SR Leader class

Last updated

SR/BR Leader class [1]
Leader-05.jpg
Leader locomotive 36001 with test train at Oxted
Type and origin
Power typeSteam
Designer Oliver Bulleid
BuilderSR Brighton Works
Build date19461949
Total produced5 (only one completed)
Specifications
Configuration:
   Whyte 0-6-0+0-6-0 T
   UIC C′C′ h6t
Gauge 4 ft 8+12 in (1,435 mm) standard gauge
Driver dia.5 ft 1 in (1.549 m)
Length67 ft (20.42 m)
Loco weight150 long tons (168 short tons; 152 tonnes)
Fuel type Coal
Fuel capacity4 long tons (4.5 short tons; 4.1 tonnes)
Water cap.4,000 imp gal (18,000 L; 4,800 US gal)
Firebox:
  Grate area25.5 sq ft (2.37 m2)
Boiler pressure280 lbf/in2 (1.93 MPa)
Cylinders Six (Three in each bogie)
Cylinder size 12+14 in × 15 in (311 mm × 381 mm)
Valve gear Bulleid chain driven valve gear
Performance figures
Tractive effort 26,300 lbf (116.99 kN)
Career
Operators
Class SR / BR: Leader
Power classSR / BR: Unknown
Locale Southern Region
Withdrawn1951
DispositionAll scrapped

The Leader was a class of experimental 0-6-0+0-6-0 T steam locomotive, produced in the United Kingdom to the design of the innovative engineer Oliver Bulleid. The Leader was an attempt to extend the life of steam traction by eliminating many of the operational drawbacks associated with existing steam locomotives. It was intended as a replacement for the ageing fleet of M7 class tank engines still in operation on the Southern Railway (SR). [2] Design work began in 1946 and development continued after the nationalisation of the railways in 1948, under the auspices of British Railways (BR).

Contents

The Leader project was part of Bulleid's desire to modernise the steam locomotive based on experience gained with the Southern Railway's fleet of electric stock. [2] Bulleid considered that attitudes towards the labour-intensity of steam operation had changed during the post-war period, favouring dieselisation and electrification. In an effort to demonstrate the continued potential of steam, Bulleid pushed forward the boundaries of steam-power, hoping it could compete with diesel and electric locomotives in terms of labour-saving and ease of operation. [3]

The design incorporated many novel features, such as the use of thermic siphons, bogies and cabs at either end of the locomotive, resulting in its unique—for a steam locomotive—modern diesel-like appearance. Several of its innovations proved to be unsuccessful however, partly accounting for the project's cancellation in the early 1950s. Five Leader locomotives were started, although only one was completed. The operational locomotive was trialled on the former Southern Railway network around Brighton. Problems with the design, indifferent reports on performance and political pressure surrounding spiralling development costs, led to all locomotives of the class being scrapped by 1951.

Background

The basis of the Leader originated from a 1944 review of the Southern Railway's steam locomotive fleet, resulting in a Southern Railway design brief which called for a high-powered locomotive requiring little maintenance to replace the ageing fleet of M7 class tank engines. [2] The brief also stipulated that the locomotive would be used on both passenger and freight trains, requiring high route availability. Bulleid proposed an initial design based on his SR Q1 class locomotive, which had proved easy to maintain in service. [3] As the proposal progressed, Bulleid saw that certain tasks required with conventional steam locomotives could be eliminated by adopting some of the features of the contemporary Southern electric locomotives. [2] However, one of the subsequent designs of a 0-4-4-0 wheel arrangement had an unacceptably high axle-loading of 20 long tons (20.3 tonnes; 22.4 short tons), which increased the risk of damaging the Southern Railway's track. [4] By developing the proposal further, Bulleid settled for a 0-6-0+0-6-0 T design of bogie locomotive, which spread the weight more evenly over the rails and reduced the axle-loading. [5]

Design

Works diagram of the Leader Bulleid Leader.jpg
Works diagram of the Leader

A series of initial ideas were presented to the Southern Railway management by Bulleid that incorporated double-ended running, giving the locomotive driver maximum visibility in either direction without a boiler or tender obscuring his view. The need for a turntable to turn the locomotive was therefore eliminated, although the initial designs were rejected by the operating department because of problems with welding technique. [6] The accepted design included two 0-6-0 steam bogies with weight-saving sleeve valves and chains to couple the driving axles. The boiler was offset to provide space for a communication corridor, allowing the driver to access both cabs without leaving the locomotive, an arrangement which led to later problems. [7] The firebox, near the centre of the locomotive, was fed by the fireman from a third cab, linked to both driving cabs by the communication corridor. [8] The entire ensemble was placed on a common frame and thus often referred to as an 0-6-6-0 T , even though the actual notation is 0-6-0+0-6-0 T since both engine units pivoted as on a Garratt, Double Fairlie or Meyer locomotive. [9] [10] [11] [12]

The Leader prototype was constructed at Brighton railway works, work beginning in 1946. [6] An initial order for five locomotives was placed straight from the drawing board in 1946 and a further 31 were ordered in 1947, although, with nationalisation looming, this was merely a gesture. [13] The latter order was cancelled after the Southern Railway was taken into public ownership, to allow trials to be carried out on the prototype. [13]

Bogie and cylinder design

Each of the two bogies had three cylinders, with the driving wheels connected by chains enclosed in an oil-bath, based upon Bulleid's chain-driven valve gear on his Pacific locomotives. [14] The valve gear used the unusual sleeve valve arrangement that was also tested on the ex-LB&SCR H1 class Hartland Point in parallel with the construction of the first Leader locomotive. [14] The Leader was the first steam locomotive to use a form of sleeve valve since Cecil Paget's locomotive of 1908 and the concurrent testing of the principle on Hartland Point hints at the rushed nature of the locomotive's conception. [15] The locomotive sat on the unusual Bulleid Firth Brown wheels, which were lighter, yet stronger, than the spoked equivalent.

The use of sleeve valves and oil baths to lubricate the moving parts of the engine units was inspired by contemporary internal combustion engine practice. [6] This included oscillating gear that gave a 25-degree axial movement to the sleeves, allowing even lubrication of the moving parts. [16] However, this resulted in an over-complicated mechanism that was difficult to maintain, perpetuating the seizures it was meant to eradicate. This feature was removed from both bogies of the prototype as the trials progressed. [17] Another innovative feature of the steam bogie assembly was the ability to interchange them when faults occurred, an easy operation for maintenance staff when compared to the complexities of overhauling a regular steam locomotive's motion. [4]

The three cylinders of each bogie were cast in mono-block format, each surrounded by two annular inlet steam chests and a single large outlet steam chest. [16] These had the added function of keeping the cylinder heated by hot steam to maintain the temperature and pressure of steam entering the cylinders. However, these castings were difficult to machine accurately. [16] The steam-sealing arrangements needed for this system were also complex, with each of the six cylinders and valve sleeves requiring 24 sealing rings. [15]

Boiler, firebox, smokebox and casing design

The Leader boiler and firebox, showing the offset firehole door position (dotted). Also visible are two of the four thermic siphons. Leader boiler under construction.jpg
The Leader boiler and firebox, showing the offset firehole door position (dotted). Also visible are two of the four thermic siphons.

The boiler was the culmination of lessons learned with the Pacifics and was a prolific steam-raiser. All Leader boilers were constructed at Eastleigh, and proved to be the least problematic area of the entire design. [14] The boiler pressure was set at 280 psi (1,900 kPa) and each was fitted with four thermic siphons within the firebox, both to increase the rate of evaporation and improve water circulation. [18] These had been used previously to great effect on Bulleid's Merchant Navy and West Country and Battle of Britain class designs. [18]

The Leader had a "dry lining" firebox. It was not surrounded on top and sides by a "jacket" of water as in normal practice, [19] but was constructed of welded steel and used firebricks instead of water for insulation, a novel but troublesome solution. [6] Using firebricks reduced the grate area from 47 square feet (4.4 m2) to 25.5 square feet (2.37 m2) and concentrated the fire in a smaller area. [19] The firehole door was offset to the left of the boiler backhead, which created difficulties for the fireman when adding coal to the fire. [20] The firebox was not initially equipped with a firebrick arch, although one was retro-fitted during the summer of 1950. [21] The arch was problematic because it led to a tendency for flames to enter the cab at high outputs, a situation made worse by the narrowing of the firebox area. [21]

The smokebox had an inherent problem in maintaining a constant vacuum. This was a result of another Bulleid labour-saving innovation, a sliding hatch controlled from the front cab, that enabled ash to be cleaned out via a chute onto the track when the locomotive was on the move. [22] The problem lay with ash gathering around the edges of the slide, allowing air to leak into the smokebox, thereby reducing the overall efficiency of the locomotive. [19] The fierce blast from the exhaust also meant that ash and embers were ejected into the atmosphere, creating a potential lineside fire hazard. [23]

For ease of maintenance, the boiler, firebox and smokebox were encased in steel sheeting, which meant that the engine's shape resembled that of a modern diesel locomotive. That was a major departure from traditional steam locomotive design, allowing the engine to be cleaned using a carriage-washing plant. [24] The locomotive was designed to carry 4 tons (4.06 tonnes) of coal and 4,000 imperial gallons (18,000 L; 4,800 US gal) of water, and the coal bunker was covered by a tarpaulin to prevent water ingress into the fireman's cab. [1] Entry into the locomotive was by way of ladders leading up to sliding doors, although, due to the bogie design, the climb into the fireman's cab necessitated clambering over the oilbath casing. [19]

Construction

Construction of the first five Leader locomotives began at the Southern Railway's Brighton railway works in July 1947. [25] British Railways inherited the Leader project upon nationalisation in 1948, which was far enough advanced to continue constructing the prototype, as Bulleid was still Chief Mechanical Engineer of the newly formed Southern Region of British Railways. [26] Although work on the other four locomotives stalled, the prototype Leader emerged from Brighton as locomotive No. 36001 in June 1949.

The other four members of the initial order made by the Southern Railway, Nos. 360025, were at varying stages of construction by the end of the development period. No. 36002 was almost complete, No. 36003 was without its outer casing, and Nos. 360045 were little more than sets of frames, although most of their major components had been constructed at Eastleigh and Brighton and were stored ready for fitting. [6] With no prospect of further money being allocated by the Railway Executive for their completion, the unfinished locomotives were put into store at various depots around the former Southern Railway network pending a decision on their future. [6]

Operation

With a calculated tractive effort of 25,350 lb, the Leader was given the power classification of 5. [27] This was considerably lower than the contemporary WC/BB pacifics which were rated as class 7, and this meant that the Leader had to be able to have an axle loading that would allow it to operate over secondary routes and on branch lines where the double-ended design would be of most benefit, something that was not likely with the weight inherent in the design.

On completion, No. 36001 was immediately put into service trials using empty passenger carriage stock in the south-east of England. [6] The official trial records kept at Brighton works reported varying degrees of success and failure on the runs undertaken. [28] However, the results of the trials as reported to British Railways headquarters at Marylebone were "conspicuous by the absence of praise" for the strengths of the Leader, namely the boiler, braking system and total adhesion provided by the two bogies. [29] Several theories have been put forward regarding this state of affairs, the most plausible being that the more conservative members of the railway workforce at Brighton and the Railway Executive felt that the Leader was too revolutionary and were keen to maintain the status quo. [30]

Performance of No. 36001

The Leader being lifted onto its power bogies at Brighton, May 1949. The casing allowed the locomotive to be put through a carriage-washing plant. Leader at Brighton.jpg
The Leader being lifted onto its power bogies at Brighton, May 1949. The casing allowed the locomotive to be put through a carriage-washing plant.

Following trials that lasted over a year, No. 36001 was shown to have several flaws, including heavy coal and water consumption, mechanical unreliability, untenable working conditions for both fireman and driver, loss of steam through the cylinder rings and uneven weight distribution on the bogies. After renewing the cylinder assembly, it was tested around Brighton and Eastleigh using an LNER Dynamometer car, where good running was experienced at high costs in fuel and effort on the part of the fireman. For a period of two weeks the Leader was tested against the performance of a U class locomotive [27] which indicated that the brake release was too slow in service for use on tight schedules despite the brake application being noted as the best used on a Bulleid design. [31] These trials were interrupted by breakage of the crank axles, these being replaced by axles from 36002 only for these to break in turn at approximately the same mileage as the originals. [27]

Throughout No. 36001's trials, the firebrick lining provided a constant problem by continually collapsing into the fire. [8] The firebricks were then replaced with cast iron substitutes that melted in the intense heat of the firebox, which were in turn replaced by thicker 9-inch (230 mm) firebricks. [6] Some of the firemen allotted to the Leader complained about cramped conditions in the centre cab of the locomotive, a situation made worse by flames entering the cab from the firebox at high outputs. [23] It was an enclosed space that was constantly hot and the single fireman's entrance door on the side of the locomotive was left open during travel to promote ventilation. [8] The door into the fireman's cab also attracted criticism, as it would have been blocked in the event of the locomotive overturning on that side, preventing the fireman's escape, so that members of the railway trade union ASLEF threatened to stop their crews from operating the Leader. [19] Measurements in the fireman's cab showed temperatures could reach 120 °F (50 °C) earning the locomotive the nickname of The Chinese Laundry due to the heat and humidity. [27]

During work on the crank axles at Eastleigh Works the opportunity was taken to place the locomotive on the weighbridge which showed that the offset boiler and coal bunker caused the locomotive's centre of gravity to be shifted to one side. [27] Experiments had to be undertaken to balance the locomotive by filling the linking corridor with large quantities of scrap metal, replaced in a re-design by a raised floor, covering the weighted material. These modifications resulted in the engine exceeding the total weight limit of 150 tons (151 tonnes), severely limiting the design's route availability during testing. [32] A related problem was that despite being a tall locomotive, at 12 feet 11 inches (3.94 m), the cab ceilings were relatively low. The cab at the smokebox end of the locomotive suffered from the same excessive heat as did the fireman's cab. To circumvent this problem the locomotive was used in reverse, as the rear cab was next to the water tank and coal chute and therefore away from the hot gases circulating inside the smokebox. [33]

Despite its problems, the locomotive displayed outstanding steaming characteristics and total traction from the two power bogies on its trial runs. [34] When properly fired, the Leader was capable of keeping up with the schedules, even running ahead on occasions. However, operational difficulties were encountered when stopping for water - not only did the locomotive use water at a rapid rate, requiring frequent stops but the all-enclosed casing and the overall height of the locomotive meant that many of the water cranes were too low to feed directly into the water tank, thus requiring either an improvised arrangement of scoops and hoses or filling the tank from a standpipe and hose - both options greatly extended the amount of time needed to take on water. These delays tended to lose any time advantages gained when the locomotive performed well and affected the published performance figures. [35] Despite hauling test trains over the Central Section of the former Southern Railway, the Leader prototype was never used on a revenue-earning service because of the risk of failure of the valve gear and the adverse publicity this would cause for British Railways. [36]

Livery and numbering

Southern Railway

When the project was under the auspices of the Southern Railway, No. 36001 would have been numbered CC101. [1] Bulleid advocated a continental style of locomotive nomenclature, based upon his experiences at the French branch of Westinghouse Electric before the First World War. The Southern Railway number followed an adaptation of the UIC classification system where "C" refers to the number of driving axles – in this case three on each bogie. [37] Since the design has six driving axles, the numbering would have been CC101CC105 for the initial batch, the final number being the locomotive identifier.

British Railways

Leader 36001 outside Brighton works in 1949 Leader1949.jpg
Leader 36001 outside Brighton works in 1949

Operational livery was photographic grey with red and white lining. The British Railways "Cycling Lion" crest was also used though, after the works photograph, this was painted over without explanation. [6] Numbering was the British Railways standard system, in the 36001 series. [6] If the class had gone into full production, the locomotives would have been painted in British Railways mixed traffic/freight black livery with red, grey and cream lining. 36001 was initially painted in this livery but this preceded the official works photograph and was subsequently repainted in photographic grey livery. [38]

Operational assessment

Production of the Leader demonstrated the inherent unsuitability of encasing a steam boiler in an enclosed superstructure. The environment inside was highly unsuitable, the weight was prohibitive, and necessary maintenance such as boiler washouts could only be achieved by a major dismantling of the locomotive. [27]

Despite the high expectations attached to the Leader, it was not the motive power revolution that Bulleid intended it to be. No part of the Leader design was perpetuated on the British Railways Standard class locomotives by Robert Riddles, nor did it find favour internationally, with the Garratt locomotives providing a similar function for less maintenance. [3] The whole concept was quietly dropped in 1951 after Bulleid left British Railways to become Chief Mechanical Engineer of Córas Iompair Éireann (where he produced CIÉ No. CC1, a peat-burning locomotive to a similar design) and all five were scrapped. [3] The culmination of the project was a £178,865 5s 0d (equivalent to £6,520,026 as of 2021 [39] ) bill for the taxpayer though, when the press reported the story as late as 1953, it was claimed that £500,000 (equivalent to £18,226,082 as of 2021) was wasted on the project. [40] R. G. Jarvis, who was placed in charge of the project after Bulleid's departure, insisted that the locomotive required an entire re-design to solve the problems of the original concept.

After the problems during the trials in 1950, in November of that year 36001 and the four other Leader locomotives then in various stages of assembly were all cut up for scrap. [27] Only the numberplates of No. 36001 and No. 36002 are known to exist. [41] The numberplate for No. 36001 is in the National Railway Museum; a locomotive builder's plate intended for the locomotive, but never fitted in service, was auctioned for £1050 in 2008. [42] The Leader was a bold attempt at pushing back the boundaries of contemporary steam locomotive design and, if successful, may have prolonged the life of steam on British Railways. [3]

Related Research Articles

<span class="mw-page-title-main">Steam locomotive</span> Railway locomotive that produces its pulling power through a steam engine

A steam locomotive is a locomotive that provides the force to move itself and other vehicles by means of the expansion of steam. It is fuelled by burning combustible material to heat water in the locomotive's boiler to the point where it becomes gaseous and its volume increases 1,700 times. Functionally, it is a steam engine on wheels.

<span class="mw-page-title-main">Fairlie locomotive</span> Type of articulated locomotive

A Fairlie locomotive is a type of articulated steam locomotive that has the driving wheels on bogies. The locomotive may be double-ended or single ended.

<span class="mw-page-title-main">Tank locomotive</span> Steam locomotive which carries its fuel and water onboard

A tank locomotive or tank engine is a steam locomotive which carries its water in one or more on-board water tanks, instead of a more traditional tender. Most tank engines also have bunkers to hold fuel; in a tender-tank locomotive a tender holds some or all of the fuel, and may hold some water also.

<span class="mw-page-title-main">Oliver Bulleid</span> British railway engineer (1882-1970)

Oliver Vaughan Snell Bulleid CBE was a British railway and mechanical engineer best known as the Chief Mechanical Engineer (CME) of the Southern Railway between 1937 and the 1948 nationalisation, developing many well-known locomotives.

<span class="mw-page-title-main">Steam locomotive components</span> Glossary of the main components of a typical steam locomotive

Main components found on a typical steam locomotive include:

<span class="mw-page-title-main">LSWR N15 class</span> Class of 74 two-cylinder 4-6-0 locomotives

The LSWR N15 class was a British 2–cylinder 4-6-0 express passenger steam locomotive designed by Robert Urie. The class has a complex build history spanning three sub-classes and ten years of construction from 1918 to 1927. The first batch of the class was constructed for the London and South Western Railway (LSWR), where they hauled heavy express passenger trains to the south coast ports and further west to Exeter. After the Lord Nelsons, they were the second biggest 4-6-0 passenger locomotives on the Southern Railway. They could reach speeds of up to 90 mph (145 km/h).

<span class="mw-page-title-main">SR West Country and Battle of Britain classes</span> Class of 110 three-cylinder 4-6-2 locomotives

The SR West Country and Battle of Britain classes, collectively known as Light Pacifics or informally as Spam Cans, or "flat tops", are air-smoothed 4-6-2 Pacific steam locomotives designed for the Southern Railway by its Chief Mechanical Engineer Oliver Bulleid. Incorporating a number of new developments in British steam locomotive technology, they were amongst the first British designs to use welding in the construction process, and to use steel fireboxes, which meant that components could be more easily constructed under wartime austerity and post-war economy.

<span class="mw-page-title-main">SR U class</span> Class of 50 two-cylinder 2-6-0 locomotives

The SR U class are 2-6-0 steam locomotives designed by Richard Maunsell for passenger duties on the Southern Railway (SR). The class represented the penultimate stage in the development of the Southern Railway's 2-6-0 "family", which improved upon the basic principles established by GWR Chief Mechanical Engineer (CME) George Jackson Churchward for Great Western Railway (GWR) locomotives. The U class design drew from experience with the GWR 4300s and N classes, improved by applying Midland Railway ideas to the design, enabling the SECR to influence development of the 2-6-0 in Britain.

<span class="mw-page-title-main">SECR N class</span> Class of English steam locomotives

The SECR N class was a type of 2-6-0 ("mogul") steam locomotive designed in 1914 by Richard Maunsell for mixed-traffic duties on the South Eastern and Chatham Railway (SECR). Built between 1917 and 1934, it was the first non-Great Western Railway (GWR) type to use and improve upon the basic design principles established by GWR Chief Mechanical Engineer (CME) George Jackson Churchward. The N class was based on the GWR 4300 Class design, improved with Midland Railway concepts.

<span class="mw-page-title-main">Franco-Crosti boiler</span>

The Franco–Crosti boiler is a type of boiler used for steam locomotives. It was designed in the 1930s by Attilio Franco and Dr Piero Crosti. The main difference between it and conventional feedwater heaters widely used on the continent is that the Franco-Crosti boiler uses both exhaust steam and exhaust gases from the firebox. Conventional feedwater heaters only use exhaust steam.

<span class="mw-page-title-main">SECR N1 class</span> Class of 6 three-cylinder 2-6-0 locomotives

The SECR N1 class was a type of 3-cylinder 2-6-0 ('mogul') steam locomotive designed by Richard Maunsell for mixed traffic duties, initially on the South Eastern and Chatham Railway (SECR), and later operated for the Southern Railway (SR). The N1 was a development of the basic principles established by the Great Western Railway's (GWR) Chief Mechanical Engineer (CME) George Jackson Churchward and by Maunsell's previous N class design.

<span class="mw-page-title-main">LSWR D15 class</span>

The LSWR D15 class 4-4-0 was the last steam locomotive design by Dugald Drummond for the London and South Western Railway in 1912. By 1912, Dugald Drummond had built several classes of unsuccessful 4-6-0 express passenger locomotives. The result of these failures was that when he designed what was to be his last class in 1911, a new 4-4-0 design emerged from Eastleigh Works in February 1912, with what was to be the first of his D15 class.

<span class="mw-page-title-main">SECR K and SR K1 classes</span> Two classes of 20 two-cylinder (K) and 1 three-cylinder (K1) 2-6-4T locomotives

The SECR K class was a type of 2-6-4 tank locomotive designed in 1914 by Richard Maunsell for express passenger duties on the South Eastern and Chatham Railway (SECR), which operated between London and south-east England. The Southern Railway (SR) K1 class was a three-cylinder variant of the K class, designed in 1925 to suit a narrower loading gauge. They were among the first non-Great Western Railway (GWR) types to use and improve upon the basic design principles of power and standardisation established by GWR Chief Mechanical Engineer (CME) George Jackson Churchward. The locomotives were based on the GWR 4300 class, improved by the Midland Railway's ideals of simplicity and ease of maintenance.

<span class="mw-page-title-main">SR Merchant Navy class</span> Class of 30 three-cylinder 4-6-2 locomotives

The SR Merchant Navy class is a class of air-smoothed 4-6-2 (Pacific) steam locomotives designed for the Southern Railway by Oliver Bulleid. The Pacific design was chosen in preference to several others proposed by Bulleid. The first members of the class were constructed during the Second World War, and the last of the 30 locomotives in 1949.

Córas Iompair Éireann No. CC1, generally known as the Turf Burner, was a prototype 0-6-6-0 articulated steam locomotive designed by Oliver Bulleid to burn turf and built at CIÉ's Inchicore Works in Dublin. CC1 shared some, but not all, of the characteristics of Bulleid's previous attempt to develop a modern steam locomotive, the Leader. Like the one completed Leader, CC1 had a relatively short career and was never used in front-line service. It was the last steam locomotive to be constructed for an Irish railway.

<span class="mw-page-title-main">South African Class 16E 4-6-2</span> Class of 6 South African 4-6-2 locomotives

The South African Railways Class 16E 4-6-2 of 1935 is a class of passenger steam locomotive.

<span class="mw-page-title-main">South African Class 14 4-8-2</span>

The South African Railways Class 14 4-8-2 of 1913 was a steam locomotive.

<span class="mw-page-title-main">South African Class 14C 4-8-2, 1st batch</span>

The South African Railways Class 14C 4-8-2 of 1918 was a steam locomotive.

The L&YR 2-10-0 was a prospective design for a class of 2-10-0 steam locomotives on the Lancashire and Yorkshire Railway. Initial designs were made by George Hughes between 1913 and 1914, but none of the class were built. If they had been, these would have been the UK's first 10-coupled locomotives in regular service.

The Great Southern and Western Railway (GS&WR) Class 351 initially consisted of four 0-6-0 tender locomotives designed by Robert Coey for use on heavy freight trains on the main line. They were joined by four similar locomotives built in 1912 introduced by Richard Maunsell, these had detail differences such as larger cabs and higher running plates. They included an extended smokebox to which a Phoenix superheater was briefly trialed but abandoned. They were initially designated GS&WR Class 249 but were subsequently grouped into class 351.

References

Notes
  1. 1 2 3 Bulleid (1977, p. 143)
  2. 1 2 3 4 Bulleid (1977 , p. 135)
  3. 1 2 3 4 5 Day-Lewis (1964), The Leader locomotive
  4. 1 2 Bulleid (1977 , p. 129)
  5. Bulleid (1977 , p. 136)
  6. 1 2 3 4 5 6 7 8 9 10 Haresnape (1979) Section 4
  7. Robertson (2007 , p. 116)
  8. 1 2 3 Harris (1994 , p. 115)
  9. Robertson (2007 , p. 42)
  10. Espitalier, T.J.; Day, W.A.J. (1943). The Locomotive in South Africa - A Brief History of Railway Development. Chapter II - The Adoption of the 3 ft. 6 in. Gauge on the Cape Government Railways (Continued). South African Railways and Harbours Magazine, August 1943. p. 592.
  11. Holland, D.F. (1971). Steam Locomotives of the South African Railways. Vol. 1: 1859–1910 (1st ed.). Newton Abbott, England: David & Charles. p. 25. ISBN   978-0-7153-5382-0.
  12. Dulez, Jean A. (2012). Railways of Southern Africa 150 Years (Commemorating One Hundred and Fifty Years of Railways on the Sub-Continent – Complete Motive Power Classifications and Famous Trains – 1860–2011) (1st ed.). Garden View, Johannesburg, South Africa: Vidrail Productions. p. 21. ISBN   9 780620 512282.
  13. 1 2 Robertson (2007 , p. 46)
  14. 1 2 3 Tuplin (1965 , p. 413)
  15. 1 2 Robertson (2007 , p. 47)
  16. 1 2 3 Tuplin (1965 , p. 414)
  17. Robertson (2007 , p. 77)
  18. 1 2 Robertson (2007 , p. 25)
  19. 1 2 3 4 5 Harris (1994 , p. 116)
  20. Bulleid (1977 , p. 145)
  21. 1 2 Harris (1994 , p. 117)
  22. Tuplin (1965 , p. 415)
  23. 1 2 Robertson (2007 , p. 95)
  24. Bulleid (1977 , p. 125)
  25. Bulleid (1977 , p. 140)
  26. Bulleid (1977 , p. 141)
  27. 1 2 3 4 5 6 7 Townroe, S. C. (October 1971). "More light on the Leader Class". Railway World . Vol. 32, no. 377. Shepperton: Ian Allan. pp. 436–438.
  28. Cox (1966 , p. 18)
  29. Cox (1966 , p. 19)
  30. Robertson (2007 , p. 151)
  31. Bulleid (1977 , p. 151)
  32. Cox (1966 , p. 16)
  33. Robertson (2007 , p. 87)
  34. Robertson (2007 , p. 158)
  35. Robertson (2007 , p. 156)
  36. Robertson (2007 , p. 150)
  37. Burridge (1975 , p. 60)
  38. Robertson (2007 , p. 37)
  39. UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth . Retrieved 11 June 2022.
  40. Sunday Dispatch, 18 January 1953
  41. Robertson (2007 , p. 110)
  42. Great Central Railwayana Auctions (2007) Auction Catalogue: Great Central Railwayana, 6 October 2007 Archived 11 July 2011 at the Wayback Machine , Retrieved 17 February 2009. Sold for £1050, see Lot 24.
Bibliography

Further reading