Utrecht sneltram

Last updated

Utrecht sneltram
Opening Uithoflijn 1.jpg
CAF trams at P+R Science Park
Overview
Locale Utrecht, Netherlands
Number of lines3
Operation
Began operation17 December 1983
Operator(s) Westnederland (1983–1994)
Midnet (1994–1999)
Connexxion (1999–2013)
Qbuzz (2013–present)
Technical
Track gauge 1,435 mm (4 ft 8+12 in)

The Utrecht sneltram (literally Utrecht fast tram, more accurately written in Dutch as Utrechtse sneltram) is a light rail system in the Dutch city of Utrecht. The system consists of 3 tram routes connecting Utrecht Centraal railway station with the residential areas of Lombok and Kanaleneiland and the suburbs Nieuwegein and IJsselstein to the southwest of the station, and with the Uithof district and Utrecht University to the southeast.

Contents

Organization

There are four entities associated with the sneltram. There is also the brand name U-OV where "OV" is the Dutch abbreviation for openbaar vervoer (public transport).

Bestuur Regio Utrecht is the regional public transport authority in the Utrecht region. BRU does long- and short-term planning for public transport in the region working closely with municipalities and travellers' organisations. [1]

Qbuzz operates bus and tram vehicles in the Utrecht region under the brand name U-OV on behalf of Bestuur Regio Utrecht, a client of Qbuzz since 8 December 2013. [1]

The province of Utrecht is the owner of the sneltram, and manages its assets through a provincial entity called Regiotram Utrecht. [1]

Regiotram Utrecht is responsible for the management, maintenance and expansion of the entire tram system in and around the city of Utrecht. Regiotram Utrecht has approximately three dozen employees located at the Nieuwegein depot. The entity manages and maintains tram infrastructure such as trams, track, signaling, level crossings, stops and digital information panels for riders. It also deals with safety on the tram system. [2]

Lines

Network map as of 2022 Utrecht tram map.png
Network map as of 2022

The Utrecht sneltram travels via Utrecht Centraal station (abbreviated as Utrecht CS) between the Uithof district southeast of the station to Nieuwegein and IJsselstein southwest of the station. [3]

The section of the sneltram running southwest of Utrecht CS is dubbed the SUNIJ line (SUNIJ-lijn sneltram Utrecht-Nieuwegein/IJsselstein lijn meaning "line") after the communities served. From Utrecht CS, the SUNIJ line runs to Stadscentrum in Nieuwegein where the line branches to separate termini, tram 20 to Nieuwegein-Zuid and tram 21 to IJsselstein-Zuid. [4] The section running southeast of Utrecht CS is dubbed the Uithof line (Uithoflijn), and runs to P+R Science Park in the Uithof district. Tram routes 20, 21 and 22 all use the Uithof line. [4]

At Utrecht CS, there are two tram stops: Jaarbeursplein on the west side of the station, and Centrumzijde ("downtown side") on its east side. Until 2 July 2022, no trams carried passengers between these two stops, and passengers had a 500-metre walk to transfer between the SUNIJ and Uithof lines at Utrecht CS. Today, on weekdays, it is possible to ride from Nieuwegein-Zuid and IJsselstein-Zuid to P+R Science Park without changing trams. [4]

There are three tram routes:

On weekends and after 21:30 on weekdays, there is no service on the Uithof line; at which times, tram routes 20 and 21 would terminate at Utrecht CS Centrumzijde instead of P+R Science Park, and tram 22 would not run. Tram 22 will start operation on 22 August 2022. [4]

The sneltram operates largely off-street except for level crossings. Between the P+R Science Park and Padualaan stops in the Uithof as well as between the Centrumzijde and Jaarbeursplein stops at Utrecht Centraal, trams operate in a paved right-of-way shared with buses. Trams operate in dedicated centre-of-road reservation between Jaarbeursplein and the Vasco da Gamalaan stops. Around the Kanaleneiland-Zuid stop, trams operate between two parallel streets in a dedicated right-of-way. [5]

History

The sneltram light rail system was constructed during the late 1970s and early 1980s. There were two branches both opened on 17 December 1983. One branch ran between Moreelsepark (Utrecht city centre) to Nieuwegein-Zuid in the suburb of Nieuwegein as line 100. A second branch ran from Moreelsepark to Doorslag in Nieuwegein as line 101. The operator was Westnederland. [6]

On 14 December 1985, line 101 was extended to the Achterveld stop in IJsselstein. [7] [6]

In 1994, Midnet took over operation of the sneltram from Westnederland, and lines 100 and 101 were renumbered as 60 and 61 respectively. [6] [8]

In 1999, Connexxion took over operation of the sneltram from Midnet. [6]

On 2 July 2000, line 61 was extended from Achterveld via Binnenstad (both in IJsselstein) to IJsselstein-Zuid. [6]

Citadis tram from Mulhouse on a demo run on the SUNIJ-lijn on 9 September 2007 Tramway Citadis 302 Mulhousien Utrecht.jpg
Citadis tram from Mulhouse on a demo run on the SUNIJ-lijn on 9 September 2007

In September 2007, Alstom Transport arranged the loan to Utrecht of a low-floor Citadis tram from Mulhouse. The tram made demo runs between 7 and 13 September. On 9 September, a car-free Sunday in Utrecht, the Mulhouse tram was put on public display. At the time, Utrecht was considering a replacement of its then 30-year-old tram fleet and the replacement of bus lanes with trams. [9]

In 2009, the Moreelsepark stop was closed to accommodate the construction of a new public transit terminal. Until this time, Moreelsepark was the downtown terminal for the sneltram. With its closure, the stop Centraal Station became the new terminal. [10]

On 13 December 2009, the spitstram (rush-hour tram) went into service as line 260 using trams purchased second hand from Vienna. It ran between Utrecht und Nieuwegein Zuid during the morning and afternoon peak periods. [6]

In December 2011, Qbuzz took over operation of the sneltram from Connexxion. [11]

In 2013, the stops Centraal Station and Westplein closed due to construction at Utrecht Centraal station. The stop Jaarbeursplein became the new temporary terminal. [12] [7] [13]

On 11 July 2014, the Vienna trams were retired from service and sold to Kraków in Poland, thus ending line 260 spitstram service. [6]

In 2015, the Province of Utrecht became the owner of the Utrecht sneltram. [14]

In December 2016, the first low-floor CAF-tram arrived in Utrecht at the tram depot. [15]

On 18 March 2019, there was a shooting attack on a tram near the junction of 24 Oktoberplein. [16]

On 28 November 2019, a new workshop building was officially opened at the depot (Tramremise Nieuwegein). It handles maintenance for low-floor trams as well as for the older high-floor trams. [17]

On 14 December 2019, line 22 (dubbed Uithoflijn) opened from Utrecht Centraal to the Uithof district. [18] It replaced bus line 12, in service since 1969, which used articulated buses that were 18 and 25 metres long, the latter length having two articulations. [19] Upon opening of the line, the frequency was 10 trams per hour per direction. Service was weekdays only with no service after 22:00; this was the same hours of service as for bus line 12. Bus 28 serves the route when line 22 is not running. [13] There was still a 500-metre walk at Utrecht Centraal for any passengers wanting to transfer between the SUNIJ and Uithof lines. [4] At this time the Utrecht sneltram had three lines:

Line606122
Length of line13.3 km17.7 km7.5 km
Number of stops [3] 15199

Effective 2 March 2020, the frequency of line 22 was increased from 10 to 12 trams per hour per direction. By the beginning of February, the top day for ridership was 18,000. Regiotrams hoped to increase the frequency to 16 trams per hour per direction in December 2020. [20]

Effective 20 March 2020, all tram service on line 22 was temporarily replaced by bus line 28 due to the COVID-19 pandemic. With the closure of the University of Utrecht and other institutions in Utrecht Science Park, line 22 ridership had fallen by over 90 percent. Also fewer tram drivers were available because many drivers were calling in sick. Trams on lines 60 and 61 continued to run but less frequently. [21] On 1 April 2020, tram service was reintroduced on line 22 but only during rush hours. Also, double-articulated buses were put into service on bus line 28. These measures were to allow greater physical distancing among passengers which include health workers employed at Utrecht Science Park. [22]

On 30 May 2020, the SUNIJ line south of P+R Westhaven was shut down in order to lower and extend station platforms to accommodate coupled pairs of low-floor CAF trams. [23] [24] High-floor trams continued to operate between P+R Westhaven and Jaarbeursplein until 4 July when that portion of the line also shut down. The last day of service for SIG trams was on 3 July, [14] when the high-floor trams had their last runs after 37 years of service. From 4 July, the SUNIJ line was fully shut down for renovation. [14]

On 3 January 2021, line 60 from Utrecht Centraal to Nieuwegein Zuid reopened using 7-section CAF trams. [24] (Effective that same date, the tram stop "5 Meiplein" was renamed to "Winkelcentrum Kanaleneiland", with "winkelcentrum" meaning "shopping centre". [25] ) On 14 March 2021, line 61 went fully into service between Jaarbeursplein and IJsselstein-Zuid. [26]

Images from Google Streetview
Searchtool.svg Tram crossing at Laan van Maarschalkerweerd showing road signals

On 16 March 2021, a coupled pair of trams travelling north towards Stadion Galgenwaard station was struck and derailed by a van at a level crossing along the road Laan van Maarschalkerweerd. No serious injuries were reported, but both the road and tracks required an extended closure, and heavy damage was reported to the overhead wires in addition to damage to the derailed trams, one of which was sprawled across the road. Police allege that the van driver was under the influence and had run through a red light. [27] [28] Between March and September 2021, there have been three incidents of road users ignoring a red light at a tram crossing, which were not protected by crossing gates. In each case, the road vehicle struck the side of the tram between the operator cabin and the first wheel set, lifting the tram off the track during the collision. The three collisions damaged five trams in all, of which one from the incident at Laan van Maarschalkerweerd may be beyond repair. The province of Utrecht hopes to recover 5 million euros for the damage to trams and infrastructure from the motorists' insurance companies, since their clients were all at fault. The province has asked U-OV to lower the speed of trams at crossings from 40 km/h to 20 km/h. The province plans to spend 750,000 euros to improve safety at tram crossings, and to order five additional trams to create a reserve in its fleet. [29]

Between 26 June 2021 and 6 September 2021, line 22 was replaced by buses in order to repave the combined tram/bus lanes near Science Park station. The pavement surface was crumbling posing hazards to vehicles. A new paving technique was used that re-attached the paving to the tram track using a special liquid substance. [30] [31]

Between 26 February and 8 July 2022, buses replaced trams to Nieuwegein and IJsselstein in order to relocate the Stadscentrum tram stop and realign the tracks. [32] [4] Upon reopening, the stop was renamed from Stadscentrum to Nieuwegein City. [4]

Between March and April 2022, the level crossing at Symfonielaan near the Zuilenstein tram stop was closed in order to widen the bicycle paths crossing the tracks and to add crossing gates for extra protection. The crossing has the bicycle paths on both sides of the road; previously, the crossing was protected only by traffic lights. A fatal collision in 2020 between a tram and a scooter at the crossing was the reason for this improvement. [33]

Starting 2 July 2022, passengers could ride trams between the Jaarbeursplein and Centrumzijde stops at Utrecht Centraal station thus eliminating a 500-metre walk for passengers transferring between the SUNIJ and Uithof lines. SUNIJ lines 60 and 61 became tram routes 20 and 21 respectively which continued onto P+R Science Park on weekdays. [4]

By mid-November 2022, wheel-sound dampers had been installed on all trams to reduce squealing on curves. Twenty greasing installations were installed in IJsselstein, in Nieuwegein and at several places in the city of Utrecht. In 2023, the rails are to be ground so that tram wheels will optimally contact the rails. These efforts are to reduce noise and noise complaints. [34]

SUNIJ renovation (2020–2021)

Between 31 May and 4 July 2020, the SUNIJ line was shut down in stages in order to renovate the line. The main work was to lower and lengthen tram platforms to accommodate new low-floor CAF trams. The project also included upgrades to the line's infrastructure (signals and switches) and work to stabilize the tram roadbed. Tram service was replaced by buses. [14] [26]

Passenger service from Utrecht to Nieuwegein Zuid was originally to have resumed on 21 September, and to IJsselstein Zuid on 26 October. [35] However, the Dutch rail safety authority ILT (Inspection Leefomgeving en Transport) blocked the opening declaring that the project was not a renovation but rather new construction, which required different documention to proceed to opening. [36] There was an extra delay in opening line 61 due to work to reinforce the tram roadbed near IJsselstein Zuid. The opening dates were then revised to January 2021 for line 60 to Nieuwegein Zuid and February 2021 for line 61 to IJsselstein Zuid. [37]

From 10 November 2020, day time tests resumed running a coupled pair of CAF trams between Utrecht and Nieuwegein. (Previously, tests had been done at night in the summer of 2020.) Technical tests were carried out such items as for traffic signals and turnouts. At each tram stop, the exact position where a 75-metre, two-tram consist should stop was determined in order to reserve a boarding location for wheelchair users on the platform. During this test phase, trams operated below 40 km/h. After ILT granted an operating permit, tram operators were trained and system testing conducted, timed against an operating schedule. [38] Line 60 from Utrecht Centraal to Nieuwegein Zuid reopened on 3 January 2021 using 7-section CAF trams running 8 times per hour from Monday through Saturday. (The frequency would be reduced to 4 times per hour after line 61's reopening.) [24]

Prior to the renovation, the Stadscentrum tram stop was located on the south side of the street Passage at the entrance to the Cityplaza shopping mall. [39] After the line reopened on 3 January 2021, [24] the stop had been temporarily relocated north of Passage between the streets Schouwstede and Hagestede. In future, the stop will be moved once again to its final location south of Passage at the street Weverstede. [40]

On 16 January 2021, overnight testing began on line 61 to IJsselstein-Zuid. [41] On 28 February 2021, line 61 went into operation; however, passengers were allowed to ride line 61 trams only between Jaarbeursplein and Stadscentrum (Nieuwegein) and had to continue further south by bus. Line 61 trams ran between Stadscentrum and IJsselstein-Zuid as test runs operating according to a schedule but without picking up passengers. [26] On 14 March 2021, line 61 fully reopened for passenger service between Jaarbeursplein and IJsselstein-Zuid. To compensate riders for the late reopenings, U-OV offered the public free trips for two weeks on both lines 60 and 61. [42]

On 22 October 2021, construction started to lengthen the platforms at the Jaarbeursplein tram stop in order to accommodate coupled trains with a length of 75 metres. After the platforms are lengthened, U-OV could start running trams with passengers in mid-2022 between Jaarbeursplein and Utrecht CS Centrumzijde. This would eliminate the 300-metre walk for passengers transferring between the SUNIJ and Uithof lines at Utrecht Centraal. [43]

Vehicles

High-floor trams

SIG high-floor tram Qbuzz 5022 als U-tram, Jaarbeursplein.JPG
SIG high-floor tram

From 1983 to 2020, the SUNIJ-lijn used 27 single-articulated, high-floor trams built by Schweizerische Industrie Gesellschaft (SIG). These trams weighed 37.5 ton, were 30 meter long and are capable of a maximum speed of 80 km/h. In 2012, the SIG-trams were renovated including bogies, air-conditioning, seats and repainting. [44] The last run of the SIG trams was on 3 July 2020. On 4 July, the SUNIJ-lijn was fully shut down to renovate the line, and lower and lengthen its platforms to accommodate low-floor trams. The SIG-trams have been replaced by CAF low-floor trams. [14]

After the closure of the SUNIJ line, all SIG trams but one were scrapped. On 30 November 2020, SIG-tram 5017 was shipped along with spare parts to the Nederlands Transport Museum in Nieuw-Vennep for preservation. The museum intends to operate the tram carrying riders to attractions within Park 21, an event park under development in Haarlemmermeer. [45]

Vienna trams purchased second-hand Weens driewagenstel van de Sneltram Utrecht.JPG
Vienna trams purchased second-hand

In 2008, Utrecht purchased trams built in the 1980s from Vienna at a cost of 837,000 euros. The Vienna trams (de Weense trams) were delivered to Utrecht in 2009. [44] [46] The trams required some adjustments before going into service. They received a new onboard computer and a mobile telephone to communicate with central dispatchers. Adjustments were required to tram doorways and the platform height. These trams were used only during rush hours at the busiest stops between Utrecht Centraal and Nieuwegein Stadscentrum. Special sign boards indicated to passengers where the Vienna trams stopped. When received, the trams had no noteworthy defects, and they had run well in Vienna. [47] However, in Utrecht the Vienna trams had technical problems costing the operator 3.2 million euros in maintenance; they also caused extra wear to the rails. The rise in ridership expected in 2008 when the trams were purchased did not materialize. The trams were sold to Krakow, Poland [46] and were disposed of by the summer of 2014. [44]

Low-floor trams

The new generation of trams are articulated, low-floor Urbos 100 trams built by Construcciones y Auxiliar de Ferrocarriles (CAF). Two versions were ordered: a shorter version with 5 articulated sections and a longer version with 7: [15]

CAF trams at Utrecht CS Centrumzijde, terminal of the Uithoflijn Opening Uithoflijn 6.jpg
CAF trams at Utrecht CS Centrumzijde, terminal of the Uithoflijn
Characteristic5-section7-section
Articulated sections57
Number ordered2722
Length33M41M
Width2.65M2.65M
Passenger capacity216277
In serviceDecember 2019December 2020

On the SUNIJ-lijn, one tram of each length will be coupled together which will yield a train length of 75 metres and a capacity of about 490 passengers. [48]

Storage and Maintenance

The depot (Tramremise Nieuwegein) on the SUNIJ-lijn is the main storage and maintenance facility of the sneltram system, handling both low- and high-floor trams. The depot building houses: [17]

There are 8 tracks through the workshop including one for the tram wash. Outside in the yard, there is space to store the fleet of trams. [17] The roof of the workshop building has 810 solar panels able to produce 292 kilowatts of electricity. [49]

Just beyond the P+R Science Park stop on the Uithoflijn, there are additional storage tracks. [13]

See also

Related Research Articles

<span class="mw-page-title-main">Utrecht</span> City and municipality in the province of Utrecht, Netherlands

Utrecht is the fourth-largest city and a municipality of the Netherlands, capital and most populous city of the province of Utrecht. It is located in the eastern corner of the Randstad conurbation, in the very centre of mainland Netherlands, about 35 km south east of the capital Amsterdam and 45 km north east of Rotterdam. It has a population of 361,966 as of 1 December 2021.

<span class="mw-page-title-main">Nieuwegein</span> Municipality in Utrecht, Netherlands

Nieuwegein is a municipality and city in the Dutch province of Utrecht. It is bordered on the north by the city of Utrecht, the provincial capital. It is separated from Vianen to the south by the river Lek and borders on IJsselstein in the southwest and Houten in the east. Nieuwegein has 64,606 inhabitants as of 1 December 2021.

<span class="mw-page-title-main">Soest, Netherlands</span> Municipality in Utrecht, Netherlands

Soest is a municipality and a town in the central Netherlands, in the province of Utrecht. It is about 6 km (4 mi) west of Amersfoort.

<span class="mw-page-title-main">Gemeente Vervoerbedrijf</span>

The Gemeente Vervoerbedrijf Amsterdam (GVB; English: Amsterdam Municipality Transportation Company) is the municipal public transport operator for Amsterdam, the capital of the Netherlands, operating metro, tram, bus and ferry services in the metropolitan area of Amsterdam.

Utrecht Science Park is a science park and neighbourhood in Utrecht, Netherlands. It is located to the east of the city. It is the largest campus of Utrecht University. Apart from the faculties of Law, Humanities and University College Utrecht, most of the university buildings are located in Utrecht Science Park. It is also a main location of the HU University of Applied Sciences Utrecht and the University Medical Center Utrecht, and houses the main university library, student housing and botanical gardens.

<span class="mw-page-title-main">Amsterdam Zuid station</span> Railway station in Amsterdam, Netherlands

Amsterdam Zuid is a railway station situated in the borough of Amsterdam-Zuid in Amsterdam, Netherlands. For a number of years, it was named Amsterdam Zuid WTC, in reference to the neighbouring World Trade Center Amsterdam. During 2006, in conjunction with the rapid development of the area surrounding the station, the station was enlarged and the reference to the WTC was formally dropped from the name.

<span class="mw-page-title-main">RandstadRail</span> Light rail network in South Holland

RandstadRail is a light rail network in the Rotterdam–The Hague metropolitan area in the west of the Netherlands that is jointly operated by HTM Personenvervoer (HTM) and Rotterdamse Elektrische Tram (RET). It connects the cities of Rotterdam, The Hague and Zoetermeer, primarily using former train and existing tram tracks.

<span class="mw-page-title-main">Utrecht Centraal railway station</span>

Utrecht Centraal, officially Station Utrecht Centraal, is the transit hub that integrates three bicycle parkings, two bus stations, two tram stops and the central railway station for the city of Utrecht in the province of Utrecht, Netherlands.

<span class="mw-page-title-main">Tramlijn 5 (Amsterdam)</span>

Tramlijn 5 is a tram line operating between Amsterdam and Amstelveen in the Netherlands. Operated by the municipal transport company GVB, the route normally runs between Van Hallstraat in Amsterdam and Stadshart in the neighbouring municipality of Amstelveen. Tram line 5 connects several important areas of the city, including the Zuidas financial district and Leidseplein, and also provides a rapid tram route south of Amsterdam Zuid station to Stadshart, Amstelveen's town centre.

<span class="mw-page-title-main">Trams in Amsterdam</span>

The Amsterdam Tram is a tram network in Amsterdam, Netherlands. It dates back to 1875 and since 1943 has been operated by municipal public transport operator Gemeentelijk Vervoerbedrijf (GVB), which also runs the Amsterdam Metro and the city bus and ferry services. Amsterdam has the largest tram network in the Netherlands and one of the largest in Europe.

<span class="mw-page-title-main">Maarssen railway station</span>

Maarssen is a railway station in Maarssenbroek and on the opposite side of the Amsterdam Rijnkanaal to Maarssen, Netherlands. The station opened on 18 December 1843 and is located on the Amsterdam–Arnhem railway. The services are operated by Nederlandse Spoorwegen.

<span class="mw-page-title-main">Qbuzz</span> Dutch public transport bus company

Qbuzz is a public transport company in the Netherlands that operates services in South Holland, Utrecht, Drenthe and Groningen. Founded in 2008, it was a 100% subsidiary of Nederlandse Spoorwegen between 2013 and 2017. It is currently owned by Ferrovie dello Stato Italiane.

The main public transport in the Netherlands for longer distances is by train. Long-distance buses are limited to a few missing railway connections. Regional and local public transport is by bus, and in some cities by metro and tram. There are also ferries.

Marne was a metro station in Amstelveen on metro line 51, a hybrid metro/sneltram route that used high-floor trams. The station closed on 3 March 2019 and was subsequently demolished. After closure, the metro line south of Amsterdam Zuid station, also known as the Amstelveenlijn, was converted for low-floor trams. Today, there is no tram stop at the site. Since its opening in 9 December 2020, the trams of line 25 have been bypassing the site without stopping.

<span class="mw-page-title-main">Utrecht Vaartsche Rijn railway station</span>

Vaartsche Rijn is a railway station in the Dutch city of Utrecht. It is situated on the railway lines between Utrecht and Arnhem and between Utrecht and 's-Hertogenbosch. Construction started in September 2010 and after some delays was officially opened at 23 August 2016. The station was built as part of ProRail's Randstadspoor project to improve suburban rail travel. Six to eight thousand riders are expected to use the station each day.

Tram route 8 is a tram route in Antwerp and nearby Wommelgem. The present day route was opened on 8 December 2019 connecting the Astrid premetro station with the Wommelgem Roundabout P+R. The route was the first to use the newly opened premetro tunnel under Borgerhout, called the Reuzenpijp, which begins at Astrid station and comes above ground just before the Muggenberg stop. It is promoted as a "fast tram" (sneltram) route, as most stations in the premetro tunnel have not (yet) been opened, allowing a 15-minute connection between the city center and the Wommelgem P+R.

<span class="mw-page-title-main">Nieuwegein City (tram stop)</span>

Nieuwegein City is a tram stop of the Utrecht sneltram network, located beside the Nieuwegein Cityplaza shopping mall in Nieuwegein. It is along the SUNIJ line which runs south from the Jaarbeursplein and Centrumzijde stops at Utrecht Centraal railway station. South of the Nieuwegein City stop is the main junction of the sneltram network where southbound trams from Utrecht branch to either IJsselstein-Zuid and Nieuwegein-Zuid, tram routes 20 and 21 respectively.

Nieuwegein-Zuid is a tram stop of the Utrecht sneltram network, located in the most southern part of Nieuwegein. The stop opened in 1983. Today it is the terminus of tram route 20 from Utrecht Central Station and P+R Science Park. It connects the Hoog-Zandveld neighbourhood of Nieuwegein with IJsselstein and Utrecht. It is located right next to a shopping center.

<span class="mw-page-title-main">Amsteltram</span>

Amsterdam tram line 25, also known as the Amsteltram, is a tram line between Amsterdam Zuid station in Amsterdam and Westwijk in Amstelveen. It officially opened on 13 December 2020. Work is underway to extend the Amsteltram further south to the municipality of Uithoorn. The tram line replaced metro line 51, a light rail line (sneltram) that ceased running south of Amsterdam Zuid station on 3 March 2019 to convert it for low-floor trams. Tram line 5 shares the stops with line 25 between Zuid station and Oranjebaan stations. Line 5 had also shared the same tracks with metro line 51, the former using low-level platforms for regular trams, and the latter using high-level platforms.

<span class="mw-page-title-main">IJtram</span> Amsterdam tram line 26

Amsterdam tram line 26, popularly known as the IJtram, is a tram line operating between Amsterdam Centraal station and the IJburg district in Amsterdam, the Netherlands. As of 2019, the IJtram was the busiest tram line in Amsterdam, carrying 30,000 riders per day. The 8.5-kilometre (5.3 mi) line has 11 stops and a scheduled end-to-end travel time of 22 minutes.

References

  1. 1 2 3 "Openbaar Vervoer" (in Dutch). Bestuur Regio Utrecht. Retrieved 20 April 2020.
  2. "Openbaar Vervoer / Sneltram / Regiotram Utrecht" (in Dutch). Province of Utrecht . Retrieved 20 April 2020.
  3. 1 2 "Utrecht (system map)". Urban Rail. 2019. Retrieved 18 January 2020.}
  4. 1 2 3 4 5 6 7 8 "Vanaf begin juli zonder overstap met de tram reizen" (in Dutch). RegioTram Utrecht. 22 June 2022. Archived from the original on 22 June 2022.
  5. "U-OV Utrecht Tramlijn 21 Cabinerit P+R Science Park - IJsselstein-Zuid 2022" (in Dutch). Rail Public Transport. 18 July 2022.
  6. 1 2 3 4 5 6 7 "U-OV (Qbuzz) Sneltram Utrecht". Bilder und Informationen für den Straßenbahn- und Eisenbahnfreund (in German). Hans und Brigitte Männel. Archived from the original on 17 April 2020. Retrieved 17 April 2020.
  7. 1 2 "Utrecht Trams Holland". The Aylesbury News. Retrieved 18 January 2020.}
  8. "Autobussen Website". autobussenwebsite.nl (in Dutch). Retrieved 19 April 2020.
  9. "The Mulhouse Citadis tram visits Utrecht" (in Dutch). Alstom Transport. 24 September 2007. Archived from the original on 23 April 2020. Retrieved 23 April 2020.
  10. "Persbericht: "Planontwikkeling westzijde Stationsgebied kan verder"". utrecht.nl (in Dutch). City of Utrecht. 3 March 2009. Archived from the original on 30 May 2012. Retrieved 10 February 2019.
  11. "Qbuzz wins Utrecht sneltram concession". Railway Gazette International . 26 October 2010. Retrieved 4 January 2015.
  12. "Hele maandag geen trams door vertraging werk Westplein". rtvutrecht.nl (in Dutch). RTV Utrecht. 22 April 2013. Archived from the original on 2 February 2018. Retrieved 10 February 2019.
  13. 1 2 3 "Veelgestelde vragen". Uithoflijn (in Dutch). City of Utrecht. Archived from the original on 20 January 2020. Retrieved 18 January 2020.}
  14. 1 2 3 4 5 "Adieu SIG, welkom aan de nieuwe CAF sneltram" (in Dutch). RioTram Utrecht. 2 July 2020. Archived from the original on 3 July 2020. Retrieved 3 July 2020.
  15. 1 2 Zasiadko, Mykola (8 May 2019). "BAM to prepare Utrecht tracks for Urbos trams". RailTech. Retrieved 18 January 2020.}
  16. "Utrecht shooting: 'One dead' as man opens fire in tram". BBC News. 18 March 2019. Archived from the original on 18 March 2019. Retrieved 18 March 2019.
  17. 1 2 3 "Nieuwe Tramremise Nieuwegein officieel in gebruik genomen". Province of Utrecht (in Dutch). 28 November 2019. Archived from the original on 22 January 2020. Retrieved 21 January 2020.}
  18. "Tram 22 Start op 16 December". Regiotram Utrecht (in Dutch). 13 December 2019. Retrieved 18 January 2020.[ dead link ]
  19. "De laatste kilometers van buslijn 12". DUIC.nl (in Dutch). 10 December 2019. Archived from the original on 22 March 2020. Retrieved 22 March 2020.
  20. "Tram 22 rijdt vaker" (in Dutch). Regiotram Utrecht. 28 February 2020. Archived from the original on 22 March 2020. Retrieved 22 March 2020.
  21. "Tram 22 rijdt voorlopig niet meer" (in Dutch). Regiotram Utrecht. 19 March 2020. Archived from the original on 22 March 2020. Retrieved 22 March 2020.
  22. "Tram 22 Rijdt Opnieuw in De Spits" (in Dutch). Regiotram Utrecht. 31 March 2020. Archived from the original on 2 April 2020. Retrieved 31 March 2020.
  23. "Vernieuwing trambaan in IJsselstein en Nieuwegein" (in Dutch). RegioTram Utrecht. 22 May 2020. Archived from the original on 30 May 2020. Retrieved 29 May 2020.
  24. 1 2 3 4 "Vernieuwde tramlijn 60 Utrecht-Nieuwegein/Zuid rijdt vanaf 3 januari" (in Dutch). RegioTram Utrecht. 28 December 2020. Archived from the original on 5 January 2021. Retrieved 5 January 2021.
  25. "Vervoerplan 2021" (PDF) (in Dutch). U-OV. 10 November 2020. Archived (PDF) from the original on 28 January 2022.
  26. 1 2 3 "Nieuwe serie testritten op tramlijn 61 tussen Utrecht en IJsselstein" (in Dutch). RegioTram Utrecht. 25 February 2021. Archived from the original on 1 March 2021. Retrieved 1 March 2021.
  27. Hebron, Herbert. "Utrecht tram derailed after collision with delivery van". en24 News. Archived from the original on 17 March 2021. Retrieved 16 March 2021.
  28. "Persbericht politie naar aanleiding van ongeluk met tram Uithoflijn" (in Dutch). Regiotram Utrecht. 19 March 2021. Archived from the original on 27 March 2021. Retrieved 27 March 2021.
  29. "Rijden door rood zorgde voor drie aanrijdingen met trams en veel schade" (in Dutch). RegioTram Utrecht. 17 September 2021. Archived from the original on 19 September 2021.
  30. "Vernieuwing tram/busbaan Utrecht Science Park vanaf 26 juni" (in Dutch). Regiotram Utrecht. 4 June 2021. Archived from the original on 4 June 2021. Retrieved 28 June 2021.
  31. "Vernieuwde tram/busbaan Utrecht Science Park klaar voor gebruik" (in Dutch). RegioTram Utrecht. 1 September 2021. Archived from the original on 11 September 2021. Retrieved 11 September 2021.
  32. "Nieuwe tramhalte voor City Nieuwegein" (in Dutch). RegioTram Utrecht. 3 December 2021. Archived from the original on 6 December 2021. Retrieved 6 December 2021.
  33. "Aanpak verkeersveiligheid kruising trambaan Symfonielaan" (in Dutch). RegioTram Utrecht. 2 March 2022. Archived from the original on 9 March 2022.
  34. "Aanpak geluidsoverlast tram: wieldempers op alle trams" (in Dutch). RegioTram Utrecht. 15 November 2022. Archived from the original on 27 November 2022.
  35. "Test vernieuwde tramlijn is begonnen" (in Dutch). RegioTram Utrecht. 4 August 2020. Archived from the original on 15 November 2020. Retrieved 6 August 2020.
  36. Vosman, Quintus (21 September 2020). "Utrecht Tram Conversion Delayed" (in Dutch). Railvolution. Archived from the original on 21 September 2020. Retrieved 21 September 2020.
  37. "Planning ingebruikname SUNIJ lijn bekend" (in Dutch). Regiotram Utrecht. 28 October 2020. Archived from the original on 15 November 2020. Retrieved 15 November 2020.
  38. "De nieuwe tram rijdt test overdag in november" (in Dutch). RegioTram Utrecht. 13 November 2020. Archived from the original on 13 November 2020. Retrieved 15 November 2020.
  39. "Stadscentrum Nieuwegian Tram Stop". Google Maps. Retrieved 20 May 2021.
  40. "Tijdelijke tramhalte Nieuwegein-Centrum beter bereikbaar" (in Dutch). RegioTram Utrecht. 19 May 2021. Archived from the original on 19 May 2021. Retrieved 20 May 2021.
  41. "Nieuwe tram rijdt 's nachts test in IJsselstein" (in Dutch). RegioTram Utrecht. 13 January 2021. Archived from the original on 13 January 2021. Retrieved 26 January 2021.
  42. "Vernieuwde tramlijn 61 Utrecht-IJsselstein rijdt vanaf 14 maart" (in Dutch). RegioTram Utrecht. 12 March 2021. Archived from the original on 14 March 2021. Retrieved 14 March 2021.
  43. "Vernieuwing tramhalte Jaarbeursplein Utrecht" (in Dutch). RegioTram Utrecht. 22 October 2021. Archived from the original on 22 October 2021.
  44. 1 2 3 "Het Materieel/De Tram". Regiotram Utrecht (in Dutch). Archived from the original on 20 January 2020. Retrieved 18 January 2020.}
  45. "Utrechtse tram overgedragen aan Transport Museum" (in Dutch). RegioTram Utrecht. 2 December 2020. Archived from the original on 2 December 2020. Retrieved 2 December 2020.
  46. 1 2 "Opnieuw uitstel maar geen afstel voor Weense trams". AD (in Dutch). 12 December 2012. Retrieved 2 March 2020.
  47. "Opnieuw uitstel maar geen afstel voor Weense trams". Treinreisigers.nl (in Dutch). 13 February 2009. Archived from the original on 26 July 2014.
  48. "Sein op Groen voor Vernieuwing Tramsysteem". Regiotram Utrecht (in Dutch). 19 December 2016. Archived from the original on 20 January 2020. Retrieved 18 January 2020.}
  49. "Tramremise Produceert Duurzame Stroom" (in Dutch). Regiotram Utrecht. 23 May 2020. Archived from the original on 23 May 2020. Retrieved 19 May 2020.

Coordinates: 52°00′33″N5°02′18″E / 52.0092°N 5.0383°E / 52.0092; 5.0383