Soviet destroyer Sposobny (1970)

Last updated

Sposobnyy1982.jpg
Sposobny underway in the Sea of Japan, early 1982
History
Naval Ensign of the Soviet Union (1950-1991).svgNaval Jack of Russia.svgSoviet Union → Russia
NameSposobny
Builder 61 Communards Shipyard
Laid down10 March 1969
Launched11 April 1970
Commissioned25 September 1971
Decommissioned6 January 1993
FateScrapped in 1995
General characteristics
Class and type Kashin-class destroyer
Displacement
Length144 m (472 ft) (o/a)
Beam15.8 m (52 ft)
Draught4.46 m (14.6 ft)
Installed power4 × M8E gas turbines M3 unit aggregate; 72,000 hp (54,000 kW)
Propulsion2 x shaft CODAG
Speed34 kn (63 km/h; 39 mph)
Range3,500  nmi (6,500 km; 4,000 mi) at 18 knots (33 km/h; 21 mph)
Complement266
Sensors and
processing systems
  • Radar
    • Volga
    • MR-600 Voskhod
    • MR-310 Angara
    • MR-500U Kliver
    • 2 x Yatagan
    • 2 x MR-105 Turel
    • Groza
  • Sonar
    • MG-312 Titan
    • MG-311 Vychegda
Armament
  • 2 × twin 76 mm (3 in) AK-726 guns
  • 2 × twin launchers for SA-N-1 'Goa' SAM (32 missiles)
  • 1 × 5 533 mm (21 in) torpedo tubes
  • 2 × twelve barrel RBU-6000 ASW rocket launchers
  • 2 × six barrel RBU-1000 ASW rocket launchers

Sposobny (Russian: Способный, "Capable") was a Project 61 (NATO reporting name Kashin-class) destroyer of the Soviet Navy, which briefly became part of the Russian Navy. The ship served during the Cold War from 1971 to 1989.

Contents

She served with the Pacific Fleet for the duration of her career, often operating in the Indian Ocean and the Pacific in order to show the flag. Sposobny cruised in the Indian and the Pacific Oceans during 1973–1974, 1983, and 1985, punctuated by a 1976 goodwill visit to Vancouver, Canada, and active support to Vietnam during the 1979 Sino-Vietnamese War. A planned modernization in 1987 at the Sevastopol Marine Plant in Ukraine was never completed due to the fall of the Soviet Union and she was transferred to the Russian Navy despite a failed Ukrainian attempt to take control. Sold to the shipyard to pay off debts, the destroyer was decommissioned in 1993 before being sold for scrap two years later.

Design

A United States Navy-produced profile drawing of a Kashin-class destroyer Kashin-class destroyer profile 1987.png
A United States Navy-produced profile drawing of a Kashin-class destroyer

Sposobny was one of the second series of her class of twenty Soviet Designation Project 61 Berkut A (NATO reporting name Kashin-class) destroyers. The vessels were initially designated as guard ships, but in 1966 were reclassified as Large Anti-Submarine Ships. All surviving ships, including Sposobny, were again reclassified as guard ships in January 1992. [1] The class was built to replace the Kotlin-class destroyer and Riga-class frigate, which had been rendered obsolete by the advent of guided missiles. It was designed to defend larger warships and transports against low-flying aircraft, cruise missiles, and submarines, [2] though the anti-submarine role ultimately became secondary to its air defense mission. They were the first class of Soviet warships designed to survive a nuclear explosion, and as a result had the main ship control station on the lower deck deep in the hull, separate from the enclosed bridge. [3]

The Kashin-class destroyers were 144 meters (472 ft) long with a beam of 15.8 meters (52 ft) and a draught of 4.46 meters (14.6 ft). Sposobny displaced 3,440 tonnes (3,386 long tons) standard and 4,290 tonnes (4,222 long tons) full load, and had a complement of 266. The ship was equipped with a helicopter pad aft to carry a single Kamov Ka-25PL Hormone-A helicopter; the helicopter could only be temporarily aboard the ship due to the lack of a hangar. [4] [5]

Sposobny was propelled by two combined diesel and gas (CODAG) shafts powered by four M-3A gas turbines, [6] which created 72,000  shp (54,000 kW), giving her a maximum speed of 34 knots (63 km/h; 39 mph); her class were the first Soviet warships equipped with gas turbines. [3] She had a range of 3,500  nmi (6,500 km; 4,000 mi) at 18 kn (33 km/h; 21 mph) and 2,000 nmi (3,700 km; 2,300 mi) at 30 kn (56 km/h; 35 mph). [3] [4]

Armament

Location of fire control systems, search radars, and armament of sister ship Strogy Strogiy-en.jpg
Location of fire control systems, search radars, and armament of sister ship Strogy

For her air defense role, she was equipped with two double ZIF-101 launchers with sixteen 4K90 missiles each for the M-1 Volna surface-to-air missile system (NATO reporting name SA-N-1 Goa), a navalised version of the S-125 Neva. Two double AK-726 76.2 mm guns protected against both aerial and surface threats. She was also equipped with two 12-barrel RBU-6000 and two 6-barrel RBU-1000 anti-submarine rocket launchers, and a quintuple mounting for 533-millimeter (21.0 in) dual-role torpedoes. [3] [4] The Ka-25 helicopter that could be landed on the destroyer was also capable of aiding in the search and destruction of submarines. [5]

Sensors and electronic warfare

As a ship of the second series of her class, Sposobny was equipped with more advanced sensors. Instead of the two MR-300 search radars of the first series, she received an MR-310 Angara on her foremast and an MR-500U Kliver on the mainmast. She differed from the earlier members of her series in being equipped with two more advanced Volga navigational radars on the foremast instead of a single Don radar. The destroyer was equipped with MG-312 Titan and MG-311 Vychegda sonar. [4] [6]

For fire control, Sposobny received the Yatagan guidance radar for her Volna, the Turel for her AK-726, and the Groza for her torpedoes. Sposobny also had a MG-26 communications outfit, a Triton transceiver, the MPP-315 remote indicator for her Volga, and the Nikel-KM identification friend or foe system. For electronic warfare she was equipped with the MRP 13–14 direction finding system. [4] [6]

Construction and service

Built in the 61 Communards Shipyard in Nikolayev with the serial number 1713, the destroyer was laid down on 10 March 1969, launched on 11 April 1970, and completed on 25 September 1971. [7] Sposobny was added to the Navy List on 25 April 1970. [8]

1970s

Assigned to the Pacific Fleet on 27 October, she departed Sevastopol under the command of Captain 3rd rank G. Kudryavtsev on 15 February 1972. After passing the Cape of Good Hope she reached the Pacific Fleet base at Vladivostok on 26 August and joined the 175th Missile Ship Brigade of the fleet's 10th (Pacific) Operational Squadron. Between 17 and 24 December 1973, as part of a detachment of the fleet with command ship Admiral Senyavin and a Project 641 submarine, under the flag of First Deputy Commander of the Pacific Fleet Kontr-admiral Vladimir Maslov, the destroyer visited Port Louis, Mauritius. On the return voyage Admiral Senyavin and Sposobny visited Bombay between 9 and 15 February 1974. [9]

As part of a fleet detachment with Udaloy-class destroyer Gnevny and the tanker Ilim under the flag of squadron commander Kontr-admiral Vladimir Varganov, she visited Vancouver, Canada from 25 to 30 August 1976, being open to public viewing. The visit was part of an exchange program that was reciprocated by the visit of Canadian warships to Leningrad later that year, [10] although anti-whaling and anti-Soviet demonstrations were made against the ships; the visit was the first since 1944. [11] With a detachment of warships and in cooperation with anti-submarine aircraft she participated in anti-submarine exercises on 26 August 1977. [9] Alongside Admiral Senyavin, the cruisers Vasily Chapayev and Admiral Fokin , destroyers Strogy and Bozbuzhdenny , and the frigate Razyashchiy , she supported Vietnam during the Sino-Vietnamese War between February and March 1979. [12] Operating in the South China Sea, the ships intercepted Chinese battlefield communications and passed them on to Vietnamese forces. [13]

1980s and end of service

Transferred to the 201st Anti-Submarine Warfare Brigade in 1982, Sposobny twice operated in the Sea of Japan that year, tracking American ships. Between 9 and 13 June 1983, with a fleet detachment of the 8th (Indian Ocean) Operational Squadron that also included the frigate Grozyashchiy and the tanker Pechenga under the flag of squadron commander Kontr-admiral Gennady Semyonov, she made an official visit to Colombo, Sri Lanka. The destroyer operated in the South China Sea and Indian Ocean in 1985, receiving an excellent rating for her performance. [9]

On 16 July 1987, she was temporarily transferred to the Black Sea Fleet and on 30 July delivered to the Sevastopol Marine Plant for repairs and modernization as prototype for Project 01090 prior to transfer to the Northern Fleet. [9] As the work began, the design for the modernization was changed to Project 01091. The modernization was to be completed by 30 September 1989, and differed only from the Project 01090 modernization of her sister ship Smetlivy in that she was to receive experimental nonacoustic submarine detection equipment instead of the Kaira sonar that Smetlivy was given. [14] To provide space for the equipment the aft gun turret was to be removed and the complex was to be installed at the stern helicopter pad, with two sponsons for lowering towed antennas. The modernization was 70% complete by the fall of the Soviet Union. [15]

Due to the fall of the Soviet Union, the modernization was not completed, and on 29 October 1992 the transfer to the Black Sea Fleet was made permanent. This followed an unsuccessful Ukrainian attempt to raise the Ukrainian flag over the ship on 3 July after the crew took the oath of allegiance to Ukraine; the ship remained under Russian control. She was removed from the Navy list on 6 January 1993, and to pay off the navy's debts to the shipyard she was transferred to the ownership of the Sevastopol Marine Plant. Relocated from the North Dock to Yuzhnaya Bay to remove weapons and equipment, she was stripped by 20 November, when the crew was disbanded and the ship became property of the plant. The hull was sold to an Indian company for scrapping and was towed away from Sevastopol on 2 April 1995. [14] [15]

During her career, Sposobny was assigned the temporary tactical numbers 522 (in 1971), 109 (in 1973), 547 (in 1982), 544 (in 1982), and 578 (in 1987). [9]

Related Research Articles

Kashin-class destroyer Class of Soviet anti-aircraft guided missile destroyers

The Kashin class, Soviet designation Project 61, were series of anti-aircraft guided missile destroyers built for the Soviet Navy since the 1960s. As of 2020, no ships remain in service with the Russian Navy, but three modified ships continue in service with the Indian Navy as Rajput-class destroyers.

<i>Udaloy</i>-class destroyer 1980s class of Soviet/Russian guided missile anti-submarine destroyer

The Udaloy class, Soviet designation Project 1155 Fregat and Russian designation Project 11551 Fregat-M, are series of anti-submarine guided missile destroyers built for the Soviet Navy, seven of which are currently in service with the Russian Navy. Twelve ships were built between 1980 and 1991, while the thirteenth ship built to a modified design, known as Udaloy II class, followed in 1999. They complement the Sovremenny-class destroyers in anti-aircraft and anti-surface warfare operations. The codename Udaloy comes from an archaic Russian adjective удалой, meaning daring or bold.

Soviet destroyer <i>Nezamozhnik</i> Russian Fidonisy-class destroyer

Nezamozhnik was one of eight Fidonisy-class destroyers built for the Imperial Russian Navy during World War I. Originally named Zante (Занте), the ship was left unfinished during the Russian Revolution in 1917 and later captured by Ukrainian and White forces. The mostly complete destroyer was towed from her shipyard by retreating White forces and wrecked during a storm in 1920. She was refloated by the Soviets following their victory in the Russian Civil War and completed in 1923 as Nezamozhny (Незаможный).

Soviet cruiser <i>Kronstadt</i> Soviet Navys Kresta II-class cruiser

Kronstadt was a Project 1134A Kresta II-class cruiser of the Soviet Navy, named for the Kronstadt naval base. The first ship of her class, the ship served during the Cold War, from 1969 to 1991. She served with the Northern Fleet, with her shakedown cruise being through the Mediterranean Sea. After colliding with a destroyer in 1975, she spent five years being repaired and modernized. She was decommissioned in 1991 before being sold for scrap two years later due to reduced naval funding and deteriorating conditions.

Soviet cruiser <i>Admiral Isakov</i> Soviet Kresta II-class cruiser

Admiral Isakov was a Kresta II-class cruiser of the Soviet Navy and briefly of the Russian Navy, named for Soviet admiral Ivan Isakov. The second ship of her class, she served mostly during the Cold War from her commissioning in 1970.

Admiral Nakhimov was a Project 1134A Kresta II-class cruiser of the Soviet Navy, named for Russian naval commander Pavel Nakhimov. The third ship of her class, the ship served during the Cold War, from 1971 to 1991. She served with the Northern Fleet for the duration of her career, often operating in the Atlantic and the Mediterranean in order to show the flag. She was decommissioned in 1991 before being sold for scrap due to reduced naval funding in 1993.

Soviet cruiser <i>Admiral Makarov</i> (1970) Soviet Kresta II-class cruiser

Admiral Makarov was a Project 1134A Berkut A class cruiser of the Soviet Navy and briefly of the Russian Navy. The fourth ship of her class, the ship served mostly during the Cold War, from 1972 to 1992. She served with the Northern Fleet for the duration of her career, often operating in the Atlantic and the Mediterranean in order to show the flag, and was refitted between 1983 and 1985. She was decommissioned in 1992 due to deteriorating conditions which reduced naval funding prevented from being addressed before being sold for scrap in 1994.

Soviet cruiser <i>Marshal Voroshilov</i> Soviet Kresta II-class cruiser

Marshal Voroshilov was a Project 1134A Berkut A class cruiser of the Soviet Navy, which briefly became part of the Russian Navy after being renamed Khabarovsk in 1991. The fifth ship of her class, the ship served mostly during the Cold War, from 1973 to 1992.

Soviet cruiser <i>Admiral Oktyabrsky</i> Soviet Kresta II-class cruiser

Admiral Oktyabrsky was a Project 1134A Berkut A -class cruiser of the Soviet Navy, which briefly became part of the Russian Navy. The sixth ship of her class, the ship served mostly during the Cold War, from 1973 to 1993.

Soviet cruiser <i>Marshal Timoshenko</i>

Marshal Timoshenko was a Project 1134A Berkut A class cruiser of the Soviet Navy. The eighth ship of her class, the vessel served during the Cold War with the Northern Fleet, often operating in the Atlantic Ocean but also travelling to various ports in the Mediterranean and Red Seas. The cruiser was taken out of service to be modernised in 1988 but a lack of funds meant the work was not completed. Instead Marshal Timoshenko was decommissioned in 1992.

Soviet cruiser <i>Vasily Chapayev</i>

Vasily Chapayev was a Project 1134A Berkut A class cruiser of the Soviet Navy named for Soviet commander Vasily Chapayev. The ninth ship of the class, the vessel served mostly during the Cold War from being launched in 1974.

Tserigo (Цериго) was one of eight Fidonisy-class destroyers built for the Imperial Russian Navy during World War I. She was never completed and was towed to Odessa and Sevastopol after the anti-Bolshevik White evacuation of her shipyard in early 1920. After the White movement abandoned Crimea later that year, the unfinished destroyer was towed to Istanbul and then French North Africa with Wrangel's fleet. After France recognized the Soviet Union in 1924, she was intended to be transferred to Soviet control, but the agreement was never implemented. The destroyer was instead scrapped in place by 1934.

Soviet destroyer <i>Dzerzhinsky</i> Destroyer of the Soviet Navy

Dzerzhinsky (Дзержинский) was one of eight Fidonisy-class destroyers built for the Imperial Russian Navy during World War I. She was originally named Kaliakria (Калиакрия) before she was renamed Dzerzhinsky in 1926.

Soviet destroyer <i>Shaumyan</i> Russian Fidonisy-class destroyer

Shaumyan (Шаумян) was one of eight Fidonisy-class destroyers built for the Imperial Russian Navy during World War I. She was originally named Levkas (Левкас) before she was renamed Shaumyan in 1925. Left unfinished during the Russian Revolution in 1917 and later captured by Ukrainian and White forces, the destroyer was completed by the Soviets in 1925 following their victory in the Russian Civil War.

Soviet destroyer <i>Boyky</i> (1936) Destroyer of the Soviet Navy

Boyky was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Black Sea Fleet. After the start of the German invasion of the Soviet Union in June 1941, the ship helped to lay minefields off Sevastopol. During the Siege of Odessa, Boyky transported troops and supplies while providing naval gunfire support to the defenders and then helped to evacuate them in October. During the Siege of Sevastopol, she performed the same sorts of missions and then participated in the Battle of the Kerch Peninsula at the end of 1941.

Sposobny was one of 18 Storozhevoy-class destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Sposobny was completed in 1941 to the modified Project 7U design and assigned to the Black Sea Fleet.

Soviet cruiser <i>Admiral Isachenkov</i> Soviet Navys Kresta II-class cruiser

Admiral Isachenkov was a Project 1134A Berkut A -class Large Anti-submarine Ship of the Soviet Navy. The seventh ship of the class, the vessel was launched in 1972 and served during the Cold War with the Northern Fleet, often operating in the Atlantic Ocean but also travelling to various ports in the Mediterranean Sea. The ship acted as flagship for the Minister of Defence, Marshal of the Soviet Union Andrei Grechko, during Okean-75 in 1975 and operated alongside the newly launched Project 1143 Krechyet aircraft carrier Kiev in 1977 and 1978. The ship also shadowed the NATO aircraft carriers HMS Ark Royal, USS Independence and USS John F. Kennedy. The cruiser was taken out of service for repairs in 1981 and substantially upgraded with new weapons and communications systems, re-entering service in 1982. With the end of the Cold War, the Navy reassessed its need for large warships and, after a career stretching nearly twenty years, Admiral Isachenkov was decommissioned in 1992 and sold to be broken up.

Russian destroyer <i>Admiral Kharlamov</i> Udaloy-class destroyer of the Russian Navy

Admiral Kharlamov was an Udaloy-class destroyer of the Russian Navy.

Soviet frigate <i>Razyashchiy</i> Krivak-class frigate

Razyashchiy was a Project 1135 Burevestnik-class Large Anti-Submarine Ship or Krivak-class frigate of the Soviet Navy. Displacing 3,200 tonnes full load, the vessel was built around the Metel anti-submarine missile system. Launched on 22 July 1974, Razyashchiy joined the Pacific Fleet of the Soviet Navy. While serving in the Arabian Sea, in 1983, Razyashchiy suffered minor hull damage from colliding with the destroyer USS Fife while approaching a US fleet. The ship also undertook visits to Port Louis, Mauritius, and Danang, Vietnam, to, among other objectives, enhance the relationships between these countries and the Soviet Union. In 1991, the vessel was transferred to the newly-formed Russian Navy. After nearly twenty years of service, however, Razyashchiy was in a poor state and so was decommissioned on 29 October 1992 and sold to be broken up on 6 October 1994.

Soviet frigate <i>Grozyashchiy</i> Krivak-class frigate

Grozyashchiy or Grozyashchy was a 1135M Burevestnik-class guard ship, or frigate with the NATO reporting name 'Krivak-II', that served with the Soviet and Russian Navies. Launched on 7 February 1977, the vessel operated as part of the Pacific Fleet as an anti-submarine vessel, with an armament built around the Metel Anti-Ship Complex. Grozyashchiy undertook a number of visits to nations friendly to the Soviet Union, including Angola, Mauritius, Mozambique and Sri Lanka. The ship also formed part of the Soviet presence during the Sino-Vietnamese conflicts and visited Da Nang, Vietnam, in the October 1981. With the dissolution of the Soviet Union, Grozyashchiy joined the Russian fleet, but lack of funding meant that a planned repair in 1992 was not completed and instead the vessel was decommissioned on 13 February 1995 and sold to be broken up.

References

Citations

  1. Berezhnoy 1995, p. 10.
  2. Zablotsky & Kostrichenko 2005, p. 10.
  3. 1 2 3 4 Gardiner, Chumbley & Budzbon 1995, pp. 390–391.
  4. 1 2 3 4 5 Pavlov 1995, p. 81.
  5. 1 2 Zablotsky & Kostrichenko 2005, p. 21.
  6. 1 2 3 Zablotsky & Kostrichenko 2005, pp. 31–32.
  7. Zablotsky & Kostrichenko 2005, p. 127.
  8. Berezhnoy 1995, p. 12.
  9. 1 2 3 4 5 Zablotsky & Kostrichenko 2005, p. 126.
  10. "Soviets deny plan to halt whale hunting" . The Vancouver Sun. 26 August 1976. pp. 1, 2. Retrieved 23 November 2018 via Newspapers.com.
  11. "Goodwill mission of Soviets marred by demonstrators" . The Vancouver Sun. 30 August 1976. p. 17. Retrieved 23 November 2018 via Newspapers.com.
  12. Averin 2007, p. 70.
  13. Kelemen 1984, p. 342.
  14. 1 2 Zablotsky & Kostrichenko 2005, p. 180.
  15. 1 2 Zablotsky & Kostrichenko 2005, p. 190.

Bibliography