The Caltrain Express (CTX) project was implemented from 2002 to 2004 to establish the Baby Bullet express service, which shortened the transit time on the Caltrain commuter rail line between San Francisco and San Jose, and certain stations in between. New locomotives and rolling stock were purchased for dedicated express service, bypassing most stations; quad-track overtake sections were added in two locations along the Peninsula Corridor right-of-way to allow express trains to pass slower local trains that were making all stops; tracks were also upgraded with continuous-welded rail; a centralized traffic control system was added; and crossovers were added every few miles to allow single-tracking trains around disabled trains. Congresswoman Jackie Speier, then serving as a California State Senator, is credited with securing the funding for CTX and one of the new locomotives acquired for the project is named for her as a result. During commute hours, the Baby Bullet went up to 20 percent faster than driving south from San Francisco to San Jose. On September 21, 2024, with the completion of the Caltrain modernization project and the transition to electrified trains, the Baby Bullet was renamed as simply the Express service. [1]

Contents

History

In 1997, after plans to extend Caltrain to downtown San Francisco were put on hold, the Peninsula Corridor Joint Powers Board (PCJPB) started the Rapid Rail Study, which was published as a draft in October 1998. [2] The 1998 Rapid Rail Study prioritized planned capital improvements to implement the 1997 Caltrain 20-Year Strategic Plan, which sought to improve service and increase ridership, which was assumed to correspond directly to improved service (through decreased transit times and increased train frequencies). The highest-priority projects were intended to rehabilitate the line to "reverse decades of deferred maintenance" and enhance the line by adding overtake tracks to implement express service. [2] [3] After rehabilitation and enhancement, the Rapid Rail Study called for electrification of the line. [2]

Proposed rehabilitation work included rebuilding tracks and grade crossings to enable Caltrain to raise the systemwide speed limit to 79 to 90 mph (127 to 145 km/h) and replacing bridges, culverts, and signals. [2] The initial enhancement projects included adding third overtake tracks in Burlingame (between the stations at Millbrae and San Mateo, for northbound trains) and San Mateo (between 9th Avenue and Hillsdale, for southbound trains) to allow express trains to pass slower all-stop local trains, and adding a third turnback track in Palo Alto to allow more frequent short-line service. [2] In 1999, PCJPB published an implementation plan for the Rapid Rail Study which called for a $280 million investment from the three counties served by Caltrain. [3]

California State Senator Jackie Speier and Caltrain leadership are credited with the idea to provide an express service for Caltrain during a brainstorming session. [4] Senator Speier sponsored Senate Bill 2003 in February 2000 authorizing US$127,000,000(equivalent to $218,500,000 in 2023) to fund CTX; [5] the first draft of the bill included funding to create "little bullet" express Caltrain service between San Francisco and San Jose (with the goal to cut transit time in half compared to local, all-stop service) and also to rehabilitate the Dumbarton Rail Bridge in preparation to reroute Altamont Corridor Express (then Altamont Commuter Express) service from Stockton over the Dumbarton Rail Corridor. [6] By March 2000, the bill was being referred to as the "Baby Bullet Bill" [7] and it passed the Senate Transportation Committee on a 9–0 vote in April 2000 [8] after it had been amended to remove Dumbarton Rail and focus solely on establishing express service. [9] The funding request for the Caltrain express service was later incorporated directly into the Governor's budget. [10] CTX was one of the projects recommended by the Metropolitan Transportation Commission (MTC) under Resolution 3434 in December 2001. [11]

Construction

CTX officially broke ground during a ceremony held at 4th and King on June 28, 2002. [12] The groundbreaking was attended by officials and politicians who had supported CTX, including Senator Speier, Governor Gray Davis, Secretary of Transportation and Housing Maria Contreras-Sweet, MTC Commissioner Sue Lempert, Caltrans Director Jeff Morales, and San Mateo County Supervisor Mike Nevin. [12] At the time, it was the largest capital improvement program for Caltrain. [12]

JPBX #927 and 928, the last two (of six) locomotives acquired for CTX, in San Francisco (2016) MPI MP36PH-3C locomotives of Caltrain at night.jpg
JPBX #927 and 928, the last two (of six) locomotives acquired for CTX, in San Francisco (2016)

During CTX construction, Caltrain shut down weekend service for two years starting in July 2002 to allow track work. [5] [13] samTrans introduced the RRX bus line to temporarily replace weekend Caltrain service, but RRX was not a direct replacement, as the ride between San Francisco and San Jose was scheduled for 98 minutes, buses only ran until 8 P.M., and the line only had two intermediate stops, at Hillsdale and Palo Alto. [5] [14] [15] [16] After construction was complete and weekend service resumed in June 2004, Caltrain offered free rides the first two weekends to lure riders back and to thank riders for their patience. [17] [18] [19] During construction, service was also reduced to a single track on Thursday and Friday nights after 9 p.m. [15]

Baby Bullet service

By April 2004, Caltrain was showing off the rolling stock it had acquired for Baby Bullet service. [20] Construction was substantially complete by May 2004 when Caltrain began running "test" trains on the weekends to shake down the system and gain crew experience, [17] [21] and the Baby Bullet trains entered revenue service on June 7, 2004; the first northbound Baby Bullet discharged over 600 passengers upon its arrival in San Francisco at 6:45 a.m., and had carried more than 1,000 during its inaugural run. [22] The first southbound Baby Bullet left San Francisco with 420 passengers at 7:20 a.m. [22] Baby Bullet trains often ran at standing room capacity during the first year. [23]

Just prior to the inauguration of Baby Bullet service, Caltrain served an average of 27,000 riders per weekday. [13] One year later, Caltrain ridership had increased by 12%, [24] and by 2014, ten years later, Caltrain ridership had more than doubled to over 60,000 riders per weekday. [25] Notably, once San Mateo County commuters were given the choice between BART and Caltrain to San Francisco after the completion of the BART extension to San Francisco International Airport, many riders continued to prefer Caltrain and the Baby Bullet service, which was cheaper and quicker than switching to BART at Millbrae, in part because Caltrain, which follows the 1907 Bayshore Cutoff route constructed by Southern Pacific, does not take a long detour west around San Bruno Mountain to reach San Francisco. [24]

In addition to having one of the new locomotives named for her, Senator Speier received MTC's John F. Foran Legislative Award for her pivotal role in bringing Baby Bullet service online. [4] CTX received an award from the California Transportation Foundation as the Program of the Year for 2004. [26] During the same ceremony, Speier was honored as the Legislator of the Year. [26]

In 2017, the Rail and the California Economy report noted that Baby Bullet trains operated at 95% on-time performance (making stops within ten minutes of scheduled times) and, at around 60 minutes from San Francisco to San Jose, was faster than driving south on U.S. 101 during key commute hours. Driving times during peak afternoon commute hours could reach 75 minutes or more. [27]

On September 21, 2024, with the completion of the Caltrain electrification project, the Baby Bullet was renamed as simply the "Express" service. [1]

Design

North overtake quad-track section just south of Tunnel #4, north of the Bayshore platform Bayshore Station 3227 15.JPG
North overtake quad-track section just south of Tunnel #4, north of the Bayshore platform

Caltrain split the CTX project into two separate phases, based on geographic region. The North CTX extended from San Francisco to Redwood City, and the South CTX spanned the tracks from Menlo Park to Santa Clara. [28] The North CTX contract was awarded in April 2002 to the joint venture partnership of Herzog Contracting Corporation and Stacy & Witbeck (Herzog-Stacy-Witbeck). [29] Herzog-Stacy-Witbeck also won the South CTX contract, as announced in January 2003. [30] The key elements of CTX were the overtake tracks, high-speed crossovers, and a central traffic control system which collectively allowed a single office to route trains. [31] To support smoother operation at higher sustained speeds, Caltrain also laid down continuous-welded rails. [32]

Station rebuilds

During the CTX project, Caltrain rebuilt the Bayshore station, relocating it slightly south of the prior location to accommodate the north quad track overtake section ending just south of Tunnel #4. This moved nearly all of the Bayshore station out of the City and County of San Francisco and broke a planned intermodal connection to the Third Street Light Rail Project, the first expansion phase of the Muni Metro light rail system, which was building tracks down Third Street. The new T Third Street line, which opened in 2007, terminates at Sunnydale Station as Muni Metro has never built any tracks in San Mateo County, and a planned 0.5-mile (0.80 km) loop extension to Bayshore was studied in 2012. [33] [34] A small rail bridge south of Bayshore was built over a creek as part of CTX. [35]

The Lawrence station was in the right-of-way planned for the south quad-track overtake section, so Lawrence was rebuilt with new platforms and an under-track pedestrian tunnel. [30] Work at Lawrence was anticipated to be completed by the end of 2003, [36] and the rebuilt Lawrence was opened in March 2004. [37]

The Millbrae station also received some upgrades; a third track was added and existing tracks were relocated, requiring Caltrain to demolish the existing platform. [38] Millbrae station updates were scheduled to complete with the opening of the new intermodal station in January 2003. [38]

Track upgrades (overtakes, crossovers, and traffic control)

South overtake quad-track section south of Sunnyvale Sunnyvale four tracks (33608468046).jpg
South overtake quad-track section south of Sunnyvale

CTX added quad-track overtake sections near the cities of Brisbane and Sunnyvale. [13] [39] [40] During the initial design phase, overtakes were also announced for Millbrae and Redwood City. [41] Millbrae gained a third track, and Redwood City added two sidings near Redwood Junction, approximately 1.2 miles (1.9 km) between Chestnut Street and Fifth Avenue. [28] From north to south, the completed quad-track overtake sections are: [28]

  1. Brisbane, approximately 2 miles (3.2 km) between Candlestick Cove and Tunnel #4 (overlaps Bayshore Station)
  2. Sunnyvale, approximately 2 miles (3.2 km) between Fair Oaks and Bowers (overlaps Lawrence Station)

CTX also included crossover switches, which improved operating flexibility to allow trains to bypass stalled trains, [42] [43] and a centralized traffic control (CTC) system, which allowed track signaling and switching operations to be handled from a single facility in San Jose, rather than relying on dispatched crews throwing manual switches. [14] [32] [31] [43] Prior to CTX, trains typically had to stop and de-board operators and conductors, who would throw switches by hand. [21] Although CTC was already partially implemented near the two main terminals at San Francisco and San Jose, CTX added CTC throughout the route, and 12 signal bridges were added to the line in total. [43]

By November 2002, Caltrain had rebuilt 5,900 feet (1,800 m) of track as part of the North CTX project, which included conversion to continuous welded rail and replacement of wooden ties with concrete ties. [35] Full-speed testing of track upgrades occurred over two weekends in May 2004, just before the Baby Bullet service started in June. [17] Crews and central control practiced overtaking slower trains and routing around delays induced by disabled trains. [17] [21]

Stops and scheduling

Baby Bullet service launched in June 2004 with ten trains per weekday, which made only four intermediate stops between San Francisco and San Jose Diridon: Millbrae, Hillsdale, Palo Alto, and Mountain View. [17] The ten trains consisted of three northbound and two southbound trains in the morning, and three southbound and two northbound trains in the afternoon; the two southbound morning trains and two northbound afternoon trains made additional stops at 22nd Street to serve reverse commuters. [17] Since these trains operated with far fewer stops, they took only 57 minutes to travel between San Francisco and San Jose, compared to 96 scheduled minutes for local trains making all stops, [17] even though the maximum train speed remained at 79 miles per hour (127 km/h). [13] [22] [39]

This cuts my commute so much that it's faster than driving.

Scott Hofmeister, Inaugural day interview with San Francisco-to-Mountain View commuter, June 7, 2004 [22]

The revised schedule was the product of more than two hundred iterations, and added ten trains per weekday without increasing staffing because equipment was being used more efficiently. [44] However, mid-day (off-peak) service was reduced at seven stations; trains used to stop every half hour, but the mid-day headway changed to every hour at 22nd Street, Bayshore, South San Francisco, Broadway, Hayward Park, Redwood City, Atherton, and Tamien. [17]

Riders to stations not served by Baby Bullet service complained their commute times increased because their trains slowed to allow Baby Bullets to overtake. [45] Clem Tillier noted ridership at stations not served by Baby Bullets continued to be depressed in the years following CTX implementation, [46] and that elimination of Baby Bullet service under a planned 76-train schedule actually improved service quality. [47] Caltrain had initially proposed trimming the schedule from 86 trains per weekday to 48 trains only during peak hours to close a budget gap in 2011, [48] later refining the proposal to 76 trains per weekday and eliminating Baby Bullet service. [49] However, one-time funds were diverted from other sources and no service cuts were made in 2011. [50]

Baby Bullet stopping patterns [lower-alpha 1]
MilesZoneStationInaugural Service [lower-alpha 2]
(June 7, 2004) [51]
Pattern A2 [lower-alpha 3]
(Apr 10, 2017) [52]
Pattern A3 [lower-alpha 4]
(Aug 30, 2021) [53]
Pattern A4 [lower-alpha 5]
(Sep 21, 2024) [1]
Pattern B [lower-alpha 6]
(Aug 1, 2005) [54]
Pattern B2 [lower-alpha 7]
(Oct 1, 2012) [55]
Pattern B3 [lower-alpha 8]
(Apr 10, 2017) [52]
Weekend [lower-alpha 9]
(Jan 1, 2011) [57]
0.01 San Francisco StopStopStopStopStopStopStopStop [lower-alpha 9]
1.9 22nd Street R [lower-alpha 10] R [lower-alpha 10] R [lower-alpha 10] StopR [lower-alpha 10] R [lower-alpha 10] R [lower-alpha 10] [lower-alpha 9]
5.2 Bayshore [lower-alpha 9]
9.3 South San Francisco Stop
11.6 San Bruno
13.72 Millbrae StopStopStopStopStopStopStopStop
15.2 Broadway [lower-alpha 11]
16.3 Burlingame
17.9 San Mateo StopT [lower-alpha 12] T [lower-alpha 12] T [lower-alpha 12] Stop
18.9 Hayward Park
20.3 Hillsdale StopStopStopStopStop
21.9 Belmont
23.2 San Carlos
25.4 Redwood City R [lower-alpha 3] [lower-alpha 10] StopStopStopStopStopStop
28.93 Menlo Park R [lower-alpha 10] R [lower-alpha 10] R [lower-alpha 10]
30.1 Palo Alto StopStopStopStopT [lower-alpha 12] Stop [lower-alpha 7] StopStop
30.8 Stanford [lower-alpha 13]
31.8 California Avenue T(PM)
34.0 San Antonio
36.1 Mountain View StopStopStopStopR [lower-alpha 10] R [lower-alpha 10] R [lower-alpha 10] Stop
38.8 Sunnyvale StopT [lower-alpha 12] T [lower-alpha 12] T [lower-alpha 12] Stop
40.84 Lawrence
44.3 Santa Clara
45.7 College Park [lower-alpha 14]
46.9 San Jose StopStopStopStopStopStopStopStop
48.9 Tamien T [lower-alpha 12] T [lower-alpha 12] T/R(AM) [lower-alpha 15]
 
Timetable DateWeekday
Baby Bullets
Pattern A CountPattern A2 CountPattern A3 CountPattern A4 CountPattern B CountPattern B2 CountPattern B3 CountWeekend Count
5 June 2004 [51] 10AM:5
PM:5
2 May 2005 [58] 12AM:6
PM:6
1 August 2005 [54] 22AM:5
PM:5
AM:6
PM:6
1 January 2011 [57] 22AM:5
PM:5
AM:6
PM:6
AM:2
PM:2
1 October 2012 [55] 22AM:5
PM:5
AM:6
PM:6
AM:2
PM:2
10 April 2017 [52] 22AM:5
PM:5
PM:6AM:6AM:2
PM:2
30 August 2021 [53] 12AM: 6
PM: 6
21 September 2024 [1] 14AM: 6
PM: 8
Notes
  1. Since Zones 5 and 6 have no Baby Bullet service stops, these zones are omitted for clarity.
  2. Renamed to "Pattern A" on Aug 1, 2005, when "Pattern B" stops were added along with ten new Baby Bullet trains. "Pattern A" discontinued effective Apr 10, 2017.
  3. 1 2 Modification of "Pattern A" effective Apr 10, 2017; adds reverse commute stop at Redwood City to accommodate planned PCEP work. Discontinued March 30, 2021, due to reduced ridership from the COVID-19 pandemic.
  4. Modification of "Pattern A2" effective Aug 30, 2021; all trains stop at Redwood City regardless of direction and time of day. "Pattern A3" discontinued effective Sep 21, 2024.
  5. Modification of "Pattern A3" effective Sep 23, 2024; all trains stop at South San Francisco, San Mateo, Sunnyvale, and 22nd Street regardless of direction and time of day
  6. "Pattern B" discontinued effective Oct 1, 2012.
  7. 1 2 Modification of "Pattern B" effective Oct 1, 2012; adds reverse commute stop at Palo Alto so all Baby Bullets stop at Palo Alto, regardless of direction or pattern
  8. Modification of "Pattern B2" effective Apr 10, 2017; adds stop at Tamien in the mornings for reverse commute (southbound trains). Discontinued March 30, 2021, due to reduced ridership from the COVID-19 pandemic.
  9. 1 2 3 4 Weekend Baby Bullet trains terminate & originate at Bayshore during tunnel notching work between October 2018 and late spring 2019. Bus bridge provides service to all stops north of Bayshore. [56] Discontinued December 12, 2020, due to reduced ridership from the COVID-19 pandemic.
  10. 1 2 3 4 5 6 7 8 9 10 11 12 13 Stop for reverse commute only (southbound trains during morning peak hours; northbound trains during afternoon peak hours).
  11. Weekend service only as of 2005.
  12. 1 2 3 4 5 6 7 8 9 Stop for traditional commute only (northbound trains during morning peak; southbound trains during afternoon peak).
  13. Limited service, football games only
  14. Limited service intended for students
  15. Traditional commute stop. Reverse commute stop for mornings only.

In 2005, Caltrain expanded Baby Bullet service by adding two trains per weekday in May, [59] and ten more trains per weekday in August, for a total of twenty-two Baby Bullet trains per weekday; the August schedule revision added express stops for certain "Pattern B" trains at San Mateo, Redwood City, Menlo Park, Sunnyvale, and Tamien. [23] With this expansion, though, weekday service to the holdout-rule stations at Broadway and Atherton was dropped, [23] the sparse weekday service to Paul Avenue was suspended entirely, [60] and other trains operating during commute hours were changed from local-service, all-stop to limited service, skipping stops either between San Francisco and Redwood City, or between Redwood City and San Jose; Redwood City became a major transfer point for riders. [61]

MPI locomotive JPBX#925 is named for Jackie Speier. Jackie Speier Caltrain.jpg
MPI locomotive JPBX#925 is named for Jackie Speier.

In 2011, Caltrain added Baby Bullet service to weekend schedules. [57] [62] There were four weekend/holiday Baby Bullets per day (two in the mornings and two in the evenings), each making seven intermediate stops between 4th&King and Diridon: Millbrae, San Mateo, Hillsdale, Redwood City, Palo Alto, Mountain View, and Sunnyvale; these stations were selected for their proximity to activities as probable leisure time destinations. [62]

Caltrain modified Pattern B trains to add a reverse-commute stop at Palo Alto in October 2012. With this change, all Baby Bullet trains stop at Palo Alto, regardless of pattern or direction. [55] Caltrain shifted to a modified Pattern A on April 10, 2017, which added a reverse-commute stop at Redwood City. The revised schedule also extended service to Tamien for reverse-commute (southbound) Pattern B trains in the morning and California Ave for peak-direction (southbound) Pattern B trains in the afternoon. [52]

Caltrain service on weekends north of Bayshore was suspended and replaced by a bus bridge from October 2018 to March 2019 in order to accommodate tunnel notching work for the Peninsula Corridor Electrification Project. Weekend Baby Bullet trains originated and terminated at Bayshore, and a bus bridge made stops at both stations in San Francisco. [56]

In response to the COVID-19 pandemic and loss of passenger traffic, Caltrain discontinued all weekday Baby Bullet service from Monday, March 30, 2020, to August 27, 2021, and all weekend Baby Bullet service indefinitely, starting December 12, 2020. [63] Weekday Baby Bullet service was restored on August 30, 2021, with twelve trains total: six northbound and six southbound, with three each during peak morning and afternoon commute hours. [53]

Effective September 21, 2024 with the transition to full electric service between San Francisco and San Jose, Baby Bullet service was discontinued and rebranded as the "Express" service. 14 Express trains run each weekday, 3 per direction during peak morning commute hours and 4 per direction during peak afternoon commute hours. [1] Express trains make nine stops between San Francisco 4th & King and San Jose Diridon: 22nd Street, South San Francisco, Millbrae, San Mateo, Hillsdale, Redwood City, Palo Alto, Mountain View, and Sunnyvale, with a scheduled journey time of 59 minutes. Select Express trains provide timed cross-platform transfers at San Jose Diridon to and from South County Connector diesel trains for continuing service to Gilroy.

Rolling stock

Caltrain purchased six MPI MP36PH-3C locomotives and seventeen Bombardier BiLevel Coaches to assemble Baby Bullet trains, supplementing the existing fleet of EMD F40PH locomotives and Nippon Sharyo gallery cars, which continued in local and limited-stop service. [18] [64] The prime mover in the MP36PH-3C is an EMD 16-645F3B V-16 diesel, with approximately 15–20% more power than the 16-645E3B in the F40PH, and head-end power is provided by a Caterpillar C-27; [65] [66] Caltrain was the lead customer for the MP36PH-3C. [64] Caltrain unveiled the first of the new locomotives, JPBX #923 in a ceremony held on April 4, 2003, at Burlingame and attended by Senator Speier. [65] The event ended in a round-trip excursion to Redwood City. [66] Locomotive JPBX #925 was dedicated to Senator Speier; her popularity, as evidenced by the named locomotive, was cited as one factor contributing to Lawrence Lessig's decision to withdraw from the special election (where he would have opposed her) to replace Tom Lantos in 2008. [67]

PCJPB purchased the seventeen Bombardier cars (ten coaches and seven cab cars) from Sound Transit, [65] which oversees the Seattle-region Sounder commuter rail service. Sound Transit had ordered thirty-two cars in 1999 to be delivered in 2001 for a planned system expansion, and a combination of events, where the manufacturer completed the cars ahead of schedule and the expansion plans were unexpectedly delayed, left the cars available for Caltrain. [68] The cars made their debut on June 28, 2002, during the groundbreaking ceremony that accompanied the launch of CTX; dignitaries had boarded the low-floor Bombardier cars at South San Francisco and rode up to 4th and King. [12] [69] Bombardier cars entered revenue service in October 2002. [70] During the first year of Baby Bullet service in 2004, the five-car Bombardier consists had a capacity of only sixteen bicycles per train, and carried heavy passenger loads. [22]

As part of the 2024 Caltrain electrification project, Stadler KISS EMUs were introduced on the line. The MP36PH-3C locomotives and BiLevel Coaches remain in service, now exclusively serving the South County Connector between San Jose Diridon and Gilroy. [71] [72]

Related Research Articles

<span class="mw-page-title-main">Caltrain</span> Commuter rail line in California

Caltrain is a commuter rail line in California, serving the San Francisco Peninsula and Santa Clara Valley. The southern terminus is in San Jose at the Tamien station with weekday rush hour service running as far as Gilroy. The northern terminus of the line is in San Francisco at 4th and King Street. Caltrain has 28 regular stops, one limited-service weekday-only stop, one weekend and holiday-only stop (Broadway), and one football-only stop (Stanford). While average weekday ridership in 2019 exceeded 63,000, impacts of the COVID-19 pandemic have been significant: in June 2024, Caltrain had an average weekday ridership of 24,580 passengers.

<i>Capitol Corridor</i> Amtrak service between San Jose and Auburn, California

The Capitol Corridor is a 168-mile (270 km) passenger train route in Northern California operated by Amtrak between San Jose, in the Bay Area, and Auburn, in the Sacramento Valley. The route is named after the two points most trains operate between, San Jose and Sacramento. The route runs roughly parallel to I-880 and I-80. Some limited trips run between Oakland and San Jose. A single daily round trip runs between San Jose and Auburn, in the foothills of the Sierra Nevada. Capitol Corridor trains started in 1991.

<span class="mw-page-title-main">Third Street Light Rail Project</span> San Francisco Muni tram line

The Third Street Light Rail Project was the construction project that expanded the Muni Metro system in San Francisco, California, linking downtown San Francisco to the historically underserved southeastern neighborhoods of Bayview-Hunters Point and Visitacion Valley along the eastern side of the city. Construction was finished in late 2006, non-revenue weekend service began on January 13, 2007, and full service began on April 7, 2007. The new service, as the T Third Street Metro line, replaced the 15 Third bus line, which ran south from the Caltrain Depot at 4th and King streets, along Third Street and Bayshore Boulevard to the southeastern neighborhoods.

<span class="mw-page-title-main">Millbrae station</span> Train station in Millbrae, California, U.S.

Millbrae station is an intermodal transit station serving Bay Area Rapid Transit (BART) and Caltrain, located in Millbrae, California. The station is the terminal station for BART on the San Francisco Peninsula, served by two lines: The Red Line before 9 pm and the Yellow Line during the early morning and evening. It is served by all Caltrain services. The station is also served by SamTrans bus service, Commute.org and Caltrain shuttle buses, and other shuttles.

<span class="mw-page-title-main">Peninsula Commute</span> Passenger rail service between San Francisco and San Jose

The Peninsula Commute, also known as the Southern Pacific Peninsula or just Peninsula, was the common name for commuter rail service between San Jose and San Francisco on the San Francisco Peninsula. This service ran as a private, for-profit enterprise beginning in 1863. Due to operating losses, the Southern Pacific Railroad (SP) petitioned to discontinue the service in 1977. Subsidies were provided through the California Department of Transportation (Caltrans) in 1980 to continue service, and it was renamed Caltrain in 1985.

<span class="mw-page-title-main">Palo Alto station</span> Train station in Palo Alto, California, U.S.

Palo Alto station is an intermodal transit center in Palo Alto, California. It is served by Caltrain regional rail service, SamTrans and Santa Clara VTA local bus service, Dumbarton Express regional bus service, the Stanford University Marguerite Shuttle, and several local shuttle services. Palo Alto is the second-busiest Caltrain station after San Francisco, averaging 7,764 weekday boardings by a 2018 count. The Caltrain station has two side platforms serving the two tracks of the Peninsula Subdivision and a nearby bus transfer plaza.

<span class="mw-page-title-main">22nd Street station (Caltrain)</span> Train station in San Francisco, California, U.S.

22nd Street station is a Caltrain commuter rail station located south of 22nd Street between the Dogpatch and Potrero Hill neighborhoods of San Francisco, California beneath the Interstate 280 freeway viaduct. The only below-grade Caltrain station, it is bracketed on the north and south by two tunnels which take the line under the eastern slope of Potrero Hill. The station is also served by Muni routes 48 and 55.

<span class="mw-page-title-main">Bayshore station (Caltrain)</span> Train station in San Francisco, California, U.S.

Bayshore station is a Caltrain commuter rail station in the Visitacion Valley neighborhood of San Francisco, California. The station is on the border of San Francisco and the neighboring city of Brisbane. The parking lot and the northern section of the station are in San Francisco, while the remainder is in Brisbane. The station address is in San Francisco proper.

<span class="mw-page-title-main">South San Francisco station (Caltrain)</span> Train station in South San Francisco, California, U.S.

South San Francisco station is a Caltrain station in South San Francisco, California. The station is on the east side of the Bayshore Freeway, east and south of the curved Grand Avenue overpass, and north of where the freeway crosses over the tracks. Downtown South San Francisco is to the west, across the freeway. It previously underwent a substantial modernization and expansion project, completed in January 2022.

<span class="mw-page-title-main">San Bruno station (Caltrain)</span> Train station in San Bruno, California, U.S.

San Bruno station is a Caltrain station located in San Bruno, California. The station is located just northeast of downtown San Bruno, above the intersection of San Mateo and San Bruno Avenues, adjacent to Artichoke Joe's Casino.

<span class="mw-page-title-main">Broadway station (Caltrain)</span> Train station in Burlingame, California, U.S.

Broadway station is a Caltrain station in Burlingame, California. Caltrain only serves the stop on weekends and holidays; weekday service is provided by a bus shuttle to nearby Millbrae station.

<span class="mw-page-title-main">San Mateo station</span> Train station in San Mateo, California, U.S.

San Mateo station is the northernmost of the three Caltrain stations in San Mateo, California. It is in downtown San Mateo.

<span class="mw-page-title-main">Gilroy station</span> Train station in Gilroy, California, U.S.

Gilroy station is a Caltrain station located in Gilroy, California, United States. It is the southern terminus of the South County Connector service, and is only served during weekday rush hours in the peak direction, with trains going toward San Jose in the morning and returning southbound in the evening. The station building was constructed by the Southern Pacific Railroad in 1918 and restored in 1998. Future plans call for extended Amtrak Capitol Corridor service, as well as California High-Speed Rail trains, to also stop at Gilroy. The station was named to the National Register of Historic Places in 2019 as Gilroy Southern Pacific Railroad Depot.

<span class="mw-page-title-main">Atherton station</span> Closed Caltrain rail station

Atherton station was a Caltrain station in Atherton, California. The station had one side platform and one island platform serving the two tracks of the Peninsula Subdivision, with a concrete and wooden shelter on the west side of the tracks. The station opened by the Southern Pacific Railroad in 1866 as Fair Oaks and was renamed Atherton in 1912. Caltrain cut weekday service to the station in 2005 due to low ridership and a hold-out rule that prohibited two trains from being at the station simultaneously. Weekend and holiday service continued until December 19, 2020.

<span class="mw-page-title-main">Paul Avenue station</span>

Paul Avenue station was a Caltrain station located in the Bayview neighborhood of San Francisco, California. The lightly used station was closed on August 1, 2005, and the platform and shelter were removed in 2009. A replacement station to the north has been proposed.

<span class="mw-page-title-main">Blossom Hill station (Caltrain)</span> Train station in San Jose, California, U.S.

Blossom Hill station is a Caltrain station located off Monterey Road near the Blossom Hill Road expressway in San Jose, California. The station is only served during weekday peak hours, with northbound trains in the morning and southbound trains in the evening.

<span class="mw-page-title-main">Caltrain Modernization Program</span> Railway electrification project in California, US

The Caltrain Modernization Program (CalMod), sometimes referred to as the Caltrain Electrification Project, was a $2.44 billion project which added a positive train control (PTC) system and electrified the main line of the U.S. commuter railroad Caltrain, which serves cities in the San Francisco Peninsula and Silicon Valley. The electrification included installation of a 25 kV catenary system over the double-tracked line from San Francisco to San Jose, and acquisition of new rolling stock, consisting of Stadler KISS double-decker electric multiple units (EMU). Caltrain is transitioning from its legacy push-pull trains hauled by diesel-electric locomotives, most of which have been in service since 1985.

<span class="mw-page-title-main">The Portal (San Francisco)</span> Planned transit project in San Francisco

The Portal, also known as the Downtown Rail Extension (DTX), is a planned second phase of the Salesforce Transit Center. When complete, it will extend the Caltrain Peninsula Corridor commuter rail line from its current northern terminus at 4th and King via a 1.3-mile (2.1 km) tunnel. The new terminus will be near the Financial District and will provide intermodal connections to BART, Muni, Transbay AC Transit buses, and long-distance buses. In addition, the California High Speed Rail Authority (CHSRA) plans to use DTX and the Caltrain-owned Peninsula Corridor for service on the CHSRA San Francisco–San Jose segment. Because DTX uses a long tunnel, current diesel locomotives are not suitable and the Caltrain Modernization Program (CalMod), which includes electrification of the line and acquisition of electrified rolling stock, is a prerequisite.

<span class="mw-page-title-main">Monterey County Rail Extension</span>

The Monterey County Rail Extension is a planned commuter rail extension that would bring Caltrain passenger service south of its existing Gilroy, California terminus to Salinas in Monterey County, using the existing Coast Line owned by Union Pacific (UPRR). Implementation of the rail extension will occur over three phases, starting from Salinas and moving north. When construction is complete, there will be four trains operated over the extended line per weekday: two northbound trains that depart from Salinas and travel to San Francisco in the morning, and two southbound trains that return to Salinas in the afternoon.

References

  1. 1 2 3 4 5 "Caltrain September 2024 schedule".
  2. 1 2 3 4 5 Draft Caltrain Rapid Rail Study (PDF) (Report). Peninsula Corridor Joint Powers Board. October 1, 1998. Archived (PDF) from the original on August 7, 2011. Retrieved March 29, 2017.
  3. 1 2 Caltrain Rapid Rail Study Implementation Plan (PDF) (Report). Peninsula Corridor Joint Powers Board. 1999. Archived (PDF) from the original on August 7, 2011. Retrieved March 29, 2017.
  4. 1 2 "Caltrain's Baby Bullet Service and Founder Honored" (Press release). Peninsula Corridor Joint Powers Board. September 22, 2004. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  5. 1 2 3 Gathright, Alan (July 5, 2002). "Weekend Caltrain to stop running for 2 years". San Francisco Chronicle. Retrieved March 25, 2017.
  6. Matier, Phillip; Ross, Andrew (February 25, 2000). "Speier's Train Bill Would Add Rail Service to Silicon Valley". San Francisco Chronicle. Retrieved March 26, 2017.
  7. Cabanatuan, Michael (March 28, 2000). "ACE Train's Board Wary of Expansion Plans / Rep. Speier's proposal lacks money, critics say". San Francisco Chronicle. Retrieved March 26, 2017.
  8. Pence, Angelica (April 7, 2000). "New Move To Extend Caltrain / Silicon Valley exodus prompts call for service". San Francisco Chronicle. Retrieved March 25, 2017.
  9. Speier, Jackie (April 11, 2000). "Bill Number: SB 2003, Amended Bill Text". California Secretary of State. Retrieved March 26, 2017.
  10. Mays, Jon (February 8, 2001). "Speier's bill proposes $225 mil for transit". San Mateo Daily Journal. Archived from the original on March 28, 2017. Retrieved March 25, 2017.
  11. MTC (December 19, 2001). "Regional Transit Expansion Program of Projects: Metropolitan Transportation Commission Resolution No. 3434, Revised" (PDF). Metropolitan Transportation Commission. Archived (PDF) from the original on March 18, 2016. Retrieved March 18, 2016.
  12. 1 2 3 4 "Governor Helps Launch CTX" (PDF). Staying on Track. BayRail Alliance. July–August 2002. Retrieved March 26, 2017.
  13. 1 2 3 4 Cabanatuan, Michael (June 8, 2004). "CALTRAIN / 'Baby Bullet' to premiere / Rail travel between S.F, San Jose gets faster come Monday". San Francisco Chronicle. Retrieved March 25, 2017.
  14. 1 2 Softky, Marion (July 10, 2002). "Caltrain launches major renovations". The Almanac. Retrieved March 25, 2017.
  15. 1 2 "Weekend Shutdown for Construction Moves Ahead" (Press release). Peninsula Corridor Joint Powers Board. March 2002. Archived from the original on October 15, 2002. Retrieved March 26, 2017.
  16. "Weekend Trains to be Replaced by Buses" (Press release). Peninsula Corridor Joint Powers Board. June 2002. Archived from the original on October 12, 2002. Retrieved March 26, 2017.
  17. 1 2 3 4 5 6 7 8 Heredia, Christopher (May 14, 2004). "Speedy baby bullet trains ready to roll". San Francisco Chronicle. Retrieved March 26, 2017.
  18. 1 2 "Caltrain to Roll Out Baby Bullet, Weekend Service in June" (Press release). Peninsula Corridor Joint Powers Board. May 11, 2004. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  19. "Caltrain Plans Weekend of Fun and Free Rides" (Press release). Peninsula Corridor Joint Powers Board. June 1, 2004. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  20. "Caltrain Bullet Train on View for Santa Clara Weekend Celebration" (Press release). Peninsula Corridor Joint Powers Board. April 14, 2004. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  21. 1 2 3 "Caltrain to Begin Running Weekend "Test" Trains" (Press release). Peninsula Corridor Joint Powers Board. May 10, 2004. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  22. 1 2 3 4 5 Cabanatuan, Michael (June 8, 2004). "BAY AREA / Bully for Baby Bullet, riders say / High praise, heavy loads for swift new commuter trains". San Francisco Chronicle. Retrieved March 25, 2017.
  23. 1 2 3 Murphy, Dave (August 1, 2005). "TRANSPORTATION / Baby Bullet service expands / Starting this morning, Caltrain is running 96 trains on weekdays". San Francisco Chronicle. Retrieved March 25, 2017.
  24. 1 2 Murphy, Dave (June 30, 2005). "BART's Peninsula Line Falls Short of Hopes / Competition from cheapter baby Bullet trains could be hurting ridership on extension". San Francisco Chronicle. Retrieved March 25, 2017.
  25. Cabanatuan, Michael (October 26, 2014). "Business, Caltrain group looks to improve rail commute system". San Francisco Chronicle. Retrieved March 25, 2017.
  26. 1 2 "Baby bullet wins award". East Bay Times. May 31, 2005. Retrieved March 27, 2017.
  27. Institute of Transportation Studies, University of California, Berkeley (2017). Rail and the California Economy (PDF) (Report). California Department of Transportation. Archived (PDF) from the original on August 31, 2017. Retrieved August 31, 2017.{{cite report}}: CS1 maint: multiple names: authors list (link)
  28. 1 2 3 "CTX Fact Sheet". Peninsula Corridor Joint Powers Board. August 2002. Archived from the original on August 9, 2002. Retrieved March 25, 2017.
  29. "Caltrain Board Awards North CTX Improvement Contract" (Press release). Peninsula Corridor Joint Powers Board. April 2002. Archived from the original on October 15, 2002. Retrieved March 26, 2017.
  30. 1 2 "Southern Caltrain Construction Set to Begin" (Press release). Peninsula Corridor Joint Powers Board. January 2003. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  31. 1 2 "Staying on Track for the Future: Caltrain Construction Continues" (Press release). Peninsula Corridor Joint Powers Board. March 2003. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  32. 1 2 "Caltrain Tracks to be Ripped Out" (Press release). Peninsula Corridor Joint Powers Board. August 2002. Archived from the original on October 15, 2002. Retrieved March 26, 2017.
  33. Bayshore Intermodal Station Access Study (PDF) (Report). San Francisco County Transportation Authority. March 2012. Retrieved March 26, 2017.
  34. Wildermuth, John (April 28, 2014). "Bayshore Station envisioned as vibrant transit hub". San Francisco Chronicle. Retrieved March 26, 2017.
  35. 1 2 "North CTX Construction to Shutdown 16th Street Near Tracks" (Press release). Peninsula Corridor Joint Powers Board. November 2002. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  36. "Rain Delays Planned Caltrain Lawrence Station Move" (Press release). Peninsula Corridor Joint Powers Board. April 2003. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  37. "New Lawrence Caltrain Station Set to Open" (Press release). Peninsula Corridor Joint Powers Board. February 26, 2004. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  38. 1 2 "North CTX Construction Moving Faster than Expected" (Press release). Peninsula Corridor Joint Powers Board. September 2002. Archived from the original on October 15, 2002. Retrieved March 26, 2017.
  39. 1 2 Cabanatuan, Michael (April 3, 2004). "BAY AREA / 'Baby Bullet' trains shoot for June rollout". San Francisco Chronicle. Retrieved March 25, 2017.
  40. "Caltrain CTX and Baby Bullets boos Ridership 17%" (PDF). Staying on Track. BayRail Alliance. December 2004. Retrieved March 26, 2017.
  41. Gathright, Alan (November 19, 2001). "Fast train to San Jose may boost L.A. bullet / Caltrain commuter seen as a first step". San Francisco Chronicle. Retrieved March 25, 2017.
  42. "Caltrain Track Work to Require Detour in San Mateo" (Press release). Peninsula Corridor Joint Powers Board. April 2003. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  43. 1 2 3 "Signal a "Go" for Caltrain Thanks to CTX Construction Project" (Press release). Peninsula Corridor Joint Powers Board. August 2003. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  44. "Transforming Caltrain: From Caterpillar to Butterfly in Three Easy Steps" (Press release). Peninsula Corridor Joint Powers Board. March 15, 2005. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  45. Ringham, Arthur (July 7, 2004). "OPINION: Baby Bullet – fast track (if you can catch it)". San Francisco Chronicle. Retrieved March 25, 2017.
  46. Tillier, Clem (December 18, 2011). "The Baby Bullet Effect". Caltrain HSR Compatibility Blog. Retrieved March 27, 2017.
  47. Tillier, Clem (April 9, 2011). "Mind The Service Gap". Caltrain HSR Compatibility Blog. Retrieved March 27, 2017.
  48. Cabanatuan, Michael (January 21, 2011). "Caltrain seeks answers to funding crisis". San Francisco Chronicle. Retrieved March 27, 2017.
  49. Cabanatuan, Michael (April 7, 2011). "Caltrain find funds to save schedule, delays vote". San Francisco Chronicle. Retrieved March 27, 2017.
  50. Cabanatuan, Michael (April 21, 2011). "Caltrain plan would keep services going 1 year". San Francisco Chronicle. Retrieved March 27, 2017.
  51. 1 2 "Timetables" (PDF). Peninsula Corridor Joint Powers Board. June 5, 2004. Archived from the original (PDF) on September 20, 2004. Retrieved March 27, 2017.
  52. 1 2 3 4 "Northbound Timetables" (PDF). Peninsula Corridor Joint Powers Board. April 10, 2017. Archived from the original (PDF) on May 5, 2017. Retrieved April 4, 2017.
  53. 1 2 3 "Weekday Timetable" (PDF). Peninsula Corridor Joint Powers Board. August 30, 2021. Retrieved August 13, 2021.
  54. 1 2 "Timetables" (PDF). Peninsula Corridor Joint Powers Board. August 1, 2005. Archived from the original (PDF) on August 26, 2005. Retrieved March 27, 2017.
  55. 1 2 3 "Timetables" (PDF). Peninsula Corridor Joint Powers Board. October 1, 2012. Archived from the original (PDF) on May 22, 2013. Retrieved March 27, 2017.
  56. 1 2 "Weekend Timetable with Bus Bridge" (PDF). Peninsula Corridor Joint Powers Board. October 3, 2018. Retrieved October 3, 2018.
  57. 1 2 3 "Timetables" (PDF). Peninsula Corridor Joint Powers Board. January 1, 2011. Archived from the original (PDF) on March 4, 2011. Retrieved March 27, 2017.
  58. "Timetables" (PDF). Peninsula Corridor Joint Powers Board. May 2, 2005. Archived from the original (PDF) on May 24, 2005. Retrieved March 27, 2017.
  59. "Caltrain Rolls Out Two More Bullet Trains Monday, May 2" (Press release). Peninsula Corridor Joint Powers Board. May 2, 2005. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  60. "Caltrain to Continue Weekend Service for Broadway and Atherton" (Press release). Peninsula Corridor Joint Powers Board. May 23, 2005. Archived from the original on May 26, 2005. Retrieved June 4, 2018.
  61. Murphy, Dave; Fulbright, Leslie (August 2, 2005). "BAY AREA / Riders get a bang out of Bullets as expanded trainservice starts / Caltrain praised for easing stress, shaving commute". San Francisco Chronicle. Retrieved March 26, 2017.
  62. 1 2 Cabanatuan, Michael (January 1, 2011). "Caltrain to test weekend Baby Bullet runs". San Francisco Chronicle. Retrieved March 25, 2017.
  63. "Caltrain to Implement Additional Weekday Service Reductions" (Press release). Peninsula Corridor Joint Powers Board. March 26, 2020. Retrieved December 28, 2020.
  64. 1 2 "Commute Fleets". Peninsula Corridor Joint Powers Board. 2017. Retrieved March 25, 2017.
  65. 1 2 3 Shelton, Bruce (May 2003). "Caltrain unveils the Baby Bullet locomotive" (PDF). Staying on Track. BayRail Alliance. Retrieved March 26, 2017.
  66. 1 2 "The Stork Delivers Caltrain's New Baby" (Press release). Peninsula Corridor Joint Powers Board. April 2003. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  67. Sanchez, Julian (February 25, 2008). "Long odds lead Lessig to decide against run for Congress". Ars Technica. Retrieved March 26, 2017.
  68. "Sound Transit Motion No. M2001-72". Sound Transit. August 9, 2001. Retrieved March 25, 2017.
  69. "Caltrain Unveils New Passenger Cars at CTX Event" (Press release). Peninsula Corridor Joint Powers Board. June 2002. Archived from the original on October 15, 2002. Retrieved March 26, 2017.
  70. "Caltrain Baby Bullet Cars Entering Service" (Press release). Peninsula Corridor Joint Powers Board. October 2002. Archived from the original on March 18, 2006. Retrieved March 26, 2017.
  71. "Stadler wins big contract for Caltrain bilevel EMUs". Trains Magazine. August 16, 2016. Retrieved October 16, 2016.
  72. "Caltrain to place first electric trainsets in service". Trains. August 9, 2024. Retrieved August 10, 2024.