Railways in Northallerton

Last updated

Class 91 (left) to London King's Cross and Class 185 to Middlesbrough, pass in Northallerton station Class 91 to London King's Cross and Class 185 to Middlesbrough, pass in Northallerton station.jpg
Class 91 (left) to London King's Cross and Class 185 to Middlesbrough, pass in Northallerton station

The network of railways in Northallerton, North Yorkshire, England, was constructed by three companies whose lines through the town were built between 1841 and 1852. They were all amalgamated into the North Eastern Railway (NER) which in turn was subsumed into the London and North Eastern Railway in 1923 and British Rail in 1948. British Rail closed two lines, the Wensleydale line in 1954 and a section of the Leeds Northern Railway to Harrogate in 1969. The Wensleydale line was retained as a freight branch and resurrected as a heritage railway in 2003 but the line to Harrogate closed completely. Despite closures and rationalisation, the station still is at a major junction on the East Coast Main Line.

Contents

Northallerton is on the East Coast Main Line and TransPennine Express Northern Line. The station is 200 miles (320 km) north of London King's Cross, 30 miles (48 km) north of York railway station [1] and 175 miles (282 km) south of Edinburgh Waverley railway station. [2]

History

1841–1901

A railway between York and Darlington via Northallerton was suggested in 1826 in the York Herald, [3] but the first railway, built by the Great North of England Railway (GNE), following the proposed route, only opened to mineral traffic in January 1841 and to passengers in March of the same year. [4] When navvies were digging in the Castle Hills area of Northallerton, three Roman sarcophagi were unearthed which were taken to Darlington. [5] Northallerton station opened in March 1841, and the "York Herald" described it as "in the Elizabethan Gothic style". [6] Although much remodelled, the station is in the same location, with staggered platforms as when first built. [7] [8] Opening beyond Darlington to Newcastle did not come until 1844. In 1842, the GNE was absorbed into the Newcastle & Darlington Junction Railway (N&DJR), [9] who, in 1846 gained Parliamentary approval for a line between Northallerton and Bedale. Work started the same year, but because of the unscrupulous practices of George Hudson, who controlled the N&DJR, work was halted in early 1848 [10] The line opened between Northallerton and Bedale in March 1848. [11] Various other schemes progressed the line through Wensleydale and the N&DJR became part of the York, Newcastle and Berwick Railway (YN&BR). The Wensleydale line left Northallerton westwards [12] and had two connections with the mainline north of Northallerton; one at Castle Hills South and the other at Castle Hills North. Initially, access was from the north (the Darlington direction) which meant that trains originating in Northallerton had to reverse. [13] This was remedied in 1882 with the opening of a direct curve onto the Wensleydale line. [14]

The third line was the Leeds Northern Railway (LNR), previously the Leeds & Thirsk Railway, whose line opened in June 1852. [15] The LNR line paralleled the YN&BR line at a lower level to the west. The GNE formation was built on an embankment that took it from what became Cordio Junction to Castle Hills on an embankment made from 252,641 cubic yards (193,158 m3) of earth [16] from when Castle Hills, north of the station, was levelled. This was the second most difficult engineering task undertaken by the company between York and Darlington after the stone viaduct at Croft. [17] The LNR station, Northallerton Town was in the North Bridge area. [18] The LNR passed under the YN&B just north of Northallerton station where a short tunnel was driven under the YN&B line at an angle of 23%. Tunnelling took place while keeping the upper line open. [19] [note 1] [8] [20] No work took place until designs the tunnel were submitted by the LNR engineer, Joshua T Naylor, to the YN&B. [21] The tunnel was constructed by driving piles into the GNE embankment and inserting a platform above them to support the rails. The tunnel was excavated and the space bricked up until the arches at either end could be completed. [22] The tunnel is 26-foot (7.9 m) wide and 160-foot (49 m) long. [23]

The former Northallerton Town railway station (LNR), now a private business Northallerton Town railway station (LNR).jpg
The former Northallerton Town railway station (LNR), now a private business

A spur at the north end of the station allowed trains to and from Melmerby to call at the station and access the line towards Eaglescliffe and Stockton in 1856. [24] This route was taken via the Thirsk line from Melmerby and then north along what became the ECML. It along with the YN&B and the LNR, became part of the North Eastern Railway in 1854, [note 2] [25] precipitated the closure of Northallerton Town station (LNR) although it remained open for well over a century as a goods depot. [26] The line to Wensleydale was absorbed into the NER in 1858. [27]

The LNR opened two platforms on its line adjacent to Northallerton station. They remained in use after mainline trains had been diverted through the station and via Thirsk. [28] The low platforms were the terminus for local trains from Melmerby (via Sinderby until 1901, when the line from Melmerby was doubled and became the key line north, [note 3] [29] and the line from Thirsk to Melmerby became secondary. When mainline trains were re-routed via the Melmerby to Northallerton line, the NER installed a junction at Cordio Wood to feed a spur into the south of the station. [30] [31] The low platforms became redundant and were abandoned but were resurrected during the Second World War and for engineering diversions. [30] Access to the low platforms was via a path from the upper platforms. A door in the subway under the main running lines allowed passengers to interconnect between all platforms. [32]

York, Newcastle & Berwick, York & North Midland, Leeds Northern maps.jpg

Other lines were planned, some gained Parliamentary approval. One was the York & Carlisle Railway which proposed a line from Northallerton and Bishop Auckland meeting near Barnard Castle and crossing the Pennines. The plan was abandoned in 1846 when the company merged with another. [33]

1901–1948

In 1911, the station was remodelled when an improved connection was installed on the western side for access to the Wensleydale line. The down platform (Darlington-bound) was converted into an island platform with two running lines and a north-facing bay for Wensleydale services. Another bay was installed on the up platform (York-bound) which allowed services to depart south for the Ripon line, although the stopping service until 1901 had used the low platforms. [8] [28] [34]

Starting in 1897, the tracks were "widened" in several sections between York and Northallerton. [35] [36] In 1931, the London and North Eastern Railway quadrupled most of the line and created the grade separated Longlands Junction south of Northallerton by 1933. [31] [37] It connected to the original formation from Ripon and allowed freight to avoid the station from the York direction. Trains heading south accessed the line south via the Longlands Tunnel (55 yards (50 m)) under the fast lines through the station. [38] In 1942, the LNER installed up and down slow lines between Pilmoor and Thirsk as wartime necessities led to an upsurge in traffic. [39] British Rail completed the quadrupling of the line in 1959 and 1960. [40]

Northallerton - a Down freight heading for Teesside Northallerton - a Down freight heading for Tees-side - geograph.org.uk - 2261324.jpg
Northallerton - a Down freight heading for Teesside

In 1941, concerns about wartime bombing prompted building a chord from north of Romanby Road level crossing to Castle Hills Junction [41] to connect the lower and upper lines and opened in November 1941. [42] Should Northallerton station be bombed, it provided an alternative route. The new section was engineered with a unique feature; because of the gradient it was too low to bridge the Wensleydale line and too high to dive under the railway. [41] Engineers created two moveable sections on rail wheels which when pushed together, created a bridge allowing trains bound to and from Wensleydale to traverse the section. [43] If the wartime chord needed to be used, the moveable sections could be moved onto sidings on either side of the running lines. [44] The bridge was constructed from two 17-foot (5.2 m) girders that straddled the lower running lines. [42] The bridge completed the track circuits and prevented trains from running under when the bridge was in place, or from running over it if the lower wartime lines were in use. Trains could still access the Wensleydale line by reversing at Castle Hills Junction. Apart from testing, there is no evidence that the chord was used as Northallerton was rarely attacked (some bombs did land on one of the livestock marts). [45] Closure of this section came in 1946. [46]

1948 – present day

When the passenger service ended on the Wensleydale line in April 1954 (due to its £14,000 per year loss-making revenue according to British Rail), [47] [11] [48] the direct curve from the station onto the line was used less until it closed in 1970. [31] [49] Thereafter, freight services used Castle Hills siding and reversed into the loop to run-round. Some freight trains traversed the line with locomotives at both ends, a procedure known as top and tail, which removed the necessity to reverse and run-round. [50] Services on the line comprised various loads, but up until December 1992, [11] it conveyed limestone from Redmire to the British Steel complex at Redcar. [51] The operation involved the train arriving from Teesside into the station via the Eaglescliffe line and reversing into the Castle Hills siding and continuing up the branch. On returning, the train reversed the process to access the Eaglescliffe line. [52] In 1996, the Ministry of Defence paid £750,000 to upgrade the line to convey military vehicles in and out of Catterick Camp. [53]

The last section of line to be closed, the Leeds Northern Line from Harrogate and Ripon, closed to passengers in 1967 but was not closed completely until 1969. The widened lines on the ECML, which provided four tracks between Northallerton and York, were an easier route south than some steeply graded sections around Ripon and Wetherby. [37] The former LNR route was re-opened for services in the aftermath of the Thirsk rail crash. Some questioned the validity of closing the line citing the crash at Thirsk as reason to keep it open as an alternative line when the ECML would be closed. [54] Various reports have detailed re-opening the line but some historical studies have suggested that the route should only open between Ripon south to Harrogate as there would be no business case to provide for a railway running further north. [55] [56] [57] In 2015, North Yorkshire County Council submitted plans for transport schemes in North Yorkshire, the provision of a railway connecting Harrogate and Ripon to the ECML was among them. However, while the routeing of the railway north suggests that the freight railway through Northallerton could be closed, the plan calls for the junction of a re-opened line to be north of Northallerton town. [58] [59]

185102 at Northallerton having just passed over Low Gates level crossing. The engineers sidings are on the right 185102 at Northallerton.jpg
185102 at Northallerton having just passed over Low Gates level crossing. The engineers sidings are on the right

With the loss of the local and long-distance traffic on the Wensleydale and Harrogate lines, the bay platforms at the southern and northern ends of the station were taken out of commission. In 1982, British Rail announced its intention to revamp the dilapidated station, but with no funding from local authorities, the option to retain the Victorian buildings were limited. [60] The down side buildings were removed in 19721973 and the up side lost its glass canopies in 1985. [61] The station was remodelled between 1985 and 1986 with the down line on the western edge of the station (the down relief line) also being removed. [62] [63]

Local passenger services were lost on the NorthallertonEaglescliffe route and most other passenger workings were transferred leaving freight using the line. British Rail started a named train to Midldlesbrough, the Cleveland Executive, but it ceased just before the ECML was electrified because of poor patronage north of Northallerton station. The route regained passenger services in the 1990s when Regional Railways introduced the Middlesbrough Manchester Airport services which used the line rather than having to reverse at Darlington. [64]

The ECML was electrified with a 25 kiloVolt Alternating Currency overhead catenary in 1991. [65] The section between York and Northallerton was energised and tested in September 1990, [66] electric services between London King's Cross and Edinburgh did not commence until July 1991. [67] Electrification involved raising many bridges and spelt the end for the signalbox which opened in September 1939 and controlled a large section of the ECML. [68] The signalbox closed in April 1990 when control was transferred to York IECC, [69] although the control of the barriers (but not the signals) at the Low Gates level crossing was kept under the authority of the box at Low Gates. [61] Signalling control now rests at the Rail Operating Centre at York. [20] [70]

The North Eastern Railway had pursued a scheme to electrify the line between Northallerton and Ferryhill via Stockton in 1922/1923. [71] This line was also considered for electrification by British Rail for a proposed Channel Tunnel freight terminal on Teesside in 1994, but was not taken past the planning stage. [72] In 2009, electrification was announced on the Transpennine route between Manchester Victoria, Huddersfield, Leeds and York and electrification of the line between Northallerton and Middlesbrough was mooted by Network Rail to provide through running between Manchester and Middlesbrough. [72]

In 2017, a platform in the station was lengthened to enable the new Class 800 trains to call on East Coast services. [73]

Wensleydale Railway

In 2003, the Wensleydale Railway signed a 99-year lease with Railtrack (the predecessor of Network Rail) and started services on the former Wensleydale line. [74] Initially, trains ran to Leeming Bar as the eastern terminus, but in 2014 Northallerton West railway station opened. It is a temporary structure as the Wensleydale Railway was keen to reopen the closed 1970 curve and run trains into, or as close as possible to, Northallerton station. The north-facing bay platform used for the Wensleydale branch has been filled in and is part of the car park. [75] The section between Leeming Bar and Northallerton does not see scheduled services as the level crossing on Yafforth road is in need of upgrading. In 2016, a train struck a car on the level crossing, [76] and while the report did not attribute direct blame on the company, it said that the approaches and sighting of the level crossing should be improved. [77] [note 4] [78]

Goods

The North Eastern Railway applied for Parliamentary permission to build a freight yard between the Darlington and Eaglescliffe lines. It was given permission in 1901 and 1903 but nothing was built. [79] The town had two goods yards; one at the station and the other next to the closed Northallerton Town station known as High and Low Goods Yard(s) respectively. [80] Northallerton auction mart was next to the station and cattle were forwarded from the yard which also had coal drops. It remained a wagonload freight location until the early 1980s. [81] The low yard was used for general merchandise. [82] The yards had three and two sidings respectively which are used but for engineering purposes.

Northallerton forwarded the same types of freight as any other station on the local lines. The Wensleydale Pure Milk Society Dairy to the north west of the station forwarded milk products to London, Hull, Newcastle, Sunderland and Dewsbury and received milk from Wensleydale. The one wagon movement was a hand-pushed trolley operated by two workers, which was pushed into the station from the creamery. This conveyed cream for dispatch and the wagon was converted so that it could work on the line, [83] and had a red flag placed on a very tall pole so that its movement could be observed by traincrews. [84]

Current services

Northallerton station is served by LNER services between Edinburgh and London King's Cross, TransPennine Express (TPE) services between Middlesbrough and Manchester airport, Newcastle and Liverpool Lime Street and Grand Central services between Sunderland and London King's Cross. Most LNER services and all CrossCountry services pass through at speed without stopping. One TPE service per hour in each direction does not stop at the station.

Most freight trains are routed via the old Leeds Northern Railway line on the lower tracks avoiding the station. This means freight trains on the lower lines cross four level crossings in the town. From south to north they are; [20]

Low Gates level crossing often has its barriers down at peak time for 25 minutes in an hour. [85] This leads to traffic tailbacks on the A167 which can take 15 minutes for the traffic to clear. [86] Problems with queuing traffic and congestion in the town have led to calls for the level crossing to be bypassed, bridged or closed. One suggestion was that the corridor the freight lines occupy be turned into an inner ring road and a new rail formation be cut further north to provide a new chord to the Middlesbrough line from the ECML further north than the current station. [87] [88] This would mean traffic could use the trackbed to access the A167 without going through the town as there is no bypass around the town for road traffic. [89]

A bridge to the north of the town, which opened in December 2022, is expected to provide some road traffic relief to the crossing at Low Gates. [90] [91]

Stations and engine sheds

The first engine shed in the town was located adjacent to Northallerton Town railway station. It was a single road shed which opened in 1852 and remained open after the route to Northallerton station opened in 1856. It closed in 1858. [98]

A two-road engine shed was provided for services on the Wensleydale branch. It was built in 1857 and replaced in 1881 and an extension was added in 1886. [99] The shed was adjacent to the low platforms at Northallerton station and had one through and one dead-end line. [100] The shed was coded as 51J under British Railways as a sub-shed of Darlington. [101] With the withdrawal of passenger services on the Wensleydale line, the shed closed in March 1963, nine years after passenger traffic had ceased on the branch. The site is now in private business use. [102]

The turntable was located in the goods yard adjacent to the main station. It could accommodate locomotives up to a length of 42 feet (13 m). [103] Its location at the station rather than adjacent to the locomotive shed was a legacy from when Leeds Northern services terminated in the station and ran round before proceeding south. An engine moving from the station to the locomotive shed had to travel over 1 mile (1.6 km) and negotiate two junctions to reach it. [80] The turntable was next to the coaling plant and watering facility; none of the structures were relocated to the engine shed on the lower lines. [98]

The water tank was situated between the low and high platforms and held over 30,000 imperial gallons (140,000 L; 36,000 US gal) of water. As it was located on low ground, it was built to a height above that of the upper-level platforms to allow enough pressure to feed the water column by the turntable, making it significantly higher than would normally be expected. [104]

Incidents

Notes

  1. Some writers refer to the tunnel as a "long bridge". The Eastern Trackmaps diagrams refers to the formation as a tunnel.
  2. Initially, the North Eastern Railway was created by the YN&B, the LNR and the York and North Midland Railway, with the Malton & Driffield Railway being amalgamated quite soon afterwards.
  3. Doubling began in March 1899 and took two years.
  4. The level crossing at Yafforth was used to stage a crash under the banner "Operation Zebra Smash" in 1994. Railtrack set the crossing up with fake barriers and pushed a train onto the level crossing which smashed a Vauxhall Astra GTE.

Related Research Articles

<span class="mw-page-title-main">East Coast Main Line</span> Railway link between London and Edinburgh and London and Leeds

The East Coast Main Line (ECML) is a 393-mile long (632 km) electrified railway between its northern terminus at Edinburgh Waverley and southern terminus at London King's Cross station. The key towns and cities of Peterborough, Doncaster, York, Darlington, Durham and Newcastle are on the line. The line is a key transport artery on the eastern side of Great Britain running broadly parallel to the A1 road. The main line acts as a 'spine' for several diverging branches, serving destinations such as Cambridge, Leeds, Hull, Sunderland and Lincoln, all with direct services to London. In addition, a few ECML services extend beyond Edinburgh to serve Glasgow Central, although the principal London-Glasgow route is the West Coast Main Line (WCML).

<span class="mw-page-title-main">York railway station</span> Railway station in York, England

York railway station is on the East Coast Main Line (ECML) serving the cathedral city of York, North Yorkshire, England. It is 188 miles 40 chains (303.4 km) north of London King's Cross and on the main line it is situated between Doncaster to the south and Thirsk to the north. As of June 2018, the station is operated by London North Eastern Railway. It is the busiest station in North Yorkshire, the second busiest in Yorkshire & the Humber, and the fifth busiest in Northern England. In Britain's 100 Best Railway Stations by Simon Jenkins, the station was one of only ten to be awarded five stars.

<span class="mw-page-title-main">Wensleydale Railway</span> Heritage railway in North Yorkshire, England

The Wensleydale Railway is a heritage railway in Wensleydale and Lower Swaledale in North Yorkshire, England. It was built in stages by different railway companies and originally extended to Garsdale railway station on the Settle-Carlisle line. Since 2003, the remaining line has been run as a heritage railway. The line runs 22 miles (35 km) between Northallerton West station, about a fifteen-minute walk from Northallerton station on the East Coast Main Line, and Redmire.

<span class="mw-page-title-main">Harrogate line</span> Passenger rail line in England

The Harrogate line is a passenger rail line through parts of North Yorkshire and the West Yorkshire area of northern England connecting Leeds to York by way of Harrogate and Knaresborough. Service on the line is operated by Northern, with a few additional workings by London North Eastern Railway starting and terminating at Harrogate. West Yorkshire Metro's bus and rail MetroCard ticket is available for journeys between Leeds and Harrogate.

<span class="mw-page-title-main">Darlington railway station</span> Railway station in Darlington, County Durham, England

Darlington railway station is on the East Coast Main Line serving the town of Darlington in County Durham, England. It is 232 miles 50 chains north of London King's Cross. It is situated between Northallerton to the south and Durham to the north. Its three-letter station code is DAR.

<span class="mw-page-title-main">Northallerton railway station</span> Railway station in North Yorkshire on the East Coast Main Line

Northallerton railway station is on the East Coast Main Line serving the town of Northallerton in North Yorkshire, England. It is between Thirsk to the south and Darlington to the north. Its three-letter station code is NTR.

<span class="mw-page-title-main">Leeming Bar railway station</span> Railway station in North Yorkshire, England

Leeming Bar railway station is a railway station in Leeming Bar, North Yorkshire, England. It is the penultimate eastern rail passenger station of the Wensleydale Railway, though the line continues towards Northallerton. Trains are timed to link in with Dales and District service buses to Northallerton to connect with the National Rail network.

<span class="mw-page-title-main">Harrogate railway station</span> Railway station in North Yorkshire, England

Harrogate railway station serves the town of Harrogate in North Yorkshire, England. Located on the Harrogate Line it is 18.25 miles (29 km) north of Leeds. Northern Trains operate the station and provide local passenger train services, with a London North Eastern Railway service to and from London King's Cross running six times per day.

<span class="mw-page-title-main">Starbeck railway station</span> Railway station in North Yorkshire, England

Starbeck is a railway station on the Harrogate Line, which runs between Leeds and York via Harrogate. The station, situated 18+14 miles (29 km) west of York, serves the village of Starbeck, in North Yorkshire, England. It is owned by Network Rail and managed by Northern Trains.

<span class="mw-page-title-main">Leeds–Northallerton railway</span>

The Leeds–Northallerton railway is a partly disused railway line between West and North Yorkshire, in northern England.

<span class="mw-page-title-main">Northallerton–Eaglescliffe line</span> Railway line in England

The Northallerton–Eaglescliffe line runs between Northallerton and Eaglescliffe stations. It connects the East Coast Main Line to the Tees Valley Line. It was built by the Leeds Northern Railway as part of their main line from Leeds to Stockton which opened on 2 June 1852, although the connection to the ECML at the Northallerton end was not opened for a further four years.

<span class="mw-page-title-main">Pilmoor, Boroughbridge and Knaresborough Railway</span> Disused railway line in Yorkshire, England

The Pilmoor, Boroughbridge and Knaresborough Railway was a railway line in North Yorkshire, England, that connected Pilmoor on the East Coast Main Line with the towns of Boroughbridge and Knaresborough. The first part of the branch headed south-westwards from the East Coast Main Line and terminated at Boroughbridge. In 1875, the branch was extended again to meet the line at Knaresborough.

<span class="mw-page-title-main">Leeds Northern Railway</span> 19th-century British railway company

The Leeds Northern Railway (LNR), originally the Leeds and Thirsk Railway, was an English railway company that built and opened a line from Leeds to Stockton via Harrogate and Thirsk. In 1845 the Leeds and Thirsk Railway received permission for a line from Leeds to Thirsk, part of which opened in 1848, but problems building the Bramhope Tunnel delayed trains operating into Leeds until 1849.

<span class="mw-page-title-main">Northallerton West railway station</span> Railway station in North Yorkshire, England

Northallerton West is a temporary station built by the Wensleydale Railway as part of plans to link the railway with Northallerton, North Yorkshire, England.

<span class="mw-page-title-main">Welbury railway station</span> Disused railway station in North Yorkshire, England

Welbury railway station was a railway station serving the village of Welbury in North Yorkshire, England. Located on the Northallerton to Eaglescliffe Line it was opened on 2 June 1852 by the Leeds Northern Railway. It closed to passengers on 20 September 1954 and closed completely in 1963.

<span class="mw-page-title-main">West Rounton Gates railway station</span> Disused railway station in North Yorkshire, England

West Rounton Gates railway station, was a railway station between Welbury and Picton railway stations on the Leeds Northern Railway in the Hambleton District of North Yorkshire, England. The station was opened in 1864, but it was served by trains on Wednesdays only for the market day in Stockton-on-Tees.

<span class="mw-page-title-main">Brompton railway station</span> Disused railway station in North Yorkshire, England

Brompton railway station was a railway station that served the town of Brompton, North Yorkshire, England. It was opened in 1854 and closed in 1965. The line it was on is still open and carries passenger traffic to and from Sunderland and Middlesbrough to Manchester Airport and London King's Cross.

<span class="mw-page-title-main">Northallerton Town railway station</span> Disused railway station in North Yorkshire, England

Northallerton Town railway station was a railway station on the Leeds Northern Railway just north-east of the present day Northallerton railway station. The station was open for only four years before an amalgamation of railway companies, and the re-routing of the trains through Northallerton station, precipitated its closure.

Melmerby railway station was a railway station and junction in North Yorkshire, England. It had one main line going south to Ripon and Harrogate and one main line north to Northallerton with one lesser line going east to Thirsk Town and also connecting with the East Coast Main Line at Thirsk railway station. Its one other line was a branch to Masham.

<span class="mw-page-title-main">Topcliffe railway station</span> Disused railway station in North Yorkshire, England

Topcliffe railway station served the village of Topcliffe, North Yorkshire, England from 1848 to 1959 on the Leeds and Thirsk Railway.

References

Citations

  1. "Report on the Derailment that occurred on 28th August 1979 at Northallerton" (PDF). railwaysarchive.co.uk. Department of Transport. p. 1. Retrieved 25 July 2018.
  2. Spaven, David; Holland, Julian (2013). Mapping the railways : the journey of Britain's railways through maps from 1819 to the present day. Glasgow: Harper Collins. p. 224. ISBN   978-0-00-750649-1.
  3. Tomlinson 1915, p. 162.
  4. Hoole 1974, p. 95.
  5. Lloyd, Chris (30 June 2010). "'Flourishing garden' now a supermarket". The Northern Echo. ProQuest   527809980.
  6. Riordan 1996, p. 12.
  7. Chrystal, Paul; Sunderland, Mark (2010). Northallerton through time. Stroud: Amberley. p. 45. ISBN   9781848681811.
  8. 1 2 3 Jenkins 1993, p. 71.
  9. Haigh & Joy 1979, p. 16.
  10. Joy, David (2005). Guide to the Wensleydale Railway. Ilkley: Great Northern Books. p. 3. ISBN   1-905080-02-6.
  11. 1 2 3 Lloyd, Chris (17 February 2011). "Looking Back - Rails in the Dales". The Northern Echo. ProQuest   851903872.
  12. Suggitt 2007, p. 54.
  13. Davies 1991, p. 197.
  14. Hoole 1985, p. 8.
  15. Burgess, Neil (2011). The lost railways of Yorkshire's North Riding. Catrine: Stenlake. p. 18. ISBN   9781840335552.
  16. Tomlinson 1915, p. 349.
  17. Riordan 2002, p. 141.
  18. Riordan 2002, p. 143.
  19. Ingledew 1858, pp. 339–340.
  20. 1 2 3 Bridge, Mike (2016). Railway Track Diagrams; Eastern. Frome: Trackmaps. p. 20. ISBN   978-0-9549866-8-1.
  21. Ingledew 1858, p. 340.
  22. Tomlinson 1915, p. 513.
  23. Ingledew 1858, p. 341.
  24. Suggitt 2007, p. 27.
  25. Langham, Rob (2013). "Introduction". The North Eastern railway in the First World War. Oxford: Fonthill. p. 7. ISBN   978-1-78155-081-6.
  26. Riordan 2002, p. 329.
  27. Body 1989, p. 144.
  28. 1 2 "Disused Stations: Northallerton Low Level Station". www.disused-stations.org.uk. Retrieved 25 July 2018.
  29. "District News - Northallerton". The York Herald. No. 14,913. 25 March 1899. p. 11. OCLC   877360086.
  30. 1 2 Hoole 1977, p. 61.
  31. 1 2 3 Cobb, M. H. (2003). The railways of Great Britain : a historical atlas at a scale of 1 inch to 1 mile vol. 2 (2 ed.). Shepperton: Ian Allan Publishing. p. 436. ISBN   0-7110-3003-0.
  32. Jenkins 1993, p. 72.
  33. Hoole 1985, pp. 6–7.
  34. Goode, C.T. (1980). The Wensleydale branch. Trowbridge: Oakwood Press. p. 11. ISBN   0-85361-265-X.
  35. Hoole 1977, p. 51.
  36. Haigh & Joy 1979, pp. 16–17.
  37. 1 2 Haigh & Joy 1979, p. 17.
  38. Body 1989, p. 137.
  39. Hoole 1974, p. 98.
  40. Hoole 1977, p. 54.
  41. 1 2 Chapman 2010, p. 8.
  42. 1 2 Jenkins 1993, p. 65.
  43. Body 1989, p. 136.
  44. Davies 1991, pp. 198–199.
  45. Berry, Chris (26 November 2012). "Market's century at heart of town". The Yorkshire Post. ProQuest   1197511967.
  46. Davies 1991, p. 199.
  47. "Return to tender: Rail trip back in time". The Yorkshire Post. 26 April 2004. ProQuest   335138455.
  48. Riordan 2002, p. 338.
  49. Railways of the Yorkshire Dales. Ilkley: Great Northern Books. 2005. p. 61. ISBN   1-905080-03-4.
  50. Shannon, Paul (2009). Diesel decades 1990s (1 ed.). Hersham: Ian Allan. p. 70. ISBN   978-0-7110-3384-9.
  51. Shannon, Paul (2008). Rail freight since 1968 : bulk freight. Great Addington, Kettering: Silver Link. p. 34. ISBN   978-1-85794-299-6.
  52. Goodyear, Alan (December 1989). "Rails to Redmire". The Railway Magazine. Vol. 135, no. 1,064. Cheam: Prospect Magazines. pp. 792–794. ISSN   0033-8923.
  53. Wainwright, Martin (11 April 1996). "Army rolls up to save rail link". The Guardian. p. 5. ISSN   0261-3077.
  54. Young, Alan (2015). The Lost Stations of Yorkshire; The North and East Ridings. Kettering: Silver Link. pp. 44–46. ISBN   978-1-85794-453-2.
  55. Chapman, Hannah (12 May 2004). "Railway renewal plan is backed". The Northern Echo. p. 4. ISSN   2043-0442.
  56. "Untitled Page". www.forgottenrelics.co.uk. Retrieved 29 July 2018.
  57. "Reopening of 11-mile Harrogate-Ripon rail link takes a step nearer". Yorkshire Evening Post. 17 January 2006. Retrieved 29 July 2018.
  58. "A Strategic Transport Prospectus for North Yorkshire" (PDF). northyorks.gov.uk. p. 35. Retrieved 29 July 2018.
  59. Windham, Dan (29 October 2015). "County Council include reopening of Ripon railway in transport plans". The Ripon Gazette. Retrieved 29 July 2018.
  60. Riordan 2002, p. 396.
  61. 1 2 Jenkins 1993, p. 181.
  62. Riordan 2002, p. 339.
  63. Jenkins 1993, p. 186.
  64. Semmens, P W B (August 1994). "Class 158s spread their wings". The Railway Magazine. Vol. 140, no. 1,120. London: IPC. p. 26. ISSN   0033-8923.
  65. Body 1989, p. 207.
  66. "Electrification of the East Coast Main Line; progress report No. 14" (PDF). railwaysarchive.co.uk. British Rail. May 1992. p. 54. Retrieved 25 July 2018.
  67. Bickerdyke, Paul, ed. (August 2018). "Time Traveller". Rail Express. No. 267. Horncastle: Mortons Media. p. 35. ISSN   1362-234X.
  68. Chapman 2010, p. 29.
  69. Riordan 2002, pp. 396–397.
  70. Rhodes, Michael (2015). Resignalling Britain. Horncastle: Mortons Media Publishing. p. 71. ISBN   978-1-909128-64-4.
  71. Hoole 1974, p. 97.
  72. 1 2 Merrick, Robert (15 August 2012). "Plan to electrify railway revived". The Northern Echo. p. 15. ISSN   2043-0442.
  73. Prest, Victoria (29 August 2017). "Rail works ready for new Azuma trains". York Press. Retrieved 25 July 2018.
  74. Robinson, Stephen (30 June 2003). "The railway that came back from the dead Train breathes new life into a Yorkshire dale". The Telegraph. p. 9. ISSN   0307-1235.
  75. Robinson, Stephen (29 June 2003). "The railway that came back from the dead". The Telegraph. Retrieved 28 July 2018.
  76. "Woman airlifted to hospital after crash with North Yorkshire train at level crossing". The Yorkshire Post. 3 August 2016. Retrieved 28 July 2018.
  77. 1 2 "Collision at Yafforth level crossing, 3 August 2016". gov.uk. 10 November 2016. Retrieved 25 July 2018.
  78. Marsden, Colin (November 1994). "Operation Zebra Smash". The Railway Magazine. Vol. 140, no. 1,123. London: IPC. p. 11. ISSN   0033-8923.
  79. Hoole 1974, p. 106.
  80. 1 2 Davies 1991, p. 198.
  81. Chapman 2010, p. 31.
  82. Davies 1991, p. 202.
  83. Hoole 1985, p. 11.
  84. Blakemore, Michael (2005). Railways of the Yorkshire Dales. Ilkley: Great Northern Books. p. 4. ISBN   1-905080-03-4.
  85. Chapman, Hannah (2 June 2016). "How can Northallerton's level crossing congestion woe be solved?". The Northern Echo. Retrieved 25 July 2018.
  86. Foster, Mark (2 February 2000). "Town fears railway plans will increase traffic jams". The Northern Echo. ProQuest   328975703.
  87. Mackintosh, Stuart (19 September 2001). "Railway line diversion plan is backed by council chiefs". The Northern Echo. p. 6. ISSN   2043-0442.
  88. Foster, Mark (22 July 2016). "Battle to beat jams in traffic-choked town". York Press. Retrieved 25 July 2018.
  89. Barnard, Ashley (20 September 2016). "Radical solutions to Northallerton's traffic misery are unveiled". The Northern Echo. ProQuest   1966277722.
  90. Chapman, Hannah (25 November 2022). "Date finally announced for opening of link road". Darlington & Stockton Times. No. 2022–47. p. 1. ISSN   2516-5348.
  91. "Long awaited Northallerton link road and bridge opens". BBC News. 16 December 2022. Retrieved 26 July 2024.
  92. Chapman, Vera (2005). Around Northallerton. Stroud: History Press. p. 94. ISBN   9781845881764.
  93. Willis, Hoe (8 October 2004). "Unhappy passengers ready to set up rail action group". The Northern Echo. p. 6. ISSN   2043-0442.
  94. 1 2 "Northallerton Rail Crash". Evening Gazette. 16 February 1961. p. 1. ISSN   0964-3095.
  95. Butt, R. V. J. (October 1995). The Directory of Railway Stations: details every public and private passenger station, halt, platform and stopping place, past and present (1st ed.). Sparkford: Patrick Stephens Ltd. p. 172. ISBN   978-1-85260-508-7. OCLC   60251199. OL   11956311M.
  96. Willis, Joe (31 October 2014). "Works starts on new rail platform to link Northallerton to Dales". Darlington and Stockton Times. Retrieved 25 July 2018.
  97. "Getting Here - Wensleydale Railway". wensleydalerail.com. Retrieved 25 July 2018.
  98. 1 2 Griffiths & Hooper 2019, p. 327.
  99. Jenkins 1993, p. 51.
  100. Jenkins 1993, p. 74.
  101. Bolger, Paul (1984). BR Steam Motive Power Depots; NER. Surrey: Ian Allan. p. 54. ISBN   0-7110-1362-4.
  102. Thompson & Groundwater 1992, p. 71.
  103. Davies 1991, p. 200.
  104. Griffiths & Hooper 2019, p. 329.
  105. Hoole 1974, p. 99.
  106. Riordan 2002, p. 45.
  107. "Shocking accident at railway station" . The York Herald. No. 12,006. 23 November 1889. p. 3. Retrieved 7 August 2018.
  108. Hoole 1974, pp. 98–99.
  109. "The Disastrous Gale". The York Herald. No. 13,590. 24 December 1894. pp. 5–6. OCLC   877360086.
  110. "Race With Death" (PDF). railways archive.co.uk. Adelaide Advertiser. 24 December 1913. Retrieved 25 July 2018.
  111. Welbourn, Nigel (1997). Lost Lines North Eastern. Shepperton: Ian Allan. p. 40. ISBN   0-7110-2522-3.
  112. "Report on the Derailment that occurred on 28th August 1979 at Northallerton" (PDF). railwaysarchive.co.uk. Department of Transport. Retrieved 25 July 2018.

Sources