Main One

Last updated
Main One
Owners:
Main Street Technologies
Key people:
Funke Opeke
Landing points
Total length14,000 km
Topologytrunk and branch
Design capacity1280  Gbit/s
Currently lit capacityn/a
TechnologyFiber optics
Date of first useJuly 22, 2010

The Main One Cable is a submarine communications cable stretching from Portugal to South Africa with landings along the route in various west African countries. On April 28, 2008, it was announced that Main Street Technologies has awarded a turnkey supply contract for the Main One Cable System to Tyco Telecommunications.

Contents

The cable system spans 14,000 km and provides additional capacity for international and Internet connectivity to countries between Portugal and South Africa on the west coast of Africa. The submarine cable project was designed in two phases, both of which were scheduled for completion in May 2010. The dual fiber pair, 1.28-Tbit/s, DWDM project connects Nigeria, Ghana, and Portugal in Phase 1 with onward connectivity through Portugal to Europe, Asia and the Americas. The Phase 1 cable system spans 6,900 kilometres. Additional connectivity extending to Angola and South Africa occurred in the second phase of the project.

Main One provides international capacity into a region that has experienced explosive growth in tele-density in recent years, but which remains constrained with respect to access to international cable capacity for global connectivity. The system is being developed by Main Street Technologies headquartered in Lagos. An October 10, 2008 press release states that the desk top study and engineering for the system has been completed. On July 22, 2010, the cable was launched. MainOne also owns a data centre subsidiary, MDXi which builds and operates Tier III data centres across West Africa.

Project management and engineering for the cable system has been contracted to specialist undersea consulting firm, Pioneer Consulting. [1]

The Chief Executive Officer of Main One is Funke Opeke.

Path

Main One - phase 1 Main one phase 1.png
Main One - phase 1

The Main One Cable is an undersea cable system stretching from Portugal to South Africa with landings along the route in various west African countries.

Landing points

The Main One cable system has the following landing points in operation in July 2010: [2]

planned landing points for phase 2 are:

Impact

Main One provides international capacity into a region that has experienced explosive growth in tele-density in recent years, but which remains constrained with respect to access to international cable capacity for global connectivity.

The Main One Cable system provides open access to regional telecom operators and Internet service providers at rates that are less than 20% of current international bandwidth prices in the region available via SAT3 or satellite service providers, according to the project's organizers. Main Street says it will encourage local content development via skills transfer of critical networking technologies and job creation with the location of the network operational center (NOC) for the entire system in Nigeria. [3]

Ownership

The cable is privately owned by Main Street Technologies, international investors like the Africa Finance Corporation and the Pan-African Infrastructure Development Fund (PAIDF) and a couple of Nigerian banks.

Acquisition

Equinix announced they will be acquiring Mainone for an enterprise value of $320m, the deal is expected to be completed in the first quarter of 2022.

Construction time-line

On April 28, 2008, it was announced that Main Street Technologies had awarded a turnkey supply contract for the Main One Cable System to Tyco Telecommunications. [4] An October 10, 2008 press release states that the desk top study and engineering for the system had been completed. [5] On July 1, 2010, press release states that Main One had been completed and commissioned. [6] The cable went live on July 22, 2010. [7]

See also

Individual cable systems off the west coast of Africa include:

Footnotes

  1. "Pioneer Consulting awarded MainOne contract", Ghana Business News
  2. MainOne cable company Project Room Archived 2010-09-24 at the Wayback Machine
  3. "Home". mainonecable.com.
  4. http://lw.pennnet.com/display_article/327046/13/ARCHI/none/NNEWS/1/Tyco-awarded-Main-One-cable-contract/
  5. http://lw.pennnet.com/display_article/342314/13/ARTCL/none/none/1/Main-One-Cable-System-progressing-on-schedule/
  6. "Untitled Document". Archived from the original on 2010-09-25. Retrieved 2010-07-05.
  7. "allAfrica.com: Nigeria: MainOne Fibre Optic Cable Launched". Archived from the original on 2010-07-25.

Sources

Related Research Articles

SAT-3/WASC or South Atlantic 3/West Africa Submarine Cable is a submarine communications cable linking Portugal and Spain to South Africa, with connections to several West African countries along the route. It forms part of the SAT-3/WASC/SAFE cable system, where the SAFE cable links South Africa to Asia. The SAT-3/WASC/SAFE system provides a path between Asia and Europe for telecommunications traffic that is an alternative to the cable routes that pass through the Middle East, such as SEA-ME-WE 3 and FLAG. SAT-3 has a capacity of 340 Gbit/s while SAFE has a capacity of 440 Gbit/s. The SAT-3 system together with SAFE was built by a consortium of operators. As of 2006, major investors included Telkom Group, France Telecom (12.08%), Nitel (8.39%); TCI, a subsidiary of AT&T Inc. (12.42%); and VSNL (8.93%).

The Eastern Africa Submarine Cable System (EASSy) is an undersea fibre optic cable system connecting countries in Eastern Africa to the rest of the world.

<span class="mw-page-title-main">Hibernia Networks</span> American telecommunications company

Hibernia Networks, alternately known as Hibernia Atlantic, was a privately held, US-owned provider of telecommunication services. It operated global network routes on self-healing rings in North America, Europe and Asia including submarine communications cable systems in the North Atlantic Ocean which connected Canada, the United States, the Republic of Ireland, the United Kingdom and mainland Europe. Hibernia managed cable landing stations in Dublin, Republic of Ireland; Coleraine, Northern Ireland; Southport, England; Halifax, Canada; Lynn, Massachusetts, United States.

Globacom Limited, commonly known as Glo, is a Nigerian multinational telecommunications company founded on 29 August 2003 by Mike Adenuga. As of June 2018, the company employs more than 3,500 people worldwide.

TGN Atlantic (TGN-A) previously VSNL Transatlantic and TGN Transatlantic, is a submarine telecommunications cable system transiting the Atlantic Ocean. The cable has been in operation since 2001.

<span class="mw-page-title-main">Internet in South Africa</span> Overview of the Internet in South Africa

The Internet in South Africa, one of the most technologically resourced countries on the African continent, is expanding. The internet country code top-level domain (ccTLD) .za is managed and regulated by the .za Domain Name Authority (.ZADNA) and was granted to South Africa by the Internet Corporation for Assigned Names and Numbers (ICANN) in 1990. Over 60% of Internet traffic generated on the African continent originates from South Africa. As of 2020, 41.5 million people were Internet users.

<span class="mw-page-title-main">SEACOM (African cable system)</span> African submarine communications cable

SEACOM launched Africa's first broadband submarine cable system along the continent's Eastern and Southern coasts in 2009. SEACOM is privately owned and operated.

The Matrix Cable System (MCS) is a submarine telecommunications cable linking Indonesia and Singapore with a 2nd phase to Landing at Perth, Australia. It was constructed by Tyco.

PIPE Pacific Cable (PPC-1) is a 6,900 km submarine cable laid by PIPE Networks. It runs from Cromer, New South Wales, in Australia, to Piti, Guam.

<span class="mw-page-title-main">Fola Adeola</span> Nigerian businessman and investor

Tajudeen Afolabi Adeola is a Nigerian businessman and investor. He is the Founder of Guaranty Trust Bank ., a member of the Commission for Africa, as well as founder and chairman of the FATE Foundation.

Europe India Gateway (EIG) is a submarine communications cable system that connects the U.K., Portugal, Gibraltar, Monaco, France, Libya, Egypt, Saudi Arabia, Djibouti, Oman, United Arab Emirates, and India.

<span class="mw-page-title-main">West Africa Cable System</span> Submarine communications cable linking Africa with the United Kingdom

The West Africa Cable System (WACS) is a submarine communications cable linking South Africa with the United Kingdom along the west coast of Africa that was constructed by Alcatel-Lucent. The cable consists of four fibre pairs and is 14,530 km in length, linking from Yzerfontein in the Western Cape of South Africa to London in the United Kingdom. It has 14 landing points, 12 along the western coast of Africa and 2 in Europe completed on land by a cable termination station in London. The total cost for the cable system is $650 million. WACS was originally known as the Africa West Coast Cable (AWCC) and was planned to branch to South America but this was dropped and the system eventually became the West African Cable System.

<span class="mw-page-title-main">Africa Coast to Europe (cable system)</span> Optical-fiber submarine cable system

Africa Coast to Europe (ACE) is an optical-fiber submarine cable system serving 24 countries on the Europe, west coast and south Africa, managed by a consortium of 20 members.

The GLO-1 (Globacom-1) submarine communications cable is a cable system along the west coast of Africa between Nigeria and the UK, owned by Nigerian telecoms operator Globacom.

<span class="mw-page-title-main">National broadband plan</span>

Broadband is a term normally considered to be synonymous with a high-speed connection to the internet. Suitability for certain applications, or technically a certain quality of service, is often assumed. For instance, low round trip delay would normally be assumed to be well under 150ms and suitable for Voice over IP, online gaming, financial trading especially arbitrage, virtual private networks and other latency-sensitive applications. This would rule out satellite Internet as inherently high-latency. In some applications, utility-grade reliability or security are often also assumed or defined as requirements. There is no single definition of broadband and official plans may refer to any or none of these criteria.

<span class="mw-page-title-main">Gulf Bridge International</span>

Gulf Bridge International (GBI) is the Middle East's first privately owned submarine cable system linking the countries bordering the Persian Gulf on a self-healing ring to each other and onward to Europe, Africa and Asia. Gulf Bridge International (GBI), both owns and operates this submarine cable asset as a carrier's carrier as well as offering a full suite of wholesale transmission, IP capacity options, and Enterprise Services. Its main headquarters are located at the Qatar Science & Technology Park in Doha, Qatar.

Africa World Airlines Limited (AWA) is a Ghanaian airline company that was incorporated in 2010 and commenced flights in 2012. It has its head office in Airport City Accra, and its main hub at Kotoka International Airport in Accra.

<span class="mw-page-title-main">WASACE</span>

WASACE was a planned system of submarine communications cables consisting of four sections with a total length of 29,000 km linking four continents.

Funke Opeke is a Nigerian electrical engineer, founder of Main Street Technologies and Chief Executive Officer of Main One Cable Company, a communications services company based in Lagos State, south-western Nigeria.