Location | Winchester, Nevada |
---|---|
Coordinates | 36°08′27″N115°09′30″W / 36.140898°N 115.158320°W |
Owner | Jackie Robinson |
Operator | Comcast Spectacor |
Capacity | 23,000 |
Construction | |
Broke ground | October 29, 2014 |
Construction cost | $4.9 billion |
Architect | Cuningham Group |
Website | |
Official website |
All Net Resort & Arena was a planned entertainment complex in Las Vegas. A project of businessman and former basketball player Jackie Robinson, the complex would have included a resort hotel, retail and restaurant space, and a multi-purpose arena with a retractable roof. Its location was set on the Las Vegas Strip at the former site of a Wet 'n Wild waterpark, next to the Sahara Las Vegas in Winchester, Nevada.
Robinson announced the project in December 2013. Designed by the Cuningham Group, it was initially planned to open in December 2016, at a cost of $1.3 billion. However, the project cost increased several times, and the start of construction was delayed repeatedly because of difficulty acquiring construction funds.
Over the years, All Net received numerous extensions from the Clark County Commission, which voted against another extension in November 2023, putting an end to the project.
All Net Resort & Arena was proposed for 27 acres (11 ha) on the north Las Vegas Strip, located between the Sahara resort to the north and the Fontainebleau resort to the south. [1] [2] The property had previously been the site of the Wet 'n Wild water park, which closed in 2004 for redevelopment. [3] Several projects were proposed for the site over a number of years. [4] Paul Lowden, the owner of the property, had wanted to open a resort known as Palace of the Sea. [5] The project was never built, and Lowden's company, Archon Corporation, agreed to sell the land to Texas developer Christopher Milam in 2006. [6] Milam planned to construct a skyscraper resort on the site known as Crown Las Vegas, [7] but this project was also canceled.
In early 2010, Milam proposed building the Silver State Arena on the former Wet 'n Wild land, which was still owned by Paul and Sue Lowden. The arena would include seating for up to 22,000 people, and Milam sought public funding from Clark County to help finance the project, with a potential opening in 2012. The project would be built by Milam's International Development Management, and would be 85-percent privately financed. [8] [9] [10] It was one of several arenas proposed for the Las Vegas Valley. [11]
Silver State Arena faced opposition from the Clark County Commission, which was hesitant to help fund the project amid financial struggles. [12] [13] [14] To win the support of the commission, Milam sought to attract NBA and NHL teams to the arena. [15] [16] Some nearby residents opposed the project, over concerns about noise, pollution, and increased traffic. [17] MGM Mirage also opposed the project. [10] Milam later proposed an arena for other locations in the Las Vegas Valley, [18] [19] [20] but the project remains unbuilt. [21]
On December 23, 2013, businessman Jackie Robinson, a former UNLV student and NBA player, announced plans to build his own sports arena on the former Wet 'n Wild property. The project was tentatively known as All Net Arena & Resort, and he planned to pursue a naming rights deal eventually. [22] [23] The four-level arena would measure 863,000 sq ft (80,200 m2), [24] and include seating for 22,800 people. The project would also include a 300,000 sq ft (28,000 m2) promenade known as Victory Plaza. Other features would include a 500-suite non-gaming boutique hotel, a restaurant, a nightclub, retail space, a spa, and a wedding chapel. The arena would include a retractable roof, which would allow for a range of indoor and outdoor events. [22] [23] [25] The roof was intended as a main feature for the project. [26] Robinson hoped to attract an NBA team to play at the arena. [22] [27]
The project received a number of skeptics who believed that it would never materialize. [27] [28] [29] [30] Robinson had an option to purchase the property from the Lowdens, or lease it over a 50-year period. [31] He expected to break ground by mid-2014, with the opening scheduled for December 2016. The resort would cost $1.3 billion, including $690 million for the arena. Robinson had funding from a variety of sources, including several banks and the EB-5 program. He had begun planning the project four or five years earlier, but the Great Recession halted his plans. Cuningham Group Architecture was hired to design the project, with the company's Brett Ewing as architect. [22] [23] [32] Comcast Spectacor was chosen to operate the arena. [32]
In August 2014, the Clark County Commission unanimously approved a zoning change that would allow the All Net Resort & Arena to be built, despite opposition from residents of the adjacent Turnberry Place complex. The project was approved to include a 44-story hotel with 500 rooms, and a 16-screen movie theater was added to the plans. At the time, Robinson was working with the Minority Business Development Agency to recruit investors. [28] He hoped to raise $300 million through the EB-5 program. [27]
A groundbreaking ceremony was held for the $1.4 billion project on October 29, 2014. Five months later, Robinson had yet to reach a development agreement with Clark County, which was needed for his lenders to provide financing for the start of construction. He had already received a permit to remove asphalt from the site, and he planned to eventually excavate 50 feet into the ground for parking spaces. He hoped to begin construction later in 2015, with an opening by late 2017. [27] [31] [33] Demolition began on the property shortly thereafter, and Robinson hoped to get the arena finished by 2019. [34]
Legal problems involving a financial partner further delayed the start of construction. SL Hare Capital sued Robinson in 2015, alleging that his group made false statements to gain financing. This led to a countersuit by Robinson's group, alleging that SL Hare had falsely claimed to have secured $300 million for the project. The case was eventually dismissed in January 2017. Two months later, earth moving equipment and dirt haulers were working the site, preparing it for underground parking and utilities. Robinson expected to open the project in December 2019. [4] [35]
In mid-2017, Robinson had a second, 63-story hotel tower added to the plans. It would include 2,000 rooms. The expansion would help ensure the project's success upon opening. [36] [37] He announced shortly thereafter that the project had gained full independent financing. [38] The county approved Robinson's expanded plans in October 2017. The project cost had increased to $2.7 billion, with Credit Suisse as the primary lender. Turnberry Place residents were satisfied with the revised project and the retail space that it would bring. Robinson now expected to begin work on the site by the end of 2017, with completion by mid-2020. The excavation process was expected to take up to eight months. [37] [39] The site consisted of an excavated hole for the next several years while the start of construction faced numerous delays. [40]
In June 2019, Robinson said the project was fully financed and that building designs would take approximately 45 days to receive county approval, while construction would take about three years. [41] In August 2019, Robinson said he was in the final stages of getting his loan for the project, which was expected to cost nearly $3 billion. The project would be financed with money from Qatar, Zürich, and central banks in Europe. Moving the money into the U.S. was a lengthy process. Robinson's group had also invested more than $37 million into the project. [42]
In October 2020, the Clark County Commission granted a final six-month extension for the project to finalize agreements with the county. [1] These included a decommissioning plan in the event that construction stops, and a development agreement, both of which were approved in April 2021. [43] [44] Robinson planned to purchase the property from the Lowdens for $400 million. [45] Construction was scheduled to begin in October 2021, with the project now expected to cost $4 billion. [46] However, these plans would be delayed as well, due to a dispute with Robinson's financiers. A new $4.7 billion funding package, financed by Active Capital Holdings, was announced in February 2022. [2] [47] However, Robinson said the announcement was premature. A new investor and funding package was unveiled in October 2022, a few weeks after some work resumed on the site. The project is expected to cost $4.9 billion, [40] and construction was expected to begin by September 2023. [48] [49] [50]
Research was conducted at the site to prepare for future work related to underground parking. The project applied for a grading permit in mid-2023. [51] [52] Robinson hopes to have the project completed by the end of 2026, although this is contingent on the county's approval of the grading permit, which had yet to occur as of October 2023. Robinson said the arena would be beneficial to new resorts along the northern Strip, including Resorts World and Fontainebleau. [51] [52]
The project's land use applications had expired and been extended several times. On November 21, 2023, commissioners denied a fourth extension request, putting an end to the project. [53] [54]
All Net Resort & Arena was expected to include a 44-story and 63-story hotel, a movie theater, a bowling alley, restaurants, and conference space, among other features. [42]
The Las Vegas Strip is a stretch of Las Vegas Boulevard in Clark County, Nevada, that is known for its concentration of resort hotels and casinos. The Strip, as it is known, is about 4.2 mi (6.8 km) long, and is immediately south of the Las Vegas city limits in the unincorporated towns of Paradise and Winchester, but is often referred to simply as "Las Vegas".
Station Casinos, LLC is an American hotel and casino company based in Las Vegas suburb of Summerlin South, Nevada, and founded by Frank Fertitta Jr. Station Casinos, along with Affinity Gaming, Boyd Gaming and Golden Entertainment, dominate the locals casino market in Las Vegas. The company purchased several sites that were gaming-entitled, meaning that major casinos can be built at that location without additional approvals. There are only a limited number of such sites available in the Las Vegas area. Station Casinos has also branched out into managing casinos that they do not own. Red Rock Resorts, Inc. is a publicly traded holding company that owns a portion of Station Casinos.
The Las Ramblas Resort was a proposed mixed-use project that was to be constructed in Paradise, Nevada. The project was to be located on 25 acres (10 ha) of land on Harmon Avenue, east of the Las Vegas Strip. Las Ramblas would have included 11 towers encompassing a hotel and condominium residences for a total of 4,400 units, including 300 hotel rooms. Other amenities would have included a small casino, retail stores, a spa and health club, and nightclubs. The complex would have totaled 8 million sq ft (740,000 m2), and was designed by Arquitectonica. The design was inspired by La Rambla, an open-air street in Barcelona.
Aria Campus, commonly known by its former name CityCenter, is a mixed-use, urban complex on the Las Vegas Strip in Paradise, Nevada. It is located on 67 acres (27 ha) and contains a total of 18-million sq ft (1,700,000 m2). The complex includes Aria Resort and Casino, the Vdara condo-hotel, the Waldorf Astoria Las Vegas hotel and condominiums, the Veer Towers condominiums, and a mall known as The Shops at Crystals. Another hotel and condo project, The Harmon, never opened due to construction defects; the site was redeveloped as another shopping mall, known as 63.
W Las Vegas was a planned condo-hotel and casino resort near the Las Vegas Strip in Paradise, Nevada. It was announced in August 2005 as a joint venture between Edge Resorts and minority partner Starwood. The project was initially expected to cost $1.7 billion, and would include approximately 3,000 hotel, condo hotel, and residential units, as well as a 75,000 sq ft (7,000 m2) casino, in addition to restaurants, nightclubs, and shopping. The project initially was to be built on 21 acres (8.5 ha) located east of the Las Vegas Strip. The cost of the project ultimately increased to $2.5 billion.
Jackie Robinson is an American former professional basketball player.
The Fontainebleau Las Vegas is a resort and casino on the Las Vegas Strip in Winchester, Nevada. It is owned and operated by Fontainebleau Development and is a sister property to Fontainebleau Miami Beach, and sits on the 24.5-acre (9.9 ha) site previously occupied by the El Rancho Hotel and Casino and the Algiers Hotel. Ownership and development has changed several times since the project was announced in May 2005. It was originally proposed by developer Fontainebleau Resorts, owned by Jeff Soffer.
Resorts World Las Vegas is a resort and casino on the Las Vegas Strip in Winchester, Nevada, United States. It is owned and operated by Genting Group as part of the Resorts World brand. It had been the site of the Stardust Resort and Casino until 2007. The Stardust was to be replaced by Echelon Place, a mixed-use project that was halted during the 2008 economic downturn. Genting bought the unfinished project in 2013, with plans to redevelop it as Resorts World Las Vegas, incorporating some of the Echelon buildings.
Wet 'n Wild was a 27-acre (11 ha) water park located at 2601 South Las Vegas Boulevard on the Las Vegas Strip in Winchester, Nevada. The $14 million water park opened on May 18, 1985, as a joint venture between Howard Hughes Development Corporation and Wet 'n Wild. A number of ownership changes occurred beginning in 1998. It was eventually sold to Palace Entertainment in 2002. However, the land itself was leased throughout the water park's history.
T-Mobile Arena is a multi-purpose indoor arena in Paradise, Nevada, United States. Opened on April 6, 2016, it is the home arena of the Vegas Golden Knights of the National Hockey League (NHL). A joint venture between MGM Resorts International and Anschutz Entertainment Group (AEG), T-Mobile Arena is situated on the Las Vegas Strip behind the New York-New York and Park MGM casino hotels.
Downtown Summerlin is a 400-acre (160 ha) mixed-use development in Summerlin, Nevada, a suburban area on the western outskirts of Las Vegas. It includes the Downtown Summerlin shopping center, office space, and several apartment properties. Downtown Summerlin was developed by The Howard Hughes Corporation, which also developed the Summerlin community.
Durango is a hotel and casino in Rhodes Ranch, a community in the Las Vegas Valley. It is located along Durango Drive, beside the Las Vegas Beltway. The resort includes an 83,178 sq ft (7,727.5 m2) casino, 209 rooms in a 15-story tower, and several restaurants.
Ahern Hotel and Convention Center is a boutique hotel and former casino in Las Vegas, Nevada. The resort is located on 2.5 acres (1.0 ha) of land at 300 West Sahara Avenue, near the Las Vegas Strip.
Majestic Las Vegas is a cancelled high-rise condominium project that was to be built on property previously occupied by the La Concha Motel on the Las Vegas Strip, in Winchester, Nevada. The project was announced by La Concha owner Lorenzo Doumani in February 2004. The 42-story condominium tower was to be accompanied by Hilton's Conrad Las Vegas, a Conrad-branded, 37-story hotel that would operate in a separate high-rise building on the same property. The project was initially expected to open in February 2006.
Virgin Hotels Las Vegas is a hotel and casino resort in Paradise, Nevada, east of the Las Vegas Strip. It previously operated as the Hard Rock Hotel from 1995 to 2020, before closing for renovations to be rebranded as Virgin Hotels.
Sphere is a music and entertainment arena in Paradise, Nevada, United States, east of the Las Vegas Strip. Designed by Populous, the project was announced by the Madison Square Garden Company in 2018, known then as the MSG Sphere. The 18,600-seat auditorium is being marketed for its immersive video and audio capabilities, which include a 16K resolution wraparound interior LED screen, speakers with beamforming and wave field synthesis technologies, and 4D physical effects. The venue's exterior also features 580,000 sq ft (54,000 m2) of LED displays. Sphere measures 366 feet (112 m) high and 516 feet (157 m) wide. The arena cost $2.3 billion, making it by far the most expensive entertainment venue built in Las Vegas.
The Gramercy is a mixed-use development project in Spring Valley, Nevada, west of the Las Vegas Strip. It includes two office buildings and 160 apartment units. Gemstone Development began construction of the project, originally known as ManhattanWest, in 2007. The project initially was to include condominiums, retail, and office space. Construction was suspended in December 2008, because of financial problems. ManhattanWest was sold in 2013, and construction resumed, with the project now known as The Gramercy. It opened in November 2014. An unfinished nine-story condominium tower was imploded in February 2015, as completing it would have been too costly.
The Las Vegas Village was an open-air venue located on the Las Vegas Strip on Las Vegas Boulevard in Paradise, Nevada. Opened in 2013 as MGM Resorts Village, the venue was 15 acres (6.1 ha) and owned by MGM Resorts International.
Dream Las Vegas is a boutique hotel and casino currently on hold on the southern Las Vegas Strip in Paradise, Nevada. It is being developed by Shopoff Realty Investments and the real estate firm Contour. Dream Las Vegas was announced in February 2020, and construction was expected to begin within a year. However, the project was delayed after the Transportation Security Administration raised numerous safety concerns, regarding its proximity with Harry Reid International Airport.
63 is a four-story shopping mall on the Las Vegas Strip in Paradise, Nevada. It is part of the CityCenter complex, developed by MGM Resorts International. The two-acre site was previously planned as The Harmon, a hotel within CityCenter. However, due to structural defects, the hotel never opened and was dismantled in 2015. The property was sold six years later to developer Brett Torino and partner Flag Luxury Group, with plans to build retail space on the site. Construction of 63 began in June 2021, and the first business in the mall opened in April 2023.