Aston Church Road Overbridge is a planned road bridge in Birmingham, England. [1]

Contents

Background

The existing Aston Court Overbridge is not long enough to allow High Speed 2 to pass underneath. As part of the project, it will be demolished and replaced with a new structure. [2]

History

Planning

The initial design for the bridge was revealed to the public in 2021. A revised design was released in November 2022 with a wider walkway and altered lighting. [3] [4] The bridge was given planning permission in September 2023. [2]

Construction

Preparatory works began in 2022. [2] The bridge was constructed in advance. On 14 August 2024 it was moved into place. [5]

Related Research Articles

<span class="mw-page-title-main">Euston railway station</span> Central London railway terminus

Euston railway station is a major central London railway terminus managed by Network Rail in the London Borough of Camden. It is the southern terminus of the West Coast Main Line, the UK's busiest inter-city railway. Euston is the tenth-busiest station in Britain and the country's busiest inter-city passenger terminal, being the gateway from London to the West Midlands, North West England, North Wales and Scotland.

<span class="mw-page-title-main">Water Orton</span> Human settlement in England

Water Orton is a village and civil parish in the North Warwickshire borough of Warwickshire in the West Midlands, England near the River Tame. It is located between Castle Bromwich and Coleshill, and borders the West Midlands metropolitan county boundary to the north, west and south. At the 2001 Census, the population was 3,573, falling to 3,444 at the 2011 Census. In the 2021 Census the population slightly rose to 3,487.

<span class="mw-page-title-main">High Speed 2</span> British high-speed rail project

High Speed 2 (HS2) is a high-speed railway which is under construction in England. The line will run between Handsacre, in southern Staffordshire, and London, with a spur to Birmingham. HS2 is to be Britain's second purpose-built high-speed railway after High Speed 1, which connects London to the Channel Tunnel. London and Birmingham will be served directly by new high speed track, and services to Glasgow, Liverpool and Manchester will use a mix of new high speed track and the existing West Coast Main Line. The majority of the project is planned to be completed by 2033.

<span class="mw-page-title-main">Birmingham Curzon Street railway station</span> Planned HS2 station in Birmingham, UK

Birmingham Curzon Street railway station is the planned northern terminus of High Speed 2 on the fringe of Birmingham city centre, England. The new railway will connect Birmingham to London Euston via Birmingham Interchange and Old Oak Common. Curzon Street will have seven terminal platforms and is planned to open in 2026.

<span class="mw-page-title-main">Birmingham Interchange</span> Future railway station in the West Midlands, England

Birmingham Interchange is a planned High Speed 2 railway station in the Metropolitan Borough of Solihull, West Midlands, England, expected to open in 2026.

<span class="mw-page-title-main">Manchester Airport High Speed station</span> Planned HS2 railway station

Manchester Airport High Speed Station was a planned High Speed 2 station at Manchester Airport, on the southern boundary of Manchester, England, next to Junction 5 of the M56 motorway on the northern side of the airport 1.5 miles (2.4 km) north-west of Manchester Airport railway station. In 2023 plans to build the line were dropped.

<span class="mw-page-title-main">Northern Powerhouse Rail</span> Proposed railway network in the North of England

Northern Powerhouse Rail (NPR), sometimes referred to unofficially as High Speed 3, is a proposed major rail programme designed to substantially enhance the economic potential of the North of England. The phrase was adopted in 2014 for a project featuring new and significantly upgraded railway lines in the region. The aim is to transform rail services between the major towns and cities, requiring the region's single biggest transport investment since the Industrial Revolution. The original scheme would have seen a new high-speed rail line from Liverpool to Warrington continuing to join the HS2 tunnel which it would share into Manchester Piccadilly station. From there, the line would have continued to Leeds with a stop at Bradford. The line was intended to improve journey times and frequency between major Northern cities as well as creating more capacity for local service on lines that express services would have been moved out from.

<span class="mw-page-title-main">History of High Speed 2</span>

The history of High Speed 2 is the background to the planned construction of High Speed 2 (HS2), a new high-speed railway in Great Britain that was originally planned to connect London, Birmingham, Manchester, Leeds and other cities in the UK.

<span class="mw-page-title-main">HS4Air</span> 2018 proposal for a high-speed rail link between HS2, Heathrow, Gatwick and HS1

HS4Air is a proposal for a 140-kilometre (87 mi) high-speed railway line in the United Kingdom, put forward in 2018 by a British engineering consultancy, Expedition Engineering.

Sir Douglas Edwin Oakervee is a British civil engineer who is a past chairman of both High Speed 2 and Crossrail, and was the 139th president of the Institution of Civil Engineers. He was awarded the CBE in 2010 for his contributions to civil engineering and appointed Knight bachelor in 2022 for services to transport and infrastructure delivery.

<span class="mw-page-title-main">Colne Valley Viaduct</span> HS2 Railway Bridge in Harefield

The Colne Valley Viaduct is a bridge, under construction as of 2024, which will carry the High Speed 2 railway over the Colne Valley Regional Park and the Grand Union Canal, in Hillingdon, west London. When completed, its length of 3.4 kilometres (2.1 mi) and a weight of 116,000 tonnes will make it the largest railway bridge in the UK. It is one of the largest single civil engineering works of HS2 Phase 1.

<span class="mw-page-title-main">Transpennine Route Upgrade</span> Rail investments in northern England, proposed November 2021

The Transpennine Route Upgrade (TRU) is a major investment being made in the railway between York and Manchester via Leeds and Huddersfield – the 76 miles (122 km) northern route over the Pennines, most of which is also known as the Huddersfield line. As of 2024, the line is heavily used but is slow and lacks capacity. It has Victorian infrastructure, covers difficult terrain including the 3-mile (4.8 km) Standedge Tunnel, and has poor access roads.

The Chiltern Tunnel is a high-speed railway tunnel currently under construction in Buckinghamshire and Hertfordshire, England, and will upon completion carry the High Speed 2 (HS2) railway line under the Chiltern Hills. The twin-bore tunnels, which are 16.04 km long, will be the longest on the HS2 line. Each tunnel will also have additional 220 m (720 ft) entry and 135 m (443 ft) exit perforated concrete portals to reduce sudden changes in air pressure and subsequent noise.

<span class="mw-page-title-main">Northolt tunnel</span> Twin-bore tunnel for HS2 railway

The Northolt Tunnel is a high-speed railway tunnel currently under construction in Greater London, England, and will upon completion carry the High Speed 2 (HS2) railway line under the West London suburbs. The twin-bore tunnels will run for 8.4 miles (13.5 km) between Old Oak Common and Ruislip. As of March 2024, the first tunnel boring machine has completed 50% of its bore length.

The Wendover Dean Viaduct is a railway viaduct currently under construction that will carry the High Speed 2 (HS2) railway line across farmland between Wendover and Great Missenden, Buckinghamshire, England.

<span class="mw-page-title-main">Integrated Rail Plan</span>

The Integrated Rail Plan for the North and Midlands or more simply, the Integrated Rail Plan (IRP), is a United Kingdom government proposal published on 18 November 2021. It aims to deliver "increased capacity, faster journeys or more frequent services on eight out of the top ten busiest rail corridors across the North and Midlands", by developing rail services along with the required infrastructure in these regions of England. It was published by the Department for Transport (DfT) and features forewords by Prime Minister Boris Johnson and Transport Secretary Grant Shapps, but its publication was delayed a number of times, partly because of the COVID-19 pandemic. It contains the significant proviso that "In line with the Government's existing approach to rail enhancements, commitments will be made only to progress individual schemes up to the next stage of development, subject to a review of their readiness." A Technical Annexe was published in January 2022. A correction slip was issued March 2022.

<span class="mw-page-title-main">HS2 rolling stock</span> Trains for the British High Speed 2 rail line

The HS2 rolling stock are trains for the under-construction High Speed 2 (HS2) high-speed rail line in the United Kingdom.

The HS2 automated people mover is a planned automated people mover (APM) in Solihull, England being built in conjunction with the High Speed 2 project in order to improve connections between HS2's upcoming Interchange station, Birmingham Airport, and other rail and community infrastructure.

The Thame Valley Viaduct is a viaduct which will carry the High Speed 2 railway line in the United Kingdom. It traverses the River Thame near Aylesbury in Buckinghamshire.

Balsall Common Viaduct is a railway viaduct under construction in Balsall Common that will carry the High Speed 2 railway line.

References

  1. "Aston Church Road Overbridge" (PDF). High Speed 2. Retrieved 2023-09-02.
  2. 1 2 3 Haynes, Jane (2023-09-01). "Glimpse of future shows how new HS2 bridge will connect Nechells and Saltley". BirminghamLive. Retrieved 2023-09-01.
  3. Johnson, Thomas (2022-11-16). "HS2 reveals updated Birmingham bridge designs after community feedback". New Civil Engineer. Retrieved 2023-09-01.
  4. Cramp, Thomas (2022-11-15). "Designs for brown HS2 bridge with LED lights unveiled for Birmingham". BirminghamLive. Retrieved 2023-09-01.
  5. Hakimian, Rob (2024-08-14). "HS2 | 1,600t bridge wheeled into position over existing railway in Birmingham". New Civil Engineer. Retrieved 2024-10-13.