Monterey County Rail Extension

Last updated

Monterey County Rail Extension
Amtrak train station Salinas ca.jpg
Salinas station will be the morning starting point for planned weekday train service to San Francisco via the Monterey County Rail Extension.
Overview
Service type Inter-city rail
StatusPlanned
LocaleNorthern California, United States
Current operator(s) Caltrain
Website Monterey County Rail Extension
Route
Termini Salinas
San Francisco (4th and King)
Distance travelled122 mi (196 km)
Service frequencyTwice daily (proposed)
    • 2× Salinas→SF (AM)
    • 2× SF→Salinas (PM)

The Monterey County Rail Extension is a planned commuter rail extension that would bring Caltrain passenger service south of its existing Gilroy, California terminus to Salinas in Monterey County, using the existing Coast Line owned by Union Pacific (UPRR). Implementation of the rail extension will occur over three phases, starting from Salinas and moving north. When construction is complete, there will be four trains operated over the extended line per weekday: two northbound trains that depart from Salinas and travel to San Francisco (4th & King) in the morning, and two southbound trains that return to Salinas in the afternoon.

Contents

History

Southern Pacific

Next-to-last Del Monte after crossing the Salinas River Trestle (April 1971) Penultimate southbound Del Monte crossing the Salinas River, April 1971.jpg
Next-to-last Del Monte after crossing the Salinas River Trestle (April 1971)

The Southern Pacific Railroad (SP) operated intercity passenger train services in California, including the Del Monte between San Francisco and Monterey, until the inception of Amtrak in 1971. Amtrak declined to continue operation of the Del Monte and the service was discontinued. [1] :49

Map III from the Rail Passenger Development Plan (1984), showing stations and route for planned passenger service between San Francisco and Monterey San Francisco - Monterey Rail Service (Map III, RPDP 1984).gif
Map III from the Rail Passenger Development Plan (1984), showing stations and route for planned passenger service between San Francisco and Monterey

Potential restoration of passenger service to Monterey had been identified as early as 1980. A study published in 1981 was described in the Caltrans 1984–89 Rail Passenger Development Plan, which stated restoration of passenger service to Monterey could be feasible if certain conditions could be met, including track improvements along the Monterey Branch Line, construction of stations south of San Jose, and completion of the Downtown Rail Extension in San Francisco. The annual operating cost would be $2.5 million, serving an estimated 190,000 to 234,000 passengers per year, assuming a schedule similar to the former Del Monte. [1] :49–50 Because Amtrak did not provide direct service to San Francisco, it continued to rebuff requests to restart the service in the 1980s. [1] :50 Operation of a San Francisco–Monterey route under SP continued to be studied; with an annual ridership forecast of 210,000, gross revenue would be $1.1 million, yielding a higher first-year farebox recovery ratio than any previous public rail transit project in California. [1] :50,52 However, because of the large capital investment required (SP estimated $3.4–4.4 million alone would be required to rehabilitate the track), the state did not continue to purse restarting the service. [1] :52

Caltrain

SP retained operation of the Peninsula Commute intercity commuter rail service after 1971, serving cities along the San Francisco Peninsula and Santa Clara Valley between San Francisco (4th and King station) and San Jose (Diridon) until it was first sponsored and then taken over by Caltrans between 1980 and 1985. [2] In 1985, the state took over the service, which was renamed to Caltrain and SP was retained as the contract operator. The tri-county (San Francsico, San Mateo, and Santa Clara) Peninsula Corridor Joint Powers Board (PCJPB) was formed to take over the regional rail service from the state and purchased the right-of-way between San Francisco and Tamien from SP in 1991. Subsequently, PCJPB extended Caltrain extended commuter service south of San Jose to Gilroy in July 1992. [3] Because the PCJPB owned right-of-way ends at Control Point Lick, just south of Tamien station, extended service south of there is provided under an agreement with the UPRR to use that railroad's Coast Line for a limited number of daily passenger trains. These are operated in the traditional commute direction: northbound in the morning from Gilroy to San Francisco, returning south in the afternoon. Caltrain built a layover yard in Gilroy between 6th and 10th streets, next to Gilroy Transit Center, where trains are stored overnight; tracks terminate just north of 10th and do not connect with the rest of the Coast Line. [4]

Since the inauguration of Gilroy service, the concept of a passenger rail extension to Monterey County has been considered, starting with the Caltrans-sponsored Passenger Rail Feasibility Study No. 05D423 (1992), which examined the possibility of passenger rail service between San Francisco, Monterey, Salinas, and Hollister, concluding that Salinas was a feasible origin for the commuter rail service. [5] :214 In 1994, the Monterey County Regional Transportation Plan selected a Caltrain extension as the locally preferred alternative. [5] :214 The cities of Salinas and Watsonville also considered rail station improvements and construction starting in 1996, including a Draft Pajaro Valley Station Project Study Report (1997) [5] :214 and Pajaro Railyards Area Feasibility Study (2000), [5] :214 culminating in a study sponsored by the Transportation Agency for Monterey County (TAMC), Extension of Caltrain Commuter Service to Monterey County Business Plan (2000). [6] :2–1 [7]

Under the Business Plan, a one-way fare from Salinas was estimated to cost approximately $3.50 and increased ridership would bring in an extra $1.4 million in annual revenue. [7] :3 The total cost of the project was estimated to be $25.7 M, most of which would be spent for improvement/construction of the three stations ($19.5 M) and the new layover facility in Salinas ($3.8 M). [7]

Subsequently, Caltrain was approached by TAMC to extend service further south along the Coast Line from Gilroy into Monterey County. A draft of the Caltrain Extension to Monterey County Alternatives Analysis was first published in 2006 and updated in 2007; [5] four alternatives were analyzed, with most assuming inter-county commuter rail service provided by Caltrain, extended from Gilroy to either Castroville or Salinas, connecting to Monterey via Marina on a new intra-county service provided by either bus rapid transit, light rail transit, or local buses:

2006/07 Alternatives Analysis [5] :10,12,48
Alt.Main line (intercounty) service Monterey Branch Line (intracounty) serviceCost ($M)
TypeService
(potential vehicles)
TypeService
(potential vehicles)
A Commuter rail Caltrain Extension to Salinas, transfer to local service at Castroville or Salinas
(Caltrain, Superliner, or Colorado Railcar DMU)
BRT Phased implementation:

(articulated or rigid buses, trolley cars)

193
B Caltrain Extension to Salinas, transfer to local service at Salinas
(Caltrain, Superliner, or Colorado Railcar DMU)
Phase 1:
BRT

(articulated or rigid buses, trolley cars)

  • Intercity rail service (Monterey to SF)

(streetcar-like DMUs)

305
Phase 2:
LRT

(streetcar-like DMUs)

  • Intercity rail service (Monterey to SF)

(streetcar-like DMUs)

C Caltrain Extension to Salinas, transfer to local service at Castroville
(Caltrain, Superliner, or Colorado Railcar DMU)
LRT Phased implementation:

(streetcar-like DMUs)

230
D Express Bus Monterey County to Bay Area [lower-alpha 1] Local Bus Monterey/Marina
Marina/Salinas
1.234

Also in 2006, with the Caltrain Express project completed, PCJPB began planning the electrification of the line, publishing results in the Project 2025 report (2006); [8] the electrification project would compete with MCRX for Caltrain's time and attention.

A draft environmental impact report (DEIR) published in 2006 stated the lack of public transportation options between Monterey County and the San Francisco Bay Area has resulted in increased private commuter vehicle traffic. [6] :1–6 The 2006/07 Alternatives Analysis estimated that approximately 6,000 people commuted daily from Monterey County to the Bay Area. [5] :ES-1 According to the DEIR, traffic on U.S. Route 101 was projected to rise by up to 56% in 2020 compared to 1998 levels, resulting in unstable traffic flow from the Salinas city limits to the Santa Clara County line as a result. [6] :1–7,Table 1-2

The proposed extension would create new stations and stops in Pajaro (serving Watsonville in adjacent Santa Cruz County at an estimated cost of US$6,585,000(equivalent to $9,559,000 in 2022)) [6] and Castroville (at an estimated cost of US$11,150,000(equivalent to $16,186,000 in 2022)) [6] before terminating at the existing Salinas Amtrak station that currently is served by Coast Starlight passenger service. Under these plans, the Salinas station would be rebuilt as an intermodal station to connect commuter rail with Monterey-Salinas Transit buses. A layover yard would be added to accommodate Caltrain crews and maintenance, and the total cost of the Salinas improvements was estimated at US$39,705,000(equivalent to $57,637,000 in 2022). [6] The 2006/07 Alternatives Analysis stated the Caltrain Extension would attract 1,028 riders in each direction in 2010, doubling ridership by 2030; this would be equivalent to expanding the freeway by 14 to 12 lane over the 74.2 mi (119.4 km) extension, and "when compared to the cost of constructing equivalent freeway capacity", the project would "pay for itself in one year". [5] :ES-8

The cost of operating commuter rail from the anticipated start of service until 2030 was estimated at US$64,900,000(equivalent to $94,211,000 in 2022) for two daily round trips, including an expansion to four round trips daily within ten years. [6] Extensions to Hollister have been proposed since at least 2003. [9] This project depends on state and federal funding availability, a possible local sales tax measure, and an agreement with UPRR, the owner of the Coast Line. This project is managed by TAMC, who released the Final Environment Impact Report (EIR) for this project in 2006. [10]

Capitol Corridor

Existing and planned standard gauge commuter rail services in the San Francisco Bay Area, as of 2021
. Monterey County Rail Extension map.svg
Existing and planned standard gauge commuter rail services in the San Francisco Bay Area, as of 2021.

In 2009, Caltrain requested that TAMC approach other train operators. TAMC subsequently opened discussions with the Capitol Corridor Joint Powers Authority (CCJPA) and the Caltrans Division of Rail to extend Capitol Corridor service south from San Jose to Salinas using the same Coast Line routing and stations. [11] The switch to Capitol Corridor was cited as an advantage, since CCJPA had experience with commuter trains sharing service on UPRR-owned freight right-of-way. Two Capitol Corridor trains would originate from Salinas in the mornings and run through to San Jose and on to Sacramento, with two evening trains making the return trip south to Salinas. [11]

By 2016, plans had shifted to favor an extension of Capitol Corridor to Salinas. [12] In 2018, the awarding of Road Repair and Accountability Act funds, Caltrain was named as the operator of the first commuter rail service to Salinas, with an extension of the Capitol Corridor service to follow. [13]

By March 2020, two daily Caltrain round trips were planned to begin in 2022 after the completion of the Salinas layover facility and trackwork at Gilroy. Future phases would add stations at Pajaro/Watsonville and Castroville, with the potential for up to six daily round trips. [14] As of February 2024, construction necessary for the Salinas service was expected to begin in the summer of 2025. [15]

Route

Rail passenger traffic between Salinas and Tamien (via Gilroy) will run over the existing Union Pacific-owned Coast Subdivision. The three phases of the MCRX project are centered around the three stations that will be built or rebuilt for passenger service:

  1. Salinas (intermodal upgrade of existing Amtrak station, MCRX terminus)
  2. Pajaro/Watsonville (new intermodal infill station, connecting to routes in Santa Cruz County)
  3. Castroville (new intermodal infill station, connecting to Pacific Grove via Marina and Monterey)

Phase 1 — Salinas

Salinas station building (Oct 2021), as rebuilt with intermodal bus connections Salinas station building, October 2021.jpg
Salinas station building (Oct 2021), as rebuilt with intermodal bus connections

The first phase of the project will extend the southern terminus to the existing Salinas station and improve it. In addition, the layover yard will be moved from Gilroy to a new site in Salinas, and the Gilroy station will be upgraded to allow through-traffic by extending the PCJPB-owned tracks south across 10th Street in Gilroy to connect with the Coast Line. [16]

Work on the Salinas station has been ongoing since June 1996. The city of Salinas finalized site plans in June 1998 and acquired the 3.5-acre (1.4 ha) station site in 1999 from the UPRR, then subsequently constructed the existing Amtrak facility. [5] :215 Construction on Salinas station was completed in January 2021 at an estimated cost of $11.2 million; [17] it has been upgraded with an intermodal transfer area using five bus bays in the station parking lot, and Lincoln Avenue has been extended across West Market Street with a new signalized intersection to facilitate traffic flows. [18]

The next part of the work involves construction of an overnight train layover facility at Salinas. [19] The cost of the Salinas train layover facility is estimated to be $25 million. [17] The project is expected to start accepting bids for construction in 2024 and finish as early as 2025. [19] Gilroy track modifications are scheduled for approximately the same time with an estimated cost of $16 million; the scope and schedule need approval from Union Pacific. [20]

Phase 2 — Pajaro/Watsonville

The next phase of the project will add a new intermodal Pajaro/Watsonville infill station to serve both Pajaro and Watsonville, at the site of the former Southern Pacific Watsonville Junction station, connecting with Santa Cruz METRO bus routes for destinations in Santa Cruz County. [21] In addition, there are several proposal to inaugurate commuter rail service over the Santa Cruz Branch Rail Line, which runs west and north along the coast between Pajaro and Davenport via Santa Cruz. [22]

Pajaro/Watsonville station would be close to the intersection of Lewis and Salinas roads, south of the eastern leg of the existing rail wye where the Coast Line and Santa Cruz Branch meet. The cost of the new intermodal station is estimated to be $69 million, including site preparation; for expanded service, an additional $30 M would be needed for modifications. The station plans are undergoing environmental review, and construction could start as early as 2026. [23]

The 2000 Business Plan report suggested that on-track speeds could be improved in the future by widening the "Betabel" curve (Curve No. 109, near the Betabel Road interchange with U.S. Highway 101), south of Gilroy. Track speeds are restricted to 50 mph (80 km/h) in this area, and drop further as trains negotiate more sharp curves at Chittenden Pass / Pajaro Gap, near a rock quarry. [7] :28–30 The cost of these improvements, including a potential new rail tunnel, were estimated to be approximately $11 to $14 M, approximately half the estimated cost of the entire extension at the time, making it more likely to be implemented as a future improvement. [7] :30

Santa Cruz Branch
Iowa Pacific 1102 passing Watsonville station, October 2014.jpg
Iowa Pacific #1102 at downtown Watsonville (2014)
5576 1199217600 - Flickr - drewj1946.jpg
SP #3765 on the 1905 San Lorenzo River Bridge, a filming location for The Lost Boys
Santa Cruz Mont Bay nov 23 24 2012 018x4RP (8236196919).jpg
Iowa Pacific #1101 in downtown Santa Cruz (2012)
SP 2872 Davenport Jan 85xRP - Flickr - drewj1946.jpg
SP #2872 at Davenport (1985)

The Santa Cruz Railroad inaugurated rail service to Watsonville in 1876, having started work on the line from Santa Cruz in 1873. A second rail line was completed in 1880, connecting the city to the San Francisco Bay Area via a narrow-gauge railway built by the South Pacific Coast Railroad over the Southern Coast Ranges. Both companies were acquired by the Southern Pacific by 1887, which began offering Suntan Special excursion service from San Jose to Santa Cruz via the over-the-mountain line in July 1927. [24] :12–13 After a winter storm shut down the mountain line and CA-17 opened paralleling its route, Southern Pacific rerouted Suntan Special service starting in summer 1940 to the longer overland route via Gilroy and Pajaro until the final excursions over Labor Day weekend, 1959; [24] :13–14 although the route was much longer, the travel time increased by only 30 minutes because the gentler terrain allowed higher speeds. [25]

In 1996, when the Southern Pacific was being acquired and merged into Union Pacific, the Santa Cruz County Regional Transportation Commission (SCCRTC) ran several demonstration trains, including the "return of the Suntan Special" (contracted Caltrain service from San Jose to Santa Cruz via Watsonville, Aptos, and Capitola), "Coastal Cruzer" (San Jose to Santa Cruz via Aptos and Capitola using a diesel multiple unit IC3 Flexliner), and "First Night Trolley" (shuttle service within Santa Cruz using another DMU, the RegioSprinter), each attracting more than 1,000 passengers. [24] :14 On October 12, 2012, SCCRTC acquired the Santa Cruz Branch from Union Pacific, as the Class 1 operator was not interested in allowing passenger service. [24] :14–15 [25] A demonstration of a battery-dominant hydrogen fuel cell streetcar manufactured by TIG/m along this line was held in October 2021. Coast Futura offered the service without collecting fares to determine the feasibility of rail transit operation. [26]

Potential Santa Cruz Branch stations [24] :58
StationCityDistance from Coast Line
PajaroPajaro0.32 mi (0.51 km)
Downtown WatsonvilleWatsonville1.67 mi (2.69 km)
SeascapeAptos10.32 mi (16.61 km)
Aptos Village12.52 mi (20.15 km)
Seacliff Village13.16 mi (21.18 km)
New Brighton/Cabrillo14.17 mi (22.80 km)
CapitolaCapitola15.68 mi (25.23 km)
41st Ave16.77 mi (26.99 km)
17th AveSanta Cruz17.85 mi (28.73 km)
Seabright19.17 mi (30.85 km)
Boardwalk19.76 mi (31.80 km)
Downtown Santa Cruz20.02 mi (32.22 km)
Bay St/California20.72 mi (33.35 km)
Westside Santa Cruz22.05 mi (35.49 km)
DavenportDavenport31 mi (50 km)

The rail right-of-way owned by SCCRTC is sufficiently wide in almost all places to accommodate a single track alongside the planned 32 mi long (51 km), 12 ft wide (3.7 m) Monterey Bay Sanctuary Scenic Trail (MBSST), closely following the shoreline of Monterey Bay from the San Mateo County line to Pajaro. [24] :17–19 The first segment of the trail in Santa Cruz, stretching 2.1 mi (3.4 km) north from milepost 28.6, is called the North Coast segment and connects to Davenport; work on North Coast is scheduled to start in fall 2024 and will take approximately a year to complete. [27] [28] When finished, MBSST will extend the existing Monterey Bay Coastal Trail, spanning approximately 50 mi (80 km) from Lovers Point at Pacific Grove in the south to Wilder Ranch in the north. [29]

Phase 3 — Castroville

Castroville depot (1975) Castroville freight house 1975 postcard.jpg
Castroville depot (1975)

The final phase of the project would add the Castroville station, another multimodal infill station that will be built at Castroville, [30] connecting to a new planned local express transit service along the Monterey Branch Line down the Monterey Peninsula to Monterey via Marina. [31]

The Castroville station plans have received environmental clearance, but the $27 million required for construction have not yet[ when? ] been identified. [30]

Monterey Branch
The Monterey Bay Coastal Recreational Trail follows the abandoned rail right-of-way in Monterey (2013). Monterey Beach.jpg
The Monterey Bay Coastal Recreational Trail follows the abandoned rail right-of-way in Monterey (2013).

The Monterey Branch is a 19.6 mi (31.5 km) long rail line which was completed in 1879 by Southern Pacific, connecting Castroville to Lake Majella in Pacific Grove. [32] :1 SP operated regular Del Monte passenger service between Monterey and San Francisco from 1881 until 1971, as the length of the intercity service was just 125 mi (201 km), under the 150 mi (240 km) cutoff for Amtrak to take over operations. [33] After passenger service was discontinued, the rail line continued in use for freight until 1978, when the line was shortened to the crossing at Contra Costa Street in Seaside [32] :1 and continued to be used by United States Army trains transporting material to Fort Ord until the early 1990s. [34] Meanwhile, the cities of Monterey and Pacific Grove began acquiring segments of the southern/western end of the right-of-way in 1976, opening the first section of what would become the 18 mi (29 km) Monterey Bay Coastal Trail in 1980. [35] The Passenger Rail Feasibility Study kicked off in 1992, and made recommendations for inter- and intra-county passenger rail service, with the goals of connecting Monterey County to the Bay Area and alleviating heavy traffic along CA-1.

Del Monte at Monterey, September 1970.jpg
Del Monte at Monterey (Sep 1970)
Monterey station and Monterey Bay Coastal Trail, June 2018.JPG
Monterey and the Coastal Trail (Jun 2018)

TAMC contracted Amtrak to run a Talgo 8 trainset from San Francisco to Fort Ord on June 12, 1999, to demonstrate its viability and build interest in regular service, [36] but poor track conditions forced the cancellation of further demonstrations. [34] On July 13 of that year, Governor Gray Davis signed SB886 into law, which allowed TAMC to participate in any passenger rail service agreement between Caltrans and Amtrak in the San Francisco-San Jose-Monterey corridor. [37] In September 2003, TAMC purchased the remaining Monterey Branch Line right-of-way between Seaside and Castroville for $9.4 million and began planning to build a light rail transit service using the existing and replaced rails. Parsons performed an alternatives analysis in 2008, with updates in 2009 and 2011, identifying light rail as the locally preferred alternative. The Alternatives Analysis for the Monterey Peninsula Fixed Guideway Corridor Study was again updated in 2012 by Kimley-Horn. [38] TAMC intended the project to quality under the FTA Small Starts threshold of $250 M, as a more expensive project would have to be funded under New Starts, which are intended for more densely-populated areas and adds significant difficulties for qualification. [38] :35

Potential Monterey Branch Line LRT stations [38] :Fig.4–7
StationCityDistance from Coast Line
Castroville†‡Castroville0.00 mi (0 km)
Blackie Road0.65 mi (1.05 km)
MarinaMarina5.97 mi (9.61 km)
Beach6.51 mi (10.48 km)
Reservation7.08 mi (11.39 km)
Palm7.45 mi (11.99 km)
University9.15 mi (14.73 km)
First StreetSeaside9.73 mi (15.66 km)
PlayaSeaside/Sand City12.63 mi (20.33 km)
Contra Costa13.50 mi (21.73 km)
Casa VerdeMonterey14.39 mi (23.16 km)
USN Postgraduate School14.85 mi (23.90 km)
El Estero Park15.46 mi (24.88 km)
Figueroa15.72 mi (25.30 km)
Portola Plaza15.99 mi (25.73 km)
† = potential terminus; one alternative (LRT-1) has the line terminate at Marina with bus connections to Salinas and Castroville, while the extended alternative (LRT-2) has the line continuing all the way to Castroville
‡ = station proposed in extended alternative (LRT-2) only

Funding has been uncertain and the light rail project, which would run 16 mi (26 km) from Castroville to Monterey, has been paused. [32] :1 While the application for federal transit subsidies is being considered, TAMC has asked Monterey-Salinas Transit to run bus rapid transit service over the right-of-way. [31] The MST SURF! BRT service will run over 6 mi (9.7 km) of the Monterey Branch Line right-of-way, between Marina and Sand City / Seaside. [39] The busway would run parallel to the tracks and CA-1, between the rails and Beach Range Road, stretching from Contra Costa Street (in Seaside) to Reservation Road (in Marina). [32] :Fig.3-2 SURF! would be MST's second BRT line, following the Jazz Line connecting Seaside and Monterey. [40]

List of stations

Ordered from north to south, with milepost markers denoting distance from San Francisco 4th & King

Monterey County Rail Extension stations
StationDistance [lower-alpha 2] [41] Connecting services
Pajaro/Watsonville 97.0 Santa Cruz Branch Rail Line
Castroville 106.5 Monterey Branch Line
Salinas 114.9 Coast Starlight
Coast Line (continues)
Notes
  1. including Caltrain stations in San Francisco, San Mateo, and Santa Clara counties
  2. Milepost distance from San Francisco [5] :218

Related Research Articles

<span class="mw-page-title-main">Castroville, California</span> Unincorporated community in California, United States

Castroville is an unincorporated town and census-designated place (CDP) in Monterey County, California, United States. At the time of the 2020 census the population was 7,515, up from 6,481 in 2010. Castroville is known for its artichoke crop and for the annual Castroville Artichoke Festival, leading to its nickname as the "Artichoke Center of the World".

<span class="mw-page-title-main">Caltrain</span> California commuter rail line

Caltrain is a California commuter rail line serving the San Francisco Peninsula and Santa Clara Valley. The southern terminus is in San Jose at Tamien station with weekday rush hour service running as far as Gilroy. The northern terminus of the line is in San Francisco at 4th and King Street. Caltrain has 28 regular stops, one limited-service weekday-only stop, one weekend-only stop (Broadway), and one football-only stop (Stanford). While average weekday ridership in 2019 exceeded 63,000, impacts of the COVID-19 pandemic have been significant: in August 2022, Caltrain had an average weekday ridership of 18,600 passengers.

<i>Capitol Corridor</i> Amtrak service between San Jose and Auburn, California

The Capitol Corridor is a 168-mile (270 km) passenger train route in Northern California operated by Amtrak between San Jose, in the Bay Area, and Auburn, in the Sacramento Valley. The route is named after the two points most trains operate between, San Jose and Sacramento. The route runs roughly parallel to I-880 and I-80. Some limited trips run between Oakland and San Jose. A single daily round trip runs between San Jose and Auburn, in the foothills of the Sierra Nevada. Capitol Corridor trains started in 1991.

<span class="mw-page-title-main">Santa Clara Valley Transportation Authority</span> Public transit operator in Santa Clara County, California

The Santa Clara Valley Transportation Authority, more commonly known simply as the Valley Transportation Authority (VTA), is a special district responsible for public transit services, congestion management, specific highway improvement projects, and countywide transportation planning for Santa Clara County, California. It serves San Jose, California, and the surrounding Silicon Valley. It is one of the governing parties for the Caltrain commuter rail line that serves the county. In 2022, the VTA's public transportation services had a combined ridership of 21,381,600, or about 84,800 per weekday as of the third quarter of 2023.

<span class="mw-page-title-main">San Jose Diridon station</span> Transit hub in San Jose, California, U.S.

San Jose Diridon station is the central passenger rail depot for San Jose, California. It also serves as a major intermodal transit center for Santa Clara County and Silicon Valley. The station is named after former Santa Clara County Supervisor Rod Diridon Sr.

<span class="mw-page-title-main">Coast Line (Union Pacific Railroad)</span> Railroad line in California along the Pacific coast from Los Angeles to the Bay Area

The Coast Line is a railroad line between Burbank, California and the San Francisco Bay Area, roughly along the Pacific Coast. It is the shortest rail route between Los Angeles and the Bay Area. Though not as busy as the Surf Line, the continuation of the Coast Line southbound to San Diego, it still sees lots of passenger trains, especially because of that of the Pacific Surfliner, which runs from the San Diego Santa Fe Depot to San Luis Obispo via Union Station in Los Angeles, is the third busiest Amtrak route outside of the Northeast Corridor between Washington D.C. and Boston, which in turn hosts two of Amtrak's busiest routes being the Acela and the Northeast Regional.

<span class="mw-page-title-main">Monterey–Salinas Transit</span>

Monterey–Salinas Transit (MST) is the public transit system for Monterey County, California. Service is primarily to the greater Monterey and Salinas areas, but extends as far south as Paso Robles and Big Sur and as far north as Watsonville. Most lines follow a hub-and-spoke system, connecting at hubs in Monterey or Salinas. In 2022, the system had a ridership of 1,986,500, or about 8,400 per weekday as of the third quarter of 2023.

<span class="mw-page-title-main">Tamien station</span> Train station in San Jose, California, U.S.

Tamien station is an intermodal passenger transportation station in the Tamien neighborhood of central San Jose, California, served by the VTA light rail and the Caltrain commuter rail line, along with bus connections. The station has two elevated island platforms, one for each service. The two platforms are connected by a walkway at ground-level that is below the two platforms. The light rail platform is located in the center median of the State Route 87 freeway just north of the Alma Avenue overpass. The Caltrain platform is located between Lick Avenue and State Route 87, just north of Alma Avenue.

<span class="mw-page-title-main">Gilroy station</span> Train station in Gilroy, California, U.S.

Gilroy station is a Caltrain station located in Gilroy, California, United States. It is the southernmost terminus of the Caltrain system, and is only served during weekday rush hours in the peak direction, with trains going toward San Francisco in the morning and returning southbound in the evening. The station building was constructed by the Southern Pacific Railroad in 1918 and restored in 1998. Future plans call for extended Amtrak Capitol Corridor service, as well as California High-Speed Rail trains, to also stop at Gilroy. The station was named to the National Register of Historic Places in 2019 as Gilroy Southern Pacific Railroad Depot.

<i>Del Monte</i> (train) Former Southern Pacific passenger train

The Del Monte was a passenger train operated by the Southern Pacific Railroad between San Francisco and Monterey, California. It ran from 1889 to 1971.

<span class="mw-page-title-main">Morgan Hill station</span> Train station in Morgan Hill, California, U.S.

Morgan Hill station is a Caltrain station located in the downtown area of Morgan Hill, California. The station is only served during weekday peak hours, with northbound trains in the morning and southbound trains in the evening.

<span class="mw-page-title-main">Salinas station</span> Train and bus stop in Central California

Salinas station, also known as the Salinas Intermodal Transportation Center, is an intermodal transit center in downtown Salinas, California, United States. As a transit hub, the facility is a passenger rail station and bus station.

The Downtown Rail Extension (DTX) is a planned second phase of the San Francisco Transbay Transit Center (TTC). When complete, it will extend the Caltrain Peninsula Corridor commuter rail line from its current northern terminus at 4th and King via a 1.3 mi (2.1 km) tunnel. The new terminus will be near the Financial District and will provide intermodal connections to BART, Muni, Transbay AC Transit buses, and long-distance buses. In addition, the California High Speed Rail Authority (CHSRA) plans to use DTX and the Caltrain-owned Peninsula Corridor for service on the CHSRA San Francisco–San Jose segment. Because DTX uses a long tunnel, current diesel locomotives are not suitable and the Caltrain Modernization Project (CalMod), which includes electrification of the line and acquisition of electrified rolling stock, is a prerequisite.

The Santa Cruz and Monterey Bay Railroad (SCMB), or Santa Cruz Branch Rail Line (SCBRL), is a historic railway running through Santa Cruz County, California. It once ran operationally from Davenport to the Watsonville Junction where it connected to the Union Pacific Coast Line. Over the years it has had many splays and connections to other local railroads over, through, and around the Santa Cruz Mountains. It is still active today, including a connection with the Roaring Camp Railroads line that makes regular trips between Felton and the Santa Cruz Beach Boardwalk.

<i>Suntan Special</i>

The Suntan Special was a summer excursion train service operated by the Southern Pacific Railroad between San Francisco and Santa Cruz, California, from 1927 to 1959.

Pajaro/Watsonville is a proposed train station on Caltrain and Amtrak California's Capitol Corridor trains to serve both Pajaro and Watsonville, California. The station is expected to open after track improvements in the area and service commences to Salinas as part of the Monterey County Rail Extension. It will be located in Watsonville Junction near the corner of Salinas Road and Lewis Road, adjacent to the former Southern Pacific Railroad depot and current Union Pacific Railroad office.

Castroville Multimodal Station is a future train station in Castroville, California. It is planned to serve both Caltrain and Amtrak California's Capitol Corridor trains as part of the Monterey County Rail Extension. The station will be located along Del Monte Avenue between Blackie Road and Wood Street. It is expected to open after track improvements in the area and commencement of service to Salinas.

<span class="mw-page-title-main">Monterey Branch Line</span>

The Monterey Branch Line is a railway line located in Monterey County, California. It runs 16 miles (26 km) between Castroville, where it connects to the Union Pacific Coast Line, and Monterey, formerly running as far as Pacific Grove. It is roughly paralleled by California State Route 1 and is active to Sand City as of 2020.

References

  1. 1 2 3 4 5 Rail Passenger Development Plan: 1984-89 Fiscal Years. Sacramento, CA: Division of Mass Transportation, Caltrans. 1984. OCLC   10983344.
  2. "Milestones 1980s". Peninsula Corridor Joint Powers Board. Retrieved August 18, 2021.
  3. "Milestones 1990s". Peninsula Corridor Joint Powers Board. Retrieved August 18, 2021.
  4. "San Francisco to Lick and Gilroy Layover Yard - Aerial photo map of Joint Facility trackage" (PDF). Peninsula Corridor Joint Powers Board. June 8, 2005. Retrieved August 19, 2021.
  5. 1 2 3 4 5 6 7 8 9 10 Parsons (April 2007). Caltrain Extension to Monterey County: Alternatives Analysis (PDF) (Report). Draft. Transportation Agency for Monterey County. Retrieved August 30, 2021.
  6. 1 2 3 4 5 6 7 Parsons Transportation Group (April 26, 2006). Caltrain Extension to Monterey County Passenger Rail Stations—Volume I: Draft Environmental Impact Report (PDF) (Report). Transportation Agency of Monterey County. Retrieved July 3, 2016.
  7. 1 2 3 4 5 Parsons Transportation Group, Inc. (August 2000). Extension of Caltrain Commuter Service to Monterey County Business Plan (PDF) (Report). Transportation Agency for Monterey County. Retrieved August 29, 2022.
  8. Project 2025 (Report). Peninsula Corridor Joint Powers Board. November 30, 2006. Archived from the original on May 4, 2007.
  9. "Commuter rail service from Hollister?". Hollister Free Lance. April 24, 2003. Retrieved October 16, 2020.
  10. Parsons Transportation Group (July 2006). Caltrain Extension to Monterey County Passenger Rail Stations—Volume III Final Environment Impact Report (EIR) (PDF) (Report). San Jose, California: Transportation Agency of Monterey County. Retrieved December 6, 2014.
  11. 1 2 Parsons (August 2013). Addendum: Capitol Corridor Extension to Monterey County Environmental Impact Report (PDF) (Report). Transportation Agency for Monterey County. Retrieved July 3, 2016.
  12. Rahaim, Nick (January 5, 2017). "Frank's Fish Market will close to pave way for new Salinas train station". Monterey County Now. Retrieved January 15, 2017.
  13. Johnson, Jim (May 9, 2018). "Salinas commuter rail extension project gets $10 million SB 1 gas tax grant". Monterey Herald. Retrieved May 11, 2018.
  14. "Monterey County Rail Extension" (PDF). Transportation Agency for Monterey County. March 2020.
  15. Mathaw, Briana (February 7, 2024). "Caltrain looking to expand rail service to Monterey County". KION56. Retrieved February 13, 2024.
  16. "Monterey County Rail Extension Phase 1: Kick Start Project". Transportation Agency for Monterey County. Retrieved August 30, 2022.
  17. 1 2 "Salinas Intermodal Transportation Center" (PDF). Transportation Agency for Monterey County. January 2022. Retrieved August 30, 2022.
  18. Schmalz, David (October 12, 2021). "A long-stalled commuter rail extension project from Gilroy to Salinas is making critical progress, and finally has an estimated arrival time". Monterey County Now. Retrieved August 22, 2022.
  19. 1 2 Herrera, James (October 15, 2022). "Heart of Salinas gets a new life". Monterey Herald. Retrieved November 2, 2022.
  20. "Gilroy Station Track Project" (PDF). Transportation Agency for Monterey County. January 2022. Retrieved August 30, 2022.
  21. "Monterey County Rail Extension Phase 2: Pajaro / Watsonville". Transportation Agency for Monterey County. Retrieved August 30, 2022.
  22. "Rail Service Studies". Santa Cruz County Regional Transportation Commission. Retrieved August 30, 2022.
  23. "Pajaro/Watsonville Multimodal Transportation Station" (PDF). Transportation Agency for Monterey County. March 2022. Retrieved August 30, 2022.
  24. 1 2 3 4 5 6 Fehr & Peers; LTK Engineering Services; RailPros (December 2015). Santa Cruz Branch Rail Line, Rail Transit Feasibility Study (PDF) (Report). Santa Cruz County Regional Transportation Commission. Retrieved August 18, 2021.
  25. 1 2 Whaley, Derek R. (September 6, 2019). "Curiosities: The Sun Tan Special". Santa Cruz Trains. Retrieved August 29, 2022.
  26. Hartman, Melissa (October 15, 2021). "Streetcar demonstration opens to the public in Watsonville, Santa Cruz". Santa Cruz Sentinel. Retrieved November 1, 2021.
  27. "Monterey Bay Sanctuary Scenic Trail". Federal Highway Administration, U.S. Department of Transportation. Retrieved August 29, 2022.
  28. "Monterey Bay Sacntuary Scenic Trail Network (Coastal Rail Trail". Santa Cruz County Regional Transportation Commission. Retrieved August 29, 2022.
  29. Alta Planning + Design (July 2007). Monterey Bay Sanctuary Scenic Trail Master Plan (PDF) (Report). Transportation Agency for Monterey County. Retrieved August 29, 2022.
  30. 1 2 "Monterey County Rail Extension Phase 3: Castroville". Transportation Agency for Monterey County. Retrieved August 30, 2022.
  31. 1 2 "Monterey Branch Line". Transportation Agency for Monterey County. Retrieved August 30, 2022.
  32. 1 2 3 4 Kimley–Horn (March 2021). "3: Project Description" (PDF). Initial Study/Mitigated Negative Declaration: MST SURF! Busway and Bus Rapid Transit Project, Monterey County, California (Report). Monterey-Salinas Transit. Retrieved August 30, 2022.
  33. Challenger Tom (December 8, 2019). "Monterey Branch Railroad". Gribble Nation. Retrieved August 30, 2022.
  34. 1 2 "The Monterey Branch: Castroville to Pacific Grove, CA". Abandoned Rails. Retrieved August 22, 2022.
  35. Stark, Laura (May 12, 2017). "California's Monterey Bay Coastal Recreation Trail". Rails to Trails Conservancy. Retrieved August 29, 2022.
  36. "Rail service to Monterey County Planned" (PDF). Staying on Track. Peninsula Rail 2000. August 1999. Retrieved August 22, 2022.
  37. California State Assembly. "An act to amend Section 14035 of the Government Code, relating to transportation". 1999–2000 Session of the Legislature. Statutes of California. State of California. Ch. 103 (Direct URL).
  38. 1 2 3 Kimley-Horn and Associates, Inc. (March 2012). Alternatives Analysis for the Monterey Peninsula Fixed Guideway Corridor Study (PDF) (Report). Transportation Agency for Monterey County. Retrieved August 30, 2022.
  39. "SURF! Busway and Bus Rapid Transit Project". Monterey-Salinas Transit. Retrieved August 30, 2022.
  40. "Our Newest Busway & Bus Rapid Transit Project: SURF! Express" (PDF). Monterey-Salinas Transit. Retrieved August 30, 2022.
  41. SMA Rail Consulting (April 2016). "California Passenger Rail Network Schematics" (PDF). California Department of Transportation. p. 5–6.