Soviet submarine K-85

Last updated
Soviet submarine K-77.jpg
History
Naval Ensign of the Soviet Union (1950-1991).svgSoviet Union
NameK-85
Builder Shipyard 189 named after Grigoriy Ordzhonikidze, Leningrad
Laid down25 October 1961
Launched31 January 1964
Commissioned22 January 1965
Decommissioned30 June 1993
RenamedB-85, 25 July 1977
Fate Scrapped, 1998–1999
General characteristics
Type Juliett-class submarine
Displacement
  • 3,174  t (3,124 long tons) (surfaced)
  • 3,750 t (3,690 long tons) (submerged)
Length85.9 m (281 ft 10 in)
Beam9.7 m (31 ft 10 in)
Draft3.29 m (10 ft 10 in)
Propulsion
Speed
  • 16 knots (30 km/h; 18 mph) (surfaced)
  • 18 knots (33 km/h; 21 mph) (submerged)
Range
  • 18,000  nmi (33,000 km; 21,000 mi) at 7 knots (13 km/h; 8.1 mph) (snorkeling)
  • 27.8 nmi (51.5 km; 32.0 mi) at 18 knots (33 km/h; 21 mph) (submerged)
Test depth240 m (790 ft)
Complement78
Sensors and
processing systems
Electronic warfare
& decoys
Nakat-M ESM
Armament

K-85 was a "Project 651" (NATO reporting name: Juliett-class) diesel-electric submarine built for the Soviet Navy during the 1960s. Commissioned in 1965, the boat was armed with long-range cruise missiles to carry out its mission of destroying American aircraft carriers and bases. The missiles could be fitted with either conventional or nuclear warheads. While much of the submarine's activities during the Cold War are unknown, she did make at least two patrols in the Mediterranean Sea while assigned to the Northern Fleet. The submarine was renamed B-124 in 1977 and was transferred to the Baltic Fleet four years later. B-124 was decommissioned in 1993 and subsequently scrapped.

Contents

Background and description

In the late 1950s, the Soviet Navy was tasked to neutralize American bases and aircraft carriers and decided that submarines armed with cruise missiles were the best method to accomplish this. The number of expensive nuclear-powered (Echo-class submarines) that it could afford and build in a timely manner was insufficient to meet its requirements, so it decided to build the Juliett class as it was significantly cheaper and faster to build. [1]

The Juliett-class boats are a double-hulled design that displaces 3,174 metric tons (3,124 long tons ) on the surface and 3,750 tonnes (3,690 long tons) submerged. Unlike the later submarines of the class, K-68's hull was built from non-magnetic steel and was not covered with anechoic tiles. The boats have an overall length of 85.9 meters (281 ft 10 in), a beam of 9.7 meters (31 ft 10 in), and a draft (ship) of 6.29 meters (20 ft 8 in). The Julietts have a test depth of 240 meters (790 ft) and a design depth of 300 meters (980 ft). The prominent blast deflectors cut out of the outer hull behind the missile launchers make the submarines very noisy at high speed. Their crew numbered 78 men. [2]

Propulsion and performance

The Juliett class is powered by a diesel-electric system that consists of two 4,000- metric-horsepower (2,900  kW ) 1D43 diesel engines and a pair of 3,000-metric-horsepower (2,200 kW) MG-141 electric motors for cruising on the surface. Two additional 200-metric-horsepower (150 kW) electric motors are intended for slow speeds underwater and are powered by four banks of lead-acid battery cells that are recharged by a 1,000-metric-horsepower (740 kW) 1DL42 diesel generator. The boats are fitted with a retractable snorkel to allow the diesel engines to operate while underwater. [3] [4]

On the surface, the submarines have a maximum speed of 16 knots (30 km/h; 18 mph). Using their diesel-electric system while snorkeling gives the Julietts a range of 18,000 nautical miles (33,000 km; 21,000 mi) at 7 knots (13 km/h; 8.1 mph). Using just the electric motors underwater, they have a maximum range of 810 nmi (1,500 km; 930 mi) at 2.74 knots (5.07 km/h; 3.15 mph). Their best-submerged speed on electric motors is 18 knots (33 km/h; 21 mph), although it reduces their range to 27.8 nmi (51.5 km; 32.0 mi). They were designed to carry enough supplies for 90 days of operation. [4] [5]

Armament

To carry out the Julietts' mission of destroying American carrier battle groups and bases, they were fitted with two pairs of missile launchers, one each fore and aft of the sail. The launchers were used by the surface-launched SS-N-3 Shaddock family of long-range, turbojet-powered, cruise missiles that could be equipped with either a high-explosive or nuclear warhead. [6]

The more traditional armament of the Julietts consisted of six 533-millimeter (21 in) torpedo tubes mounted in the bow and four 406-millimeter (16 in) torpedo tubes in the stern. Due to space limitations, no reloads were provided for the bow tubes, but each stern tube had two reloads for a total of twelve. [4]

Fire control and sensors

A photo of sister ship K-24 in Peenemunde, Germany. The Argument (Front Door) radar is at the front of the sail, with the Front Piece datalink above it. Aft of the sail, the rear missile mount is visible, elevated to its maximum of 15deg. U 461 2592x1944.jpg
A photo of sister ship K-24 in Peenemünde, Germany. The Argument (Front Door) radar is at the front of the sail, with the Front Piece datalink above it. Aft of the sail, the rear missile mount is visible, elevated to its maximum of 15°.

The submarines relied upon aircraft for their long-range anti-ship targeting which they received via the Uspekh-U data link system. Their own Argument missile-guidance radar controlled the missiles until they were out of range via a data link. The missiles' onboard radar would detect the targets and transmit an image back to the submarine via video data link so the crew could select which target to attack, after which the missile relied upon its own radar for terminal guidance. The Argument radar has a massive antenna that was stowed at the front of the sail and rotated 180° for use. The data link antenna was mounted on top of the missile-guidance antenna. [7]

The boats are fitted with Artika-M (MG-200) and Herkules (MG-15) sonars, Feniks-M (MG-10) and MG-13 hydrophones, and an Albatros (RLK-50) search radar. [3] They are also equipped with a Nakat-M Electronic warfare support measures system. [8]

Construction and career

K-85 was laid down at Shipyard 189 named after Grigoriy Ordzhonikidze in Leningrad on 25 October 1961. She was launched on 31 January 1964 and operated from Tallinn and Liepāja during initial tests in mid-year before being transferred via the White Sea–Baltic Canal to Belomorsk and Severodvinsk for further testing. Entering service on 30 December 1964, the submarine was officially included in the 35th Submarine Division of the Northern Fleet on 22 January 1965. [9] [8] Based at Malaya Lopatkina Bay, the boat made her first patrol in the Mediterranean Sea in 1966. It was plagued with problems with its diesel engines and periscope caused by poor-quality workmanship by the shipyard that got worse over her patrol and forced the navy to abort her mission and return home prematurely for repairs. From January to March 1967 the repairs were carried out at SRZ-35 in Rosta, Murmansk. Between August and November she went on patrol. On 9 September she was ordered to assist K-3 which had suffered a deadly fire while in the Norwegian Sea but was unable to reach K-3 during the day, instead being order to continue the patrol. [10]

In the first half of 1968 the submarine underwent repairs at SRZ-35 to replace her batteries, flooded during the previous cruise. Between August and November, the submarine spent 93 days at sea in the Mediterranean during the 1968 Czechoslovak crisis. While passing through the Strait of Gibraltar it was targeted with practice depth charges by American anti-submarine forces. In 1969 it conducted practice missile firing in the White Sea. The submarines of the 35th Division were relocated to Ara Bay near Vidyayevo in October of that year. K-85 collided with the fishing vessel Yerevan in 1970. Between April 1971 and January 1974 the submarine was under routine repair at SRZ-35, Murmansk. K-85 (the K standing for (Russian: крейсерская, romanized: kreyserskaya, lit.'cruiser') was redesignated B-124 (the B standing for Russian: большая, romanized: bolshaya, lit.'large') on 25 July 1977. Between October 1978 and April 1979 she conducted a Mediterranean cruise, replenishing at Tartus. [10]

B-124 conducted a cruise around Scandinavia into the Baltic to join the Baltic Fleet in 1981. The submarine was transferred to the 16th Submarine Division of the 14th Submarine Squadron of the Baltic Fleet on 24 February 1981, based at Liepāja. During 1982 and 1983 the submarine underwent modernization at SRZ-29 in Liepaja, receiving new batteries. The submarine was removed from service and laid up at Liepaja on 1 November 1989, but returned to service on 31 December 1990 as part of the 58th Submarine Brigade of the Baltic Fleet, reorganized from the 16th Submarine Division. The submarine B-124 was decommissioned on 30 June 1993 for disposal. [11] After the Russian withdrawal from Latvia it was left moored half-submerged in Liepaja at Tosmare shipyard in agreement with a Russian military contract. The submarine hull was sold for scrap to the German company VMG and raised by the Lithuanian firm Opron Shipping in 1997 before being scrapped at Tosmare between 1998 and 1999. [10]

Related Research Articles

Juliett-class submarine

The Project 651, known in the West by its NATO reporting name Juliett class, was a class of Soviet diesel-electric submarines armed with cruise missiles. They were designed in the late 1950s to provide the Soviet Navy with a nuclear strike capability against targets along the east coast of the United States and enemy combatants. The head of the design team was Abram Samuilovich Kassatsier. They carried four nuclear-capable cruise missiles with a range of approximately 300 nautical miles (560 km), which could be launched while the submarine was surfaced and moving less than four knots (7.4 km/h). Once surfaced, the first missile could be launched in about five minutes; subsequent missiles would follow within about ten seconds each. Initially, the missiles were the inertially-guided P-5. When submarine-launched ballistic missiles rendered the P-5s obsolescent, they were replaced with the P-6 designed to attack aircraft carriers. A special 10 m2 target guidance radar was built into the forward edge of the sail structure, which opened by rotating. One boat was eventually fitted with the Kasatka satellite downlink for targeting information to support P-500 4K-80 "Bazalt" anti-ship cruise missiles. The Juliett class had a low magnetic signature austenitic steel double hull, covered by two inches (51 mm) thick black tiles made of sound-absorbing hard rubber.

Soviet submarine <i>K-222</i> Nuclear-powered cruise-missile submarine

K-222 was the first and only Project 661 nuclear-powered cruise-missile submarine built for the Soviet Navy during the Cold War. Although the Soviets saw K-222 as an unsuccessful design, upon completion it was the world's fastest submarine and the first to be built with a titanium hull.

Soviet submarine <i>K-77</i> Soviet Juliett-class cruise-missile submarine

K-77 was a "Project 651" diesel–electric submarine built for the Soviet Navy during the 1960s. Commissioned in 1965, the boat was armed with long-range cruise missiles to carry out its mission of destroying American aircraft carriers and bases. The missiles could be fitted with either conventional or nuclear warheads.

K-131 was a Project 675 of the Soviet Navy's Northern Fleet, she was also redesignated K-192.

Echo-class submarine

The Echo class were nuclear cruise missile submarines of the Soviet Navy built during the 1960s. Their Soviet designation was Project 659 for the first five vessels, and Project 675 for the following twenty-nine. Their NATO reporting names were Echo I and Echo II. All were decommissioned by 1994.

Whiskey-class submarine Diesel-electric attack submarine that the Soviet Union built in the early Cold War period

Whiskey-class submarines are a class of diesel-electric attack submarines that the Soviet Union built in the early Cold War period.

K-56 was a Project 675 nuclear submarine of the Soviet Navy.

Soviet submarine <i>S-80</i>

S-80 was a diesel-electric submarine of the Soviet Navy.

Charlie-class submarine

The Project 670 Skat submarine was a nuclear-powered cruise missile submarine built for the Soviet Navy and later operated by the Russian Navy. All Charlie I/II-class submarines are decommissioned. One Charlie-class submarine was used for testing an Oniks missile. Charlie I and its successor Charlie II-class submarines are designed by the Lazurit Central Design Bureau of Gorky.

The S-99 experimental submarine was the only ship of the Project 617 class that the Soviet Union built during the early Cold War. She was the only Soviet submarine which used a German Walter turbine fueled by high-test peroxide (HTP). Entering service in 1956, the boat was assigned to a training unit of the Baltic Fleet. S-99 was badly damaged by a HTP explosion in 1959 and was not repaired. The submarine was decommissioned in 1964 and subsequently scrapped.

Soviet cruiser <i>Kronstadt</i> Soviet Navys Kresta II-class cruiser

Kronstadt was a Project 1134A Kresta II-class cruiser of the Soviet Navy, named for the Kronstadt naval base. The first ship of her class, the ship served during the Cold War, from 1969 to 1991. She served with the Northern Fleet, with her shakedown cruise being through the Mediterranean Sea. After colliding with a destroyer in 1975, she spent five years being repaired and modernized. She was decommissioned in 1991 before being sold for scrap two years later due to reduced naval funding and deteriorating conditions.

Soviet frigate <i>Bodryy</i>

Bodryy was a Project 135 Burevestnik-class Large Anti-Submarine Ship or Krivak-class frigate. Launched on 15 April 1971, the vessel served with the Soviet Navy until it was dissolved and then was transferred to the Russian Navy. The ship played a key role in helping the Soviets develop techniques for tracking ballistic missile submarines in the 1970s. Bodryy was retired on 17 July 1997 and scrapped.

Soviet frigate <i>Bditelnyy</i> Krivak-class frigate

Bditel'nyy or Bditelnyy was a Project 1135 Burevestnik Large Anti-Submarine Ship or Krivak-class frigate that served with the Soviet and Russian Navies. Launched on 28 March 1970, the vessel served as part of the Baltic Fleet but operated more widely than the Baltic Sea, demonstrating the emerging blue water capability of the Navy. A dedicated anti-submarine vessel, with an armament built around the Metel system, the ship spent the period between 26 December 1970 and 30 September 1971 undertaking trials and tests to prove the new systems. During that time General Secretary Leonid Brezhnev and Admiral of the Fleet Sergey Gorshkov were both hosted on board. The vessel then subsequently undertook tracking of submarines in the Baltic, Black and Mediterranean Seas, and even travelled as far as Cuba, crossing the Atlantic Ocean. The ship also visited friendly ports like Annaba in Algeria, Gdynia in Poland and Rostock in East Germany. With the end of the Cold War, the ship also travelled to Belgium and visited Antwerp. During June 1993, Bditelnyy took part in BALTOPS-93, the first joint exercise between NATO and Russia. However, soon afterwards, the ship was retired and, on 31 July 1996, decommissioned and subsequently broken up.

Soviet cruiser <i>Admiral Isakov</i> Soviet Kresta II-class cruiser

Admiral Isakov was a Kresta II-class cruiser of the Soviet Navy and briefly of the Russian Navy, named for Soviet admiral Ivan Isakov. The second ship of her class, she served mostly during the Cold War from her commissioning in 1970.

Soviet frigate <i>Revnostnyy</i> Krivak-class frigate

Revnostnyy was a Project 1135M Burevestnik-class Guard Ship or 'Krivak' class frigate that served with the Soviet Navy. Launched on 23 April 1980, the vessel operated as part of the Pacific Fleet as an anti-submarine vessel, with an armament built around the Metel Anti-Ship Complex. Revnostnyy patrolled extensively as far afield as the Arabian Peninsula and Sea of Japan. The ship undertook a friendly visit to India in 1984 and, during the following year, formed part of the escort for a flotilla led by the Soviet aircraft carrier Novorossiysk which helped develop Soviet tactics for carrier-borne aircraft. Taken out of service for an overhaul in 1988, Revnostnyy was instead placed in reserve until 24 July 2003, when the ship was decommissioned and sold to be broken up.

Soviet frigate <i>Ryavnyy</i> Krivak-class frigate

Ryavnyy was a Project 1135M Burevestnik-class Guard Ship or 'Krivak II' class frigate that served with the Soviet Navy. Launched on 1 September 1979, the vessel operated as part of the Pacific Fleet as an anti-submarine vessel, with an armament built around the Metel Anti-Ship Complex. Ryavnyy took part in operations in the Indian and Pacific Oceans and undertook visits to countries friendly to the Soviet Union. The ship spent time in the Seychelles and North Yemen in 1982 and North Korea in 1985 and 1986. Taken out of service for an overhaul in 1989, Ryavnyy was instead placed in reserve until 17 July 1997, when the ship was decommissioned and sold to be broken up.

Soviet frigate <i>Gordelivy</i> Krivak-class frigate

Gordelivy was a Project 1135M Burevestnik-class Guard Ship or 'Krivak II'-class frigate that served with the Soviet and Russian Navies. Launched on 3 May 1978, the vessel operated as part of the Pacific Fleet as an anti-submarine vessel, with an armament built around the Metel Anti-Ship Complex. Gordelivy operated in the Indian and Pacific Oceans. The ship was involved in the recovery of a BOR-4 prototype spaceplane in 1982 and undertook a friendly visit to Mumbia, India, in 1985. Decommissioned and sold to a South Korean company in 1994, Gordelivy left Russia on 27 June 1995 to be broken up.

Soviet frigate <i>Neukrotimyy</i> Krivak-class frigate

Neukrotimyy was a Project 1135M Burevestnik-class Guard Ship or 'Krivak II'-class frigate that served with the Soviet and Russian Navies. The vessel was known as Komsomolets Litvyy between 1987 and 1990. Launched on 17 September 1977, Neukrotimyy was designed to operate as an anti-submarine vessel with the Baltic Fleet, using an armament built around the Metel Anti-Ship Complex. The vessel undertook many visits to other countries outside the Soviet Unions, including Angola, East Germany, Nigeria and Poland. Following the dissolution of the Soviet Union, in 1991, the ship was transferred to the Russian Navy and continued to travel to countries like the Netherlands. Despite being accidentally holed in 2005 and being badly burnt in a fire in 2008, Neukrotimyy remained the penultimate of the class to remain in service, finally being decommissioned on 29 June 2009.

Soviet submarine <i>K-70</i> Soviet Juliett-class cruise-missile submarine

K-70 was a "Project 651" diesel–electric submarine built for the Soviet Navy during the 1960s. Commissioned in 1965, the boat was armed with long-range cruise missiles to carry out its mission of destroying American aircraft carriers and bases. The missiles could be fitted with either conventional or nuclear warheads. K-70 was initially assigned to the Northern Fleet, but was transferred to the Pacific Fleet a few months later. The submarine was decommissioned in 1989 and subsequently scrapped.

Soviet submarine <i>K-68</i> Soviet Juliett-class cruise-missile submarine

K-68 was a "Project 651" diesel–electric submarine built for the Soviet Navy during the 1960s. Commissioned in 1965, the boat was armed with long-range cruise missiles to carry out its mission of destroying American aircraft carriers and bases. The missiles could be fitted with either conventional or nuclear warheads. While much of the submarine's activities during the Cold War are unknown, she did make at least one patrol in the Mediterranean Sea before serving as the test bed for an auxiliary nuclear reactor from 1976 to 1991. K-68 was decommissioned in 1992 and subsequently scrapped.

References

  1. Friedman, p. 344; Vilches Alarcón, pp. 13–14
  2. Pavlov, p. 60; Vilches Alarcón, p. 13
  3. 1 2 Hampshire, p. 24
  4. 1 2 3 Pavlov, p. 60
  5. Friedman, p. 402
  6. Vilches Alarcón, pp. 12, 18, 22; Polmar & Noot, p. 289
  7. Polmar & Moore, p. 97; Hampshire, pp. 26–27
  8. 1 2 Hampshire, p. 25
  9. Pavlov, p. 60; Vilches Alarcón, p. 18
  10. 1 2 3 Nikolayev, Andrey. "Подводная лодка К-85, Б-124. Проект 651". www.deepstorm.ru. Retrieved 2023-05-05.
  11. Hampshire, pp. 28, 46; Vilches Alarcón, pp. 16, 20

Bibliography