SEA-ME-WE 3

Last updated

SEA-ME-WE 3
Cable typeFibre-optic
Construction beginning1997
Construction finished2000;23 years ago (2000)
Design capacity0.02 Tbit/s (1999)
0.96 Tbit/s (2007)
1.28 Tbit/s (2009)
4.6 Tbit/s (2015)
Lit capacity2.3 Tbit/s per pair (two fibre pairs)
Owner(s)92 Party Consortium (5 Suppliers)
Website http://www.smw3.com/ http://www.seamewe3.net/

SEA-ME-WE3 or South-East Asia - Middle East - Western Europe 3 is an optical submarine telecommunications cable linking those regions and is the longest in the world. Completed in late 2000, it is led by France Telecom and China Telecom, and is administered by Singtel, a telecommunications operator owned by the Government of Singapore. The Consortium is formed by 92 other investors from the telecom industry. It was commissioned in March 2000.

Contents

It is 39,000 kilometres (24,000 mi) in length [1] and uses wavelength-division multiplexing (WDM) technology with Synchronous Digital Hierarchy (SDH) transmission to increase capacity and enhance the quality of the signal, especially over long distances (this cable stretches from North Germany to Australia and Japan).

According to the cable system network administrator's website, the system capacity has been upgraded several times. The cable system itself has two fibre pairs, each carrying (as of May 2007) 48 wavelengths of 10 Gbit/s. [2]

In December 2009, the 4th 10G Upgrade increased WDM channels from 48 to 64 per fibre pair. [3] [4]

On 1 Jan 2015, the 5th Capacity Expansion was distributed to all the owners. Data capacity of the submarine network is increased significantly with 100G technologies. [5]

Landing points

The route (in red) and landing points (numbered in black) SEA-ME-WE-3-Route.png
The route (in red) and landing points (numbered in black)

It has 39 landing points which are in:

  1. Norden, Germany
  2. Ostend, Belgium
  3. Goonhilly, United Kingdom
  4. Penmarch, France
  5. Sesimbra, Portugal
  6. Tetuan, Morocco
  7. Mazara del Vallo, Italy
  8. Chania, Greece
  9. Marmaris, Turkey
  10. Yeroskipou, Cyprus
  11. Alexandria, Egypt
  12. Suez, Egypt
  13. Jeddah, Saudi Arabia
  14. Djibouti, Djibouti
  15. Muscat, Oman
  16. Fujairah, United Arab Emirates
  17. Karachi, Pakistan
  18. Mumbai, India
  19. Kochi, India
  20. Mount Lavinia, Sri Lanka
  21. Pyapon, Myanmar
  22. Satun, Thailand
  23. Penang, Malaysia
  24. Medan, Indonesia
  25. Tuas, Singapore
  26. Jakarta, Indonesia
  27. Perth, Australia
  28. Mersing, Malaysia
  29. Tungku, Brunei
  30. Da Nang, Vietnam
  31. Batangas, Philippines
  32. Taipa, Macau
  33. Deep Water Bay, Hong Kong
  34. Shantou, China
  35. Fangshan, Taiwan
  36. Toucheng, Taiwan
  37. Shanghai, China
  38. Geoje, South Korea
  39. Okinawa, Japan

History

In December 1994, a Memorandum of Understanding (MOU) was signed by 16 Parties for the development of the SEA-ME-WE3 project between Western Europe and Singapore. In November 1996, additional MOUs were signed to extend the system from Singapore to the Far East and to Australia. Finally in January 1997, the Construction and Maintenance Agreement for SEA-ME-WE3 was signed by 92 International Carriers. By end-2000 the entire network was completed.

Service disruptions

In July 2005, a portion of the SEA-ME-WE3 submarine cable located 35 kilometres (22 mi) south of Karachi that provided Pakistan's major outer communications became defective, disrupting almost all of Pakistan's communications with the rest of the world, and affecting approximately 10 million Internet users. [6] [7] [8]

On 26 December 2006 this link severed, causing major disruption to internet services to and from the Far East. The cause of this was suspected to be a magnitude 7.1 earthquake off the coast of Taiwan. It was stated that the link would take 3 weeks to repair. [9]

On 30 January 2008 an apparent ship's anchor off Egypt's Alexandria coast is thought to have cut the newer SEA-ME-WE 4 cable, which is intended to provide redundancy, causing slow Internet connections and disruption to international calls to the U.S. and Europe from the Middle East and South Asia. Over 70 percent of the network in Egypt was down. Although central to India's largest carrier, Bharat Sanchar Nigam Limited, the deputy-director general of that organisation said "Only 10 to 15 percent of our connectivity with the international gateway faced problems". [10]

On 19 December 2008, the cable was again severed, simultaneously with SEA-ME-WE 4, the FLAG FEA cable, and the GO-1 cable. [11] [12]

On 25 December 2011, the cable was again severed. See also 2011 submarine cable disruption.

On 10 January 2013, the cable was again severed, this time 1,126 kilometres from the Tuas Cable Landing Station in Singapore, between repeaters 345 and 346. [13] The repair ship ASEAN Explorer was sent to the site. A permit was required from the Indonesian Authorities to effect repairs: on 3 March 2013 it was reported that "The cable ship operator has advised that the required permit to undertake works has not been granted. A tentative repair date of 09 April 2013 has been posted but still position isn't clear when it will get restore". [14]

On 30 November 2014, the cable again experienced a problem in the Jakarta to Perth sector. ASEAN Explorer appeared onsite of the cable breakage point on 24 December 2014 which involved over a week of repairs. Cable was restored on 1 January 2015. [15]

On 8 January 2015, the cable once again experienced problems on the Perth to Jakarta Section. [16]

On 15 September 2015 the cable was again cut at segment 3.3 causing significant disruption to services from Australia to Singapore. Service disruptions caused particular impact for Apple customers due to the release of the iPhone 6, iOS9 and OSX just prior to the cable cut. Apple's services were reported as being crippled for Telstra customers but the impact was noticeable for all other Australian ISP's. [17] This disruption was expected to be repaired sometime after mid October 2015. [18] This was the third time that the cable had been cut in this segment in just over two and a half years.

On 25 September 2015 at 03:07 UTC, the cable once again experienced problems at SEA-ME-WE3's S3.3 (Perth-BU) at about 1143 km from Tuas cable station (between repeater R346 and R345). [19] This was the same location as where the previous problem occurred, which took 3 months for Indonesian authorities to permit a cable ship to repair the damage. On 29 September 2015, it was advised that a cable ship had been mobilized to the area, [20] to isolate and resolve the fault, with a tentative fix date of mid to late October 2015, however due to the complexity of repairing cables, this time frame was only an estimated time frame for a fix.

On 27 September 2015 at 01:49 UTC, further faults were identified in the cable in SEA-ME-WE3's S3.1. The fault location was at 360 km from Ancol Cable Station (between repeater R108 & R109)., [21] cable ship ASEAN Explorer was mobilised to this location.

On 11 December 2016 at 9:30 AEST, Vocus Group confirmed that SEA-ME-WE3 failed due to a cable cut 1125 km from the Singapore Tuas Cable Landing Station. The ASEAN Explorer arrived at the location of the cable fault on 10 January 2017. A tentative repair window from 11–14 January 2017 was scheduled, subject to permit approvals. On 16 January 2017 Vocus advised that the repair works to SEA-ME-WE3 had been completed and all Ethernet and transit traffic in and out of Singapore has been restored. [22]

On 29 August 2017 Vocus Group confirmed a cable break on the Perth to Singapore segment (S3.3). On 27 September 2017, Cable Ship ASEAN Explorer confirmed a "shunt fault" on the insulating material either caused by ship anchors or sea currents. On 3 October 2017, a new issue was detected. On 16 October 2017, ASEAN Explorer completed repairs on the cable, and traffic was restored. [23] [24]

On 3 December 2017 at 10:24 AEST, Vocus Group confirmed that SEA-ME-WE3 suffered a fault approximately 1126 km from the cable landing station in Singapore. Vocus confirmed that the break had been fixed as of 01:24 UTC 15 January 2018. [25]

On 11 May 2018 at 09:58 AEST, Vocus Group confirmed that SEA-ME-WE3 suffered two shunt faults approximately 28 km (in a deep trench which would require mobilisation of specially designed cable barge with deep de-trenching tool capability to perform recovery [26] ) and 231 km from the cable landing station in Singapore (S3.3). Vocus confirmed that the break had been fixed as of 1 June 2018. [27]

On 4 September 2018 at 09:34 AEST, Vocus Group confirmed that SEA-ME-WE3 had a fault on the segment between Perth and Singapore. [28] This disruption led to the Australia Singapore Cable [29] being brought into service ten days early. [30] [31]

On 26 October 2018 at 11:35 AEST, iiNet Group reported that SEA-ME-WE3 was down again. [32] No status update has been posted by Vocus so far, however a post exists claiming that there was a possible cable fault from Perth Station to a branching unit between repeaters R342 and R343. [33]

On 20 September 2019 at 11:58 AEST, iTnews [34] reported that the Perth to Singapore portion of the cable had been cut between repeaters 345 and 346.

Interception

In August 2013 a major German newspaper claimed that an alliance of Western and Asian intelligence agencies has managed to tap into the cable. The Süddeutsche Zeitung , Germany's largest broadsheet newspaper, wrote that GCHQ has been leading the interception effort, supported by the National Security Agency, which is GCHQ's American equivalent. The paper cited Edward Snowden as the source of the information. [35] [36] Australian media subsequently revealed that Australia's Defence Signals Directorate (DSD) also participates in the undersea cable interception operation, sharing massive amounts of intercepted data with its British and American counterparts: The Age said that the Australian interception activity is facilitated with the help of the Security and Intelligence Division of Singapore's Ministry of Defense. [37]

SEA-ME-WE 2

SEA-ME-WE3 was based on the success of the earlier shorter cable SEA-ME-WE2. At the time of commissioning, 18 October 1994, SEA-ME-WE2 was the world's longest optical fibre submarine cable system at 18,751 km. The cable has two single mode fibre pairs with a combined capacity of 1.12 Gbit/s, (2*560 Mbit/s), 151 repeaters and 9 branches. [38]

SEA-ME-WE 2
Cable typeFibre-optic
PredecessorSEA-ME-WE
SuccessorSEA-ME-WE 3
Construction finishedOctober 1994
Design capacity1.12 Gbit/s
Lit capacity0.56 Gbit/s per pair (two fibre pairs)
DefunctOctober 2006
Owner(s)Consortium (52 Owners)

Countries Linked

SEA-ME-WE

The SEA-ME-WE cable history started in June 1985 when the first 12/25 MHz capacity, 13.500 km long SEA-ME-WE cable llcommissioned using analog/copper technology. SEA-ME-WE cable was decommissioned in June 1999.

See also

Several other cable systems following a substantially similar route to SEA-ME-WEA 3 between Asia and Western Europe:

Related Research Articles

<span class="mw-page-title-main">Submarine communications cable</span> Transoceanic communication line placed on the seabed

A submarine communications cable is a cable laid on the seabed between land-based stations to carry telecommunication signals across stretches of ocean and sea. The first submarine communications cables laid beginning in the 1850s carried telegraphy traffic, establishing the first instant telecommunications links between continents, such as the first transatlantic telegraph cable which became operational on 16 August 1858.

<span class="mw-page-title-main">SAT-3/WASC</span>

SAT-3/WASC or South Atlantic 3/West Africa Submarine Cable is a submarine communications cable linking Portugal and Spain to South Africa, with connections to several West African countries along the route.

Fibre-optic Link Around the Globe (FLAG) is a 28,000-kilometre-long fibre optic mostly-submarine communications cable that connects the United Kingdom, Japan, India, and many places in between. The cable is operated by Global Cloud Xchange, a subsidiary of RCOM. The system runs from the eastern coast of North America to Japan. Its Europe–Asia segment was the fourth longest cable in the world in 2008.

<span class="mw-page-title-main">SEA-ME-WE 4</span> Submarine communications cable system

South East Asia–Middle East–Western Europe 4 is an optical fibre submarine communications cable system that carries telecommunications between Singapore, Malaysia, Thailand, Bangladesh, India, Sri Lanka, Pakistan, United Arab Emirates, Saudi Arabia, Egypt, Italy, Tunisia, Algeria and France. It is intended to be a complement to, rather than a replacement for, the SEA-ME-WE 3 cable.

APCN 2 or Asia-Pacific Cable Network 2 is a submarine telecommunications cable linking several countries in the Asia-Pacific region.

<span class="mw-page-title-main">2006 Hengchun earthquakes</span> Earthquakes and tsunami near Taiwan

The 2006 Hengchun earthquakes occurred on December 26 at 20:26 and 20:34 local time off the southwest coast of Taiwan in the Luzon Strait, which connects the South China Sea with the Philippine Sea. The International Seismological Centre measured the shocks at 7.0 and 6.9 on the moment magnitude scale. The earthquakes not only caused casualties and building damage, but several submarine communications cables were cut, disrupting telecommunication services in various parts of Asia.

<span class="mw-page-title-main">Nextgen Networks</span> Australian communications company

Nextgen Networks is a wholly owned subsidiary of Vocus Group.

PacRimWest was a twin-pair 560Mbit/s optical submarine telecommunications cable which served as Australia's main link to the world along with its partner cables Tasman2 and PacRimEast.

<span class="mw-page-title-main">Vocus Group</span> Australian telecommunications company

Vocus Group Limited, formerly known as Vocus Communications, is an international telecommunications company headquartered in North Sydney, Australia. Founded by James Spenceley as a wholesale, business, government and consumer telecommunications provider, Vocus owns and manages Australia's second largest intercapital fibre network. Vocus provides retail, wholesale and corporate telecommunications services across Australia and New Zealand. Vocus offers data network services such as Internet, dark fibre, IP WAN, unified communications and telephony and cloud services to mid, large and corporate businesses direct and also acts as a wholesaler. The company owns and operates 18 data centres across Australia and New Zealand and has an onshore network operations centre run by the engineers who built the network.

The 2008 submarine cable disruption refers to three separate incidents of major damage to submarine optical communication cables around the world. The first incident caused damage involving up to five high-speed Internet submarine communications cables in the Mediterranean Sea and Middle East from 23 January to 4 February 2008, causing internet disruptions and slowdowns for users in the Middle East and India. The incident called into doubt the safety of the undersea portion of the Internet cable system.

SHEFA-2 is an undersea communication cable linking the Faroe Islands to mainland Scotland via the Northern Isles. It is named after the route on which it is being deployed (SHEtland-FAroes) and succeeds an earlier cable called SHEFA-1 on the same route.

<span class="mw-page-title-main">SEACOM (African cable system)</span> African submarine communications cable

SEACOM launched Africa's first broadband submarine cable system along the continent's Eastern and Southern coasts in 2009. SEACOM is privately owned and operated.

PIPE Pacific Cable (PPC-1) is a 6,900 km submarine cable laid by PIPE Networks. It runs from Cromer, New South Wales, in Australia, to Piti, Guam.

The Asia-America Gateway (AAG) is a 20,000-kilometre (12,000 mi) long submarine communications cable system, connecting South-East Asia with the mainland of the United States, across the Pacific Ocean via Guam and Hawaii.

<span class="mw-page-title-main">Telin</span> Indonesian carrier services and investment company

PT Telekomunikasi Indonesia International or Telkom International, and commonly abbreviated as Telin, is an Indonesian carrier services and investment company and is a wholly owned subsidiary of Telkom Indonesia. It is an international telecommunication business serves as Telkom's business arms in managing and developing its business lines outside Indonesia.

<span class="mw-page-title-main">SEA-ME-WE 5</span> Underwater communications cable system

South East Asia–Middle East–Western Europe 5 is an optical fibre submarine communications cable system that carries telecommunications between Singapore and France. The cable is approximately 20,000 kilometres long and provides broadband communications with a design capacity of 24 terabits per second between South East Asia, the Indian subcontinent, the Middle East and Europe.

The Australia Singapore Cable (ASC) is a 4,600 km fibre-optic submarine communications cable that entered service in September 2018, linking Australia and Singapore via Christmas Island and Indonesia. ASC is owned and operated by Vocus Communications and interconnects with the Vocus Australian domestic optical fibre network at the Australian landing site in Perth. The ASC consists of four fibre pairs and, at launch, had a total design capacity of 40 terabits per second.

South East Asia–Middle East–Western Europe 6 is an in-progress optical fibre submarine communications cable system that would carry telecommunications between Southeast Asia, the Middle East, and Western Europe. It is estimated to cost between $65 million and US$72 million. Bangladesh, Singapore, Malaysia, Indonesia, Thailand, Sri Lanka, India, Pakistan, Saudi Arabia, Qatar, Oman, the UAE, Djibouti, Egypt, Turkey, Italy, France, Myanmar and Yemen are members of the SEA-ME-WE-6 Consortium. It will run from Singapore to France and will have a bandwidth of 120 Tbps. Once completed, It will be 19,200 km long. Work on SEA-ME-WE 6 began in early 2022. It is expected to be in operation in the first quarter of 2025. In Saudi Arabia, its landing point will be the Mobily landing station in the city of Yanbu.

The Oman Australia Cable (OAC) is a 9,800 km fibre-optic submarine communications cable that entered service in September 2022, linking Oman and Australia via the Cocos (Keeling) Islands. The cable consists of three fibre pairs and had an initial design capacity of 39 terabits per second.

References

whirlpool topic

  1. "Background". SEA-ME-WE 3. n.d. Archived from the original on 26 October 2012. Retrieved 31 October 2012.
  2. "Background". SEA-ME-WE 3. n.d. Archived from the original on 26 October 2012. Retrieved 13 January 2009.
  3. The main trunk shall contain at least 2 fibre pairs and each fibre pair shall be capable of operating at a minimum of 10Gbit/s, providing a minimum of 64 Basic System Payload Modules in each fibre pair. "Standard IRU Agreement" (PDF). SEA-ME-WE 3. 30 November 2012. p. 23. Archived from the original on 3 March 2016.{{cite web}}: CS1 maint: bot: original URL status unknown (link)
  4. SEA-ME-WE 3 4th 10G Upgrade (Dec 2009) "Capacity Upgrade of In-service Systems using WDM Technology" (PDF). Fujitsu. 23 April 2014. p. 12.
  5. "Background". SEA-ME-WE 3. n.d. Archived from the original on 26 October 2012. Retrieved 15 February 2016.
  6. Pakistan Times | Top Story: Standby Net arrangements terminated in Pakistan Archived 13 February 2011 at the Wayback Machine
  7. "Communication breakdown in Pakistan". The Sydney Morning Herald. 29 June 2005.
  8. "Pakistan cut off from the world". The Times of India . 28 June 2005. Archived from the original on 22 October 2012.
  9. "Asia phone links start to recover". BBC News. 28 December 2006.
  10. "Bloomberg Politics - Bloomberg". Bloomberg.com. 11 August 2023. Retrieved 11 August 2023.
  11. "Severed Cables in Mediterranean Disrupt Communication". Bloomberg. 19 December 2008.
  12. "GO submarine cable fault part of wider disruption between Italy and Egypt". Times of Malta. 19 December 2008.
  13. "Perth-Singapore cable severed". iTnews. 15 January 2013.
  14. "Event 2295154 | iiNet Network Status - Internet Service". www.iinet.net.au. Retrieved 11 August 2023.
  15. "Event 3669107 | iiNet Network Status - Internet Service". www.iinet.net.au. Retrieved 11 August 2023.
  16. "Event 3757465 | iiNet Network Status - Internet Service". www.iinet.net.au. Retrieved 11 August 2023.
  17. "Cut submarine cable cripples Apple services for Telstra customers".
  18. Cable cripples Apple servicessubtelforum.com Archived 7 October 2015 at the Wayback Machine
  19. "Event 4351219 | iiNet Network Status - Internet Service | Internet Service | iiNet Australia". www.iinet.net.au. Archived from the original on 21 July 2018. Retrieved 28 September 2015.
  20. Internode. "Internode :: Support :: Network Status and Advisories". advisories.internode.on.net. Retrieved 29 September 2015.
  21. iiNet. "Whirlpool Forums - iiNET subforum" . Retrieved 29 September 2015.
  22. Vocus Group. "Vocus Group - Incident Summary" . Retrieved 13 December 2016.
  23. Vocus Group. "Vocus Group - Incident Summary" . Retrieved 18 October 2017.
  24. Crozier, Ry (30 August 2017). "Aussie internet pain after Asian subsea cables cut". iTNews. Retrieved 15 November 2018.
  25. "Vocus Status". status.vocus.com.au. Retrieved 15 January 2018.
  26. "OVH Network Status". status.ovh.com. Retrieved 25 May 2018.
  27. "Vocus Status". status.vocus.com.au. Retrieved 2 August 2018.
  28. "Vocus Status". status.vocus.com.au. Retrieved 4 September 2018.
  29. "What will happen when SEA-ME-WE3 can't continue to serve us…". Vocus. 20 December 2017. Archived from the original on 13 March 2018. Retrieved 6 September 2018.
  30. "New Perth to Singapore internet cable comes to the rescue". Sydney Morning Herald. Fairfax Media. 5 September 2018. Archived from the original on 6 September 2018. Retrieved 6 September 2018.
  31. Bushell-Embling, Dylan (6 September 2018). "Vocus lights up ASC early due to cable cut". Technology Decisions. Westwick-Farrow Pty Ltd. Archived from the original on 6 September 2018. Retrieved 6 September 2018.
  32. "#6116897 - Perth to Singapore Int'l Link Down". forums.whirlpool.net.au. Retrieved 26 October 2018.
  33. "线路爆炸". tgstat.com (in Chinese). Retrieved 26 October 2018.
  34. "Major Perth-to-Singapore submarine cable cut". iTnews. Retrieved 26 September 2019.
  35. Süddeutsche Zeitung, 28 August 2013 (accessed 30.8.2013)
  36. John Goetz, Hans Leyendecker and Frederik Obermaier (28 August 2013). "British Officials Have Far-Reaching Access To Internet And Telephone Communications" (accessed 30.8.2013)
  37. The Age, 29 August 2013 (accessed 30.8.2013)
  38. Anton A. Huurdeman (31 July 2003). The Worldwide History of Telecommunications. John Wiley & Sons. pp. 462–. ISBN   978-0-471-20505-0 . Retrieved 19 February 2013.
  39. "Tasman Global Access (TGA) Cable". Submarine Cable Map. Retrieved 10 July 2017.