Overview | |
---|---|
Line | Calder Valley line |
Coordinates | 53°41′02″N2°05′31″W / 53.68389°N 2.09194°W |
OS grid reference | SD940208 |
Status | Open |
Operation | |
Opened | 1 March 1841 |
Closed | 20 December 1984 |
Reopened | 19 August 1985 |
Technical | |
Design engineer | Thomas Longridge Gooch |
Length | 1 mile 1,125 yards (2.638 km) |
No. of tracks | 2 |
Grade | 1-in-330 (southwards) |
Summit Tunnel in England is one of the world's oldest railway tunnels. It was constructed between 1838 and 1841 by the Manchester and Leeds Railway Company to provide a direct line between Leeds and Manchester. When built, Summit Tunnel was the longest railway tunnel in the world.
The tunnel, between Littleborough and Walsden near Todmorden, was bored beneath the Pennines, a natural obstruction to most forms of traffic. The tunnel is just over 1.6 miles (2.6 km) long and carries two standard-gauge tracks in a single horseshoe-shaped tube, approximately 24 feet (7.2 m) wide and 22 feet (6.6 m) high. Summit Tunnel was designed by Thomas Longridge Gooch, assisted by Barnard Dickinson. Progress on its construction was slower than anticipated, largely because excavation was more difficult than anticipated. On 1 March 1841, Summit Tunnel was opened by Sir John Frederick Sigismund Smith; it had cost of £251,000 and 41 workers had died.
On 20 December 1984, the Summit Tunnel fire occurred. There were no deaths and five months later, the tunnel reopened after repairs. The tunnel has remained in continuous use with little interruption since it opened.
Summit Tunnel, between Littleborough and Todmorden [1] is the highest section of the 51-mile (82 km) long Manchester and Leeds Railway, which was built parallel to the Rochdale Canal. When built, it was the world's longest railway tunnel and a critical element of the first trans-Pennine line. [1]
The tunnel was designed by the civil engineer Thomas Longridge Gooch, a collaborator of George Stephenson and his son Robert Stephenson on several railway schemes. [1] Between spring 1835 and 1844, Gooch was the engineer for the Manchester and Leeds Railway on behalf of George Stephenson, who was working on other projects. In September 1837, during Gooch's tenure, work commenced boring the tunnel. [1] Gooch was assisted by Barnard Dickinson. When speaking about the tunnel, Dickinson exclaimed: "This tunnel will defy the rage of tempest, fire, war or wasting age". [2]
The tunnel is 1 mile 1,125 yards (2.638 km) long and 22 feet (6.6 m) tall; the horseshoe-shaped bore is 26 feet (7.9 m) wide and accommodates a pair of tracks. [3] [4] [5] The tunnel falls on a gradient of 1-in-330 southwards (towards Littleborough). [6] It was driven by hand through shale, coal and sandstone, after which the walls were lined with six courses of brick, using more than 23 million bricks. [7] The bricks were handmade locally and up to 60,000 were laid in a single day. [1] Roman cement was used for its impermeability to water. It has been estimated that about 8,100 tonnes (dry weight) of cement was transported to the tunnel from Hull. [1] During August 1838, James Wood, the chairman of the Manchester and Leeds Railway, laid the first brick in a ceremony. [1]
The original contractors were Evans, Stewart and Copeland. [1] At the peak of construction, a workforce of between 800 and 1,250 men and boys was active, aided by about 100 horses and 13 stationary steam engines, which were used to remove material from the shafts. [1] The bedrock was hewn using physical strength and hand tools, illuminated only by candlelight. At an early stage of track laying, the rails were laid directly onto excavated rock, but conventional wooden sleepers were also used. [1] The spoil was used for other purposes, including in the construction of Blackpool Promenade. [1]
Alignment of the tunnel was achieved by drilling 14 vertical shafts to provide survey points. [1] When the tunnel was complete, two shafts were sealed and the remaining 12 were retained as ventilation. The ventilation shafts were up to 92 to 308 feet (28 to 94 m) deep. During the tunnel's service life, No.6 was sealed after rock falls. [1]
Progress on construction was slower than expected; the bedrock and blue shale through which it was bored proved to be harder to excavate than anticipated. [1] In March 1839, because of slow progress, the original contractors were dismissed and George Stephenson took over, after which the pace of work increased until a strike of the bricklayers occurred in March 1840. [2] The last brick was laid on 9 December 1840. [1]
Summit Tunnel should have opened on New Year's Eve 1840; but the opening was delayed after the discovery of a defective invert, 0.5 miles (0.8 km) from one end which had displaced the central track drain. [8] After repairs, the tunnel was officially opened by Sir John Frederick Sigismund Smith, the government inspector of railways on 1 March 1841. [9] Summit Tunnel cost £251,000 and the loss of 41 lives. [1] The cost was far greater than the railway company expected. [2]
The southern portal of the tunnel was grade II listed in 1986. [10]
The tunnel closed for the first eight months of 1985 following a fire that generated sufficient heat to vitrify sections of its outer brickwork. [1] [2] The build up of heat in the surrounding ground led to a 'false spring'; many plants produced flowers and buds as the warm soil triggered new growth. Damage to the tunnel lining was minimal which was attributed to heated gases from the fire escaping through the ventilation shafts. [2] Restoration involved replacing 550 yards (500 m) of track and sleepers before it re-opened to traffic on 19 August 1985. [1] [11]
On 28 December 2010, a passenger train travelling from Manchester to Leeds was derailed when it struck ice that had fallen onto the tracks from one of the ventilation shafts. The ice had built up during exceptionally cold weather and fell into the tunnel when it started to thaw. The train was the first to use the tunnel in three days as a result of a temporary break in services around Christmas. It collided with the tunnel wall, but remained upright and no injuries were reported. [12] [13]
Media related to Summit Tunnel, England at Wikimedia Commons
Box Tunnel passes through Box Hill on the Great Western Main Line (GWML) between Bath and Chippenham. The 1.83-mile (2.95 km) tunnel was the world's longest railway tunnel when it was completed in 1841.
The Kilsby Tunnel is a railway tunnel on the West Coast Main Line in England, near the village of Kilsby in Northamptonshire, roughly 5 miles (8 km) southeast of Rugby. It is 2,423 yards (2,216 m) long.
Totley Tunnel is a 6,230-yard tunnel under Totley Moor, on the Hope Valley line between Totley on the outskirts of Sheffield and Grindleford in Derbyshire, England.
The Summit Tunnel fire occurred on 20 December 1984, when a dangerous goods train caught fire while passing through the Summit Tunnel on the railway line between Littleborough and Todmorden on the Greater Manchester/West Yorkshire border, England.
The Calder Valley line is a railway route in Northern England between the cities of Leeds and Manchester as well as the seaside resort of Blackpool. It is the slower of the two main rail routes between Leeds and Manchester, and the northernmost of the three main trans-Pennine routes.
The Manchester and Leeds Railway was a British railway company that built a line from Manchester to Normanton where it made a junction with the North Midland Railway, over which it relied on running powers to access Leeds. The line followed the valley of the River Calder for much of the way, making for easier gradients but by-passing many important manufacturing towns. Crossing the watershed between Lancashire and Yorkshire required a long tunnel. The line opened throughout in 1841.
The Cowburn Tunnel is a railway tunnel at the western end of the Vale of Edale in the Derbyshire Peak District of England. The tunnel is 3,702 yards (3,385 m) long. It is the deepest railway tunnel in England, at 875 feet.
Clay Cross Tunnel is a 1,784 yards (1,631 m) tunnel on the Midland Main Line line near Clay Cross in Derbyshire, England. It was the most substantial single civil engineering feature present on the North Midland Railway and was one of the more ambitious railway tunnels to be built during the early development of Britain's railway network.
Hebden Bridge railway station serves the town of Hebden Bridge in West Yorkshire, England. The station is on the Calder Valley Line, operated by Northern since April 2016, from York and Leeds towards Manchester Victoria and Preston. The station is 8.5 miles (14 km) west of Halifax and 26 miles (42 km) west of Leeds.
Todmorden railway station serves the town of Todmorden in West Yorkshire, England, originally on the Yorkshire and Lancashire border. It was built by the Manchester and Leeds Railway and is on the Calder Valley line 23 miles (37 km) west of Leeds and 17 miles (27 km) north-east of Manchester Victoria.
Littleborough railway station serves the town of Littleborough in the Metropolitan Borough of Rochdale, Greater Manchester, England.
The Sankey Viaduct is a railway viaduct in North West England. It is a designated Grade I listed building and has been described as being "the earliest major railway viaduct in the world".
Thackley Tunnel is on the Airedale line between Leeds and Shipley on the lines to Bradford and Skipton.
Morley Tunnel is a railway tunnel in West Yorkshire, England, situated between Morley and Batley railway stations on the Huddersfield line. From its northern end, it extends 3,369 yards (3,081 m), passing beneath Morley town centre, to its southern end.
Bramhope Tunnel is on the Harrogate Line between Horsforth station and the Arthington Viaduct in West Yorkshire, England. Services through the railway tunnel are operated mainly by Northern. The tunnel was constructed during 1845–1849 by the Leeds and Thirsk Railway. It is notable for its 2.138-mile (3.441 km) length and its Grade II listed, crenellated north portal. The deaths of 24 men who were killed during its construction are commemorated in Otley churchyard by a monument that is a replica of the tunnel's north portal.
The River Irwell Railway Bridge was built for the Liverpool & Manchester Railway (L&MR), the world's first passenger railway which used only steam locomotives and operated as a scheduled service, near Water Street in Manchester, England. The stone railway bridge, built in 1830 by George Stephenson, was part of Liverpool Road railway station. The bridge was designated a Grade I listed building on 19 June 1988.
Linslade Tunnel is a railway tunnel in Bedfordshire, England, on the West Coast Main Line about 0.54 miles (0.9 km) north of Leighton Buzzard railway station and built under Linslade Woods. Consisting of three individual bores, the tunnel is somewhat unusual as there is a slight bend in its alignment.
Bowling Tunnel is a railway Tunnel on the Calder Valley line, south of Bradford in West Yorkshire, England. The Tunnel was completed in 1850 after some difficulty in construction, and allowed trains from the south to access the second railway terminus in the town of Bradford. The Tunnel remains open to railway traffic with trains between Halifax and Bradford Interchange using it.
Lees Moor Tunnel is an abandoned tunnel on the former Great Northern Railway line between Queensbury and Keighley in West Yorkshire, England. The former dual track tunnel is just north of the village of Cullingworth in West Yorkshire and when built was 1,533 yards (1,402 m) long. Due to the pitch black inside and the squealing of the wheels on the 1 in 50 radius curve, drivers nicknamed it the 'Hell Hole'. After closure to passengers, the tunnel was used in experiments involving the effects of smoke inhalation and cancer.
Watford Tunnels are a pair of railway tunnels on the West Coast Main Line just north-west of Watford in Hertfordshire, Eastern England. The original was built in 1837 for the London and Birmingham Railway to the design of Robert Stephenson and is just over a mile long. When the line was widened in the 1870s, a second tunnel was built just to the east. Both tunnels had decorative portals and the south portal of the original tunnel is a Grade II listed building.