Wang Chau housing controversy

Last updated

The Wang Chau housing controversy comprises a series of events related to a housing project in Wang Chau, Yuen Long District, Hong Kong. Initiated in 2012, the housing project aims to develop 17,000 public housing units in three phases. [1] Phase 1 refers to ongoing development of 4,000 units in a "green-belt" site; while phases 2 and 3 refer to the deferred plan to build the rest of the targeted units in the "brownfield" site. [2] The case came under media scrutiny after activist Eddie Chu Hoi-dick raised concerns about potential collusion between the Hong Kong government, businesses and rural landlords in his election campaign. [3]

Contents

Planning and engineering study

In July 2012, Hong Kong Housing Authority commissioned Ove Arup & Partners Hong Kong Limited (Arup) to conduct a study on the feasibility of the Wang Chau Public Housing Development. [4] The Study covered planning, engineering and environmental issues. Results indicated that it was technically feasible to develop 17 000 public housing flats in Wang Chau. [5]

Task force and consultation

Task force chaired by chief executive

The Chief Executive of Hong Kong, Leung Chun-ying set up a task force to discuss issues relating to public housing development at Queen's Hill and Wang Chau. The task force met once on 27 June 2013 [6] to discuss about statutory procedure, consultation, brownfield and environmental protection. [7] The Financial Secretary John Tsang was absent from the meeting. [3]

Two rounds of informal consultation before downsizing the plan

On 16 July 2013 and 5 September 2013, representatives of the Housing Department and Home Affairs Department carried out two informal consultations with the following rural leaders: [8]

After being briefed on the proposed development plan of building 17, 000 public housing flats at Wang Chau, [9] the local representatives expressed concerns about the need for infrastructural support, impact on environment and brownfield issues. [10]

In early January 2014, the Housing Department proposed to the Secretary for Transport and Housing that the Wang Chau Housing Development be carried out in phases, firstly with Phase 1 (development in green-belt site) and leaving Phases 2 and 3 (development in brown-belt site) to later periods. [7] This proposal was approved by the Secretary, who then reported to the senior levels of the Government. [7]

Meeting between three secretaries

The Chief Executive chaired a meeting attended by the top government officials - Financial Secretary, Chief Secretary and Secretary for Justice on 27 January 2014. Leung decided to take the Housing Department's recommendation to defer the second and third phases. [11]

Consultation after downsizing the plan

Two rounds of informal consultation

Officials from the Housing Department held two rounds of informal consultations on 12 March 2014 and 17 March 2014 with Yuen Long rural leaders to explain the adjusted target. [12]

Secretary for Transport and Housing, Anthony Cheung said "no minutes were taken of the informal consultations and lobbying with local representatives". [8]

Formal consultation

On 23 May 2014 and 24 June 2014, [13] the Housing Department, in two formal consultations, put forward the Wang Chau public housing development plan to the Ping Shan Rural Committee and the Yuen Long District Council respectively. [14] The proposal included the size of the site for development, number of targeted units, estimated population and other facilities to be constructed. [13]

Participants in the meeting on 24 June 2014 included:

However, the proposal only included the plan to build 4,000 public flats on the green belt site, with no reference to any planned development on the brown belt sites. The participants discussed about the infrastructural works required to meet the demands of the development project, [15] as well as technical amendments to the Ping Shan Outline Zoning Plan. [16] Some District Council members expressed concerns regarding:

  1. the potential violation of the principle of presumption against development in green-belt zones;
  2. the capacity of the West Rail Line in meeting the increased traffic demand;
  3. the "fung shui" of the villages in the vicinity; and
  4. the residents' living environment as a result of increased population density. [10]

Despite these concerns, some supported the project and opined that it could satisfy the strong housing demand of the public. [10]

Support from District Council

The Ping Shan Rural Committee members and Yuen Long District Council members agreed with the Wang Chau development plan. [4] Thereafter the District Council passed the development plan on the green belt site, but many councillors criticised the government for not informing them about the plan to develop the brown belt sites. [17]

Reluctance towards phases 2 and 3

An internal government document, leaked by Apple Daily, said the Housing Department was "unlikely to proceed" with phases 2 and 3 due to opposition. [18]

Eviction of non-indigenous villagers

Notice of eviction

In September 2015, Land Department issued eviction letters and resettlement booklets to 200 non-indigenous villagers residing in the three villages, Wing Ning Tsuen, Fung Chi Tsuen, and Yeung Uk Sun Tsuen, requiring them to move out before January 2018. [19] On 11 November 2016, a formal eviction notice was placed at the villages' entrances overnight. [20] Frustrated by the eviction notice, dozens of villagers staged a sit-in protest at the entrances to the villages in an attempt to block officials' access into the villages. [21]

District Council proceeded to the details of the Housing Department

On 21 May 2015, the Yuen Long District Council in a meeting discussed on the proposed infrastructural works from the Civil Engineering and Development Department on public access road for the Wang Chau project. [13] The Discussion Paper only referred to downsized target, the 4000 public housing units. [13]

Alleged collusion

Plan submitted to the Legislative Council

In March 2016, the Development Bureau and the Transport and Housing Bureau submitted the Latest Plan for Public Housing Development at Wang Chau to the LegCo Panel on Development. [22] According to the Plan, the P&E Study estimated that the development at Wang Chau "could produce a total of 17,000 public housing units", [22] and stated that the Housing Authority planned to "first develop the southern portion of the site for about 4,000 public housing units" after considering "the overall development priority and the time required for the clearance of the existing squatters, temporary structures, brownfield operations, etc.". [22]

Alleged collusion

In July and August 2016, Eddie Chu brought up the Wang Chau issue during his campaign for the LegCo Election 2016. [3] Chu doubted if there was collusion between the Government, landlords, businesses, and triads in the downsizing of the Wang Chau project. [3] Besides, Chu criticized the Government for carrying out informal discussions with rural leaders instead of conducting formal public consultation. [23]

Meeting with secretaries and press

Meeting between Chu and government officials

On 10 September 2016, Leung Chun-ying and Eddie Chu had a phone conversation. [24] According to Chu, he asked Leung to explain why the Government abandoned the public housing project at the brownfield site. [24] Leung replied that he would instruct Secretary for Development Paul Chan Mo-po to look into the case. [24]

On 15 September 2016, Paul Chan and Authority Cheung met with Eddie Chu and Edward Yiu Chung-yim, architectural sector lawmaker-elect to exchange views on the Wang Chau development project. [3] [23]

Press conference

Chief Executive (Leung Chun-ying), Financial Secretary (John Tsang), Secretary for Transport and Housing Bureau (Anthony Cheung), Acting Secretary for Development, Permanent Secretary for Transport and Housing and Deputy Secretary for Development spoke on the Wang Chau housing project after leaked documents revealed the task force chaired by CE had engaged in informal consultations with rural leaders. [25]

Informal consultations with rural leader

Leung denied any trade-off with rural forces at all, citing parts of the internal document that the 4000 units have always been referred to as "phase one" of the Wang Chau project, out of the targeted 17,000 flats. He made clear that the government sought to tackle the "Easy first and then hard", given that the P&E Study showed phases 2 and 3 required the government to deal with more complicated issues such as the (1) contamination and (2) the handling of brownfield operations. [26]

Task force and the "Three Secretaries Meeting"

In defence of the task force and "Three Secretaries Meeting", Leung described the Wang Chau housing project as a "very rare opportunity for the government to be able to build large numbers of public housing units", which justified him taking charge of the task force. He added that it was appropriate for him to assist in coordinating work since Financial Secretary was the head of the Steering Committee of Land Supply and oversaw the Development Bureau; while Chief Secretary oversaw the Transport and Housing Bureau. [26]

Tsang's involvement in the Wang Chau project

Tsang accepted that the Steering Committee had been told to carry out detailed discussions on Queen's Hill and Wang Chau, but denied responsibility for the decision to develop Wang Chau in phases. [27]

LegCo's special powers under the Power and Privileges Ordinance (Cap 382)

On 18 September 2016, 28 pan-democrats and localists lawmakers-elect signed an open letter addressed to Leung and the development and housing ministers. [1] The letter demanded explanations from the officials and urged them to carry out a public consultation on the Wang Chau project. [28]

On 22 September 2016, Eddie Chu suggested that the pan-democrats and localists should seek to invoke the LegCo's special powers under the Powers and Privileges Ordinance (Cap 382) to investigate the Government's decision-making process behind the Wang Chau housing plan. [1] [29] Starry Lee Wai-king, said that she did not find it necessary to invoke the Ordinance, and she would liaise with the Secretary for Transport and Housing to release relevant documents. [29]

Government explaining Wang Chau Plan to LegCo

On 18 October 2016, the Government submitted a paper [30] to the LegCo Panel on Housing to "provide information on the background and the latest development of the Wang Chau Development, including the considerations and justifications for the Government's decision to take forward the Development in phases." [9] The Government also made public the 2012 Planning and Engineering Study Report. [31]

Recent developments

LegCo passed a non-binding motion to suspend funding for the Wang Chau project

On 22 November 2016, The Legislative Council Development Panel passed a non-binding motion (22-20) to separate the funding for the Wang Chau Development Project from that of other capital works in the HK$12.42-billion capital works reserve fund block allocations for fiscal year 2017-18. [32]

Societal views on government's practices

Chief executive as the chairman of task force

In early September 2016, Leung Chun-ying insisted that he only took a "mediating role" [33] as the chairman of the task force. However, Apple Daily reported that Leung requested the task force to be set up, and the role of the task force would be to "consider" and "iron out" details of the development blueprint, as opposed to Leung's claims that the task force served as a "coordinating body". [33]

Edward Yiu Chung-yim, criticized that the functions of the task force overlapped with those of the steering committee of land supply, which made one doubt Leung's intention in manipulating the Wang Chau development project. [34] On the other hand, former Secretary for Housing, Planning and Lands Michael Suen Ming-yeung commented that it was normal for the Chief Executive to set up an interdepartmental task force if he deemed necessary. [34]

"Soft lobbying"

According to the Anthony Cheung, contacting local representatives through informal channels was "part of the normal procedures in public housing development projects for which no large-scale consultation exercise are conducted". [35] Executive Council member Cheung Chi-kong agreed that soft lobbying is a necessary part of politics, [36] and said that soft lobbying is "just an informal way to find out what can be negotiated". Besides, Tsang Shu-wo said that he was thankful for the Housing Authority's effort in compromising with different stakeholders and taking into account results of consultations. [37]

Starry Lee Wai-king, member of the LegCo and chairwoman of the Democratic Alliance for the Betterment and Progress of Hong Kong (DAB), said that soft lobbying was necessary but should not replace formal consultations. [38]

On the other hand, former Chief Secretary Anson Chan commented, "it was a bit absurd to convince the public that the government should defer to a rural leader, who is occupying an illegal site where he runs a car park, and instead evict the residents of three villages in the greenbelt area." [39] Similarly, Eddie Chu asserted that soft lobbying meant that villagers affected by the plans were never consulted [19] and that urban planning process needs to be democratised "especially towards the weak and the voiceless". [38]

Retaining New World Development's land adjacent to the development area

The government was also criticised for colluding with business as Leung did not take back a nearby greenbelt site owned by New World Development (NWD) for the public housing project. [40] In response, Leung denied any transfer of benefits as he did not know NWD owned the adjacent site. [41]

Related Research Articles

Frontier Closed Area

The Frontier Closed Area, established by the Frontier Closed Area Order, 1951, is a border zone area in Hong Kong, extended inwards from the border with Mainland China. For anyone to enter the area, a Closed Area Permit is required.

Tai Po New Town Place in Hong Kong, China

Tai Po New Town, or Tai Po Town, is a new town and non-administrative area in Tai Po District, in the New Territories, Hong Kong. The area is a planned town that surrounding the existing indigenous market towns Tai Po Hui and Tai Po Kau Hui, as well as east of the existing indigenous villages that located on the Lam Tsuen Valley as well as west of those villages in Ting Kok and Tai Mei Tuk and south of those villages in Nam Hang, Fung Yuen and Sha Lo Tung. Most of the lands of the new town were obtained by land reclamation. In present day, Tai Po New Town was simply known as Tai Po. The new town are largely covered by the government Tai Po Outline Zoning Plan, which legally regulated the land use of the area, on top of the terms in the land lease contract with the government. Some of the land lease within the area, were known as Tai Po Town Lot № foo. In election, the town had a different zoning scheme for the election constituencies.

Wang Chau (Yuen Long)

[File:Existing village in Wang Chau 201712.jpg|thumb|Wang Chau and Yuen Long Industrial Estate.]]

Leung Chun-ying as Chief Executive of Hong Kong

The administration of Leung Chun-ying as Chief Executive of Hong Kong, officially referred to as "The 4th term Chief Executive of Hong Kong" relates to the period of governance of Hong Kong since the transfer of sovereignty of Hong Kong, between 1 July 2012 and 30 June 2017.

Dai pai dong is a kind of traditional food stall in Hong Kong. It was famous and popular in Hong Kong during the 1960s and 1970s. The literal meaning of dai pai dong in English is “Big license stall”. The characteristics of Dai Pai Dong are lack of air-conditioners, unclean environment but various kinds of food. However, starting from 1980s, the government stopped issuing new licenses and began buying them back. Due to its hygienic problem and the deaths of the license holders, dai pai dong closed down and was replaced by different kinds of restaurant. There are only 25 dai pai dong left in Hong Kong, according to the Food and Environmental Hygiene Department, which manages the licenses. Nevertheless, because of voices about preserving local food culture, it is suggested that licenses should be issued again to the vendors and the dai pai dong owners. Besides, there are several changes of dai pai dong due to the urban development.

The Hong Kong Christian Council is a Protestant Christian ecumenical organization founded in Hong Kong in 1954. It is a member of the World Council of Churches and the Christian Conference of Asia. The current general secretary is Rev Dr Lo Lung-kwong, the previous Director of the Divinity School of Chung Chi College, Chinese University of Hong Kong, effective from 1 July 2018.

Edward Leung Hong Kong politician and activist

Edward Leung Tin-kei is a Hong Kong politician and activist. He is the former spokesperson of Hong Kong Indigenous, a localist group. He advocates Hong Kong independence, and coined the slogan "Liberate Hong Kong, the revolution of our times" during the 2016 by-election, which was later widely used in 2019–20 Hong Kong protests.

Eddie Chu Hong Kong politician

Eddie Chu Hoi-dick is a Hong Kong social activist and politician. He is a member of the Local Action and founder of the Land Justice League which are involved in conservation and environmental movements. He is known for his actions against the demolition of the Edinburgh Place Ferry Pier and Queen's Pier in 2006 and 2007 and Choi Yuen Tsuen in 2009 and 2010. He was elected to the Legislative Council of Hong Kong in the 2016 Hong Kong Legislative Council election in New Territories West. He resigned from the Legislative Council on 28 September 2020, citing that he would not serve in an "appointed legislature" after Beijing had extended the legislators' terms by a year.

Hong Kong Army Cadets Association

The Hong Kong Army Cadets Association, established on 18 January, 2015, is a Hong Kong Uniformed Youth Group, it is connected with the People's Liberation Army Hong Kong Garrison and the Liaison Office of the Central People's Government in the Hong Kong. Established with the aims "To contribute the city and serve the Fatherland".The association is opening one

The election for the Hong Kong deputies to the 13th National People's Congress (NPC) was held on 19 December 2017. 36 Hong Kong deputies were elected by an electoral college composed of 1,989 members.

Yen Chow Street Hawker Bazaar

The Yen Chow Street Hawker Bazaar, also known as Pang Jai (棚仔), is a covered market located at the intersection of Yen Chow Street and Lai Chi Kok Road in Sham Shui Po, Hong Kong. The market is known for selling fabrics, textiles, and other fashion-related paraphernalia. The market has been popular with craft enthusiasts, design students, and professionals in the fashion industry for decades.

Macau independence

Macau independence is the proposition that supports independence of Macau from the People's Republic of China. Despite receiving little attention within Macau, the issue was raised in the Legislative Council following the Hong Kong Legislative Council oath-taking controversy. In 2017, several Chinese media outlets warned against discussion of Macau independence, fearing that speculation would lead to further action.

Fujianese organized crime refers to crime syndicates, similar to triad gangs, composed of Fujianese people; the term primarily refers to Fujianese immigrant gangs in Hong Kong. In some cases, the term "Fujian gang" can also refer more broadly to legal Fujianese community associations or to native crime syndicates in the province of Fujian.

Gwyneth Ho Hong Kong journalist

Gwyneth Ho Kwai-lam is a Hong Kong social activist and former reporter of the news outlet Stand News, who rose to prominence for her frontline reporting in the 2019–20 Hong Kong protests.

Sam Cheung Hong Kong politician

Sam Cheung Ho-sum is a Hong Kong politician, social activist, and member of the Tuen Mun District Council for San Hui.

Tiffany Yuen Hong Kong politician

Tiffany Yuen Ka-wai is a Hong Kong activist and politician, who has been a member of the Southern District Council for Tin Wan since 2020. She was the vice chairperson of Demosistō before resigning from the party in 2018.

Tat Cheng Hong Kong politician

Cheng Tat-hung is a Hong Kong politician, formerly affiliated with the Civic Party. He is a member of the Eastern District Council for Tanner since 2016.

Wong Ho-wa is a Hong Kong data scientist and pro-democracy activist. He founded the open government data community g0vhk. He is an Election Committee member representing the information technology (IT) industry. He is running for the Information Technology constituency in the 2020 Hong Kong legislative election as part of the pro-democratic caucus.

The written traditional Chinese characters for vertical banners are "直幡", and the horizontal counterpart, horizontal banners, are written as "横額" in traditional Chinese. This article focuses on the use of vertical banners as protest banners in Hong Kong.

2020 detainment of Hong Kong residents at sea by China

In a post on Chinese social media dated August 26, 2020, the China Coast Guard claimed that Guangdong authorities had intercepted a speedboat on August 23 under the suspicion of illegal border crossing, and that more than ten people had been detained. The released coordinates put the incident in the South China Sea, approximately 78 kilometres from Hong Kong Island. On August 27, The Guardian cited two Hong Kong news outlets who reported, based on unnamed sources, that in the incident, a total of 12 people had been detained en route to Taiwan, of whom at least ten were Hong Kong residents. Referring to the same sources, the passengers had included activist Andy Li, who had been arrested on August 10 under charges related to the national security law and released on bail. Hong Kong police chief Chris Tang told media on August 27 that he had heard the reports on the detention, and that the force was actively seeking information from the mainland authorities.

References

  1. 1 2 3 Cheung, Tony (18 September 2016). "Hong Kong lawmakers-elect urge chief executive to come clean on Wang Chau development plan". South China Morning Post.
  2. Ng, Joyce (21 September 2016). "Revealed: decision behind Wang Chau rural housing scandal reaches very top of Hong Kong government". South China Morning Post.
  3. 1 2 3 4 5 Ng, Joyce (20 September 2016). "Tough questions for all those involved in Hong Kong's Wang Chau housing saga". South China Morning Post.
  4. 1 2 "Planning and Engineering Study for the Public Housing Development and Yuen Long Industrial Estate Extension at Wang Chau". Transport and Housing Bureau. 18 October 2016.
  5. "Two Directors of Bureaux to meet two members-elect of the Legislative Council". www.info.gov.hk. Retrieved 23 December 2016.
  6. "Government response to media enquiries on public housing development plan at Wang Chau". The Government of HKSAR. 30 September 2016.
  7. 1 2 3 "Information Note: Public housing development plan at Wang Chau" (PDF). Research Office of Legislative Council Secretariat.
  8. 1 2 The Government of HKSAR (21 September 2016). "運輸及房屋局局長於橫洲發展記者會的開場發言".
  9. 1 2 Housing Authority (28 October 2016). "Memorandum for the Hong Kong Housing Authority Wang Chau Public Housing Development" (PDF).
  10. 1 2 3 The Government of HKSAR (2 November 2016). "LCQ18: Development projects in the New Territories (Press Release)" . Retrieved 23 December 2016.
  11. Ng, Joyce (22 September 2016). "This was my decision: Hong Kong's chief executive takes responsibility for scaling back housing project". South China Morning Post.
  12. "'I made flats call'". The Standard. Retrieved 24 December 2016.
  13. 1 2 3 4 "Yuen Long Committees Meeting Discussion Paper No. 39/2015" (PDF). Civil Engineering and Development Department. May 2015. Retrieved 1 December 2016.
  14. "區議會討論元朗朗屏邨「綠化地帶」建屋計劃 | 周芷欣 | 香港獨立媒體網". 香港獨立媒體網. Retrieved 24 December 2016.
  15. 1 2 "Minutes of the 3rd Meeting of Yuen Long District Council in 2014" (PDF). Yuen Long District Council Secretariat. August 2014. Retrieved 1 December 2016.
  16. "Yuen Long Committees Meeting Discussion Paper No. 47/2014" (PDF). Planning Department. June 2014. Retrieved 1 December 2016.
  17. "District council votes against suspending controversial Wang Chau housing project". South China Morning Post. Retrieved 24 December 2016.
  18. "【橫洲黑幕】政府與鄉紳「摸底」內部紀錄重點睇". Apple Daily 蘋果日報. Retrieved 24 December 2016.
  19. 1 2 "【橫洲被發展】村民:梁志祥扮唔識我地 質疑有心拖延 | 獨媒報導 | 香港獨立媒體網". 香港獨立媒體網. Retrieved 24 December 2016.
  20. "Wang Chau villagers prepare for guard duty". The Standard. Retrieved 24 December 2016.
  21. "Wang Chau villagers furious as they wake up to find notice of government construction work". South China Morning Post. Retrieved 24 December 2016.
  22. 1 2 3 "Actions against Illegal Occupation of Government Land and the Latest Plan for Public Housing Development at Wang Chau, Yuen Long" (PDF). Development Bureau and Transport and Housing Bureau. March 2016. Retrieved 1 December 2016.
  23. 1 2 "Eddie Chu slams gov't's informal housing plan talks with rural leaders as minister denies 'collusion'". Hong Kong Free Press. 15 September 2016. Retrieved 24 December 2016.
  24. 1 2 3 "CY Leung promises to look into public housing controversy after phone call with Eddie Chu". South China Morning Post. Retrieved 24 December 2016.
  25. "Transcript of remarks at press conference on Wang Chau development". www.info.gov.hk. Retrieved 24 December 2016.
  26. 1 2 "Government response to media enquiries on Wang Chau development plan". www.info.gov.hk. Retrieved 24 December 2016.
  27. "'You always agree with your boss', but that doesn't mean you're fully behind him". South China Morning Post. Retrieved 24 December 2016.
  28. "反對「摸底」代諮詢 馬上公開規劃內情——就「橫洲公屋爭議」致特首的公開信 | 獨媒轉載 | 香港獨立媒體網". 香港獨立媒體網. Retrieved 24 December 2016.
  29. 1 2 Leung, Stanley (22 September 2016). "Lawmaker-elect Eddie Chu urges investigation into Wang Chau housing controversy". Hong Kong Free Press. Retrieved 24 December 2016.
  30. "Wang Chau plan submitted". Hong Kong's Information Services Department. Retrieved 24 December 2016.
  31. "Planning and Engineering Study for the Public housing Site and Yuen Long Industrial Estate Extension at Wang Chau" (PDF). Housing Authority. December 2012. Retrieved 1 December 2016.
  32. "Push to block Wang Chau work funding". The Standard. Retrieved 24 December 2016.
  33. 1 2 "News report claims to reveal CY role in Wang Chau task force". The Standard. Retrieved 23 December 2016.
  34. 1 2 香港01記者. "曾俊華回應執行橫洲細節:無開梁振英領導小組會、無決定分期推行". 香港01. Retrieved 23 December 2016.
  35. "Wang Chau development explained". Hong Kong's Information Services Department. Retrieved 23 December 2016.
  36. "Soft lobbying is 'inevitable', says senior official on Wang Chau housing controversy". Hong Kong Free Press. 26 September 2016. Retrieved 23 December 2016.
  37. "朱凱廸在新界得罪了誰? | 獨媒報導 | 香港獨立媒體網". 香港獨立媒體網. Retrieved 23 December 2016.
  38. 1 2 Leung, Stanley (22 September 2016). "Lawmaker-elect Eddie Chu urges investigation into Wang Chau housing controversy". Hong Kong Free Press. Retrieved 23 December 2016.
  39. "Anson Chan urges Wang Chau public consultation - RTHK" . Retrieved 23 December 2016.
  40. "Consulting firm Arup used confidential gov't data in developer's Wang Chau bid - report". Hong Kong Free Press. 28 September 2016. Retrieved 23 December 2016.
  41. "Study on clearing Hong Kong's brownfield sites won't be ready for nearly two years". South China Morning Post. Retrieved 24 December 2016.