The Water Polo Arena was a temporary sporting venue of the 2012 Summer Olympics held in London from 27 July to 12 August 2012. It was situated in the south-east corner of the Olympic Park, alongside the Aquatics Centre, and opposite the Olympic Stadium on the opposite bank of the Waterworks River.
The Aquatics Centre and Water Polo Arena were adjacent to each other in one of the most compact areas of the park. To make the best use of the space available, some back-of-house facilities, such as space for broadcasters, catering and security, were shared between the two venues.
Construction on the temporary structure began in spring 2011. During the Olympics, the 5,000-seat arena [1] hosted both the men's and women's water-polo competitions, and contained both a warm-up pool and a 37-metre (121-foot) competition pool. [1]
The first dedicated water-polo venue to be built for an Olympics, [1] the structure was taken down after the games. Elements of the venue were expected to be reused or relocated elsewhere. [1] Parts of the roofing covers and membranes of different temporary venues of the building were to be recycled via Vinyloop. This allowed the organizers to meet the standards of the Olympic Delivery Authority, concerning environmental protection. Through this recycling process, the Olympic Games PVC Policy was to be fulfilled, which stated that where London 2012 procured PVC for temporary usage or where permanent usage was not assured, London 2012 was required to ensure that there was a take-back scheme that offered a closed loop reuse system or mechanical recycling system for post-consumer waste.
London 2012 were the first Olympic Games whose guidelines included the recycling of PVC. Recycled cushions, which form part of the rippling PVC roof, were used to create the striking looking venue, as well as to improve insulation and prevent condensation. [1]
An Olympic-size swimming pool is a swimming pool which conforms to the regulations for length, breadth, and depth made by World Aquatics for swimming at the Summer Olympics and the swimming events at the World Aquatics Championships. Different size regulations apply for other pool-based events, such as diving, synchronized swimming, and water polo. Less onerous breadth and depth regulations exist for lesser swimming competitions, but any "long course" event requires a course length of 50 metres, as distinct from "short course" which applies to competitions in pools that are 25 metres in length. If touch pads are used in competition, then the distance is relative to the touch pads at either end of the course, so that the pool itself is generally oversized to allow for the width of the pads.
Ponds Forge International Sports Centre is a leisure complex in Sheffield, England. It has an Olympic-sized swimming pool with 2,600 seating capacity, a family and children's pools, water slides amongst other facilities.
London 2012 was the successful bid to host the 2012 Summer Olympics, held in London with most events taking place in Stratford in the borough of Newham. The British Olympic Association had been working on the bid since 1997, and presented its report to government ministers in December 2000.
The 2012 Summer Olympics, officially the Games of the XXX Olympiad and also known as London 2012, were an international multi-sport event held from 27 July to 12 August 2012 in London, England, United Kingdom. The first event, the group stage in women's football, began on 25 July at the Millennium Stadium in Cardiff, Wales, followed by the opening ceremony on 27 July. There were 10,518 athletes from 206 National Olympic Committees (NOCs) who participated in the 2012 Olympics.
The London Aquatics Centre is an indoor facility with two 50-metre (164-foot) swimming pools and a 25-metre (82-foot) diving pool in Queen Elizabeth Olympic Park in Stratford, London. The centre, designed by architect Zaha Hadid as one of the main venues of the 2012 Summer Olympics and the 2012 Summer Paralympics, was used for the swimming, diving and synchronised swimming events. After significant modification, the centre opened to the public in March 2014.
The 2012 Summer Olympics and Paralympics venues were mostly located in the host city of London, though some other events required facilities located elsewhere. Between the successful bid and the Olympics and Paralympics themselves, several details and venues changed.
The Water Cube (水立方), fully a.k.a the National Aquatics Centre (国家游泳中心), is a swimming center at the Olympic Green in Chaoyang, Beijing, China.
The 2007 World Aquatics Championships, or the XII FINA World Championships, were held in Melbourne, Australia from 17 March to 1 April 2007. The competition took place at three locations in central Melbourne: the Melbourne Sports and Aquatic Centre, St Kilda Beach, and Rod Laver Arena in a temporary pool christened the Susie O'Neill Pool.
The Sydney Olympic Park Aquatic Centre (SOPAC), formerly Sydney International Aquatic Centre (SIAC), is a swimming venue located in the Sydney Olympic Park in Sydney, New South Wales, Australia. Built in 1994, the SOPAC was a major venue for the 2000 Summer Olympics as it hosted the swimming, diving, synchronized swimming, the medal events for water polo, and the swimming portion of the modern pentathlon competitions. The SOPAC has since been a host venue for numerous schools and swimming associations around New South Wales. Currently, it has most notably been the venue for the annual CAS Swimming Championships. It is also scheduled to be the site of the 2022 Duel in the Pool. The SOPAC also includes a swim shop at the entry of the arena, a play area, a health club and operates swimming classes for all ages.
The Montreal Olympic Pool was constructed for the 1976 Summer Olympics as part of the Montreal Olympic Park. The Olympic Pool is part of the larger swimming centre, located in the base of the inclined Montreal Tower. The centre has a spectator capacity of 3,012 seats.
The Basketball Arena for the 2012 Summer Olympics and the 2012 Summer Paralympics was located in the Olympic Park in Stratford, London. The arena was designed to be fully recyclable, and was dismantled in January 2013, the seating was sold to Barnet owner Tony Kleanthous to be used in the construction of The Hive Stadium.
The Uytengsu Aquatics Center is a 2,500-seat outdoor aquatics venue located on the campus of the University of Southern California in Los Angeles, US. The facility features two pools: a long course pool, and a diving well with towers. The facility is the home pool for the USC Trojans swimming and diving teams.
The Olympic Aquatics Stadium was a temporary aquatics center in the Barra Olympic Park in Rio de Janeiro. The venue hosted the swimming events, Synchronized swimming finals and water polo finals at the 2016 Summer Olympics, and the para-swimming events for the 2016 Summer Paralympics.
A total of twenty-five sports venues were used to host the events of the 1948 Summer Olympics in London, United Kingdom. For the first time in the history of the modern Olympic Games, the diving, gymnastics, swimming, and water polo competitions were held indoors. These Games have since been nicknamed the "Austerity Games" for the tight control of costs at a time when the host nation was still under rationing, which resulted in a total expenditure of around £750,000. All of the venues were already in place and required only temporary modifications. The organizing committee decided not to build an Olympic Village; instead, foreign athletes were housed in makeshift camps at military bases and colleges around London, while local athletes were told to stay at home. Despite these measures, the combined venues of the 1948 Summer Olympics recorded the highest attendance figures for a Games at that time.
The 16th FINA World Championships, also Aquatics 2015, were held in Kazan, Russia from 24 July to 9 August 2015. Russia hosted this event for the first time. The number of participating national teams (190), athletes (2,400) and the number of medals (75) were the most ever amongst these championships. This was the first time the World Aquatics Championships partially overlaps with the FINA World Masters Championships that have a number of athletes, countries (110) and medals (635) which are the most ever also.
VinyLoop is a proprietary physical plastic recycling process for polyvinyl chloride (PVC). It is based on dissolution in order to separate PVC from other materials or impurities.
Lee Valley Hockey and Tennis Centre is a sports and leisure venue located in Leyton, London Borough of Waltham Forest, to the north of Queen Elizabeth Olympic Park. It is regularly used for international field hockey fixtures by both the Great Britain men's and women's field hockey teams. It hosted the 2018 Women's Hockey World Cup. Owned and managed by Lee Valley Regional Park Authority, the site was previously known as Eton Manor and was a wheelchair tennis venue for the 2012 Summer Paralympics before being converted for public use and reopening in June 2014.
The Barra Olympic Park, originally the City of Sports Complex, is a cluster of nine sporting venues in Barra da Tijuca, in the west zone of Rio de Janeiro, Brazil. The park, which served as the Olympic Park for the 2016 Summer Olympics and the 2016 Summer Paralympics, was originally built for the 2007 Pan American Games, consisting of three venues. The complex was later expanded to nine venues for the Olympics, two of which are temporary structures, and became the site of the Olympic Training Center.
The Paris Olympic Aquatic Centre is an aquatic centre located in Saint-Denis, France that is currently hosting aquatic sporting events for the ongoing 2024 Summer Olympics in Paris. Located in the heart of the Plaine Saulnier, opposite the Stade de France, in which it is connected to by a footbridge spanning the A1 autoroute, it is hosting the diving, water polo, and artistic swimming competitions. It was built under the management of the Métropole du Grand Paris.