At the end of the 19th and the beginning of the 20th century, the Southwest Line was designed to connect the port of Le Havre to the left bank of the Seine, and then to the west and southwest of France, by crossing the river near the estuary.

Contents

For some sixty years, this railway project mobilized the energies of the region, particularly Le Havre, but it was also a bone of contention between the main cities of Upper Normandy (Rouen and Le Havre). The systematic opposition of the inhabitants of Rouen to the construction of an engineering work downstream from their city (a potential obstacle to the navigation of ocean-going vessels up the Seine to their port), largely caused the failure of the line and threatened the very unity of the Seine-Inférieure [1] department.

A long preparation period

The idea of building what would later be known as the Southwest Line undoubtedly dates back to the inauguration of the Rouen - Le Havre railroad in 1847, the second stage of the radial line connecting Paris to the sea. [2] The route linking the two major cities of Normandy (established on the Cauchois plateau some twenty kilometers north of the winding Seine) had required the construction of numerous engineering structures, five tunnels, and three viaducts, [3] including the Barentin viaduct, which collapsed in January 1846 just a few months before being put into service. The inhabitants of Le Havre then realized that the only railroad line in their port city was insufficient and that it was full of architectural works that were rare in non-mountainous areas (in addition to the Barentin viaduct, there was the Mirville viaduct and the Pissy-Pôville tunnel), but vulnerable. An additional line was therefore needed to ensure the safety of communications at the Porte Océane. [4]

However, it wasn't until the early 1870s, with the completion of dyking construction on the Seine estuary in connection with the construction of the Tancarville Canal, that the initial projects were launched. In 1870, a Parisian entrepreneur, Fresson, suggested building a railway of local interest between Le Havre and Rouen via the right bank (Caudebec, Duclair), but much closer to the river than the railroad on the Cauchois [4] plateau.

The Southwest Line gave rise to numerous projects; here, two line layouts with tunnel crossings of the Seine (downstream), and a third with viaduct crossings further upstream. LigneSudOuest.jpg
The Southwest Line gave rise to numerous projects; here, two line layouts with tunnel crossings of the Seine (downstream), and a third with viaduct crossings further upstream.

Although this project was soon abandoned, it was replaced in 1871 by a proposal from Delahante and Girard to build two lines, [4] again for local interest. One would connect the two major cities of Normandy along a route almost identical to Fresson's. In contrast, the other would connect Le Havre and the département of Eure by crossing the Seine between Port-Jérôme and Quillebeuf on a ferry allowing convoys to pass from one bank to the other without breaking the load. A railroad built in the Eure between Pont-Audemer station and the banks of the Great River would have ensured the continuity of traffic to the center or Atlantic regions. This was the first mention of the Southwest Line. This project, too, was abandoned in 1873 due to the growing hostility of the Compagnie des Chemins de Fer de l'Ouest (Chemins de fer de l'Ouest), which, while recognizing the usefulness of these sections, could not bear to see its supremacy in the region [4] threatened.

This twist of fate put the issue on hold for some time, but two events in 1879 revived the proposals. The first was the registration (under number 43) of the "Pont-Audemer to Port-Jérôme Line with steam ferry on the Seine" in the classification law of July 17, known as the Freycinet law, designed to complete the railroad network. [4] It was also Gambetta's speech on October 26 to the leading figures in Le Havre that remained famous in the memory of the supporters of the Southwest [5] railroad:

"I made comparisons between your docks, between your ports, between the way your products are sold. I thought about how humiliating it was for us (not for you, the people of Le Havre, but for us, the French) to think that a great center, a great focus for goods from all over the world, could be reduced to not being able to compete, to not being in direct communication with the north, nor with the center, nor with the west of France, for the sake of a few bands of steel that it lacked. Gentlemen, this is an intolerable situation. I speak here only as an ordinary citizen and I place at your disposal my contribution as an individual and free speaker.But if it depends on me to push this issue, surely you will no longer remain blocked from behind while the sea solicits you from the front".

During the next few years, new studies were carried out, with increasing emphasis on a permanent viaduct or tunnel link for crossing the Seine.

Time for great projects

The submerged bridge crane roject by Danisy-Martin (1895). Ligne du Sud-Ouest3.jpg
The submerged bridge crane roject by Danisy-Martin (1895).
The transporter bridge project by Ferdinand Arnodin (1897). Ligne du Sud-Ouest4.jpg
The transporter bridge project by Ferdinand Arnodin (1897).
The cantilever viaduct project by Chemins de fer de l'Ouest (1900). Ligne du Sud-Ouest - Viaduc.jpg
The cantilever viaduct project by Chemins de fer de l'Ouest (1900).

The year 1883 marked a turning point in the history of the Southwest link: the inclusion of a railroad line from Pont-Audemer to Le Havre via Lillebonne and the crossing of the Great Normandy river upstream of Port-Jérôme in Table A of the Freycinet project, approved by the law of November 19, 1883, paved the way for in-depth [6] studies. An initial proposal, drawn up by Cordier in 1886, advocated an underground crossing of the Seine through a single-track [7] masonry tunnel. However, the difficulty of cutting through the unstable alluvial soil led to the rejection of this solution in 1888. [7]

This was only a temporary setback, however, as the last decade of the 19th century saw the emergence of several preliminary projects, spurred on by the mayor of Le Havre, Louis Brindeau:

While all these projects were technically very interesting, the people of Le Havre were desperately awaiting the completion of the Southwest Line. But the authorities, and in particular the Ministry of Public Works, seemed to do everything in their power to delay the construction of this line, which would be so useful for the great port of the Manche. It was not until February 6, 1900, [8] that Mr. Baudin, Minister of Public Works, authorized the construction of the railroad across the Seine, seventeen years after the adoption of Table A by his predecessor.

Two new projects saw the light of day and prompted a public inquiry:

The failure of line construction

As soon as the results of the studies were published, the people of Rouen, who had been silent until then, went on the rampage, led by Richard Waddington (General Councillor of Darnétal and President of the Chamber of Commerce and Industry). They criticized the viaduct [11] for jeopardizing the access of ocean-going vessels to their ports and for threatening the safety of navigation on the river in the event of accidental destruction or conflict. [8] They preferred a tunnel but demanded that it be buried deep enough to allow deep-draught ships to enter Rouen's docks in the future. This is what Waddington said at a meeting of the Chamber of Commerce and Industry of Rouen on July 7, 1900: [12]

" As both solutions seem to be equally expensive, the Chamber unanimously believes that the only acceptable solution is the one that will guarantee the free flow of the river now and in the future, namely, the underground crossing chosen by the legislator in 1883".

This opposition, which resulted in furious verbal fights between representatives of the two Normandy cities in the General Council, once again delayed the announcement of the public use of the Southwest Railroad. This postponement prompted private initiatives (Jean Berliet's new metal tunnel project in 1902, [13] the Fives-Lille company's proposal to cross the river by ferry [13] in 1904, etc.), which were just as fruitless as the previous ones. Years passed, exasperating the people of Le Havre, but reassuring the people of Rouen.

Fives-Lille ferry Project (1904). Ligne du Sud-Ouest6.jpg
Fives-Lille ferry Project (1904).

From 1910 to 1914, the debates centered on how to cross the Seine with an overhead structure, while the Southwest Line gradually became a second railroad from Le Havre to Paris using the left bank. Discussions focused on the height of the viaduct. Engineers increased the clearance from 57 meters to 59 meters in 1911, 63 meters in 1912, and 65 meters in 1913. [13] "Insufficient!" declared the people of Rouen, who finally won their case when the Minister of Public Works, [13] Mr. Pichery, postponed the announcement of public use on March 18, 1914.

It was during this period preceding the First World War that the confrontation between the two great cities of Normandy came to an end. Each city, through the intermediary of one man (Richard Waddington for Rouen, Louis Brindeau for Le Havre) and one or more newspapers (Journal de Rouen and the Dépêche de Rouen on one side, and the Journal du Havre on the other) inveighed against the merits of the project. Articles in one city's daily newspaper always countered those of the rival city. Identical arguments were used repeatedly, each time countered by similar demonstrations. The people of Rouen accused the people of Le Havre of wanting to stifle their port by limiting the ability of a certain number of ships to navigate upstream by building a viaduct, and of threatening traffic if the viaduct collapsed. The latter accused the former of acting selfishly to limit competition with the Porte Océane by reducing its outlets. At the peak of the quarrel, Le Havre town councilors (speaking on condition of anonymity), after inveighing against Rouen's leaders and showering them with insults, proposed a new division of the Normandy departments, Seine-Inférieure and Eure, based on a north–south rather than an east–west boundary, thus avoiding the enemy sisters ending up in the same administrative district.

Although the project was not officially buried when the announcement of public use was postponed, it looked very much like an abandonment. Studies resumed well after the war but were just as fruitless as before. There was renewed talk of a tunnel or a rail ferry, and of building the line as part of the war reparations owed by Germany. The enthusiasm and pugnacity of the people of Le Havre had waned over time, and even the most ardent defenders of the new railroad were growing weary. The 1920s were lost in procrastination; the economic crisis of the 1930s and the growing role of the automobile put an end to Le Havre's hopes. A final viaduct project, both technically and financially precise, was submitted in 1931, [13] but the time was no longer ripe for major railway projects, so it was quickly abandoned.

Reasons for failure

The Southwest Line often made the front page of local newspapers, as shown here in a newspaper supplement of Le Travailleur Normand
, May 27, 1900. Ligne du Sud-Ouest2.jpg
The Southwest Line often made the front page of local newspapers, as shown here in a newspaper supplement of Le Travailleur Normand, May 27, 1900.

Sixty years of heated debates and no fewer than forty projects (not counting variants) were all in vain because the line was never built. Why wait so long, and then never come to fruition? The difficulties encountered were numerous, and their accumulation explains the failure to build the route:

The end

When the bridge over the Seine downstream from Rouen was built in 1959 [15] for the first time, it was intended only for cars, and not for railroads. However, the railroad had shown the way, and the very fact that Tancarville, a site repeatedly recommended in the studies of the late 19th and early 20th centuries, was chosen as the site for a river crossing, confirmed the validity of the studies carried out as part of the Southwest Line project. Since then, the inauguration of the Pont de Normandie in January 1995 [16] enabled a second crossing of the Seine even further downstream. In addition to its regional significance, the new structure would be one of the links in the transverse connection between Calais and Bayonne, known as the Autoroute des Estuaires, designed to serve the west of the country and relieve the Paris [17] traffic hub, but once again the railroad was excluded from the project.

The idea of a tunnel under the Seine estuary surfaces regularly. [18] With the development of Port 2000 in Le Havre, a new project for a rail (or road) crossing of the Seine estuary is being studied (at the instigation of the city's CCI), but would only be realized in the very long term. [19]

See also

Related Research Articles

<span class="mw-page-title-main">Normandy</span> Geographical and cultural region of France

Normandy is a geographical and cultural region in northwestern Europe, roughly coextensive with the historical Duchy of Normandy.

<span class="mw-page-title-main">Rouen</span> Prefecture and commune in Normandy, France

Rouen is a city on the River Seine, in northern France. It is the prefecture of the region of Normandy and the department of Seine-Maritime. Formerly one of the largest and most prosperous cities of medieval Europe, the population of the metropolitan area is 702,945 (2018). People from Rouen are known as Rouennais.

<span class="mw-page-title-main">Le Havre</span> City in Normandy, France

Le Havre is a major port city in the Seine-Maritime department in the Normandy region of northern France. It is situated on the right bank of the estuary of the river Seine on the Channel southwest of the Pays de Caux, very close to the Prime Meridian. Le Havre is the most populous commune of Upper Normandy, although the total population of the greater Le Havre conurbation is smaller than that of Rouen. After Reims, it is also the second largest subprefecture in France. The name Le Havre means "the harbour" or "the port". Its inhabitants are known as Havrais or Havraises.

<span class="mw-page-title-main">Seine-Maritime</span> Department of France

Seine-Maritime is a department of France in the Normandy region of northern France. It is situated on the northern coast of France, at the mouth of the Seine, and includes the cities of Rouen and Le Havre. Until 1955 it was named Seine-Inférieure. It had a population of 1,255,633 in 2019.

<span class="mw-page-title-main">Upper Normandy</span> Place in France

Upper Normandy is a former administrative region of France. On 1 January 2016, Upper and Lower Normandy merged becoming one region called Normandy.

The Compagnie des chemins de fer de l'Ouest, often referred to simply as L'Ouest or Ouest, was an early French railway company which operated from the years 1855 through 1909.

<span class="mw-page-title-main">A13 autoroute</span> Controlled-access highway from Paris to Caen

Autoroute 13, or L'Autoroute de Normandie links Paris to Caen, Calvados.

<span class="mw-page-title-main">Réseau Saint-Lazare</span>

Réseau Saint-Lazare is the network of railway lines originating from Saint Lazare Station in Paris. The network stretches from Paris to Normandy and encompasses suburban services. Parisian suburban rail services are operated under SNCF's brand name Transilien. Intercity services are also operated by SNCF but under the brand name Corail.

<span class="mw-page-title-main">Paris – Normandy new line</span> Future French high-speed railway

The Ligne nouvelle Paris - Normandie (LNPN), also known as the LGV Normandie is a planned French high-speed rail line project to link Paris and Normandy. Trains will run at 250 km/h (155 mph) with a new TGV station serving Rouen.

<span class="mw-page-title-main">Grande Ceinture line</span> Paris railway loop

The Grande Ceinture line is a railway line around Paris, located 15 kilometres (9.3 mi) from the Boulevard Périphérique. The decision to build it was taken at the end of the 19th century, to connect the radial lines linking the capital to the provinces and provide relief to the busy Petite Ceinture Line.

<span class="mw-page-title-main">Chemin de fer des Côtes-du-Nord</span>

The Chemin de fer des Côtes-du-Nord, the Côtes-d'Armor today, was a 1,000 mm, metre gauge, railway in Côtes-du-Nord, France, although there were a few kilometres of line in Finistère and Ille-et-Vilaine. The first lines opened in 1905 and final closure was in 1956. The lines were a voie ferrée d'intérêt local system with a total extent of 457 kilometres (284 mi).

<span class="mw-page-title-main">Pont Gustave-Flaubert</span> Bridge in Normandy, France

The Pont Gustave-Flaubert is a vertical-lift bridge over the river Seine in Rouen, Seine-Maritime, Normandy, France. It was officially opened on 25 September 2008 after four years of construction.

<span class="mw-page-title-main">Trams in Rouen</span> Tram network in Rouen, Normandy, France

There have been two separate generations of trams in Rouen. The first generation tramway was a tram network built in Rouen, Normandy, northern France, that started service in 1877, and finally closed in 1953. There were no trams at all in Rouen between 1953 and 1994, when the modern Rouen tramway opened.

In France, a voie ferrée d'intérêt local, abbreviated VFIL, is a secondary railway constructed by a local administrative division, serving sparsely populated rural areas. These areas were beyond the economic reach of the networks of the intérêt général, which were concessions of the grandes compagnies who ran their lines for profit.

<span class="mw-page-title-main">Paris–Le Havre railway</span>

The Paris–Le Havre railway is an important 228-kilometre long railway line, that connects Paris to the northwestern port city Le Havre via Rouen. Among the first railway lines in France, the section from Paris to Rouen opened on 9 May 1843, followed by the section from Rouen to Le Havre that opened on 22 March 1847.

<span class="mw-page-title-main">Montérolier-Buchy–Saint-Saëns railway</span> Former railway in France

The Montérolier-Buchy–Saint-Saëns railway is a standard gauge branch line that operated between 1900 and 1953 in the département of Seine-Maritime, France. The line ran 10.2 kilometres (6.3 mi) in a roughly north-northwesterly direction, beginning in Montérolier-Buchy station and terminating in the small town of Saint-Saëns. The line passed through the town of Saint-Martin-Osmonville and over the Pont-du-Thil. It was administered on behalf of the département by the Compagnie des chemins de fer du Nord. The line is a cul-de-sac.

The following is a timeline of the history of the city of Le Havre, France.

<span class="mw-page-title-main">Le Havre's old tramway</span> Transport system in Normandy, France

Le Havre's tramway was built when the municipality sought to equip itself with a modern form of urban transport capable of multiplying the travel possibilities of its inhabitants, as many other French cities at the end of the 19th century did. The tramway, inaugurated in Le Havre in 1874, first horse-drawn, then electric, served until World War I, transporting over 20 million people by 1913.

The Elbeuf tramway was put into service in 1898 in the southern part of the Seine-Inférieure department to facilitate the movement of the residents of the textile city of Elbeuf and its working-class suburbs. With its four standard gauge lines, each nine kilometers long and diverging from Place du Calvaire, the network transported up to 1.5 million people, in 1899, at the beginning of the operation.

References

  1. Seine-Inférieure was renamed Seine-Maritime in 1955. [archive]
  2. The first stage from Paris to Rouen was commissioned in 1843. [archive]
  3. Article in La Vie du Rail (in French), n° 1989, p. 18-21.
  4. 1 2 3 4 5 Bertin, Hervé (1994). Petits trains et tramways Haut-Normands (in French). Cénomane. p. 72. ISBN   2902808526.
  5. Brindeau, Louis (1905). La ligne du Sud-Ouest du Hâvre à la Basse-Normandie (in French). p. 12.
  6. Bertin, Hervé (1994). Petits trains et tramways Haut-Normands (in French). Cénomane. p. 73. ISBN   2902808526.
  7. 1 2 3 4 Bertin, Hervé (1994). Petits trains et tramways Haut-Normands (in French). Cénomane. p. 74. ISBN   2902808526.
  8. 1 2 Bertin, Hervé (1994). Petits trains et tramways Haut-Normands (in French). Cénomane. p. 75. ISBN   2902808526.
  9. "Le chemin de fer du Sud-Ouest". Le Petit Havre (in French). June 9, 1900. ISSN   2610-2684 via Gallica.
  10. "Le chemin de fer du Sud-Ouest". Le Petit Havre (in French). June 12, 1900. ISSN   2610-2684 via Gallica.
  11. However, it's worth remembering that some of the mixed (sailing and motor) ships in Rouen's harbor at the time, such as the Quevilly, had an under-mast height of over 65 meters.
  12. Brindeau, Louis (1905). La ligne du Sud-Ouest du Hâvre à la Basse-Normandie (in French). p. 32.
  13. 1 2 3 4 5 Bertin, Hervé (1994). Petits trains et tramways Haut-Normands (in French). Cénomane. p. 76. ISBN   2902808526.
  14. 1 2 3 Manneville, Philippe (1980). Les chemins de fer d'intérêt local à la fin du xixe siècle et au début du xxe siècle : l'exemple d'un département, la Seine-Inférieure (in French). Extract from: Actes du 104e Congrès National des Sociétés Savantes, Bordeaux, vol. 1, 1979, p. 271-284. Paris: Bibliothèque Nationale. Paris.
  15. "Pont de Tancarville". Structurae (in French).
  16. "LE PONT DE NORMANDIE, UN COLOSSE SUR SEINE". Normandie Tourisme (in French).
  17. The connection was completed in January 2003. This website also presents the technical specifications. "Autoroute des Estuaires". Structurae (in French).
  18. "CONTRIBUTION TUNNEL DE L." (PDF) (in French).
  19. "La CCI du Havre se pare d'habits neufs". Ouest-France (in French). July 30, 2005.

Bibliography