SR U class [1] | |||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||
|
The SR U class are 2-6-0 steam locomotives designed by Richard Maunsell for passenger duties on the Southern Railway (SR). The class represented the penultimate stage in the development of the Southern Railway's 2-6-0 "family", which improved upon the basic principles established by GWR Chief Mechanical Engineer (CME) George Jackson Churchward for Great Western Railway (GWR) locomotives. [2] The U class design drew from experience with the GWR 4300s and N classes, improved by applying Midland Railway ideas to the design, enabling the SECR to influence development of the 2-6-0 in Britain. [3]
The U class was designed in the mid-1920s for production at a time when more obsolete 4-4-0 locomotives were withdrawn, and derived from Maunsell's earlier SECR K (“River”) class 2-6-4 tank locomotives. The first 20 members of the U class were rebuilds of the K class locomotives, one of which was involved in the Sevenoaks railway accident. A further 20 U class locomotives were built in 1928 to fill the gap in cross-country and semi-fast express passenger services after the withdrawal of the K class. The design also continued the standardisation of the Southern Railway locomotive fleet by using parts designed to be interchangeable with other Maunsell-designed classes.
A total of 50 locomotives were built over three batches between 1928 and 1931, and the design formed the basis for the 3-cylinder U1 class of 1928. They were able to operate over most of the Southern Railway network, gaining the nickname "U-boats" after the submarine warfare of the First World War, and continued to operate with British Railways (BR). The class saw continuous use until 1966, when all members of the U class were withdrawn from service. [4] Four U class locomotives have been preserved on two heritage railways in the south of England. [5]
The history of the U class is complex as it is linked to the fate of the 2-cylinder K ("River") class 2-6-4 tank locomotives. The design work for a new passenger 2-6-0 with 6 ft (1.83 m) driving wheels was complete by 1927, when the involvement of a K class locomotive in the Sevenoaks rail crash presented an opportunity to bring forward construction of the class. [6] The K class tank engines were the passenger counterpart to the N class 2-6-0 mixed-traffic design, and were noted for rough-riding over the cheaply laid track of the former SECR. [7] The class was withdrawn from service, and the inquiry that followed determined that the rough-riding contributed to the crash. [6] Its recommendation was that the K class should be rebuilt to 2-6-0 tender locomotives, using tried and tested features used by Maunsell and his assistant, the former GWR engineer Harold Holcroft on the N class. [8]
The N class principles applied to the U class design aided mass production, and incorporated several features found on the GWR 4300 Class locomotives designed by Churchward. [7] An order made in 1926 for a second batch of 20 K class locomotives was delayed until 1928, when the specification was revised to construct U class locomotives. [6] It was intended to replace several elderly 4-4-0 classes within the former SECR's running fleet, and attempted to standardise and ease maintenance of locomotives by sharing parts with other Maunsell designs. [3] The style of the new locomotive reflected the Midland Railway influence of another of Maunsell's assistants, the ex-Midland Railway engineer James Clayton. [9] The addition of a tender increased the operating range of the U class over its K class predecessors, and the wheel arrangement applied to the former K class locomotives improved the locomotive's stability when operational. [2]
The rebuilding programme that followed the derailment of K class No. A800 "River Cray" at Sevenoaks began at Ashford works in June 1928. The work involved in converting a 2-6-4 tank engine to a 2-6-0 tender locomotive included the removal of the side water tanks, rear coal bunker and trailing axles, although the 6 ft (1.83 m) driving wheels, right-hand drive and N class–type boiler were retained. [10] The aesthetic aspects inherited from the K class were the former Midland Railway engineer James Clayton’s contributions to the design, creating a simple, functional locomotive similar to the N class. [7]
The rebuilt locomotives were given a tender and a re-designed cab that bore a strong resemblance to those featured on designs by Henry Fowler. [9] Two designs of Maunsell tender were used, the straight-sided 3,500 imperial gallons (15,911 L) variety, and the larger 4,000-imperial-gallon (18,184 L) design used on later batches of the N class with inward-sloping raves to prevent coal spillage. [7] The first rebuild was No. A805 River Camel, which also became the first U class locomotive into service in March 1928, three months before the first production locomotive under construction at Brighton. [7] The rapid turnaround was achieved as design work was already in place, and the rebuilding of existing locomotives was cheaper than building from scratch. [8]
No. A805 was put on performance trials prior to work commencing on rebuilding of the rest of the class at Brighton and Eastleigh works. The rebuilds lost their names because of the bad publicity attached to the "River" class after the 1927 crash, and the heavily damaged No. A800 was the last member of the K class to be rebuilt to U class configuration in December 1928. [8] The unique 3-cylinder "River" tank, K1 class No. A890 River Frome was also rebuilt to the general U class specification, becoming the prototype of Maunsell's 3-cylinder U1 class derivative in June 1928. [11]
Construction of the delayed 1926 order for 20 K class locomotives began in 1928 after alteration to the U class specification. As a result of Harold Holcroft's position as one of Maunsell's assistants, the new-builds also displayed the Churchward GWR 4300 Class influence. [12] The ideas applied to this class were already used on the N, N1 and K class rebuilds, including long-travel valves for fast running, Belpaire firebox and conical boilers, constructed at the North British Locomotive Works in Glasgow. [12] The first of the production batch emerged from Brighton works in August 1928 and featured a tapered chimney and smokebox snifting valves, both of which were used on the K and N class locomotives. [1]
The 20 locomotives of the first production batch were split equally between Brighton and Ashford works, and all were completed by December 1929. [1] The production locomotives had a slightly different profile to the K class rebuilds and featured left-hand drive to improve the visibility of signals from the driver's side of the footplate. They also had higher running plates along the sides of the boiler than the rebuilds, which required smaller wheel splashers to cover the tops of the driving wheels. [8] Another variation was the flatter top to the dome covers, as the rebuilds retained the high N class type used on the K class. [8]
In common with the N, N1 and K class locomotives, the Midland Railway influence of Clayton showed in the placement of locomotive fittings on the production batch, as the water top-feed into the boiler was located inside a dome, whilst the cab area was a modified version of those on the 0-6-0s of Henry Fowler and the K class rebuilds. [9] The rebuilds had Midland Railway-style double spectacle plates (the small windows on the front face of the cab) left over from the K class cabs, whereas the production versions had one each side of the boiler. [1] Such modifications were becoming typical of the Southern Railway's attempt to produce a fleet of standardised locomotives. [7] However, all members of the U class were to vary from GWR practice, as the superheating surface area was increased, and all were equipped with outside Walschaerts valve gear. [9]
The second batch of ten new-build U class locomotives was constructed between February and May 1931 when more obsolete locomotives were withdrawn from service. This brought the total of new-build locomotives to 30, and the total number of operational U class engines to 50. [10] The new batch also featured detail differences from the rest of the class, such as the arrangement of the footsteps at the front of the locomotive, though continued to use the standard left-hand drive cab layout to improve the driver's forward vision from the cab. Smoke deflectors were fitted to the whole class from 1933 to prevent drifting smoke from obscuring forward vision. [7] The smokebox snifting valves applied to the class by Maunsell were removed by his successor Oliver Bulleid, who also fitted U1 class chimneys to improve the draughting. [10]
The U class was a reliable and economical design more than capable of attaining speeds in excess of 70 mph (110 km/h) as a result of being fitted with long-travel valves. [13] They had high capacity, tapered boilers which promoted free steaming, and 6 ft (1.83 m) driving wheels which allowed fast running over long distances. [13] They were distributed more widely than their N class counterparts, although one drawback in operating the class was the size of the cylinders and cab, which meant the U class was out of gauge for the Tonbridge-Hastings line due to inadequate clearances in tunnels along the route. [12] Otherwise, their "go anywhere" nature earned them the nickname of "U-boats", and crews praised their abilities to achieve what they were designed to do. [1]
The Southern Railway operating department undertook trials to improve fleet efficiency. When built, Eastbourne-based No. A629 was fitted with an experimental pulverised fuel burner of German design; the experiment was terminated when a minor explosion was caused by the powdered coal coming into contact with sparks thrown from the blastpipe. The experiment also proved that pulverised coal was a false economy, as much of the fine dust was sucked through the chimney without combustion taking place. The locomotive was returned to normal coal burning in 1935. [1] In 1947 the class became a test-bed for a government-backed scheme regarding fuelling arrangements in anticipation of a coal shortage. [10] Two of the class, Nos. 1625 and 1797, were converted to oil burning, with more set to follow suit; but the project was abandoned and the two oil burners were reverted to coal-firing before this could take place. [1]
All members of the class entered British Railways service in 1948, and from 1955 23 of the U class received chimneys of the British Railways Standard Class 4 variety and replacement cylinders, which had become worn through intensive use. [13] A few members of the class were given replacement frames at overhaul with a shallower curve between the front buffer beam and smokebox. During the early 1960s, the withdrawal of the ageing T9 class designed by Dugald Drummond saw the U class replacing them on services west of Exeter, though their large wheels offered little advantage on the steeper gradients that characterised this part of the railway network. [1] The favoured form of 2-6-0 motive power west of Exeter was the smaller-wheeled N class, while heavier passenger work was allocated to Bulleid's Unrebuilt Light Pacifics, which were within the weight restrictions imposed in this area. [1] The U class represented one of the less glamorous classes of passenger locomotive due to the fact that they were used mainly on mixed-traffic and secondary passenger duties.
The class were withdrawn between 1962 and 1966.
Year | Quantity in service at start of year | Quantity withdrawn | Locomotive numbers |
---|---|---|---|
1962 | 50 | 2 | 31610/30. |
1963 | 48 | 14 | 31611–12/14–15/23/31/33–37, 31794–95, 31805. |
1964 | 34 | 24 | 31613/16–18/21–22/24–26/28–29/32/38, 31792–93/96–98, 31801–02/04/06–08. |
1965 | 10 | 6 | 31619–20/27, 31790/99, 31800. |
1966 | 4 | 4 | 31639, 31791, 31803/09. |
Four members of the class have been preserved, two built at Ashford Works and two built at Brighton Works. All four surviving U Classes have steamed at some point in preservation and out of these four locomotives, 31625 and 31806 have worked on the mainline. 31806 went out for its loaded test run on Fri 13 Apr 2018 running from Wareham to Yeovil Junction via Weymouth and hauled its inaugural railtour "The Great Britain XI" from Yeovil Junction to Swanage on Thur 26 Apr 2018. No 1638 steamed for the first time in preservation in February 2006 on the Bluebell Railway. [17]
Note: Loco numbers in bold mean their current number.
Number | Builder | Built | Withdrawn | Service Life | Tender Fitted | Location | Livery | Owner | Status | Image | |
---|---|---|---|---|---|---|---|---|---|---|---|
1618 | 31618 | Brighton Works | Oct 1928 | Jan 1964 | 35 Years, 3 months | 3,500 Gal | Bluebell Railway | BR Black, Late Crest | Maunsell Locomotive Society. | Static display (at Sheffield Park shed) awaiting overhaul.Last operational in 1994 and was the second locomotive to leave Barry Scrapyard in January 1969. | |
1625 | 31625 | Ashford Works | Mar 1929 | Jan 1964 | 34 Years, 10 months | 4,000 Gal | Swanage Railway | BR Black, Late Crest | John Bunch. | Stored near Corfe Castle station. | |
1638 | 31638 | Ashford Works | May 1931 | Jan 1964 | 32 Years, 8 months | 4,000 Gal | Bluebell Railway | SR Olive Green | Owned by the Bluebell Railway, on long-term loan to the Maunsell Society. | Static display (at Horsted Keynes) awaiting overhaul.Last operational 4 July 2015. | |
1806 | 31806 | Brighton Works | Jun 1928 | Jan 1964 | 35 Years, 7 months | 3,500 Gal | Swanage Railway | BR Lined Black, Late Crest | John Bunch. | Operational, mainline certified.Returned to service in 2021, the only survivor of the K class rebuilds. [5] | |
From 1928, the entire class was painted in Maunsell's lined Southern Railway Olive green with yellow markings and "Southern" on the tender. [1] During the Second World War, the U class was painted in wartime black livery with Oliver Bulleid's Sunshine yellow lettering, and some were later painted in lined Malachite green livery. The class was initially numbered in the Southern Railway's post-grouping system from A790–A809 for the K class rebuilds, and A610–A639 with the production batches. The "A" in the numbering system denotes Ashford, where the locomotive design had originated. Southern numbering policy was eventually rationalised, [18] the other U class locomotives were subsequently renumbered to 1790–1809, and 1610–1639 at the same time. [5]
The entire class was absorbed by British Railways in 1948, and was given the Power classification 4P3F, denoting a mixed traffic locomotive. [13] Livery was initially similar to the Southern Railway, though with "British Railways" on the tender, and an "S" prefix to the Southern number. This was succeeded by the British Railways mixed-traffic lined black livery with red, cream and grey lining and the British Railways crest on the tender. [13] The British Railways standard numbering system was used to replace the Southern Railway system, and the class was allocated the series 31790–31809 for the K class rebuilds, and 31610–31639 for the rest. [19]
The SR Z class was an 0-8-0T 3-cylinder tank engine designed by Richard Maunsell and intended for heavy shunting on the Southern Railway, the first eight entering into service in 1929. It was a successful design and would have been built in greater numbers, but an order for a further ten was cancelled in 1930 due to the reduction in freight traffic as a result of the Great Depression.
The LSWR/SR H15 class was a class of 2-cylinder 4-6-0 steam locomotives designed by Robert Urie for mixed-traffic duties on the LSWR. Further batches were constructed by Richard Maunsell for the Southern Railway after 1923. They were given the nickname of "Junior King Arthur" due to the size of their driving wheels, with those on the S15 and their N15 counterparts being 5 ft 7 in (1.70 m) and 6 ft 7 in (2.01 m) diameters respectively.
The SR Class W were 3-cylinder 2-6-4T tank engines designed in 1929 by Richard Maunsell for use on the Southern Railway. They were introduced in 1932 and constructed at Eastleigh and Ashford. The class was intended for short distance, inter-company/regional freight traffic transfer in London, and were standardised with parts from the N, N1, U and U1 classes.
The LSWR N15 class was a British 2–cylinder 4-6-0 express passenger steam locomotive designed by Robert Urie. The class has a complex build history spanning three sub-classes and ten years of construction from 1918 to 1927. The first batch of the class was constructed for the London and South Western Railway (LSWR), where they hauled heavy express passenger trains to the south coast ports and further west to Exeter. After the Lord Nelsons, they were the second biggest 4-6-0 passenger locomotives on the Southern Railway. They could reach speeds of up to 90 mph (145 km/h).
The Great Western Railway (GWR) 4300 Class is a class of 2-6-0 (mogul) steam locomotives, designed by G.J. Churchward for mixed traffic duties. 342 were built from 1911–1932.
The SR class LN or Lord Nelson class is a type of 4-cylinder 4-6-0 steam locomotive designed for the Southern Railway by Richard Maunsell in 1926. They were intended for Continental boat trains between London (Victoria) and Dover harbour, but were also later used for express passenger work to the South-West of England. Sixteen of them were constructed, representing the most powerful Southern 4-6-0 design. They were all named after famous admirals.
Charles Benjamin Collett was Chief Mechanical Engineer of the Great Western Railway from 1922 to 1941. He designed the GWR's 4-6-0 Castle and King Class express passenger locomotives.
The LSWR S15 class is a British 2-cylinder 4-6-0 freight steam locomotive designed by Robert W. Urie, based on his H15 class and N15 class locomotives. The class had a complex build history, spanning several years of construction from 1920 to 1936. The first examples were constructed for the London and South Western Railway (LSWR), where they hauled freight trains to the south coast ports and further west to Exeter, as well as occasional passenger work in conjunction with their larger-wheeled N15 class counterparts.
The SR U1 class were three-cylinder 2-6-0 ('mogul') steam locomotives designed by Richard Maunsell for passenger duties on the Southern Railway. The fifth member of the Maunsell "family" of standardised moguls and 2-6-4 locomotives, the U1 was the final development of the Maunsell mogul, and marked a continuation of the basic principles established by CME George Jackson Churchward for the GWR. Developed from Maunsell's previous SR U class design, the U1 class shared characteristics with Churchward's GWR 4300 Class.
The SECR N class was a type of 2-6-0 ("mogul") steam locomotive designed in 1914 by Richard Maunsell for mixed-traffic duties on the South Eastern and Chatham Railway (SECR). Built between 1917 and 1934, it was the first non-Great Western Railway (GWR) type to use and improve upon the basic design principles established by GWR Chief Mechanical Engineer (CME) George Jackson Churchward. The N class was based on the GWR 4300 Class design, improved with Midland Railway concepts.
The SECR N1 class was a type of 3-cylinder 2-6-0 ('mogul') steam locomotive designed by Richard Maunsell for mixed traffic duties, initially on the South Eastern and Chatham Railway (SECR), and later operated for the Southern Railway (SR). The N1 was a development of the basic principles established by the Great Western Railway's (GWR) Chief Mechanical Engineer (CME) George Jackson Churchward and by Maunsell's previous N class design.
The SECR L class was a class of 4-4-0 steam tender locomotive built for express passenger service on the South Eastern and Chatham Railway. Although designed by Harry Wainwright, they were built during the Maunsell era.
The SECR K class was a type of 2-6-4 tank locomotive designed in 1914 by Richard Maunsell for express passenger duties on the South Eastern and Chatham Railway (SECR), which operated between London and south-east England. The Southern Railway (SR) K1 class was a three-cylinder variant of the K class, designed in 1925 to suit a narrower loading gauge. They were among the first non-Great Western Railway (GWR) types to use and improve upon the basic design principles of power and standardisation established by GWR Chief Mechanical Engineer (CME) George Jackson Churchward. The locomotives were based on the GWR 4300 class, improved by the Midland Railway's ideals of simplicity and ease of maintenance.
Harold Holcroft was an English railway and mechanical engineer who worked for the Great Western Railway (GWR), the South Eastern and Chatham Railway (SECR) and the Southern Railway (SR).
The SR Merchant Navy class is a class of air-smoothed 4-6-2 (Pacific) steam locomotives designed for the Southern Railway by Oliver Bulleid. The Pacific design was chosen in preference to several others proposed by Bulleid. The first members of the class were constructed during the Second World War, and the last of the 30 locomotives in 1949.
The Great Southern Railways Classes 372 and 393 were types of 2-6-0 ("mogul") steam locomotives exported to Ireland from Great Britain in 1924. They were designed by Richard Maunsell in 1914 for the South Eastern and Chatham Railway (SECR) to be members of the SECR N class of mixed-traffic engines. The GSR 372 and 393 classes were part of a batch of N and U class locomotive kits produced under a UK Government contract at the Royal Arsenal, Woolwich.
The Southern Railway L1 class was a class of 4-4-0 steam tender locomotives built for express passenger service on the South Eastern Main Line of the UK Southern Railway. They were designed by Richard Maunsell as a development of Harry Wainwright's L class.
The GS&WR 400 class or CIE class B2/B2a were a class of ten 4-6-0 steam locomotives built for the Great Southern & Western Railway (GS&WR) between 1916 and 1923 for express passenger duties on the Dublin to Cork main line. They proved initially unreliable but rebuilds from four to two cylinders between 1927 and 1937 for the seven survivors produced locomotives yielding satisfactory performance with the last two being withdrawn in 1961.
The Great Southern and Western Railway (GS&WR) Class 351 initially consisted of four 0-6-0 tender locomotives designed by Robert Coey for use on heavy freight trains on the main line. They were joined by four similar locomotives built in 1912 introduced by Richard Maunsell, these had detail differences such as larger cabs and higher running plates. They included an extended smokebox to which a Phoenix superheater was briefly trialed but abandoned. They were initially designated GS&WR Class 249 but were subsequently grouped into class 351.