Central Line (Tanzania)

Last updated
Railway network (interactive version)
1000mm gauge, 1067mm gauge Railways in Tanzania.svg
Railway network (interactive version)
1000mm gauge, 1067mm gauge
1914 map of Dar es Salaam- Kintinku section Tanganjikabahn (ostliches Blatt).png
1914 map of Dar es Salaam- Kintinku section
1914 map of Makutupora-Kigoma section Tanganjikabahn (westliches Blatt).png
1914 map of Makutupora-Kigoma section

The Central Line (German : Mittellandbahn), formerly known as the Tanganyika Railway (German : Tanganjikabahn) is the most important railway line in Tanzania, apart from TAZARA. It runs west from Dar es Salaam to Kigoma on Lake Tanganyika via Dodoma. A branch leads to Mwanza on Lake Victoria.

Contents

In 2017, Tanzania began the Tanzania Standard Gauge Railway project, which will construct a standard gauge (1435 mm) line parallel to the meter-gauge (1000 mm) Central Line between Dar es Salaam and Mwanza, with a new route branching northwest at Isaka to Kigali in Rwanda.

History

Kidete railway station Ostafrikanische Eisenbahngesellschaft - Kidete.jpg
Kidete railway station
Kigoma railway station, viewed from the station yard in 2010 Kigoma Bahnhof Geleiseseitig.jpg
Kigoma railway station, viewed from the station yard in 2010

German period

The Central Line was the second railway project coming into existence in the colony of then German East Africa after the Usambara Railway. For the Tanganjikabahn-project a company was founded, the Ostafrikanische Eisenbahngesellschaft (OAEG) (East African Railway Company) which started railway construction in 1905 with 21 million marks (ℳ) provided by Adolph von Hansemann's Disconto-Gesellschaft (Discounting Company) bank. The building started at the port and capital of that time, Dar es Salaam.

From the start the engineers fought large difficulties, the tropical climate, periodic heavy rain and lack of appropriate building material. On the other hand, they could count on the experiences from the previous building of the Usambara Railway. The 1,000 mm (3 ft 3+38 in), meter-gauge, was chosen. The Central Line is the largest technical inheritance of the German colonial age in Tanzania.

The route followed an old caravan route to Tabora, which gave large logistic advantages. German settlers soon followed with plantations, and Tabora developed into a large agricultural centre. Kilometer 200 was reached in 1907, in the vicinity of the town of Morogoro. In 1909 the railhead reached Kilosa. Kigoma at Lake Tanganyika at kilometer 1252 was reached in 1914 just prior to the First World War. The regular travel time over the total distance amounted to 58 hours. It was planned to develop the line further to Iringa and to reach Lake Malawi, a project which was stopped due to the war.

The construction of the line opened up trade between Lake Tanganyika and the east coast and spurred the growth of the ports at its termini.

British Mandate

The British mandate added to the Central Line three branch lines. The most important one, of 379 km (235 mi), ran from Tabora to Mwanza at the south bank of the Lake Victoria. Another ran from Kilosa to Mikumi. A third, established in 1931, ran 93.58 mi (150.60 km) [1] from Manyoni via Singida to Kinyangiri; [2] the section north of Singida closed between 1944 and 1947. [3]

After independence

After the independence of Tanzania, the Central Line and the Usambara Railway were connected between the stations of Mruazi and Ruvu.

The Main Line

The Central Line starts at the Tanzanian metropolis of Dar es Salaam at the Indian Ocean with today's capital of Tanzania, Dodoma, in the center of the country and proceeds further to Tanzania’s most important port at the shore of Lake Tanganyika, Kigoma. It crosses central Tanzania completely with a length of 1,254 kilometers (779 mi) and overcomes the height of the east edge East African rift valley. The main stations on this line are: Dar es Salaam, Ruvu, Morogoro, Kilosa, Dodoma, Manyoni, Tabora and Kaliua. [4]

Mwanza Line

Mwanza Train Station as seen from the main road in the centre of Mwanza town. Mwanza Train Station.JPG
Mwanza Train Station as seen from the main road in the centre of Mwanza town.

The Mwanza Railway line connects with the main line at Tabora station and ends at Mwanza railway station. The distance covered by this railway line is 378 km. Its construction started at Tabora in 1923 and ended in Mwanza in 1928. A dry port was constructed at the town of Isaka, for freight transport to Rwanda and Burundi. The main stations along the Mwanza Railway line are: Tabora, Kakola, Isaka, Shinyanga and Mwanza. [4]

Mikumi line

The Mikumi line, built between 1958 and 1963, branches southwards off the Central Line at Kilosa and crosses the Mkata Plain to Kidatu, where it meets the 1,067 mm gauge TAZARA Railway at a break-of-gauge.

Traffic

Passenger train in the main station of Dar es Salaam Dar TRC Railway Station.JPG
Passenger train in the main station of Dar es Salaam

Today’s rail services are offered by the Tanzania Railways Corporation. The timetable [5] offers two passenger services per week in each direction covering the whole length of the line. A trip from Dar es Salaam to Kigoma takes approximately 40 hours today according to the timetable. The long time of travel is due to the poor state of the railway’s infrastructure, which originates to a large extent still from the German colonial times.[ citation needed ] Three classes are offered, whereby the second class also provides sleeping cars and the first class offers sleeping cars only. [6] [7] The standard of a sleeping car of second class corresponds rather to a couchette by European standards.[ citation needed ]

Flooding in December 2009 caused serious disruption; operations resumed in June 2010. [8]

See also

Sources

  1. "Railway Construction in East Africa, 1931–35". Hansard. 25 November 1936.
  2. Tanganyika (8 July 1932). Official Gazette. p. 395.
  3. Jumanne Mkama (1966). "Transportation and Economic Development in Tanzania". p. 30.
  4. 1 2 "Railways Network". Tanzania Railways Limited. Archived from the original on 6 October 2016. Retrieved 7 March 2016.
  5. "Long Distance Train". Tanzania Railways Corporation. Retrieved 2022-12-24.
  6. "Mwanzo". www.trc.co.tz. January 2018. Retrieved 2023-08-12.
  7. "Mwanzo". www.trc.co.tz. January 2018. Retrieved 2023-08-12.
  8. "News in Brief". Railway Gazette. 2010. Archived from the original on 2019-07-13. Retrieved 2010-07-05.

Literature

Maps

6°S35°E / 6°S 35°E / -6; 35

Related Research Articles

Transport in Tanzania includes road, rail, air and maritime networks. The road network is 86,472 kilometres (53,731 mi) long, of which 12,786 kilometres (7,945 mi) is classified as trunk road and 21,105 kilometres (13,114 mi) as regional road. The rail network consists of 3,682 kilometres (2,288 mi) of track. Commuter rail service is in Dar es Salaam only. There are 28 airports, with Julius Nyerere International being the largest and the busiest. Ferries connect Mainland Tanzania with the islands of Zanzibar. Several other ferries are active on the countries' rivers and lakes.

<span class="mw-page-title-main">Kigoma</span> City and lake port in Kigoma Region, Tanzania

Kigoma is a city and lake port in Kigoma-Ujiji District in Tanzania, on the northeastern shores of Lake Tanganyika and close to the border with Burundi and The Democratic Republic of the Congo. It serves as the capital for the surrounding Kigoma Region and has a population of 232,388. The city is situated at an elevation of 775 metres (2,543 ft).

<span class="mw-page-title-main">Kilosa District</span> District in Morogoro Region, Tanzania

Kilosa District is one of the six districts of the Morogoro Region of Tanzania. Its administrative seat is the town of Kilosa. Kilosa District covers 14,918 square kilometres (5,760 sq mi). It is bordered to the north by the Manyara Region, to the northeast by the Tanga Region, to the east by Mvomero District, to the southeast by Morogoro Rural District, to the south by Kilombero District, to the southwest by the Iringa Region and to the west by the Dodoma Region. Kilosa District is home to Mikumi National Park.

<span class="mw-page-title-main">Manyoni District</span> District in Singida Region, Tanzania

Manyoni District is one of the six districts in the Singida Region of Tanzania. The district capital is the town of Manyoni. The district is bordered to the north by the Ikungi District, to the east by the Dodoma Region, to the south by the Iringa Region, to the southwest by the Mbeya Region and to the west by the Tabora Region. In 2015 the Itigi District was created from the Manyoni District, separating the Itigi Division that was the large portion of the south western of the district.

<span class="mw-page-title-main">Catholic Church in Tanzania</span>

The Catholic Church in Tanzania is part of the worldwide Catholic Church, under the spiritual leadership of the Pope in Rome.

<span class="mw-page-title-main">Rail transport in Tanzania</span>

Rail transport in Tanzania is conducted by two companies. It has historically used narrow gauge trackage, but planning and construction of new standard gauge lines is underway as of 2017.

<span class="mw-page-title-main">Outline of Tanzania</span> Overview of and topical guide to Tanzania

The following outline is provided as an overview of and topical guide to Tanzania:

The Usambara Railway was the first railway to be built in German East Africa and what is today Tanzania.

<span class="mw-page-title-main">Railway stations in Tanzania</span>

Railway stations in Tanzania include:

<span class="mw-page-title-main">Tanzania Railways Limited</span>

The Tanzania Railways Corporation(TRC) is a state-owned enterprise that runs one of Tanzania's two main railway networks. the Headquarters are located in Mchafukoge, Ilala District, Dar es Salaaam Region.

<span class="mw-page-title-main">History of rail transport in Tanzania</span>

The history of rail transport in Tanzania began in the late nineteenth century.

The Tanzanian Championship is the second tier of league football in Tanzania. The league is made up of sixteen teams that play thirty rounds, home and away.The league was formed in 1930.

The First League Tanzania is the third tier of league football in Tanzania. The league is divided into two groups, with each group having eight teams. A round-robin format is played and followed by a play-off tournament for promotion and relegation.

The Tanzanian Broadcasting Corporation is a television network. It is Tanzania's national network and is government-owned and operated.

The Isaka–Kigali Standard Gauge Railway is a planned railway line linking the town of Isaka in Tanzania to the city of Kigali in Rwanda.

The Tanzania Standard Gauge Railway is a railway system, under construction, linking the country to the neighbouring countries of Rwanda, Uganda and Burundi, and through these to the Democratic Republic of the Congo, as part of East African Railway Master Plan. The new Standard Gauge Railway (SGR), is intended to replace the old, inefficient metre-gauge railway system.

<span class="mw-page-title-main">Tanzam Highway</span> Highway from Lusaka, Zambia to Dar es Salaam, Tanzania

The Tanzam Highway leads from Lusaka in Zambia to Dar es Salaam in Tanzania. The highway was built from 1968 to 1973 in several stages and was intended to provide seaport access for Zambia and to expand the transport options for Zambia, Malawi and the then Zaire.

<span class="mw-page-title-main">Itigi District</span> District in Singida, Tanzania

Itigi District is a district council in the Singida Region of central Tanzania established in 2015. The district lies in the south-western portion of the Singida Region with 123,515 people and encompasses a large area mostly made up of protected game reserves.

<span class="mw-page-title-main">Msalala District</span> District in Shinyanga, Tanzania

Msalala District is a district council in the Shinyanga Region of Tanzania's lake zone established in 2012. The district lies in the middle of the region just north-east of the town of Kahama.