Speed climbing wall

Last updated

A speed climbing wall is an artificial standardised climbing wall and is the main apparatus used for competitive speed climbing.

Contents

For such competitions – including those in the Olympics 2020 – the speed climbing wall has been normed by the IFSC in a way that records are comparable. [1] The norm defines height, angle and surface of the wall, shape and size of the hand and footholds as well as their position and orientation on the wall. For world records, the wall has to be produced by a licensed manufacturer as well as inspected and approved by the IFSC. For safety, it has to comply with European Norm EN 12572-1. [2]

Specification

The current IFSC rules for climbing competitions [3] refer to "artificial structures designed to ... the IFSC Speed Licence Rules". For the latter, the most current document is from 2022. [4]

While both a 15 m and a 10 m wall are specified, world records are taken on the 15 m wall only.

15 m wall design

The wall itself has a height of 15000 mm and consists of two lanes, each 3000 mm wide, with a distance of 0 to 1000 mm from each other. The wall stands on a 200 mm socle and must continue 500 mm above the finish button, i.e. above the 15 m.

The wall must overhang continuously with an angle of 5°.

The climbable surface has to be light grey, covered by a resin-quartz with 0.1/0.4 granulometry, the numbers referring to grain sizes of fine sand.

The top rope anchor point must be 1000 mm higher than the climbing wall and stand out 1000 mm from the wall.

The layout for mounting the holds is based on a concept of square panels with a size of 1500 mm x 1500 mm each. Thus 20 panels, 10 vertically by 2 horizontally, form one of the two lanes. They are referred to by 'sn' and 'dx' (based on Italian terms for left and right), and numbered from 1 to 10 counting from the bottom.

Each panel holds a grid of mounting holes, 11 horizontally (lettered A-K from left to right) and 10 vertically (numbered 1–10 from bottom to top). The grid spacing is 125 mm horizontally, from the edge to the next hole, and between holes. Vertically, the distance is 188 mm from the edge and 125 mm between holds. Thus the vertical size sums up as (188 + 9 x 125 + 188) = 1501 mm, which is 1 mm more than the specified panel size. The holes have M10 threaded inserts.

Tolerances are typically of ±1 mm for panel-based measures, and ±2 mm between panels.

If the wall is not structured in the panels described above, the global grid layout should be the same as for the panelled version.

Each mounting point in the grid has an individual reference comprising the side (sn, dx), the panel number from the bottom, and the alphanumeric grid point within the panel; for example dx3 G3.

Holds

The two types of holds, 20 big hand holds and 11 small foot holds, are modelled after an official master hold provided by the IFSC. Competition holds are equally coloured in bright red.

The shape of the big holds is characterised by four forms protruding in four directions from the central mounting hole. Most prominent is a ball-like structure, clockwise followed by a rounded hill, a pointed long tail opposing the ball, and a shorter pointed tail. The concave shapes between the protruding elements have different well-defined incuts.

In the wall topology, the central mounting point is listed with its grid reference, and the vector starting at the central point going to the long tail describes the orientation, by pointing towards a second grid reference.

The shape of the small holds is simpler, however the mounting hole is excentric, thus the orientation follows the vector going through the widest protruding side.

Timing system

The mechanical-electric timing systems consists of a starting pad, recording when the competitor lifts the foot, and a stop device, which is hit with the hand at the top of the wall. The size of the stop device is not precisely specified in the rules, [4] however it covers the holes A/B 9/10 on panel dx10, and its centre has to be 13140 mm above the starting hold, which computes as 15 mm above grid line 10 of dx10.

Manually taking of time was allowed as a backup solution in previous versions of the IFSC rules, but has been removed in 2018. [5]

Belaying

Belaying is performed via a top anchor. While there are methods to quickly take in the rope manually with two belayers, automatic belay systems are increasingly installed, and the world record can only be taken when a certified auto-belay system is being used.

See also

Related Research Articles

<span class="mw-page-title-main">Door</span> Movable barrier that allows ingress and egress

A door is a hinged or otherwise movable barrier that allows ingress (entry) into and egress (exit) from an enclosure. The created opening in the wall is a doorway or portal. A door's essential and primary purpose is to provide security by controlling access to the doorway (portal). Conventionally, it is a panel that fits into the doorway of a building, room, or vehicle. Doors are generally made of a material suited to the door's task. They are commonly attached by hinges, but can move by other means, such as slides or counterbalancing.

<span class="mw-page-title-main">19-inch rack</span> Standard width frame for C&N equipment

A 19-inch rack is a standardized frame or enclosure for mounting multiple electronic equipment modules. Each module has a front panel that is 19 inches (482.6 mm) wide. The 19 inch dimension includes the edges or "ears" that protrude from each side of the equipment, allowing the module to be fastened to the rack frame with screws or bolts. Common uses include computer servers, telecommunications equipment and networking hardware, audiovisual production gear, music production equipment, and scientific equipment.

<span class="mw-page-title-main">Climbing wall</span> Artificial rock climbing wall

A climbing wall is an artificially constructed wall with grips for hands and feet, usually used for indoor climbing, but sometimes located outdoors. Some are brick or wooden constructions, but on most modern walls, the material most often used is a thick multiplex board with holes drilled into it. Recently, manufactured steel and aluminum have also been used. The wall may have places to attach belay ropes, but may also be used to practice lead climbing or bouldering.

<span class="mw-page-title-main">Router (woodworking)</span> Woodworking power tool

The router is a power tool with a flat base and a rotating blade extending past the base. The spindle may be driven by an electric motor or by a pneumatic motor. It routs an area in hard material, such as wood or plastic. Routers are used most often in woodworking, especially cabinetry. They may be handheld or affixed to router tables. Some woodworkers consider the router one of the most versatile power tools.

<span class="mw-page-title-main">Underground hard-rock mining</span> Mining techniques used to excavate hard minerals and gems

Underground hard-rock mining refers to various underground mining techniques used to excavate "hard" minerals, usually those containing metals, such as ore containing gold, silver, iron, copper, zinc, nickel, tin, and lead. It also involves the same techniques used to excavate ores of gems, such as diamonds and rubies. Soft-rock mining refers to the excavation of softer minerals, such as salt, coal, and oil sands.

<span class="mw-page-title-main">Glossary of climbing terms</span> Definitions of terms in rock climbing and mountaineering

Glossary of climbing terms relates to rock climbing, mountaineering, and to ice climbing.

<span class="mw-page-title-main">Rock-climbing equipment</span> List of manmade gear

Rock-climbing equipment requires a range of specialized sports equipment, for training, for aid climbing, and for free climbing. Developments in rock-climbing equipment played an important role in the history of rock climbing, enabling climbers to ascend more difficult climbing routes safely, and materially improving the strength, conditioning, and ability of climbers.

<span class="mw-page-title-main">Lead climbing</span> Technique of rock climbing

Lead climbing is a technique in rock climbing where the lead climber ascends the climbing route clipping their rope to climbing protection as they progress, while their second remains at the base of the route belaying the rope to protect the lead climber in the event that they fall. The term is used to distinguish between the two roles, and the greater effort and increased risk, of the role of the lead climber.

<span class="mw-page-title-main">Rock climbing</span> Type of sport

Rock climbing is a sport in which participants climb up, across, or down natural rock formations. The goal is to reach the summit of a formation or the endpoint of a usually pre-defined route without falling. Rock climbing is a physically and mentally demanding sport, one that often tests a climber's strength, endurance, agility and balance along with mental control. Knowledge of proper climbing techniques and the use of specialized climbing equipment is crucial for the safe completion of routes.

<span class="mw-page-title-main">Wood shaper</span>

A wood shaper, usually just shaper in North America or spindle moulder in the UK and Europe, is a stationary woodworking machine in which a vertically oriented spindle drives cutter heads to mill profiles on wood stock. The wood being fed into a moulder is commonly referred to as either stock or blanks. The spindle may be raised and lowered relative to the shaper's table, and rotates between 3,000 and 10,000 rpm, with stock running along a vertical fence.

Glass tubes are mainly cylindrical hollow-wares. Their special shape combined with the huge variety of glass types, allows the use of glass tubing in many applications. For example, laboratory glassware, lighting applications, solar thermal systems and pharmaceutical packaging to name the largest.

<span class="mw-page-title-main">Fly system</span> System of rope lines, blocks, counterweights and related devices within a theater

A fly system, or theatrical rigging system, is a system of rope lines, blocks (pulleys), counterweights and related devices within a theater that enables a stage crew to fly (hoist) quickly, quietly and safely components such as curtains, lights, scenery, stage effects and, sometimes, people. Systems are typically designed to fly components between clear view of the audience and out of view, into the large opening, known as the fly loft, above the stage.

<span class="mw-page-title-main">Boring (manufacturing)</span> Process of enlarging an already-drilled hole with a single-point cutting tool

In machining, boring is the process of enlarging a hole that has already been drilled by means of a single-point cutting tool, such as in boring a gun barrel or an engine cylinder. Boring is used to achieve greater accuracy of the diameter of a hole, and can be used to cut a tapered hole. Boring can be viewed as the internal-diameter counterpart to turning, which cuts external diameters.

The Flat Display Mounting Interface (FDMI), also known as VESA Mounting Interface Standard (MIS) or colloquially as VESA mount, is a family of standards defined by the Video Electronics Standards Association for mounting flat panel monitors, televisions, and other displays to stands or wall mounts. It is implemented on most modern flat-panel monitors and televisions.

<span class="mw-page-title-main">Single-rope technique</span>

Single-rope technique (SRT) is a set of methods used to descend and ascend on the same single rope. Single-rope technique is used in caving, potholing, rock climbing, canyoning, roped access for building maintenance and by arborists for tree climbing, although to avoid confusion in the tree climbing community, many have taken to calling it "stationary" rope technique.

<span class="mw-page-title-main">Climbing competition</span> Competitive rock climbing

Competition climbing is a type of rock climbing held indoors on purpose-built artificial climbing walls, although earlier versions were held on external natural rock surfaces. The three standalone competition climbing disciplines are: lead climbing, bouldering, and speed climbing. A fourth discipline of "combined" is based on combinations of results in the three main disciplines. Competition climbing is sometimes called "sport climbing", which is the type of lead climbing performed in competition climbing.

<span class="mw-page-title-main">Ice screw</span> Protection anchor for ice climbing

An ice screw is a threaded tubular screw used as a running belay or anchor by climbers on steep ice surface such as steep waterfall ice or alpine ice during ice climbing or crevasse rescue, to hold the climber in the event of a fall, and at belays as anchor points.

<span class="mw-page-title-main">Belay device</span> Mechanical piece of climbing equipment

A belay device is a mechanical piece of climbing equipment used to control a rope during belaying. It is designed to improve belay safety for the climber by allowing the belayer to manage their duties with minimal physical effort. With the right belay device, a small, weak climber can easily arrest the fall of a much heavier partner. Belay devices act as a friction brake, so that when a climber falls with any slack in the rope, the fall is brought to a stop.

<span class="mw-page-title-main">Bracket (architecture)</span> Architectural element

A bracket is an architectural element: a structural or decorative member. It can be made of wood, stone, plaster, metal, or other media. It projects from a wall, usually to carry weight and sometimes to "...strengthen an angle". A corbel or console are types of brackets.

<span class="mw-page-title-main">Speed climbing</span> Type of climbing

Speed climbing is a climbing discipline in which speed is the ultimate goal. Speed climbing is done on rocks, walls and poles and is only recommended for highly skilled and experienced climbers.

References

  1. Brendan Blanchard (2018-05-31). "What the Hell is Speed Climbing?". Climbing Magazine. Retrieved 2020-02-28.
  2. DIN EN 12572-1:2007 Künstliche Kletteranlagen – Teil 1: Sicherheitstechnische Anforderungen und Prüfverfahren für KKA mit Sicherungspunkten (Artificial climbing structures – Part 1: Safety requirements and test methods for ACS with protection points) (in German), Berlin: Beuth Verlag, 2007, (31 pages)
  3. IFSC-Rules 2019
  4. 1 2 IFSC Speed Licence Rules, version 1, February 2022
  5. IFSC Rules modification 2018 V1.5, April 2018