is a locomotive belonging to Tabor Debica. EU07-113, Warszawa Zachodnia, 2015-10.jpg
The PKP class EU07 is a popular electric locomotive on Polish railroads, used by national and private carriers. Visible on the picture is a locomotive belonging to Tabor Dębica.

Railway electrification in Poland is the process aimed at increasing the efficiency of railways and improving the railway services offered by supplying Polish railways with electricity and implementing electric rolling stock, which replaces rolling stock with other drives, mainly conventional diesel traction (in the past it was also steam traction). By the end of the 1970s, thanks to massive electrification and the introduction of a large amount of electric rolling stock into service, it allowed to replace a large number of steam locomotives and older diesel rolling stock. Despite the abandonment of works in the 90s, currently PKP and other entities managing the railway infrastructure, such as PKM or DSDiK, are working on the implementation or are already implementing the electrification of their lines. Currently, the electrification of railways in Poland is aimed at improving rail transport by increasing competitiveness and attractiveness and replacing diesel traction of national importance and saving fuel on regional lines and railways mains such as line 31 from Siedlce to Siemianówka, line 137 from Kędzierzyn-Koźle to Legnica and line 203 from Tczew to Kostrzyn.

Contents

The electric railways in Poland are powered by 3 kV DC and the length of electrified lines is over 12,156 km. [1] The share of electric rolling stock in Poland is over 84.3%.

Early electrifications under German rule

The first plans for the electrification of railways in Poland appeared before the outbreak of World War I, but works on the electrification of railways in the contemporary Polish lands was started by the Germans starting on August 15, 1897, the construction of an electrified railway line in the city of Wąbrzeźno. The railway line was put into use on April 1, 1898 and it was the first electric railway in Poland, and the line itself was of a suburban nature. [2] In 1914 at Lower Silesia electrifying and opening the railway line from Szczawienka to the Czech Meziměstí on 15 kV AC system. In the same year, the Jugowice - Walim railway line was also opened. In the following years, the number of electrified railway lines in Lower Silesia grew, thanks to which it was possible to run electric trains from Wrocław via Wałbrzych, Jelenia Góra to Węgliniec as well as Zgorzelec and Leśna. Until the 1939, over 391.87 km of railway lines were electrified in Lower Silesia. Further works were suspended due to the outbreak of World War II. [3]

Second Polish Republic

The ceremonial opening of the electrified line in Jozefow. 15 December 1936. Otwarcie jednej z zelektryfikowanych linii warszawskiego wezla kolejowego.jpg
The ceremonial opening of the electrified line in Józefów. 15 December 1936.
EL.100 series (later EP01) were produced by English Electric and were the first electric locomotives purchased by PKP EL.103 (EP01).jpg
EL.100 series (later EP01) were produced by English Electric and were the first electric locomotives purchased by PKP

At the request of the Government Commission, professor R. Podoski developed a project for the electrification of railways in Poland, which included the electrification of the Warsaw Junction Kolejowy and the electrification of the WarsawKrakówKatowice, Warsaw – PrzemyślLviv lines. [4] In 1921, according to the request of prof. Roman Podoski, a bold decision was made at that time that the electrification would be a modern DC system with a voltage of 3000 V, not widely used at that time. so a small number of them) and allowed for the collection of energy in the form of 3-phase current from existing power plants. In 1926, for financial reasons, there was a standstill in works, in 1928 a detailed schedule of works was adopted for the years 1928 to 1931, providing for the commissioning of the electrified cross-city line in November 1931.

In the years 1925–1927, thanks to the support of English capital, a line managed by the carrier from Warsaw to Grodzisk Mazowiecki was built on the basis of a concession for a section from Warsaw to Żyrardów, issued to industrialists from Łódź, who - interested in the project - relinquished it to EKD. The EKD was made available to passengers on December 11, 1927. [5]

At the beginning of 1931, the Ministry of Communications turned to larger foreign enterprises dealing with electric traction for offers for the electrification of the Warsaw cross-city line with a variant of electrification of suburban traffic on three lines, on credit terms. At the request of the Ministry, 17 offers were received, the comparison of which confirmed the advisability of electrification of the rail with 3 kV direct current, but the proposed credit terms were unacceptable. It is interesting that there was no offer from England among them, even though, as it turns out, the electrification was carried out by English companies.

On August 2, 1933, PKP concluded an agreement with two English companies: The English Electric Company and Metropolitan Vickers Electrical Company, with experience in the construction of 3 kV devices, for the implementation of the first stage of electrification of WKW within 4 years on credit terms.

The Warszawa Wschodnia – Otwock section was ready on August 14, 1936, and on December 15 of that year, the trains on the section from Otwock to Pruszków were officially launched.

In 1937, electric trains were launched on the section Pruszków – Grodzisk Mazowiecki. On September 6, on the section Grodzisk Mazowiecki – Żyrardów, on December 15, on the last section scheduled for electrification in the first stage, that is, from Warszawa Wschodnia to Mińsk Mazowiecki.

For the maintenance and repair of electric rolling stock, initially consisting of 6, and later 10 4-axle electric locomotives of the English EL 100 and Polish EL 200 series and 76 wagon unbalanced electric multiple units, popularly known as 91000 and 92000 series units, and a few years after the war as EW51 and EW52 for those refurbished in East Germany, was built in West Warsaw at Armatnia Street, the Main Electrotraction Workshop with an adjacent power plant in Grochów. [6]

Further electrification plans were interrupted by the outbreak of World War II. [7]

Communist era

Destroyed railway infrastructure near Warsaw by retreating German forces in 1945 Zniszczona linia kolejowa kolo Warszawy.JPG
Destroyed railway infrastructure near Warsaw by retreating German forces in 1945

Post-war condition

After the end of hostilities, the railway infrastructure was in a very bad condition. Due to the terrible condition of the economy, especially the electrotechnical industry, it was impossible to undertake the production of rolling stock in the country. Already at the end of the 1940s, the planning of further electrification of the lines, including the Coal Main from Chorzów to Tczew, began, but at that time electrification was not possible. However, the reconstruction of the pre-war traction network at the Warsaw railway junction was undertaken. In addition, shortly after the end of the war, the German traction network in Lower Silesia, except for the Jugowice-Walim railway line, was completely liquidated, on which the traction network remained at 1000 V DC for some time.

Already in 1945, equipment for the Brwinów substation and two mobile substations assembled on railway vehicles were ordered from the Swedish concern ASEA. At the beginning of 1946, preliminary talks were started with the ASEA concern regarding the conclusion of a loan agreement for large deliveries of electrotraction equipment for the Warsaw node. The Swedish delivery was to include 44 three-car electric multiple units, 8 BoBo electric locomotives, complete equipment of 6 traction substations and section cabins, and equipment for remote control electric system control room. The contract was signed on April 16, 1947.

The electric policy is not yet the preparatory period, but steam traction was almost electric. There was resistance or what is complemented by the entries for the correction of this transaction on the entry transaction record. The effectiveness of the Railway Electrification Office has developed in practice:

Complementary ASEA mobile substations, periodically constructed for the construction of 1948. The queue first passed to replace substations and missions, which prevent the operation of traffic to Warsaw East - Mińsk Mazowiecki. The trains started from Warszawa Wschodnia station to Miłosny 3 February, and to Mińsk Mazowiecki on March 14, 1948. At the turn of 1947 and 1948, technical possibilities of technical problems related to technical problems on the market, problems related to PKP with breakthrough capital due to the traditions of the interwar period. Due to the future electrification of the GWK using the standard voltage of 3 kV direct current for PKP, it was decided to build a traction network with dimensions and insulation typical for a voltage of 3 kV. Direct current with a voltage of 800 V was to be provided by traction substations, for which equipment was ordered in United Kingdom at the turn of 1947 and 1948.

In the years 1948–1951, the electrification of the lines on the Coast from Gdańsk to Sopot was carried out, on which the traction network was put into service in 1951–1952. [8] The rolling stock operated on the line were electric multiple units of the EW90, EW91 and EW92 series, imported from the Berlin S-Bahn as part of war reparations. In the following years, from 1953 to 1957, further fragments of the Tricity line from Sopot through Gdynia to Wejherowo were electrified.

1952–1963

First electric locomotive PKP class ET21 in Radomsko Pierwsze elektryczne pociagi w Radomsku (tuz po 1957 r.).JPG
First electric locomotive PKP class ET21 in Radomsko

From 1952, the pace of electrification of railway lines in Poland gained momentum. [8] On March 14, 1952, the railway line from Warszawa Wileńska to Zielonka was electrified. On the same day, the traction network from Zielonka to Tłuszcz was put into use. [9] At the turn of 1957–1958, the electrification of the line from Otwock to Pilawa was completed.

On September 10, 1954, the first electric train from Warsaw arrived in Łódź, entering the Łódź Fabryczna station. [10]

In 1955, the Piotrków Trybunalski – Częstochowa section was electrified, but the first electric train arrived in Częstochowa on January 21, 1956. A few months later, on May 1, electric trains began to reach Zawiercie. On June 3, the traction network for Łazy was put into operation. Then, until 1957, the railway line from Łazy to Gliwice was electrified. After the Warsaw – Gliwice main line was fully commissioned in 1957, the speed of electric trains - compared to steam trains - increased for passenger trains from 40.8 to 65.3 km / h, and for freight trains - from 29 to 49 km / h. Compared to the operation with steam traction, 60% carbon savings and significant savings in wagons were achieved. Rail transport between Silesia and Warsaw has been improved for a long time.

The obtained investment and operational experience related to the first main line and the WWK electrification allowed the Ministry of Communications to develop general assumptions for the electrification of railways in Poland, which were used, among others, by to make a significant decision by the minister to abandon the purchase of steam locomotives for PKP from 1957. It is worth adding that during its construction, a practically large team of specialists was educated for the electrification of subsequent railway routes. In the area of the Łódź junction, the Bedoń - Łódź Olechów - Łódź Kaliska and Łódź Widzew - Łodź Chojny connections with a total length of 26 km were electrified (January 25, 1958). In this way, it was possible to connect three most important stations of the Łódź agglomeration by electric traction. (Widzew, Chojny, Łódź Kaliska) In the years 1961–1962, the electrification of the very important Warsaw-Poznań bus began. On March 22, 1961, 71 km electrified section Sochaczew - Łowicz - Kutno was put into operation. On the 29 September 1962 section Kutno - Konin 79 km, electrification thus reached the area of DOKP Poznań. [11]

Ongoing plans for the electrification of the PKP network include the main lines connecting Upper Silesia with the developing Kraków district and connecting Upper Silesia with Lower Silesia, i.e. with the Wrocław district. The following set of lines were among those electrified and commissioned:

The necessity to improve and increase the railway transport capacity on the Upper Silesia - Wrocław communication route formed the basis of government decisions regarding the modernization and electrification of the Gliwice - Pyskowice – Opole – Wrocław railway line. The electrification of this trunk was carried out in stages, the entire trunk line was commissioned by electric traction on the following dates:

In 1961, additional connections in the Opole area were electrified: Groszowice - Opole Główna Towarowe (3 km) and Groszowice - Opole Wschodnie (6 km). In 1962, the section Brochów - Wrocław Towarowy (3 km) was additionally electrified in the area of Wrocław. The electrification investment Gliwice - Wrocław also includes the electrification of branches along the Odra River: Gliwice - Łabędy - Kędzierzyn - Groszowice (83 km).

In the Katowice junction itself, in 1961, the suburban section Katowice - Katowice Ligota - Tychy - Tychy Miasto was electrified. In 1962, the following sections were put into operation by electric traction:

In 1959, the traction network on the Jugowice Walim railway line was liquidated along with passenger traffic, which was served by steam locomotives for a few more months, and was finally liquidated by 1960. Freight traffic on this line was served until 1975, and the line itself was dismantled in 1984.

The EP02 series electric locomotives (1953–1954) and three-car electric multiple units of the EW53 series (1953–1955), intended for WWK, were built in Pafawag Wrocław with the use of electrical equipment purchased in England. In 1957, 2 prototypes were built, and in 1958, serial production of the locomotives began based on the Soviet technical documentation, ET21. In 1958, a prototype of the domestic three-car EMU (EW55 series) was built for suburban traffic with adaptation to high platforms, and in the years 1958–1962 a series of these vehicles was delivered for WWK. In 1962, the first three-car multiple unit for local traffic was built, with the same equipment as the EW55, but adapted to low platforms, the EN57 series. On the other hand, the demand for electric locomotives for servicing long-distance passenger trains was covered by the intervention purchase of 30 BoBo electric locomotives in CSRS (EU05 series). A contract was also concluded for the delivery from England of 20 BoBo electric locomotives (EU06 series) with full production documentation. [7] [11] [12]

31WE Koleje Dolnoslaskie train in Wroclaw Glowny 31WE-020, Wroclaw Glowny, 2016-01-09.jpg
31WE Koleje Dolnośląskie train in Wrocław Główny

1963–1971

In 1964, the electrification of the last part of the Kraków - Medyka line was completed, which had been going on since 1960 (in 1963 the Tarnów Zachodni - Dębica - Rzeszów section was electrified, and the final section Rzeszów - Medyka in 1964). On June 6, 1964, the electrification of the entire length of the Warsaw - Poznań line (after the Konin - Poznań section was electrified) started in 1958. Together with the electrified sections of Łowicz - Skierniewice (22 km - May 25, 1963) and Odolany - Warszawa Gdańska - Warszawa Praga (14 km - May 25, 1963), it constituted the electrification of an important route for the east–west direction, linking two electrified main lines Warsaw - Katowice and Warsaw - Poznań. On November 29, 1963, the electric traction connection of Katowice through Ligota - Tychy - Czechowice with Bielsko (38 km) was launched, extended on December 30, 1970, by the Bielsko - Żywiec section (21 km). On September 9, 1964, it took place on the section Czechowice - Zebrzydowice - state border (37 km). On December 19, 1966, electric traction was introduced along the entire length of the Wrocław - Wałbrzych - Jelenia Góra line (151 km); on the section Wrocław - Kuźnice Świdnickie a year earlier - December 18, 1965. It is the first electrified line of the PKP network of a piedmont character. From that moment, also in Lower Silesia, parts of the lines on which the traction network were located before the war were re-electrified.

EN57-1808 at the railway station in Wieliczka on 22 March 1994. The EN57s classes of this type became a symbol of rail electrification in the period of the Polish People's Republic. 22.03.94 Wieliczka EN57-1808 (6018762840).jpg
EN57-1808 at the railway station in Wieliczka on 22 March 1994. The EN57s classes of this type became a symbol of rail electrification in the period of the Polish People's Republic.

The next important electrified route was the Śląsk - Lublin main railway line with connections towards Kraków (Batowice - Tunel section) and Warsaw (from Radom to Czachówek and from Dęblin to Pilawa), electrified in stages and launched on the following dates:

Launching the supplementary sections, forming the shortest connection, was as follows:

By the resolution of the Council of Ministers of February 21, 1963, the electrification of the Coal Main was officially started. The first completed section was Tarnowskie Góry - Zduńska Wola Karsznice, the electrification of which was completed on November 28, 1965. The second section from Zduńska Wola to Maksymilianowo has been divided into stages: Zduńska Wola Karsznice - Lipie Góry, Lipie Góry - Inowrocław, Inowrocław - Maksymilianowo along with the electrification of the Bydgoszcz Railway Junction and Maksymilianowo - Tczew (and further to Gdynia by line Warsaw–Gdańsk railway). These stages were completed on May 30, 1966, December 30, 1966, September 9, 1967, and December 23, 1968, respectively. Due to electrification, line 131 took over 70% of the freight transport of DOKP Gdańsk. The reduction in travel costs resulted in a return on investment after 5 years. The introduction of electric traction also resulted in changes in the workshops of the locomotive shed and the creation of a control point for electric locomotives in Karsznice. The electrification of the bus was completed on May 23, 1974, when the last section from Chorzów Batory to Tarnowskie Góry was electrified. The total length of electrified lines under this project was 714 km. [13]

As soon as the 3kV direct current electrification system reached Gdynia, the voltage was switched from 800 V to 3000 V on the Gdynia Stocznia - Wejcherowo section (23 km) (October 19, 1969). At the same time, the voltage was also switched from 800 V to 3000 V on the Gdańsk Gł. - Gdańsk Nowy Port section. The separate electric traction system 800 V on the Gdańsk - Gdynia route was liquidated on December 20, 1976. The power supply was switched to 3000 V and the system was unified in the GWK. Thus, the operation of the post-German 800 V electric rolling stock operated on the Coast lasted 25 years, instead of the initially anticipated 10 years.

The prototype of the ET22 locomotive was produced in 1969, and in 1971 this vehicle entered mass production, thanks to which, with a high continuous power of 3000 kW, it could replace steam and diesel locomotives on electrified lines. ET22-001.jpg
The prototype of the ET22 locomotive was produced in 1969, and in 1971 this vehicle entered mass production, thanks to which, with a high continuous power of 3000 kW, it could replace steam and diesel locomotives on electrified lines.

In the period 1969–1970, an electric traction was put into operation on the Wrocław - Poznań line, 165 km long, and 198 km including slip roads (September 24, 1970). In addition, in the first decade of the period in question, the following lines or sections of the PKP network were electrified, starting to operate trains with electric traction:

From the 1960s, the domestic industry at a rapid pace began to provide new electric locomotives and electric multiple units, which allowed a large part to replace steam locomotives, which in the late 1970s began to be phased out in favor of diesel locomotives on non-electrified lines. In addition to the mass-scale introduction of the domestic ET22, EU07 and two-section ET41 locomotives, Polish State Railways also purchased two-section locomotives of the ET40 series in Czechoslovakia, which were produced by Skoda, and in the Soviet Union Novocherkassk Electric Locomotive Plant, locomotives of the ET42 series were purchased, which were one of the strongest series at the Polish State Railways. [14]

1972–1979

A train consisting of both locomotives of the PKP class ET22 in Skarzysko Kamienna in July 2015 ET22-695 + ET22-2040 in Skarzysko-Kamienna.JPG
A train consisting of both locomotives of the PKP class ET22 in Skarżysko Kamienna in July 2015

In the years 1973 - 1982 many important lines and communication routes were electrified. On October 15, 1973, the electric traction was started on the Paczyna - Lubliniec - Herby line (55 km), on December 29, 1973 - on the Kozłów - Koniecpol - Kielce line (44 km), built in 1971, and on December 4, 1974 - on the Częstochowa - Koniecpol - Kielce line (114 km). The Koniecpol - Częstochowa section was put into operation by electric traction a year earlier (December 29, 1973). An electrified large northern bypass of the Katowice junction was created, constituting an element of fundamental importance in the transport service of the areas adjacent to industrial Silesia and the Częstochowa region in the system of the electrified PKP network.

On December 30, 1974, the electrified Częstochowa - Wyczerpy - Siemkowice line (48 km) was put into operation, constituting a direct connection between the Częstochowa junction and the Tarnowskie Góry coal main - ports in Gdańsk and Gdynia. On December 2, 1975, the staged electrification of the Zduńska Wola - Ostrów Wlkp. - Oleśnica line (171 km) was completed. Zduńska Wola - Sieradz section (17 km) - 30.IX.1975 This way an electrified communication route from Warsaw through Łódź Kaliska, Ostrów Wlkp., Pleśnica to Wrocław was created. A direct electric traction connection was made between the economic regions of Wrocław, Wałbrzych and Jelenia Góra with Warsaw.

On December 2, 1975, electric traction began on the Kraków - Zakopane line (135 km). The Kraków - Skawina section was commissioned on November 12, 1970, and Skawina - Sucha Beskidzka on July 17, 1974. The commissioning of this old railway line, connecting the winter capital of Poland with the rest of the country, was commissioned by electric traction. If the construction of slip roads designed in the areas of Sucha and Chabówka stations (change of the train's head) had not been abandoned, the improvement of traffic would have been even greater.

On December 31, 1974, electric trains began to operate along the entire length of the Tarnowskie Góry - Kalety - Kluczbork - Ostrów Wlkp. - Jarocin - Poznań route (203 km). On the section Kluczbork - Ostrów Wlkp. Electric traction started earlier, i.e. on September 7, 1973. The electrification of the above-mentioned line created a second electric connection between Silesia and Poznań, and soon electric traction was introduced for further elements of port routes: Poznań - Inowrocław (101 km ) on December 14, 1976, and Jarocin - Gniezno (65 km)

In the years 1975 - 1977, electric trains were introduced according to the given dates also on the following lines (sections):

In the years 1971–1976, the central railway line was built, the CMK line was electrified in stages:

EU07-180 in Konin railway station in February 2001. Konin, 3.2.2001r., EU07 180.jpg
EU07-180 in Konin railway station in February 2001.

In 1978, the phased electrification of another important Poznań-Szczecin main line was completed:

After a thorough modernization, the Szczecin Dębie - Świnoujście route (101 km) became a two-track line. On December 15, 1980, its electrification was completed (the section Szczecin Dąbie - Goleniów, 23 km was electrified earlier - December 21, 1979) On September 11, 1982, the adjacent electrified connection, Wysoka Kamieńska - Kamień Pomorski, was opened, 17 km.

In the years 1971 - 1981 the electrification of the east–west transit main was extended, the following sections were put into operation:

The electrification of the east–west main line covered the dry transhipment port in Małaszewice.

In 1981, the following electrified lines were put into operation:

In the years 1981–1982, the line from Warsaw to Białystok and Ostrołęka was electrified including:

After a thorough reconstruction and modernization, the electrification of the so-called The 101 km long line on the Odtzanska line Wrocław - Głogów - Zielona Góra - Rzepin - Szczecin Głogów (Wróblin Głogowski) was put into operation on 23 December 1982. This included:

Many lines in the area of the Katowice junction were covered by electrification, including:

ET42 in Bytom Polnoc Bytom Polnocny - ET42 z cysternami.jpg
ET42 in Bytom Północ

1980s

On October 10, 1983, the electrified section Siedlce - Mordy (19 km) was put into operation. It was the initial stage of electrification of the entire Siedlce - Czeremcha line (91 km) planned for later implementation. The electrification of this line was never completed.

On December 20, 1983, the electric traction was introduced to the section Toruń - Inowrocław (35 km). On May 31, 1984, the section Poznań - Zbąszynek - Rzepin (74 km) was covered by electrification as the last fragment of the great east–west transit main, running from Terespol through Kutno, Poznań to Rzepin station. On June 1, 1984, the electric traction on the Lublin - Dorohusk line was put into operation, the first section of which was already electrified from Lublin to Świdnik. On the section Świdnik - Chełm Lub. - Dorohusk (83 km).

On December 29, 1984, the additional electrified section Rejowiec - Żulin (9 km) was put into operation. On July 20, 1984, the Toruń - Bydgoszcz section (45 km) was put into operation by electric traction. It is the last stage of electrification of the Toruń-Bydgoszcz-Inowrocław triangle. On September 30, 1984, the section Florek - Płock Miasto (46 km) was put into operation by electric traction, extended on November 27, 1984, by the section Płock Miasto - Płock Trzepowo (6 km). On December 21, 1985, the electric traction was introduced on the entire line Kutno - Toruń Gł. (106 km) together with the adjacent section of Aleksandrów Kujawski - Ciechocinek (7 km). On the Toruń - Aleksandrów Kujawski (17 km) and Aleksandrów - Ciechocinek (7 km) sections, the electric traction was introduced a little earlier - on May 31, 1985. On May 28, 1985, the electrification of the transport line, which had been going on since 1982, was put into operation Wrocław - Głogów - Zielona Góra - Rzepin - Kostrzyń - Szczecin (342 km)

On December 9, 1985, electric traction was introduced on the shortest connection between Warsaw and Gdańsk, 235 km long, with simultaneous activation of electric traction on the Malbork - Elbląg (29 km) branch - on July 20, 1985, and in 1986 on the Działdowo - Olsztyn line (83 km). The Tczew - Gdańsk section was already electrified in 1969 as part of the electrification of the coal main line, the Warsaw - Nasielsk section in 1972 as part of the electrification of the WWK region.

Koleje Slaskie trains in Lazy depot Baza Kolei Slaskich w Lazach.jpg
Koleje Śląskie trains in Łazy depot

In order to accelerate the electrification of this important communication route, works were carried out simultaneously on both sides of the line, from the side of Tczew and from the side of Nasielsk. There were two work fronts that met in the middle section of Działdowo - Iława. On October 7, 1985, the electric traction traffic introduced in 1982 on the Tłuszcz - Wyszków section was extended to Ostrołęka. 54 km. The next important communication route, the electrification of which was completed in 1986, is the Warsaw - Białystok - Kuźnica Białostocka line. The Warsaw - Tłuszcz section was electrified as early as 1952 as part of the electrification of the WWK. The Tłuszcz - Białystok - Kuźnica Białostocka route (199 km). The work included:

86,

On December 21, 1985, the electrification of the Wrocław - Legnica - Bolesławiec - Węgliniec route, 123 km long, was completed. Stages of this electrification:

On 30 May 1986, this line is completed with a second connection with an electric traction with Jelenia Góra via Lubań Śl. (section Węgliniec - Lubań Śl. - Jelenia Góra, 74 km long) and the section in the copper basin Legnica - Rudna Gwizdanów, 39 km long. On 28 May 1986, the electrification of the Kraków - Tarnów - Nowy Sącz - Krynica line reaches Marcinkowice near Nowy Sącz (the section Tarnów - Stróże - Nowy Sącz - Marcinkowice, 96 km long). The electrification to krynica was completed in 1987. The line was electrified in stages including:

EU07-396 in Pila Glowna in November 1994 15.11.94 Pila Glowna EU07-396 (48860542716).jpg
EU07-396 in Piła Główna in November 1994

On September 12, 1986, the northern bypass of WWK Warszawa Gdańska – Warszawa Czyste was included in the service of suburban trains. [15] In 1987, the railway line from Jelenia Góra to Szklarska Poręba was electrified.

Third Polish Republic

1990s

Along with the political system changes, the electrification of Polish railways slowed down. On 5 December 1994 electrified railway line 220 Olsztyn Główny – Bogaczewo and railway line 204 on section Elbląg – Bogaczewo. It was the last largest investment in the electrification of Polish railways in the 20th century. In 1995 located on the Polish–Ukrainian border the broad-gauge railway line 92 Przemyśl Główny – Medyka was electrified on voltage 3000 V DC, which facilitated access to Przemyśl for international passenger trains and eliminating the handling of international trains by Polish SM48 diesel locomotives in double traction. [16]

7 April 1995 in Warsaw opened Warsaw Metro line M1 at station Politechnika about power 750 V DC on third rail. [17]

Since 2000s

Zgorzelec railway station in July 2022 Zgorzelec (IMG 20220723 152641).jpg
Zgorzelec railway station in July 2022

In the 2000s, PKP carried out minor electrification of border lines with Germany, the Czech Republic and Slovakia.

In February 2014, work began on the modernization and electrification of the railway line 118 Kraków Główny – Kraków Lotnisko to Balice. The works were completed the following year, and the ceremonial opening of the line took place on September 25, 2015. [18]

On May 28, 2016, the power supply to Warsaw Commuter Railway was changed from 600 V to 3000 V DC. Which ultimately resulted in the resignation from using 600 V power on the Polish railways.

In 2017, the modernization and completion of the unfinished electrification of the line 68 from Lublin Zemborzyce to Stalowa Wola Rozwadów, where the traction network was put into service on December 13, 2020, began. [19]

In 2018–2019, the Węgliniec – Zgorzelec line 278, which is the E 30 line of the international pan-European transport corridors, was electrified. The traction network on the line was launched on December 15, 2019. [20]

In September 2019, work began on the electrification of the Ocice – Rzeszów railway line 71, which ended on December 12, 2021, which made it possible to shorten connections to Rzeszów from Warsaw. [21]

In addition, from 15 June 2021 to 2023 the electrification of the Pomeranian Metropolitan Railway, which was opened in 2015, was carried out. [22] In June 12 2023 the traction network was launched on the section belonging to PKM. [23]

In 10 December 2023 the electrification and modernization of the railway line 182 Tarnowskie Góry – Zawiercie together with two neighboring connectors, which are railway lines 705 and 892, were completed, thanks to which passenger connections to Katowice Airport in Pyrzowice were launched. [24]

Unrealized plans for alternating current electrification

During the implementation of electrification, many technical and economic problems related to electrification with 3000 V DC appeared, which resulted in a discussion on the selection of a new power supply system for electric traction. [25] Already in 1956, a discussion was started on the accuracy of electrification of railway lines with a voltage of 25 kV AC. In July 1957, at the request of the Ministry of Communication, the Railway Electrification Design Office carried out a study analyzing the possibilities and desirability of using single-phase alternating current electric traction with an industrial frequency of 50 Hz on PKP. [26]

In April 1959, an inter-ministerial working team was established. Thanks to the efforts of this team, a number of studies and design studies have been carried out. The electrification projects for several lines were carried out at that time in two variants: for 3 kV direct current and 25 kV 50 Hz alternating current. a reasonable compromise, the Wrocław – Legnica line (50 km long) was selected for electrification with 50 Hz alternating current, for which a preliminary project of electrification with this system was developed. The Ministry of Communications placed an order for the supply of 70 50 Hz AC electric locomotives for this line, but the rolling stock industry did not even start to build a prototype of these locomotives, considering that it could not risk starting new production for such a small series of locomotives. In 1959, PKP also tried to convince the Ministry of Communications to electrify the Coal Main to 25 kV 50 Hz alternating current, but the idea was also rejected. [7] [11] [12]

In October 1960, BPEK developed a study entitled "Selection of a test section on PKP for electrification with 50 Hz alternating current", and in March 1961, a study was prepared to compare the costs of electrification of the Kraków – Przemyśl – Medyka railway line with 3 kV direct current and 25 kV alternating current In May this year, a comparative study was also prepared on the electrification of the Poznań – Szczecin line with 3 kV direct current and 25 kV 50 Hz alternating current. The discussion on the introduction of 25 kV AC power supply lasted eight years and was completed in 1965 by the Ministry of Transport, which decided to continue the 3 kV DC electrification. The rejection of electrification plans for 25 kV 50 Hz was related to the fact that the introduction of a new type of power supply could seriously weigh on the pace of electrification and would require many points of contact with the exchange of a large number of trains. It was required to build tangential stations with individual switching of the power supply system and changing the locomotives of each train would be very expensive, and due to the need to expand the station, in some conditions impossible. Although, despite these conditions, there would be savings on power equipment, the total expenditure on electrification and associated works for the new system would be greater than the corresponding expenditure related to electrification with the DC system, which was the reason for the termination of all work on the development of 25 kV 50 Hz power supply. [27]

The topic of 25 kV AC electrification was revisited in the 1980s, but then most of the railway lines had already been electrified, and this topic did not play a significant role in the development of the future of electrification development. [28]

Another plan to introduce the 25 kV AC system on the Polish railways was the project high speed line Y from the turn of 2000s and 2010s, [29] [30] but the project has not been implemented to this day.

Current and future projects

Length Elk - Gizycko railway line 38 during electrification and modernization in July 2023. Remont linii kolejowej nr 38, miedzy Liskami a Jeziorowskimi.jpg
Length Ełk – Giżycko railway line 38 during electrification and modernization in July 2023.
The railway line 203 Tczew - Kostrzyn constituting a part of the Prussian Eastern Railway was planned for electrification in the 1970s and 1980s. Neither of these plans were implemented. Currently, PKP plans to electrify the line in the coming years. Trzcianka tory.JPG
The railway line 203 Tczew – Kostrzyn constituting a part of the Prussian Eastern Railway was planned for electrification in the 1970s and 1980s. Neither of these plans were implemented. Currently, PKP plans to electrify the line in the coming years.

In July 2020, a tender was announced for the modernization and electrification of the Ełk – Giżycko section of railway line 38 as part of the first stage related to works on the Ełk – Korsze section. [31] Eleven offers were submitted to the tender, [32] from which, a year later, Torpol's offer worth 681.3 million Polish Złoty was selected as the most advantageous one to carry out the works; [33] however, the offer was soon invalidated, and the Spanish-Chinese consortium of Aldesa Construcciones Polska, Aldesa Construcciones, Coalvi and China Civil Engineering Construction Corporation was selected to carry out the work, with which the contract was signed on December 7, 2021, which also resulted in a delay in the date of the originally planned start of works. [34] The works started on March 13, 2022, which resulted in the introduction of replacement bus transport on this section and the redirection of long-distance trains to other routes. [35] In January 2023, the European Commission awarded a subsidy of 145 million Euro from the Cohesion Fund to finance works on the Ełk – Giżycko section. [36]

On May 4, 2022, a tender was announced for the modernization and electrification of the Giżycko – Korsze section, [37] the contract for which was concluded on October 2, 2023 with Torpol. The investment cost is 876 million Polish złoty. [38]

On February 10, 2022, PKP PLK announced a tender for the modernization and electrification of the railway line 104 Chabówka – Nowy Sącz on the sections Chabówka – Rabka Zaryte and siding Klęczany – Nowy Sącz of construction for the electrificted line Podłęże – Piekiełko so called hellish line (pl: Piekielna linia). The works planned are to be completed until 2027 [39] On April 5 2023 a tender was announced to extend the works by a section Rabka Zaryte – Mszana Dolna and Limanowa – siding Klęczany. [40] In September 2023, work began on the Klęczany – Marcinkowice section. [41] On October 3, 2023, a contract was signed with Strabag for the modernization and electrification of the Rabka Zaryte – Mszana Dolna section. [42] and on March 8, 2024, an agreement was signed with the Polish-Turkish consortium Budimex S.A./Gülermak Ağir Sanayi Inşaat ve Taahhüt A.Ş./Gülermak Sp. z o.o. for the implementation of the works. [43]

2 January 2023 a tender was announced for the electrification of the Kępno – Oleśnica section of line 181 [44] and on March 8, 2024, a contract for the implementation of works was signed. [45]

17 October 2022 PKP has signed an agreement with the local government of the Mazowieckie Voivodeship for the modernization and electrification of the railway line 34 from Małkinia to Ostrów Mazowiecka and the railway line 55 from Siedlce to Sokołów Podlaski. These works are aimed at restoring passenger connections that both cities lost in 1993. [46] On 10 October 2023 an agreement was signed for the modernization and electrification of railway line 55 on the Sokołów Podlaski – Siedlce section. [47]

As part of the government's Kolej + program, it is planned to electrify line 24 with the restoration of passenger traffic from Piotrków Trybunalski to Bełchatów. [48] On 16 December 2022 PKP PLK signed with Marshal's Office of the Łódź Voivodeship contract for the performance of works modernization and electrification on line 24 worth 662 mln zł. [49] On 27 December this year a tender was announced for the execution of design works. [50] On July 24, 2023, an agreement was concluded with TPF for the implementation of design works. [51]

The self-government of the Lower Silesian Voivodship also postulates the electrification of the railway line 372 from Bojanów to Góra, where passenger traffic is planned to be restored. [52]

On November 8, 2022, PKP PLK signed an agreement with the Lublin Voivodeship for the electrification of the railway line 30 (Lublin Północny – Łuków) and the modernization and electrification of railway lines 69 and 72 on the Rejowiec – Zawada – Zamość Szopinek route as part of the Kolej + program. [53] On May 8, 2023, a tender was announced for the development of design documentation along with author's supervision for the electrification of railway line 30. [54]

On October 6, 2023, PKP PLK concluded an agreement with Multiconsult Sp. z o. o. for the preparation of design documentation for the electrification of railway line 30 Łuków – Lublin Północny. [55] According to the assumptions, work on the documentation is to be completed by 2026, and work on electrification would last in the years 2026–2029. [56]

The plans of PKP for the years 2021–2030 with the perspective until 2040 include electrification of the following lines: [57]

1. Line 14 on length Podg. Durzyn (Krotoszyn) – Leszno – Głogów.

2. Line 25 on length Tomaszów Mazowiecki – Skarżysko Kamienna.

3. Line 27 Nasielsk – Sierpc – Lipno – Toruń Wschodni.

4. Line 30 Łuków – Lublin Północny.

5. Line 31 Siedlce – Siemianówka.

6. Line 34 Małkinia – Ostrów Mazowiecka – Ostrołęka.

7. Line 106 Rzeszów Główny – Jasło.

8. Line 107 Nowy Zagórz – Łupków.

9. Line 108 on length Jasło – Nowy Zagórz – Krościenko.

10. Line 115 Tarnów – Szczucin koło Tarnowa.

11. Line 137 on length Kędzierzyn Koźle – Legnica.

12. Line 201 on length Maksymilianowo – Gdynia Główna.

13. Line 203 Tczew – Kostrzyn divided into stages: PiłaKostrzyn and Tczew – Piła.

14. Line 208 Działdowo – Chojnice on the part: Jabłonowo Pomorskie – Brodnica, Laskowice Pomorskie – Grudziądz and Wierzchucin – Tuchola.

15. Line 215 on length Laskowice Pomorskie – Bąk.

16. Pruszcz Gdański – Łeba line 229 on the part: Podg. Glincz – Kartuzy and Lębork – Nowa Wieś Lęborska.

17. Line 274 on length Lubań Śląski – Zgorzelec.

18. Line 287 Opole Zachodnie – Nysa.

On August 16, 2023, a resolution was adopted at the meeting of the Council of Ministers on the establishment of the National Railway Program (pl: Krajowy Program Kolejowy), assuming the electrification of over 1,400 km of railway lines by the end of 2030. [58]

Specification

Overhead catenary poles with T-bar booms in railway line 143. Booms of this type were installed during the electrification of railway lines until the early 1980s when they were replaced by tubular booms. Railway route 143 (Wroclaw Psie Pole, February 2011).jpg
Overhead catenary poles with T-bar booms in railway line 143. Booms of this type were installed during the electrification of railway lines until the early 1980s when they were replaced by tubular booms.
Modern electric traction network on the railway line 1. The poles are bolted to piles driven into the ground. Siec trakcyjna linia kolejowa nr 1 maj 2020.jpg
Modern electric traction network on the railway line 1. The poles are bolted to piles driven into the ground.
Network train with workers at work. Pociag sieciowy pod Lowiczem.jpeg
Network train with workers at work.

Used or planned line systems

mains voltageName of systemNote
3000 V DC Polish State Railways Standard voltage used on all railroads in country.
Warsaw Commuter Railway
SKM Trójmiasto
Pomorska Kolej Metropolitalna
Dolnośląska Służba Dróg i Kolei we Wrocławiu Planned of electrification several railway lines.
2400 V DC KWB Konin
250 V DC On this voltage, the side network functions under the loaders.
48 V DC
750 V DC Warsaw Metro Powered from third rail
25000 V AC Broad Gauge Metallurgy Line The electrification of a four-kilometer section from the transshipment terminal to the border in Hrubieszów is planned in connection with the electrification of the Kowel – Izow line by the UZ. The electrification of the entire LHS line to 25 kV AC is taken into account.
Polish State Railways The electrification of 25 kV planned for the construction of high-speed lines under the New Central Polish Airport is also taken into account.

Former line systems

mains voltageName of systemNote
400 V DC Wąbrzeźno city / Polish State Railways This type of traction was only used on Line 264 which was dismantled in 1959. [60]
600 V DC Warsaw Commuter Railway Until 27 May 2016. Currently, this voltage is used by tram lines.
650 V DC It was used at the beginning of EKD's operations.
800 V DC SKM Trójmiasto Used in the Tri-City agglomeration from 1951 to 19 December 1976.
1000 V DC Polish State Railways Used by the Polish State Railways on the Walimska Railway from 1946 to 1959. [60]
15000 V AC Polish State Railways It was in possession in 1945 in south Lower Silesia. Soon after, it was dismantled by the Red Army as a spoil of war.
Length of electrified lines [61]
YearLength% network
1938106 km0,5
1950156 km0,7
1955477 km2,1
19601026 km3,8
19652227 km8,3
19703872 km16,7
19755588 km23,5
19806868 km28,1
19817091 km29,1
PKP Cargo electric locomotives at the Kobylepole depot. November 2019 Elektrowozy ET42,ET41,ET22 i EU07 w lokomotywowni Kobylepole 24 listopada 2019.jpg
PKP Cargo electric locomotives at the Kobylepole depot. November 2019
Mean rate of electrification of railway lines in the years 1946–1995 [4]
Yearspercent of a kilometerlength electrificted railways on kilometer
1946–195030,4152
1951–195566,6333
1956–1960108,2541
1961–1965240,21 201
1966–1970329,01 645
1971–1975343,21 716
1976–1980256,01 280
1981–1985406,82 034
1986–1990497,02 485
1991–199574,4372
Number of operated standard-gauge electrified railway lines in km in 1950–2009, 2015 and 2020–2021 [62] [63] [64]
YearTotalElectrifictedNon-electrficted
NumberparticipationNumberparticipation
195022 500 2000,9%22 30099,1%
196023 2001 0004,3%22 20095,7%
197023 3003 90016,7%19 40083,3%
198024 4006 90028,3%17 50071,7%
199024 00011 40047,5%12 60052,5%
199323 30011 50049,4%11 80050,6%
199422 90011 60050,7%11 30049,3%
199522 60011 60051,3%11 00048,7%
199622 30011 60052,0%10 70048,0%
199722 30011 60052,0%10 70048,0%
199822 10011 60052,5%10 50047,5%
199921 90012 00054,8%9 90045,2%
200021 60011 90055,1%9 70044,9%
200120 10012 00059,7%8 10040,3%
200220 70012 20058,9%8 50041,1%
200320 30012 20060,1%8 10039,9%
200419 90012 00060,3%7 90039,7%
changing the counting method
200519 80011 90060,1%7 90039,9%
200619 80011 90060,1%7 90039,9%
200719 80011 90060,1%7 90039,9%
200820 00011 90059,5%8 10040,5%
200920 20012 00059,4%8 20040,6%
201519 33011 79563,7%no datano data
202019 46112 04861,9%7 54838,1%
202119 32612 15662,9%7 17037,1%

Related Research Articles

Transport in Poland involves air, water, road and rail transportation. The country has a large network of municipal public transport, such as buses, trams and the metro. As a country located at the 'cross-roads' of Europe, Poland is a nation with a large and increasingly modern network of transport infrastructure.

<span class="mw-page-title-main">PKP Intercity</span> Polish transportation subsidiary

PKP Intercity is a company of the PKP Group responsible for long-distance passenger transport. It runs about 350 trains daily, connecting mainly large agglomerations and smaller towns in Poland. The company also provides most international trains to and from Poland. Trains offer Wi-Fi connectivity.

The history of rail transport in Poland dates back to the first half of the 19th century when railways were built under Prussian, Russian, and Austrian rule. Of course, "divided Poland" in the 19th century was the territory of the former Polish–Lithuanian Commonwealth and not that one of today's Republic of Poland. After Polish independence was declared on 11 November 1918, the independent Polish state administered its own railways until control was surrendered to German and Soviet occupiers during World War II.

<span class="mw-page-title-main">Warszawa Centralna railway station</span> Railway station in Warsaw, Poland

Warszawa Centralna, in English known as Warsaw Central Station, is the primary railway station in Warsaw, Poland. Completed in 1975, the station is located on the Warsaw Cross-City Line and features four underground island platforms with eight tracks in total. It is served by the long-distance domestic and international trains of PKP Intercity and Polregio as well as some of the regional trains operated by Koleje Mazowieckie. Adjacent to the north side of the building is a bus station that serves as the central hub for night bus lines, and Złote Tarasy shopping center.

<span class="mw-page-title-main">Rail transport in Poland</span>

The Polish railways network consists of around 18,510 kilometres (11,500 mi) of track as of 2019, of which 11,998 km (7,455 mi) is electrified. The national electrification system runs at 3 kV DC.

High-speed rail service commenced in Poland on 14 December 2014, with the introduction of 20 non-tilting New Pendolino trainsets operating on 4 designated lines radiating out from Warsaw. Polish State Railways started passenger service using Pendolino trains operating at a maximum speed of 200 km/h on 80 km line Olszamowice-Zawiercie. From December 2017 there are two 200 km/h sections, 136 km long in total. All high-speed services operated by PKP in Poland are branded as Express Intercity Premium (EIP).

<span class="mw-page-title-main">Warszawa Wschodnia railway station</span> Railway station in Warsaw, Poland

Warszawa Wschodnia, in English Warsaw East, is one of the most important railway stations in Warsaw, Poland. Its more official name is Warszawa Wschodnia Osobowa. It is located on the eastern side of the Vistula river, on the border of the Praga-Północ and Praga-Południe districts, on the Warsaw Cross-City Line. It serves all trains passing through the larger Warszawa Centralna and Śródmieście stations which stop or terminate at Wschodnia station. It is one of the busiest railway stations in Poland, with over 800 daily trains.

<span class="mw-page-title-main">Łódź Fabryczna railway station</span> Railway station in Łódź, Poland

Łódź Fabryczna is the largest and most modern railway station in the city of Łódź, Poland. It was originally constructed at the initiative of industrialist Karl Wilhelm Scheibler in 1865. In the Polish classification of stations it is placed in the Premium category.

<span class="mw-page-title-main">Warszawa Zachodnia station</span> Railway station in Warsaw, Poland

Warszawa Zachodnia station, in English Warsaw West, is a railway and long-distance bus station in Warsaw, Poland on the border of Ochota and Wola districts. The railway station is the westernmost terminus of the Warsaw Cross-City Line. It serves trains from PKP Intercity, Polregio, Koleje Mazowieckie, Szybka Kolej Miejska and Warszawska Kolej Dojazdowa as well as international trains passing through Warsaw. It is one of the busiest railway stations in Poland, with over 800 daily trains.

<span class="mw-page-title-main">Grodzisk Mazowiecki–Zawiercie railway</span> Railway line in Poland

The Grodzisk Mazowiecki–Zawiercie railway better known as the Central Rail Line, designated by Polish national railway infrastructure manager PKP Polskie Linie Kolejowe as rail line number 4, is a 224 km (139 mi) long railway line in Poland between Zawiercie outside the Upper Silesian Metropolitan Area and Grodzisk Mazowiecki in the suburbs of Warsaw.

The "Proteza koniecpolska" is a colloquial term for a rail project in Poland completed in 2013 to give Częstochowa improved connections with Warsaw, Wrocław and Opole using existing rail lines.

<span class="mw-page-title-main">Berlin-Warszawa-Express</span>

The Berlin-Warszawa-Express (BWE) is a cross-border train service that connects Berlin and Warsaw via Frankfurt (Oder), operated jointly by Deutsche Bahn and Polish State Railways. The service, classed as EuroCity, runs four times per day in each direction, with the services given the numbers 40–47. Total journey time is 5 hours, 24 minutes.

<span class="mw-page-title-main">Łódź Widzew railway station</span> Railway station in Łódź, Poland

Łódź Widzew is a major railway station located in Widzew, an eastern district in the city of Łódź, Poland. It is located on a number of important railway lines including the Łódź Fabryczna to Koluszki and Warsaw railway line, the Widzew to Kutno railway line, and the Łódź Kaliska to Warsaw line. It consists of three island platforms and six tracks. The station is served by all passing passenger trains, including long distance and local services. Trains departing from the station serve major Polish cities, regional towns in the Łódź Province, and other stations in the Łódź metropolitan area. Operators include PKP Intercity, Polregio, and Łódzka Kolej Aglomeracyjna (ŁKA). The maintenance depot of Łódzka Kolej Aglomeracyjna is located at the station.

The Łódź Cross-City Line is an under construction railway line running through the centre of the city of Łódź, Poland, intended to connect three major railway stations of the city: Łódź Kaliska, Łódź Fabryczna, and Łódź Widzew. It consists of two sections: an open-air section between Łódź Widzew and Łódź Niciarniana stations, and a tunnel, currently reaching Łódź Fabryczna station.

<span class="mw-page-title-main">Łódź Pabianicka railway station</span>

A Łódź Pabianicka is a commuter station located in the city of Łódź, Poland, in Górna district, on a circular line between Łódź Kaliska and Łódź Chojny stations, in direct vicinity of the crossroads of Pabianicka St with John Paul II Avenue and Górna Road.

<span class="mw-page-title-main">Łódź–Tuplice railway</span> Railway line in Poland

The Łódź–Tuplice railway is a 388 kilometer-long railway line in Poland running between Łódź Kaliska station and the Germany–Poland border between Tuplice, Poland, and Forst (Lausitz), Germany. It is commonly used for passenger and freight services.

<span class="mw-page-title-main">Łódź–Kutno railway</span>

The Łódź—Kutno railway is a railway line located in central Poland, in Łódź Voivodeship, connecting the city of Łódź with a railway station in Kutno via Zgierz, Ozorków and Łęczyca. The section between Łódź Widzew and Zgierz stations is a part of a railway ring around the city of Łódź.

<span class="mw-page-title-main">Łódź–Bednary railway</span>

The Łódź–Bednary railway is a railway line located in Łódź Voivodeship, Poland, connecting the city of Łódź with the village of Bednary, located on Warsaw-Kunowice railway. It is commonly described as Łódź-Łowicz railway, because the passenger traffic on the railway is guided toward the main station in the town of Łowicz. The section from Zgierz to Łódź is a crucial part of a railway ring around the city.

<span class="mw-page-title-main">Łódź Retkinia railway station</span>

Łódź Retkinia is a commuter railway station in the Polish city of Łódź, in Polesie district, on the outskirts of the Retkinia housing neighbourhood. The station is located on the Łódź-Tuplice railway between Łódź Kaliska and Łódź Lublinek stations.

Dobroń is a commuter station and a block post located in the village of Dobroń, in Pabianice County, Łódź Voivodeship, Poland, serving a section of Łódź-Tuplice railway between Pabianice and Łask stations.

References

  1. "Linie kolejowe w Polsce - podstawowe parametry".
  2. "Kolej Powiatowa Wąbrzeźno i jej wagony elektryczne". Turystyczne.wąbrzezno.com.
  3. "Elektryfikacja linii kolejowych". Bazakolejowa.pl.
  4. 1 2 Magdalena Pokrzycka. "Elektryfikacja kolei : historia, teraźniejszość, perspektywy" (PDF). Bazhum.muzhp.pl. Retrieved 5 July 2022.
  5. Szymańska, Magda (2018). Warszawa zapamiętana. Dwudziestolecie międzywojenne. Warszawa: Dom Spotkań z Historią. p. 116. ISBN   978-83-66068-01-8.
  6. "Historia elektryfikacji w Polsce". Archeo.kolej.pl.
  7. 1 2 3 "Powojenna elektryfikacja kolei". Rynek-kolejowy.pl. Retrieved 5 July 2022.
  8. 1 2 "1945". Archeo.kolej.pl.
  9. "Linia kolejowa 21 (PL) • Warszawa Wileńska - Wołomin Słoneczna / Atlas Kolejowy Polski, Czech, Słowacji i Podkarpackiej Rusi". Atlaskolejowy.net.
  10. "Elektrycznym z Warszawy do Łodzi". Rynek-Kolejowy.pl.
  11. 1 2 3 "1951". Archeo.kolej.pl.
  12. 1 2 Kotlarz, Grzegorz; Dąbrowski, Henryk; Wieczorek, Edward (2008). Magistrala Węglowa. Rybnik. p. 237. ISBN   978-83-926946-0-1.{{cite book}}: CS1 maint: location missing publisher (link)
  13. Kotlarz, Grzegorz; Dąbrowski, Henryk; Wieczorek, Edward (2008). Magistrala Węglowa. Rybnik. p. 238. ISBN   978-83-926946-0-1.{{cite book}}: CS1 maint: location missing publisher (link)
  14. "1962". Archeo.kolej.pl.
  15. "1982". Archeo.kolej.pl.
  16. Marek Graff (2007). "Pociągi w komunikacji Polska – Ukraina na stacji Przemyśl Gł". Świat kolei (in Polish). Łódź: EMI-PRESS. 7: 12. ISSN   1234-5962.
  17. https://archive.today/20160305214226/http://www.metro.waw.pl/dane-techniczne-i-eksploatacyjne-istniejacego-odcinka-metra
  18. "Ogólnopolska Baza Kolejowa". Bazakolejowa.pl. Retrieved 5 July 2022.
  19. "Elektrycznym pociągiem z Lublina do Stalowej Woli". Plk-polskawschodnia.pl. 11 December 2020.
  20. "Linia kolejowa 278 (PL) • Węgliniec - Zgorzelec / Atlas Kolejowy Polski, Czech, Słowacji i Podkarpackiej Rusi". Atlaskolejowy.net.
  21. "Pociągiem elektrycznym trasą Ocice - Rzeszów". Plk-sa.pl. 12 September 2021.
  22. "Rozpoczęła się elektryfikacja linii PKM". Pkm-sa.pl. 15 June 2021.
  23. "Przełomowy dzień na linii PKM". trojmiasto.pl. 2023-06-12. Retrieved 2023-06-12.
  24. "Koleje Śląskie dojeżdżają na lotnisko Katowice – Pyrzowice [zdjęcia]". Rynek-Kolejowy.pl.
  25. "Elektryfikacja PKP na przełomie wieków XX i XXI". Stanisław Plewako. Warszawa: ZP. 2006. p. 19-20.{{cite web}}: Missing or empty |url= (help)CS1 maint: others (link)
  26. https://kurier-kolejowy.pl/aktualnosci/34236/staly-czy-przemienny.html
  27. https://kurier-kolejowy.pl/aktualnosci/34236/staly-czy-przemienny.html
  28. https://kurier-kolejowy.pl/aktualnosci/34236/staly-czy-przemienny.html
  29. http://www.mitel.uz.zgora.pl/CD/2012/REFERATY/PDF/50.pdf
  30. http://siskom.waw.pl/kp-kolej-ldp-Y.htm
  31. "Realizacja robót budowlanych dla etapu I projektu „Prace na linii kolejowej nr 38 na odcinku Ełk – Korsze wraz z elektryfikacją"".
  32. "Aż 11 ofert na prace na linii Ełk - Korsze".
  33. "Oferta Torpolu za 681,3 mln zł na linię kol. nr 38 uznana za najkorzystniejszą".
  34. "PLK z umową na modernizację linii Ełk - Korsze. Zwycięża hiszpańsko-chińskie konsorcjum".
  35. "Komunikacja zastępcza między Ełkiem a Giżyckiem. Ruszyła elektryfikacja".
  36. "145 mln euro na modernizację linii kolejowej między Ełkiem a Giżyckiem".
  37. "Poland-Warsaw: Works for complete or part construction and civil engineering work 2022/S 087-237785 Contract notice – utilities Works".
  38. "TORPOL S.A.: Zawarcie z PKP Polskie Linie Kolejowe S.A. umowy na roboty budowlane (2023-10-02 11:32)".
  39. "PKP ogłosiły przetargi na modernizację pierwszych odcinków linii 104". Limanowa.in.
  40. https://platformazakupowa.plk-sa.pl/app/demand/notice/public/23643/details
  41. https://www.rynek-kolejowy.pl/wiadomosci/modernizacja-linii-chabowka--nowy-sacz-nowe-mozliwosci-dla-podroznych-i-mieszkancow-115125.html
  42. https://www.plk-sa.pl/o-spolce/biuro-prasowe/informacje-prasowe/szczegoly/podleze-piekielko-rozpedzamy-projekt-8905
  43. https://www.plk-sa.pl/o-spolce/biuro-prasowe/informacje-prasowe/szczegoly/tunel-kolejowy-pod-gorami-usprawni-przejazd-pomiedzy-limanowa-a-nowym-saczem-9470
  44. https://ted.europa.eu/udl?uri=TED:NOTICE:102-2023:TEXT:EN:HTML&src=0
  45. https://www.plk-sa.pl/o-spolce/biuro-prasowe/informacje-prasowe/szczegoly/pociagi-pasazerskie-wroca-na-trase-kepno-olesnica-9464
  46. https://www.rynek-kolejowy.pl/wiadomosci/sa-podpisy-pod-umowami-na-kolej-plus-na-mazowszu-110323.html
  47. https://www.plk-sa.pl/o-spolce/biuro-prasowe/informacje-prasowe/szczegoly/mazowsze-pociagi-pasazerskie-znow-pojada-z-sokolowa-podlaskiego-do-siedlec-8866
  48. "W Bełchatowie będzie linia kolejowa". Radomsko24.pl. 26 April 2022.
  49. https://www.plk-sa.pl/o-spolce/biuro-prasowe/informacje-prasowe/szczegoly/kolej-plus-kolej-pasazerska-wraca-do-belchatowa-7802
  50. https://www.rynek-kolejowy.pl/wiadomosci/belchatow-przetarg-na-projekt-inwestycji-kolej-plus-111291.html
  51. https://www.rynek-kolejowy.pl/wiadomosci/kolej-plus-coraz-blizej-powrotu-kolei-pasazerskiej-do-belchatowa-114410.html
  52. "Rachwalski: Rewitalizacja linii do Góry nie jest pierwszą potrzebą". Rynek-kolejowy.pl.
  53. https://www.rynek-kolejowy.pl/wiadomosci/ponad-4-mld-zl-na-kolej-na-lubelszczyznie-umowy-podpisane-110645.html
  54. https://platformazakupowa.plk-sa.pl/app/demand/notice/public/24104/details
  55. https://www.rynek-kolejowy.pl/wiadomosci/kolej-wiecej-pociagow-bedzie-moglo-pojechac-z-lukowa-do-lublina--115564.html
  56. https://www.slowopodlasia.pl/artykul/28816,kolej-pod-napieciem-beda-elektryfikowac-linie-kolo-radzynia
  57. PKP POLSKIE LINIE KOLEJOWE S.A. - zamierzenia inwestycyjne na lata 2021-2030 z perspektywą do 2040 roku (PDF). Plk-sa.pl (Report). Warszawa. 2020.
  58. https://www.gov.pl/web/infrastruktura/jest-nowy-krajowy-program-kolejowy
  59. https://www.transportszynowy.pl/kolej/siectrakckolkonstrukcje
  60. 1 2 "Pafnucy & Włóczko Internet Kąpany". katedr.republika.pl. Archived from the original on 5 March 2016. Retrieved 30 June 2022.
  61. OpenSolution.org. "Czterdzieści pięć lat elektryfikacji PKP 1/1982 – Zeus Page – Trakcja i Wagony, Eksploatacja Kolei i inne stare pisma online". Zeus.krb.com.pl. Archived from the original on 2017-10-07. Retrieved 2017-10-07.
  62. Józef Oleński, Halina Dmochowska, Teresa Nowak, Renata Bielak. „Mały Rocznik Statystyczny Polski”. 2010, s. 222,624–625, 2010. Warszawa: Główny Urząd Statystyczny. ISSN   1640-3630.
  63. Józef Oleński, Halina Dmochowska, Teresa Nowak, Ewa Czumaj. „Mały Rocznik Statystyczny Polski”. 2009, s. 215,614–615, 2009. Warszawa: Główny Urząd Statystyczny. ISSN   1640-3630.
  64. https://utk.gov.pl/pl/aktualnosci/19158,Linie-kolejowe-w-Polsce-podstawowe-parametry.html.