Boeing South Carolina

Last updated

Boeing South Carolina
Singapore Airlines 3rd 787-10 (9V-SCC) (40974782582).jpg
Boeing 787 Dreamliner outside of Boeing South Carolina building
Boeing South Carolina
BuiltOctober 2009 (2009-10)
OperatedJuly 2011 (2011-07)–Present
Location North Charleston, South Carolina, U.S.
Coordinates 32°52′44″N80°01′50″W / 32.8789°N 80.0306°W / 32.8789; -80.0306
Industry Aerospace
Products Boeing 787 Dreamliner
Employees6,943 (2017)
Area265 acres (107 ha)
Owner(s) Boeing

Boeing South Carolina is an airplane assembly facility built by Boeing in North Charleston, South Carolina, United States. Located on the grounds of the joint-use Charleston Air Force Base and Charleston International Airport, the site is the final assembly and delivery point for the Boeing 787 Dreamliner. Boeing opened the site in July 2011, after purchasing the facilities of suppliers Vought and Global Aeronautica in 2008 and 2009. The final assembly building covers 1,200,000 square feet (110,000 m2) and opened on November 12, 2011. As of September 28, 2017, the site employs 6,943 workers and contractors.

Contents

History

Sub-assembly site

Boeing Dreamlifter, used to carry sub-assemblies of the Dreamliner, parked in South Carolina Boeing North Charleston2.jpg
Boeing Dreamlifter, used to carry sub-assemblies of the Dreamliner, parked in South Carolina

The 265-acre (107-hectare) site is located on the southern portions of the joint-use Charleston Air Force Base and Charleston International Airport located in the city of North Charleston, South Carolina.

The site was initially established in 2004 to build components for the Boeing 787 Dreamliner. Instead of conventionally building the 787 from the ground up, Boeing assigned subcontractors to do more assembly work, delivering completed sub-assemblies to the Boeing Everett Factory where workers would join them and integrate systems. [1] This approach was intended to result in a leaner, simpler assembly line and lower inventory, [2] with pre-installed systems reducing final assembly time by three-quarters to three days. [3] [2]

The South Carolina site was used by two of these subcontractors: Vought Aircraft Industries and Global Aeronautica, a joint venture of Vought and Alenia Aeronautica, to build sections of the fuselage out of composite materials. [4] [5] Global Aeronautica would receive mid-fuselage sections from an international supply chain including Alenia factories in Italy, and aft fuselage sections from the Vought factory next door. Global Aeronautica would then assemble these sections and then ship the more than 60 percent complete fuselage to Everett onboard the Boeing Dreamlifter, a fleet of converted 747s. The 334,000-square-foot (31,000 m2) facility broke ground in February 2005 and was completed in late 2006. [5]

Subcontractors had difficulties finishing sub-assemblies on schedule, and for many including Alenia, the work proved unprofitable. [6] [7] Amid these issues, and in an effort to gain more control over the supply chain, [8] Boeing purchased Vought's share of the Global Aeronautica joint venture in June 2008, [9] Vought's standalone operations in July 2009, [10] and Alenia's share of Global Aeronautica in December 2009. [11]

Final assembly site

Several Boeing 787 Dreamliner aircraft under construction inside the Boeing South Carolina final assembly building 787 Assembly Line Tails (32910230421).jpg
Several Boeing 787 Dreamliner aircraft under construction inside the Boeing South Carolina final assembly building

Now controlling a large site of land in South Carolina, where 60 percent of 787 assembly was already taking place, Boeing announced in October 2009 that it would build a new 787 Dreamliner final assembly and delivery line in North Charleston. [12] Boeing said that the second production line was necessary to "meet the market demand for the airplane," but it came amid tense negotiations between the company and the International Association of Machinists and Aerospace Workers (IAM) union representing workers in Everett who had recently gone on strike. [13] South Carolina's unionisation rates, the lowest in the country at 2.7%, were stated by Boeing management as a reason to transfer production to there. [14] IAM said the decision was retaliatory and National Labor Relations Board agreed, filing a lawsuit against the company in April 2011. The lawsuit was dropped in December after IAM withdrew its complaint as part of a new contract with Boeing, clearing the way for production to begin in South Carolina. [15] Since then, Boeing has continued to challenge the rights of unions to organize at the plant, [16] [17] and is alleged to have fired workers for their attempts to unionize. [18]

Ground was broken for the new 1,200,000-square-foot (110,000 m2) final assembly building in November 2009. The building contains eight positions for aircraft assembly and multiple floors of offices, conference rooms, and equipment storage. 18,000 tons of structural steel was used during the assembly and the building is 1,041 feet long by 618 feet wide. [4] The building also hosts 10 acres (440,000 sq ft; 40,000 m2) of solar panels on the roof that can generate up to 2.6 megawatts of electricity that is able to power the plant and giant autoclaves. Limited production began in July 2011, with the first airplane rolling out of the final assembly on April 27, 2012, taking its first flight on May 23, and delivered to Air India on October 5.

In addition to the new final assembly building and existing aft fuselage production, midbody assembly and Dreamlifter operations buildings, Boeing also opened a delivery center at the site in November 2011. [19] The center contains office space and conference rooms to meet with customers buying new planes, along with two jet bridges. A 360,000-square-foot (33,000 m2) two-bay paint facility was added in 2016, allowing Dreamliners to be painted on site, instead of being flown elsewhere. [20]

President Donald Trump attending the rollout of the 787-10 Boeing 787-10 rollout with President Trump (32335755473) (cropped).jpg
President Donald Trump attending the rollout of the 787-10

The first 787−10 was rolled out on February 17, 2017, and was considered a major achievement for the South Carolina factory, as it would be the first Boeing airliner variant assembled exclusively there. [21] The Everett plant was unable to build the −10 because the mid-fuselage sections are too large to fit inside the Dreamlifter. [22]

Undertaking drastic cost-cutting measures in the wake of the COVID-19 pandemic and its resulting impact on aviation, Boeing announced on October 1, 2020, that it would consolidate all of its 787 assembly at the South Carolina factory. [23] [24] The move was completed in February 2021.

Quality-control issues

The South Carolina plant has been accused of shoddy production and ignoring safety defects in its airplanes in favor of meeting deadlines. [25] [26] [27]

In 2019, following the discovery of exterior damage on planes manufactured in Charleston, for a time Qatar Airways would only accept delivery of Dreamliners assembled in Everett. Later that same year KLM, which had discovered loose seats, missing and incorrectly installed pins, nuts and bolts not fully tightened and a fuel-line clamp left unsecured on its jet, complained that the standard of manufacture was "way below acceptable standards." [28]

Early in 2020, Boeing engineers discovered depressions in the 787's vertical tail fin, which could lead to structural failure under limited loads, affecting hundreds of planes or the vast majority of the fleet. Eight 787s were grounded due to the issue, which had been discovered in August 2019 at the South Carolina plant, but were delivered to customers anyway. [29] [30] The company received further criticism after it was revealed that Boeing had eliminated 900 quality inspectors at about the same time that they failed to detect or stop the issues. [31]

In September 2020, Boeing admitted that the FAA was investigating quality-control lapses dating back to the introduction of the 787 in 2011 and considering requiring additional inspections for up to 900 of the roughly 1,000 Dreamliners in service. [29] By January 2021, Boeing had halted 787 deliveries to complete the inspection relating to the ongoing quality control issues. [32] The halt was only expected to last a month, but stretched on for more than a year, except for a brief restart between March and May 2021. [33] [34]

Amid the ongoing investigation, the FAA stripped Boeing of its delegated authority to inspect and sign off on 787 aircraft until the company can, "demonstrate consistent quality, stable delivery processes, and a robust plan for the rework needed on the undelivered aircraft in storage." [35] Since the January 2021 stop in deliveries, FAA has rejected several plans from Boeing to address the issues. [36] [37]

As of April 2022, Boeing has not submitted a plan to inspect and repair already constructed planes, indicating a further delay of weeks or months before the resumption of deliveries. [38] The South Carolina plant continues to build planes at a reduced pace of less than two planes a month. [39] [40]

Local impact

The new factory has provided a boost to the local economy in the wake of record-high unemployment rates during the Great Recession, especially in the manufacturing industry. North Charleston mayor Keith Summey called the new factory the "reversal of the shipyard closing," alluding to the 1996 closure of the Charleston Naval Shipyard that took a heavy toll on the local economy. [41] Boeing was offered an incentives package reportedly worth $450 million provided the company create 3,800 jobs and invest $750 million over the next seven years. [41]

Later calculations determined that the state-offered incentives package will be worth in excess of $900 million, when including property and sales tax breaks and state bonds. State lawmakers stood by the deal, insisting that the economic advantages of the package would justify a sizable investment by the state. [42]

In addition to the main 787 production facility at the airport, in 2011 Boeing has also established a 141-acre north campus, about 10 miles away near Ladson, South Carolina. The first building to open was the Interiors Responsibility Center South Carolina where 787 cabin parts are manufactured. The campus expanded in 2014 with the opening of the Boeing Research & Technology Center and Propulsion South Carolina which designs and assembles engine nacelle parts for the 737 MAX and the 777X. [43]

Related Research Articles

<span class="mw-page-title-main">Boeing 767</span> Wide-body twin-engine jet airliner family

The Boeing 767 is an American wide-body airliner developed and manufactured by Boeing Commercial Airplanes. The aircraft was launched as the 7X7 program on July 14, 1978, the prototype first flew on September 26, 1981, and it was certified on July 30, 1982. The initial 767-200 variant entered service on September 8, 1982, with United Airlines, and the extended-range 767-200ER in 1984. It was stretched into the 767-300 in October 1986, followed by the extended-range 767-300ER in 1988, the most popular variant. The 767-300F, a production freighter version, debuted in October 1995. It was stretched again into the 767-400ER from September 2000.

<span class="mw-page-title-main">Boeing 747</span> American wide-body long-range commercial jet aircraft

The Boeing 747 is a long-range wide-body airliner designed and manufactured by Boeing Commercial Airplanes in the United States between 1968 and 2023. After the introduction of the 707 in October 1958, Pan Am wanted a jet 2+12 times its size, to reduce its seat cost by 30%. In 1965, Joe Sutter left the 737 development program to design the 747. In April 1966, Pan Am ordered 25 Boeing 747-100 aircraft, and in late 1966, Pratt & Whitney agreed to develop the JT9D engine, a high-bypass turbofan. On September 30, 1968, the first 747 was rolled out of the custom-built Everett Plant, the world's largest building by volume. The 747's first flight took place on February 9, 1969, and the 747 was certified in December of that year. It entered service with Pan Am on January 22, 1970. The 747 was the first airplane called a "Jumbo Jet" as the first wide-body airliner.

<span class="mw-page-title-main">Charleston International Airport</span> Airport serving Charleston, South Carolina, USA

Charleston International Airport is a joint civil-military airport located in North Charleston, South Carolina, United States. The airport is operated by the Charleston County Aviation Authority under a joint-use agreement with Joint Base Charleston. It is South Carolina's busiest airport; in 2023 the airport served over 6.1 million passengers in its busiest year on record. The airport is located in North Charleston and is approximately 12 miles (19 km) northwest of downtown Charleston. The airport serves as a focus city for Breeze Airways. It is also home to the Boeing facility that assembles the 787 Dreamliner.

<span class="mw-page-title-main">Boeing 787 Dreamliner</span> Boeing wide-body jet airliner introduced in 2011

The Boeing 787 Dreamliner is an American wide-body airliner developed and manufactured by Boeing Commercial Airplanes. After dropping its unconventional Sonic Cruiser project, Boeing announced the conventional 7E7 on January 29, 2003, which focused largely on efficiency. The program was launched on April 26, 2004, with an order for 50 aircraft from All Nippon Airways (ANA), targeting a 2008 introduction. On July 8, 2007, a prototype 787 without major operating systems was rolled out; subsequently the aircraft experienced multiple delays, until its maiden flight on December 15, 2009. Type certification was received in August 2011, and the first 787-8 was delivered in September 2011 before entering commercial service on October 26, 2011, with ANA.

<span class="mw-page-title-main">Boeing 747-400</span> Wide-body airliner, improved production series of the 747

The Boeing 747-400 is a large, long-range wide-body airliner produced by Boeing Commercial Airplanes, an advanced variant of the initial Boeing 747. The "Advanced Series 300" was announced at the September 1984 Farnborough Airshow, targeting a 10% cost reduction with more efficient engines and 1,000 nautical miles [nmi] of additional range. Northwest Airlines became the first customer with an order for 10 aircraft on October 22, 1985. The first 747-400 was rolled out on January 26, 1988, and made its maiden flight on April 29, 1988. Type certification was received on January 9, 1989, and it entered service with NWA on February 9, 1989.

<span class="mw-page-title-main">General Electric GEnx</span> Turbofan jet engine

The General Electric GEnx is an advanced dual rotor, axial flow, high-bypass turbofan jet engine in production by GE Aerospace for the Boeing 747-8 and 787. The GEnx succeeded the CF6 in GE's product line.

<span class="mw-page-title-main">Boeing Commercial Airplanes</span> Division of the Boeing Company that builds commercial jet airplanes

Boeing Commercial Airplanes (BCA) is a division of the Boeing Company. It designs, assembles, markets, and sells commercial aircraft, including the 737, 767, 777, and 787, along with freighter and business jet variants of most. The division employs nearly 35,000 people, many working at the company's division headquarters in Renton, Washington or at more than a dozen engineering, manufacturing, and assembly facilities, notably the Everett Factory and Renton Factory, and the South Carolina Factory.

<span class="mw-page-title-main">Vought</span> 1917–1992 series of American aerospace companies

Vought was the name of several related American aerospace firms. These have included, in the past, Lewis and Vought Corporation, Chance Vought, Vought-Sikorsky, LTV Aerospace, Vought Aircraft Companies, and Vought Aircraft Industries.

Colonel James Jabara Airport is a public airport located nine miles (14 km) northeast of the central business district of Wichita, a city in Sedgwick County, Kansas, United States. It is named in honor of World War II and Korean War flying ace James Jabara, an American of Lebanese descent who has the distinction of being the first American jet ace.

<span class="mw-page-title-main">Boeing 747-8</span> Wide-body airliner, last production series of the 747

The Boeing 747-8 is the final series of the large, long-range wide-body airliners in the Boeing 747 family from Boeing Commercial Airplanes. The 747-8 is the largest variant of the 747 and Boeing's largest aircraft. After introducing the 747-400, Boeing considered larger 747 versions as alternatives to the proposed double-deck Airbus A3XX, later developed as the Airbus A380. The stretched 747 Advanced was launched as the 747-8 on November 14, 2005, for a market forecast of 300 aircraft. The first 747-8F Freighter performed its maiden flight on February 8, 2010, and the passenger 747-8I Intercontinental followed suit on March 20, 2011. The cargo version was first delivered in October 2011 and the airliner began commercial service in June 2012.

<span class="mw-page-title-main">Boeing Dreamlifter</span> Outsize cargo conversion of the 747–400

The Boeing Dreamlifter, officially the 747-400 Large Cargo Freighter (LCF), is a wide-body cargo aircraft modified extensively from the Boeing 747-400 airliner. With a volume of 65,000 cubic feet (1,840 m3) it can hold three times that of a 747-400F freighter. The outsized aircraft was designed to transport Boeing 787 Dreamliner parts between Italy, Japan, and the U.S., but has also flown medical supplies during the COVID-19 pandemic.

<span class="mw-page-title-main">Boeing Everett Factory</span> Airplane assembly facility in Everett, Washington

The Boeing Everett Factory, officially the Everett Production Facility, is an airplane assembly facility operated by Boeing in Everett, Washington, United States. It sits on the north side of Paine Field and includes the largest building in the world by volume at over 472 million cubic feet (13,400,000 m3), which covers 98.3 acres (39.8 ha).

<span class="mw-page-title-main">Boeing Renton Factory</span> Airplane assembly facility in Renton, Washington

The Boeing Renton Factory is the Boeing Company's manufacturing facility for narrow-body commercial airliners, and their military derivatives. Production includes the Boeing 737 MAX passenger airliner and the Boeing P-8 Poseidon military patrol aircraft. The factory covers 1,100,000 square feet (100,000 m2) of floor space. The factory lies adjacent to Renton Municipal Airport.

<span class="mw-page-title-main">Taranto-Grottaglie Airport</span> Airport

Taranto-Grottaglie "Marcello Arlotta" Airport is an airport serving Taranto and Grottaglie, both comunes in the province of Taranto in Italy. The airport is located 1.5 kilometres (0.9 mi) from the city of Monteiasi, 4 km (2.5 mi) from Grottaglie and 16 km (9.9 mi) from Taranto. It is named for Marcello Arlotta (1886–1918), an Italian aviator.

Vincent A. Weldon is an American aerospace engineer who has designed critical components for both the Apollo Moon missions and the Space Shuttle. In 2006 Weldon called the Boeing 787 Dreamliner unsafe, and Boeing fired Weldon under disputed circumstances.

<span class="mw-page-title-main">Boeing 737 MAX</span> Single-aisle airliner family by Boeing

The Boeing 737 MAX is the fourth generation of the Boeing 737, a narrow-body airliner manufactured by Boeing Commercial Airplanes. It succeeds the Boeing 737 Next Generation (NG) and competes with the Airbus A320neo family. The series was announced in August 2011, first flown in January 2016, and certified by the US Federal Aviation Administration (FAA) in March 2017. The first 737 MAX delivered to a customer was a MAX 8 to Malindo Air, which accepted and began operating the aircraft in May 2017.

<span class="mw-page-title-main">2013 Boeing 787 Dreamliner grounding</span> Battery problems article of a Boeing 787 Dreamliner

In 2013, the second year of service for the Boeing 787 Dreamliner, a widebody jet airliner, several of the aircraft suffered from electrical system problems stemming from its lithium-ion batteries. Incidents included two electrical fires, one aboard an All Nippon Airways 787 and another on a Japan Airlines 787; the second fire was found by maintenance workers while the aircraft was parked at Boston's Logan International Airport. The United States Federal Aviation Administration (FAA) ordered a review of the design and manufacture of the Boeing 787 Dreamliner and grounded the entire Boeing 787 fleet, the first such grounding since that of the McDonnell Douglas DC-10 in 1979. The plane has had two major battery thermal runaway events in 52,000 flight hours, neither of which were contained safely; this length of time between failures was substantially less than the 10 million flight hours predicted by Boeing.

<span class="mw-page-title-main">Boeing 777X</span> Next generation of the Boeing 777

The Boeing 777X is the latest series of the long-range, wide-body, twin-engine jetliners in the Boeing 777 family from Boeing Commercial Airplanes. The 777X features new GE9X engines, new composite wings with folding wingtips, greater cabin width and seating capacity, and technologies from the Boeing 787. The 777X was launched in November 2013 with two variants: the 777-8 and the 777-9. The 777-8 provides seating for 384 passengers and has a range of 8,745 nautical miles [nmi] while the 777-9 has seating for 426 passengers and a range of over 7,285 nmi.

<span class="mw-page-title-main">John Barnett (whistleblower)</span> American whistleblower (1962–2024)

John Mitchell Barnett was an American whistleblower who was known for his substantiated safety and quality reports to the Federal Aviation Administration (FAA) about Boeing's production of the Boeing 787 Dreamliner and death which occurred amidst a lawsuit he brought against Boeing. Barnett worked in quality control at Boeing for 32 years, serving for seven as a manager in North Charleston, South Carolina. Barnett was one of several employees to go public about malpractices at Boeing beginning in 2019 with The New York Times and was featured in the 2022 Netflix documentary titled Downfall: The Case Against Boeing.

<span class="mw-page-title-main">Boeing manufacturing and design issues</span>

A number of significant oversights have occurred in the manufacturing of aircraft produced by Boeing. Such oversights have been reported in the news as far back as 1987. Scrutiny over Boeing's process of addressing manufacturing issues began increasing in the aftermath of two fatal crashes involving the Boeing 737 MAX—Lion Air Flight 610 in late 2018 and Ethiopian Airlines Flight 302 in early 2019.

References

  1. "Boeing Unveils 787 Final Assembly Factory Flow". Boeing (Press release). December 6, 2006. Archived from the original on December 23, 2007. Retrieved September 3, 2011.
  2. 1 2 Copeland, Michael V. (May 5, 2008). "Boeing's Big Dream Is the Fastest-Selling New Airliner in History". Fortune . p. 187. Retrieved May 31, 2022.
  3. "Boeing unveils 787 Dreamliner; Airbus sends congrats". USA Today. July 9, 2007. Retrieved September 2, 2011.
  4. 1 2 "Boeing in South Carolina". Boeing . Retrieved October 8, 2017.
  5. 1 2 "Global Aeronautica opens its 787 Dreamliner integration facility". Charleston Regional Development Alliance. December 5, 2006. Retrieved May 29, 2022.
  6. "Boeing Revises 787 First Flight and Delivery Plans; Adds Schedule Margin to Reduce Risk of Further Delays" (Press release). Boeing. April 9, 2008. Archived from the original on September 15, 2011. Retrieved September 2, 2011.
  7. Thisdell, Dan (February 4, 2013). "In focus: Debt dogs Finmeccanica". Flightglobal. Retrieved April 18, 2015.
  8. Sanders, Peter (July 8, 2009). "Boeing Sets Deal to Buy a Dreamliner Plant". The Wall Street Journal.
  9. Polek, Gregory (June 11, 2008). "Boeing Closes on Global Aeronautica Acquisition". Aviation International News. Retrieved May 29, 2022.
  10. "Boeing Completes Acquisition of Vought Operations in South Carolina" (Press release). Boeing. July 30, 2009. Retrieved September 2, 2011.
  11. "Boeing Acquires Alenia North America's Interest in Global Aeronautica". Boeing (Press release). December 22, 2009. Retrieved May 29, 2022.
  12. "Boeing to Place Second 787 Assembly Line in North Charleston, SC". Boeing (Press release). October 28, 2009. Retrieved May 29, 2022.
  13. Cohen, Aubrey (April 20, 2011). "Boeing illegally put second 787 line in S.C., complaint says". Seattle Post-Intelligencer.
  14. Greenhouse, Steven (April 20, 2011). "Labor Board Says Boeing's South Carolina Plant Breaks Law". The New York Times. ISSN   0362-4331 . Retrieved May 7, 2019.
  15. Hananel, Sam (December 9, 2011). "Labor board drops high-profile Boeing complaint". Boston Globe. Associated Press.
  16. Dubé, Lawrence E. (June 28, 2018). "Boeing Wants to Ground 'Gerrymandered' Union Election Win". Bloomberg Law. Retrieved May 7, 2019.
  17. "Boeing Gets Business, GOP Backing in Battle Against S.C. Union". www.bna.com. September 7, 2018. Retrieved May 7, 2019.
  18. Sainato, Michael (May 3, 2019). "'It's because we were union members': Boeing fires workers who organized". The Guardian. ISSN   0261-3077 . Retrieved May 7, 2019.
  19. "Boeing Co. opens 787 delivery center - Charleston Business News". Charleston Regional Development Alliance News & Blog. Retrieved May 29, 2022.
  20. Wren, David (December 15, 2016). "Paint hangar rounds out Boeing's 787 production in North Charleston". Post and Courier . Retrieved October 8, 2017.
  21. "Boeing Debuts 787-10 Dreamliner" (Press release). Boeing. February 17, 2017.
  22. Wren, David (November 30, 2016). "Boeing's first 787-10 Dreamliner moves into final assembly". Post and Courier .
  23. Tangel, Andrew; Cameron, Doug (September 30, 2020). "Boeing to Move All 787 Dreamliner Production to South Carolina". Wall Street Journal . ISSN   0099-9660 . Retrieved September 30, 2020.
  24. Gates, Dominic (October 1, 2020). "Boeing makes it official: Washington state will lose 787 production next year". The Seattle Times . Retrieved October 1, 2020.
  25. {{Cite news |last=Wren |first=David |date=April 20, 2019 |title=After reports of shoddy production at North Charleston Dreamliner plant, Boeing on offensive |work=[[The Post and Courier]] |url=https://www.postandcourier.com/business/after-reports-of-shoddy-production-at-north-charleston-dreamliner-plant/article_cc0cbf86-638d-11e9-ba7f-e7ec2937b77f.html |url-access=limited |accessdate=April 20, 2019}}
  26. Kitroeff, Natalie; Gelles, David (April 20, 2019). "Claims of Shoddy Production Draw Scrutiny to a Second Boeing Jet" . The New York Times . Retrieved April 20, 2019.
  27. Kiersz, Andy (April 21, 2019). "'I never plan to fly on it': Workers reportedly recount poor practices at a Boeing factory in South Carolina that could spell trouble for Dreamliner plane". Business Insider. Retrieved July 16, 2021.
  28. Slotnick, David (August 5, 2019). "Airlines flying Boeing's 787-10 Dreamliner are complaining about quality they say is 'way below acceptable standards'". Business Insider. Retrieved July 16, 2021.
  29. 1 2 Tangel, Andrew; Pasztor, Andy (September 7, 2020). "Production Problems Spur Broad FAA Review of Boeing Dreamliner Lapses". Wall Street Journal. ISSN   0099-9660 . Retrieved September 7, 2020.
  30. Ostrower, Jon (August 27, 2020). "Boeing pulls eight 787s from service over structural issue". Air Current. Retrieved September 7, 2020.
  31. Ostrower, Jon (September 8, 2020). "Scarce quality data on 787 skins as FAA peels back onion on Boeing". Air Current. Retrieved September 8, 2020.
  32. Hemmerdinger, Jon (January 28, 2021). "Boeing to resume 787 deliveries no sooner than February". FlightGlobal. Retrieved February 22, 2021.
  33. "Boeing Delivers First 787 in Months as Inspections Continue". Bloomberg.com. March 26, 2021. Retrieved April 2, 2021.
  34. "As orders trickle in, Boeing ramps up 737 MAX but 787 deliveries are still blocked". October 12, 2021.
  35. Hemmerdinger, Jon (February 15, 2022). "FAA to issue 787 airworthiness certificates, taking authority from Boeing". Flight Global.
  36. "Boeing's Delivery of New 787 Dreamliners Likely Delayed Until at Least Late October". Wall Street Journal. September 4, 2021.
  37. Johnson, Eric M.; Shepardson, David (May 13, 2022). "Exclusive: U.S. FAA finds Boeing 787 certification documents incomplete -sources" via www.reuters.com.
  38. Tangel, Andrew (April 27, 2022). "Boeing Looked for Flaws in Its Dreamliner and Couldn't Stop Finding Them". Wall Street Journal. Retrieved April 28, 2022.
  39. "Boeing posts loss as Dreamliner flaws drive up costs, but airplane sales rise". CNBC . October 27, 2021.
  40. Jones, Callum (July 14, 2021). "Boeing cuts 787 production after structural fault found". The Times.
  41. 1 2 McDermott, John P. (October 28, 2009). "Boeing lands in North Charleston". Post and Courier . Retrieved August 3, 2014.
  42. Stech, Katy; Slade, David (October 17, 2010). "Boeing's whopping incentives". Post and Courier . Archived from the original on July 8, 2012. Retrieved January 15, 2011.
  43. McDermott, John P. (August 13, 2013). "Boeing picks North Charleston site for new 737 MAX engine inlet plant". Post and Courier . Retrieved August 3, 2014.