South Chestnut Wind Project

Last updated
South Chestnut Wind Farm as seen on I-68 from the west. South Chestnut WF from W.jpg
South Chestnut Wind Farm as seen on I-68 from the west.

The South Chestnut Wind Farm is a wind farm located in Fayette County, Pennsylvania with 23 2.0 MW Gamesa G87s that began commercial operation in 2012. [1] The wind farm has a combined total nameplate capacity of 46 MW. [2] The wind farm was developed by Iberdrola (now Avangrid in the US), and power produced by the wind farm is sold to Washington, D.C. [3]

See also

Related Research Articles

Iberdrola Spanish multinational electric utility company

Iberdrola is a Spanish multinational electric utility company based in Bilbao, Spain. Iberdrola has a workforce of around 34,000 employees serving around 31.67 million customers. Subsidiaries include Scottish Power and a significant part of Avangrid, amongst others. In 2013, the largest shareholder of the company was Qatar Investment Holding. Other significant shareholders included Norges Bank, Kutxabank and CaixaBank.

Kingsbridge Wind Power Project, also referred to as Kingsbridge 1 Wind facility , refers to a large wind farm owned and operated by Capital Power Corporation. Kingsbridge 1 Wind facility is located between Goderich and Kincardine, Ontario. The Kingsbridge 1 Wind facility is located on the southeast shore of Lake Huron in the township of Ashfield-Colborne-Wawanosh and consists of 22 1.8 MW Vestas V80 wind turbines with a capacity of 39.6 MW. Each tower is over 78 meters tall and weigh around 195 metric tonnes. The project consists of two phases and currently provides power to on average 12,500 homes.

Waymart Wind Farm is the second largest wind farm in Pennsylvania, United States. It consists of 43 GE 1.5 MW wind turbines, with a total net capacity of 64.5 MW, "which is enough renewable energy to power more than 21,000 Pennsylvania homes." The project is located in Wayne County, Pennsylvania. The wind farm was developed by Atlantic Renewable Energy and constructed by NextEra Energy Resources. In January 2018 the project was sold to Huntsman Wind LLC. Energy from the wind farm is sold to Exelon for distribution in the Mid-Atlantic region.

The Somerset Wind Farm is a wind farm in Somerset County, Pennsylvania with six GE 1.5 MW Wind Turbines that began commercial operation in October 2001. The wind farm has a combined total nameplate capacity of 9 MW, and produces about 25,000 megawatt-hours of electricity annually, which is roughly a 30% capacity factor. The wind farm was constructed by NextEra Energy Resources, based in Florida.

Hallett Wind Farm

The Hallett Wind Farm is the collective name for four wind farms near the town of Hallett, South Australia. They are owned and operated by AGL Energy.

Wind power in Ohio Electricity from wind in one U.S. state

Wind power in Ohio has a long history, and as of 2016, Ohio had 545 megawatts (MW) of utility-scale wind power installations installed, responsible for 1.1% of in-state electricity generated. Over 1000 MW more were under construction or pending approval. Some installations have become tourist attractions. There has been a sudden increase in generating capacity, as total wind power capacity in the state was just 9.7 MW in 2010. By 2019, there were 738 MW of capacity, which generated 1.71% of Ohio's electricity.

Carno wind farm

Carno is a wind farm of 68 turbines which started operation in October 1996. It covers an area of over 600 hectares on Trannon Moor, a plateau to the west of the village of Carno in Powys, Mid Wales, 400 metres (1,300 ft) above sea level.

Meyersdale Wind Farm

The Meyersdale Wind Farm is a wind farm located in Meyersdale, Somerset County, Pennsylvania with 20 NEG Micon/Vestas 1.5 MW wind turbines that began commercial operation in December 2003. The wind farm has a combined total nameplate capacity of 30 MW, enough to power about 10,000 homes. The project was constructed by NextEra Energy Resources, based in Florida.

The Mill Run Wind Energy Center is a wind farm located in Fayette County, Pennsylvania with ten 1.5 MW Enron Wind TZs that began commercial operation in November 2001. The wind farm has a combined total nameplate capacity of 15 MW, but actually produces about 39,420 megawatt-hours of electricity annually. The wind farm was developed by Atlantic Renewable Energy and Horizon Wind Energy, and constructed and operated by NextEra Energy Resources, based in Florida.

The Green Mountain Wind Energy Center was a wind power plant near Garrett, Somerset County, Pennsylvania with eight Nordex 1.3 MW turbines that began commercial operation in May 2000. This was the first commercial wind farm constructed in Pennsylvania. The wind farm had a combined total nameplate capacity of 10.4 MW and the potential to produce about 27,000 megawatt-hours of electricity annually, enough to power 3,300 homes, assuming a 30% capacity factor. The wind farm was developed by National Wind Power of the UK, now part of NPower Renewables, operated by NextEra Energy Resources, based in Florida. Energy from the wind farm was purchased and sold by Green Mountain Energy based in Texas, and was the first commercial wind farm for Green Mountain Energy. In 2016 the wind farm was dismantled and replaced with new battery technology.

Casselman Wind Power Project

The Casselman Wind Power Project is a wind farm in Somerset County, Pennsylvania with 23 GE 1.5 MW Wind Turbines that began commercial operation in 2007. The wind farm has a combined total nameplate capacity of 34.5 megawatts, but actually produces about 90,666 megawatt-hours of electricity annually. The wind farm was developed by PPM Energy and constructed by Iberdrola, based in Spain. Power produced at the wind farm is distributed by First Energy.

Meadow Lake Wind Farm Wind farm in Indiana, USA

Meadow Lake Wind Farm is an 801.25 megawatt (MW) wind farm near Brookston and Chalmers, Indiana, spreading over portions of White, Jasper, and Benton Counties. It is owned and operated by EDP Renewables North America. The facility currently has six operational phases, with 414 turbines, and is a prominent feature on both sides of Interstate 65 in western Indiana.

Criterion Wind Project

The Criterion Wind Project is a wind farm located on Backbone Mountain east of Oakland, Maryland, United States. The project has a rated capacity of 70 MW and uses 28 Liberty Wind Turbines manufactured by Clipper Windpower. Each of the wind turbines is about 415 feet tall. The Criterion Wind Project is owned by Criterion Power Partners, LLC, which is a subisiary of Exelon, and interconnected with the transmission system of the Potomac Edison Company. Electricity and renewable energy credits from the project are sold to the Old Dominion Electric Cooperative under a 20-year supply contract.

Solar power in Georgia on rooftops can provide 31% of all electricity used in Georgia.

Wind power in New Mexico Electricity from wind in one U.S. state

As of the end of 2016, New Mexico had 1,112 megawatts (MW) of wind powered electricity generating capacity, responsible for 11% of electricity produced that year. Wind power in New Mexico has the potential to generate more than all of the electricity consumed in the state.

Wind power in Hawaii Electricity from wind in one U.S. state

Wind power in Hawaii has the potential to provide all of the electricity generation in the electricity sector in Hawaii. The 114 commercial wind turbines in the state have a total capacity of 206 MW. In 2015, wind turbines produced 6.4% of Hawaii's electricity. In 2017, sources of renewable power were: In 2012, Hawaii generated 367 million kWh from wind power.

Wind power in North Carolina Electricity from wind in one U.S. state

Wind power in North Carolina is found along the coastal areas in the east and mountain regions in the western part of the state. The state has significant offshore wind resources. In 2015, small scale wind turbine projects were found throughout the state. In 2016, North Carolina's first large scale wind project, and the first in the southeastern U.S., was completed near Elizabeth City.

Wind power in Wisconsin Electricity from wind in one U.S. state

Wind power in Wisconsin started in 1990 with the installation of the Lincoln Turbines wind farm, and contributes to the state's renewable portfolio standard established in 1998. In 2016, Wisconsin had a wind generating capacity of 648 megawatts (MW), responsible for generating 2.4% of its electricity. In 2019, this increased to a capacity of 737 MW, and a 2.63% of generation.

The Desert Wind Farm, also known as Amazon Wind Farm US East, spans Perquimans and Pasquotank County on the Atlantic coastal plain in northeast North Carolina. With a total generating capacity of 208 megawatts (MW), it became the first large wind farm in the southeast United States when it came online at the end of 2016. All of the electricity is contracted to Amazon to power its growing data centers in Virginia and the region.

References

  1. "U.S. Wind Turbine Database". USGS. Retrieved 12 August 2019.
  2. "Asset Map". Avangrid Renewables. Retrieved 12 August 2019.
  3. Frazier, Reid (11 August 2015). "D.C. to buy Pennsylvania wind power". State Impact Pennsylvania. Retrieved 12 August 2019.

Coordinates: 39°45′16.5″N79°42′51.5″W / 39.754583°N 79.714306°W / 39.754583; -79.714306