SHEFA-2

Last updated

SHEFA-2 is an undersea communication cable linking the Faroe Islands to mainland Scotland via the Northern Isles. It is named after the route on which it is being deployed (SHEtland-FAroes) and succeeds an earlier cable called SHEFA-1 on the same route.

Contents

Construction and route

SHEFA-2 runs from Tórshavn in the Faroe Islands to Maywick in Shetland, then from Sandwick in Shetland onwards to Ayre of Cara in Orkney, and from Manse Bay in Orkney to Banff in Aberdeenshire, on mainland Scotland. Establishing the SHEFA-2 cable took less than two years, from the planning of the project in June 2006 until March 2008, when the cable became ready for use.

SHEFA-1 was deployed from 1971 to 1994, when CANTAT-3 (the fibre-optic submarine cable between Canada and Europe, with branches to both Iceland and the Faroe Islands), was established. It was a coaxial cable with 120 channels, carrying 120 telephone conversations at a time.

SHEFA-2 is a fibre-optic submarine cable and the capacity with the technology of 2006 is 57x10 gigabits per second. The total length of the cable is around 1000 km. SHEFA-2 includes the world's longest purely passive optical fibre cable link (390 km), entirely without amplifiers. With no submarine repeaters and no power feeds, repair and maintenance of the submarine cable is minimized. At the same time, the solution is future proof, as the end-point technology is the only item in need of change to increase the capacity.

Disruption incidents

In the spring of 2013, the cable was cut at the south of Orkney. This led to major broadband disruptions throughout Shetland. [1] Internet traffic was redirected onto the older and slower microwave links and the FARICE-1 cable.

In the summer of 2013, the cable was cut for the second time where it crosses the Moray Firth on the north-east coast of Scotland, causing more disruption to Internet connections. [2] It is believed that fishing vessels are to blame for both cable breaks.[ citation needed ]

On 20 October 2022, the SHEFA-2 submarine cable was damaged, leaving residents in Shetland without access to the Internet and emergency services. Sources speculated this might have resulted from a fishing vessel accidentally cutting the cable. [3] However others speculated on the possibility of sabotage by Russia. [4] The cable had also been cut 5 days before at a different area. After the second cut, Faroese Telecom operating the cable said it is "very rare that we have two problems at the same time". [5] It was declared to be fixed on 23 October. [6]

See also

Related Research Articles

<span class="mw-page-title-main">Fair Isle</span> Southernmost Shetland Island, Scotland

Fair Isle, sometimes Fairisle, is the southernmost Shetland island, situated roughly 38 kilometres from the Shetland Mainland and about 43 kilometres from North Ronaldsay.

<span class="mw-page-title-main">CANTAT-3</span> Canadian transatlantic telecommunications cable

CANTAT-3 was the third Canadian transatlantic telecommunications cable, in regular operation from 1994 to 2010, carrying 3 x 2.5 Gbit/s between Canada and Europe. It branches to both Iceland and the Faroe Islands. It is out of normal service for international bandwidth and is currently operated by Føroya Tele to service oil platforms in the North Sea.

<span class="mw-page-title-main">Submarine communications cable</span> Transoceanic communication line placed on the seabed

A submarine communications cable is a cable laid on the seabed between land-based stations to carry telecommunication signals across stretches of ocean and sea. The first submarine communications cables were laid beginning in the 1850s and carried telegraphy traffic, establishing the first instant telecommunications links between continents, such as the first transatlantic telegraph cable which became operational on 16 August 1858.

Telecommunications in Iceland is a diversified market. Iceland has a highly developed telecommunications sector with modern infrastructure. Multiple wholesale and retail providers are operated in a competitive market. As of 2024, Icelands telecom infrastructure is fully digitised and mostly fibre based, with 93% of households having full-fibre availability. Landlines are based on VoIP technology. Mobile telecoms in Iceland adheres to the GSM standard and 2G, 3G, 4G and 5G services are available, as well as a TETRA network for emergency communications. Iceland is connected by 4 submarine cables to both Europe and North America. Broadcasting is based on DVB-T2 standard for television and FM for radio. There are a few printed newpapers, although most mass-media is consumed online. Postal service is provided under universal obligation by the state-owned Iceland Post, but other private postal companies also operate.

<span class="mw-page-title-main">SAT-3/WASC</span>

SAT-3/WASC or South Atlantic 3/West Africa Submarine Cable is a submarine communications cable linking Portugal and Spain to South Africa, with connections to several West African countries along the route.

The Isle of Man to England Interconnector is a submarine power cable connecting the transmission system of the Manx Utilities Authority to that of Great Britain. With an undersea section of approximately 104 km, it is the second longest AC undersea cable in the world.

Fibre-optic Link Around the Globe (FLAG) is a 28,000-kilometre-long fibre optic mostly-submarine communications cable that connects the United Kingdom, Japan, India, and many places in between. The cable is operated by Global Cloud Xchange, a subsidiary of RCOM. The system runs from the eastern coast of North America to Japan. Its Europe–Asia segment was the fourth longest cable in the world in 2008.

<span class="mw-page-title-main">FARICE-1</span> Submarine communications cable

FARICE-1 is a submarine communications cable connecting Iceland, the Faroe Islands and Scotland. The cable has been in use since January 2004 and is 100% owned by Iceland. The cable had an initial design capacity of 720 Gbit/s and is a two fibre pair design. The length of the cable is 1205 km for the direct route between Iceland and Scotland. The cable structure and repeaters were made by Pirelli and the terminal equipment was supplied by TYCO. In the year 2013 the terminal equipment was upgraded by Ciena bringing the total capacity of the submarine cable to 11 Tbit/s. The cable has service access points in Reykjavik and Keflavik Airport as well as in London Telehouse East. The company Farice ehf sells services over the FARICE-1 cable. FARICE-2 was never built. DANICE is the complementary submarine cable.

<span class="mw-page-title-main">SEA-ME-WE 4</span> Submarine communications cable system

South East Asia–Middle East–Western Europe 4 is an optical fibre submarine communications cable system that carries telecommunications between Singapore, Malaysia, Thailand, Bangladesh, India, Sri Lanka, Pakistan, United Arab Emirates, Saudi Arabia, Egypt, Italy, Tunisia, Algeria and France.

<span class="mw-page-title-main">Síminn</span> Icelandic telecommunications company

Síminn hf., previously named Landssíminn and Póstur og Sími, is an Icelandic telecommunications company. It offers communication services for both private and corporate clients, including mobile (2G/3G/4G/5G), landline (VoIP/POTS), Internet (ADSL/VDSL/FTTH) and IPTV services. Síminn also operates multiple TV channels and streaming services. Síminn is listed on the Icelandic stock exchange.

<span class="mw-page-title-main">Dubai Media City</span> Tax-free zone in Dubai, UAE

Dubai Media City (DMC), part of Dubai Holding, is a tax-free zone within Dubai, United Arab Emirates.

The 2008 submarine cable disruption refers to three separate incidents of major damage to submarine optical communication cables around the world. The first incident caused damage involving up to five high-speed Internet submarine communications cables in the Mediterranean Sea and Middle East from January 23 to February 4, 2008, causing internet disruptions and slowdowns for users in the Middle East and India. The incident called into doubt the safety of the undersea portion of the Internet cable system.

<i>C.S. Sovereign</i>

C.S. Sovereign is a class DP2 type cable ship used for subsea cable installation and repair works. The ship was designed by BT Marine with Hart Fenton & Company as Naval Architects and built by Van der Giessen de Noord in 1991.

Saint Helena, Ascension and Tristan da Cunha is a British Overseas Territory in the South Atlantic, consisting of the island of Saint Helena, Ascension Island and the archipelago of Tristan da Cunha including Gough Island. Their communications provision includes dedicated radio and television stations, and telecommunications infrastructure.

SAex is a proposed submarine communications cable linking South Africa to the United States with branches to Namibia, Saint Helena, and Brazil.

Shetland HVDC Connection is a high-voltage direct current submarine power cable connecting Shetland to the British mainland.

<span class="mw-page-title-main">MAREA</span>

MAREA is a 6,605 km long transatlantic communications cable connecting the United States with Spain. Owned and funded by Microsoft and Facebook, but constructed and operated by Telxius, a subsidiary of the Spanish telecom company Telefónica, it is the "highest-capacity submarine cable in the world" with a system design capacity of 200 terabits per second as of 2019.

Føroya Tele P/f (FT) is the public telecommunications company in the Faroe Islands. It is one of the largest companies in the country with 230 employees and an annual turnover of around 40 million euros. The head office is in Tórshavn Municipality.

The telecommunications in Guernsey relate to communication systems in Bailiwick of Guernsey, which is a British Crown Dependency off the coast of Normandy, France.

References

  1. "Shetland Islands Suffer Vital Undersea SHEFA2 Fibre Optic Cable Break". ISP Review. 22 March 2013. Retrieved 6 August 2013.
  2. "Faroe to Scotland cable problem hits internet connections". BBC News. 24 July 2013. Retrieved 24 July 2013.
  3. "Damaged cable leaves Shetland cut off from mainland". BBC News. 20 October 2022. Retrieved 20 October 2022.
  4. "'Danger to come': Damaged cable in Shetlands 'may have been a dry run for Russia' - claim". Express. 20 October 2022. Retrieved 20 October 2022.
  5. Carrell, Severin (20 October 2022). "Shetland loses telephone and internet services after subsea cable cut". The Guardian . Retrieved 6 January 2023.
  6. "Shetland's damaged subsea cable now repaired, says operator". www.bbc.co.uk. 23 October 2022. Retrieved 23 October 2022.