Florida Railroad

Last updated
Florida Railroad
Florida Railroad
Overview
Locale Florida
Dates of operation18581883
Successor Florida Central and Peninsular Railroad
Seaboard Air Line Railroad
Technical
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Previous gauge 5 ft (1,524 mm)

The Florida Railroad was the first railroad to connect the east and west coasts of Florida, running from Fernandina to Cedar Key. The line later became part of the Seaboard Air Line Railroad, and, where still in use, is operated by CSX Transportation and the First Coast Railroad. The highway corridor of SR 24, US 301, and SR A1A/SR 200 closely parallels the former Florida Railroad.

Contents

History

Construction and early years

Tracks on Cedar Key Cedar Key tracks.jpg
Tracks on Cedar Key

The shipping route between the east coast and gulf coast of the United States passes through the Straits of Florida, close to the Florida Reef that lies just off the Florida Keys. Prior to the 20th century many ships were wrecked around the southern end of the Florida peninsula. A railroad across the northern end of the Florida peninsula would allow cargoes from ships in the Gulf of Mexico to be transferred to ships in the Atlantic Ocean, and vice versa, without the risk of passage through the Straits of Florida, while cutting 800 miles off the trip. [1] :27–28

In 1842 the United States Congress commissioned a survey of a route for a railroad between the St. Mary's River and Cedar Key in the Territory of Florida. In 1853 the Florida Legislature chartered the Florida Railroad to build a 5 ft (1,524 mm) [2] gauge rail line from Fernandina (near the mouth of the St. Mary's River) to Tampa, Florida, with a branch to Cedar Key. The president and chief stockholder of the Florida Railroad was U.S. Senator David Levy Yulee. Yulee decided to complete the line to Cedar Key first, leaving the connection to Tampa for later. Construction started in Fernandina in 1855. By 1858 the rail line was open between Fernandina and Starke, but the Panic of 1857 had left the railroad on the edge of bankruptcy. Yulee had to surrender a majority interest in the railroad to a northern investment syndicate headed by Edward Dickerson to save the company. The line was completed to Gainesville in 1859 and Cedar Key in 1861. Other towns served by the railroad included Callahan, Baldwin, Waldo and Archer. At 156 miles in length, it was the longest railroad to be completed in Florida before the start of the American Civil War. [1] :27–31 [3] :451–452

The Florida Railroad was adversely affected by the Civil War. The USS Hatteras raided Cedar Key in January 1862, destroying the railroad's rolling stock and buildings. In March 1862 a Union squadron seized Fernandina. Shells fired by the USS Ottawa damaged the last train leaving Fernandina, killing or injuring several passengers, and almost killing Senator Yulee. In 1864, the Confederate States Army pulled up rails from the Florida Railroad to use on a new rail line from Live Oak, Florida to Lawton, Georgia (now known as DuPont). Union forces had also destroyed 30 miles of track leading from Cedar Key. [1] :34–37,40

1939 image of Cedar Key showing the Florida Railroad's former right of way and trestle remnants Florida - Brandenton through Clearwater - NARA - 23936569.jpg
1939 image of Cedar Key showing the Florida Railroad's former right of way and trestle remnants

The Dickerson syndicate resumed operation of the Florida Railroad after the war, but with much of the railroad's equipment, facilities and track destroyed or seized, the company did not do well, and defaulted on its bonds to the Internal Improvement Fund in 1866. The railroad was auctioned off, and bought back by the Dickerson syndicate for twenty percent of the original value of the bonds. In 1872 the Florida Railroad was reorganized as the Atlantic, Gulf and West India Transit Company, still under the control of the Dickerson syndicate. The newly reorganized company began construction of the long-promised line to Tampa through subsidiary companies: the Peninsular Railroad operated the line from the connection with the Florida Railroad at Waldo to Ocala and Silver Springs, while the Tropical Florida Railroad ran from Ocala to Wildwood. In the meantime, the Atlantic, Gulf and West India Transit Company had leased the Fernandina and Jacksonville Railroad, providing a connection from its tracks at Hart's Road (later Yulee, Florida) to Jacksonville, Florida. Due to financial difficulties, the Atlantic, Gulf and West India Transit Company was reorganized as the Florida Transit Company in 1881, under the control of Sir Edward James Reed. The company was restructured again as the Florida Transit and Peninsular Railroad in 1883. [1] :40–41,47,49–52

The Florida Transit and Peninsular Railroad was merged with the Florida Central and Western Railroad, Fernandina and Jacksonville Railroad, and Leesburg and Indian River Railroad in 1884–85 to form the Florida Railway and Navigation Company. [1] :52

In 1900, a year after purchasing the majority of FC&P stock, the newly organized Seaboard Air Line Railway leased the FC&P and, in 1903, acquired it outright. [4] :146

Seaboard Air Line ownership

Once under the ownership of the Seaboard Air Line, the Florida Railroad between Baldwin and Waldo would become part of the company's main line. By 1925, track from Baldwin to Callahan was the Seaboard's Gross Subdivision, and the remaining track to Fernandina Beach was the Fernandina Subdivision. By 1932, Seaboard abandoned track from Archer to Cedar Key. [5] Remaining track from Waldo to Archer was then part of the Seaboard's Brooksville Subdivision (which continued from Archer down the former Early Bird Branch to the former Tampa Northern Railroad). The Brooksville Subdivision would be an alternate freight route from northern Florida to Tampa. [6] The line was abandoned between Callahan and Yulee in 1954. [7]

Later years

In 1967, the Seaboard Air Line merged with their long-time rival, the Atlantic Coast Line Railroad (ACL). After the merger was complete, the company was named the Seaboard Coast Line Railroad (SCL). In 1980, the Seaboard Coast Line's parent company merged with the Chessie System, creating the CSX Corporation. The CSX Corporation initially operated the Chessie and Seaboard Systems separately until 1986, when they were merged into CSX Transportation. [1] :12

Current conditions

Segments of the former Florida Railroad are still in service. Since 2005, track from Fernandina Beach to Yulee is now operated by the First Coast Railroad. Track from Callahan to Waldo is still owned by CSX and is now the Callahan Subdivision from Callahan to Baldwin, and the S Line (Wildwood Subdivision) from Baldwin to Waldo. [8] Today, State Road 24 runs along much of the former right of way of the route between Waldo and Cedar Key. The Waldo Road Greenway also runs along the former right of way between Gainesville and Waldo.

Historic Stations

Fernandina Beach's original Florida Railroad Station, now the Amelia Island Visitor Center. Fernandina Beach FL HD depot03.jpg
Fernandina Beach's original Florida Railroad Station, now the Amelia Island Visitor Center.
Miles from
Fernandina
System
Milepost
City/LocationStation [9] Connections and notes
0.0SMA 47.2 Fernandina Fernandina
6.1 O'Neill O'Neill
7.0Buena Vista
8.6Lofton
11.0 Yulee Hart's Road
12.1SMA 35.1Yuleeoriginally Hart's Road Junction
junction with Florida Central and Peninsular Railroad Northern Division (SAL)
15.4Hero
19.1 Italia Italia
25.7SMA 22.2Nassau
27.2SM 20.0 Callahan Callahanjunction with:
31.8SM 12.3 Crawford Crawfordjunction with Atlantic, Valdosta and Western Railway (GSF/SOU)
36.8 Verdie Verdie
38.7 Ingle Ingle
40.0St. Mary's
41.1 Bryceville Bryceville
47.3SM 0.0
S 653.0
Baldwin Baldwinjunction with:
50.8S 656.5Fiftone
54.9S 659.0Maxville
57.3S 661.4Hugh
61.3S 665.7Highland
62.4Trail Ridge
66.3S 669.3 Lawtey Lawtey
68.4Burrine's
69.1S 672.1Saxton
71.4Temple
73.2S 678.4 Starke Starke
73.9S 679.1Wannee Junctionjunction with Atlantic, Suwannee River and Gulf Railway (SAL)
77.4Thurston
79.4S 684.6 Hampton Hamptonjunction with Georgia Southern and Florida Railway (SOU)
84.8S 690.0 Waldo Waldojunction with Peninsular Railroad (FC&P/SAL)
88.2Millicans
91.8SR 697.2 Fairbanks Fairbanks
94.9Dowd's
96.2Nedra
98.7SR 704.0 Gainesville Gainesville junction with:
102.6Daysville
103.8 Hammock Ridge Hammock Ridge
104.7 Arredondo Arredondo
105.8SR 710.8 Kanapaha Kanapaha
108.9 Palmer Palmer
110.8Peach Orchard
113.2SR 718.4 Archer Archerjunction with Early Bird Branch
116.9Venables
117.9Albion
119.4Meredith
122.5 Bronson Bronson
128.5Lennon
134.3 Otter Creek Otter Creek
135.9Ellzey
139.6Emett
143.6Wylly
145.5 Rosewood Rosewood
146.5Hilton
148.0 Sumner Sumner
152.7Lukens
155.7760.9 Cedar Key Cedar Key

See also

Related Research Articles

The Florida Northern Railroad Company, Inc. is one of several short line railroads run by Regional Rail, LLC. It has connections to CSX at Ocala, Florida, running north to Lowell, Florida, and south to Candler, Florida. It was formerly run by CSX as their Ocala Subdivision.

<span class="mw-page-title-main">Florida Central and Peninsular Railroad</span> Historic railroad system

The Florida Central and Peninsular Railroad was the final name of a system of railroads throughout Florida, becoming part of the Seaboard Air Line Railway in 1900. The system, including some of the first railroads in Florida, stretched from Jacksonville west through Tallahassee and south to Tampa. Much of the FC&P network is still in service under the ownership of CSX Transportation.

<span class="mw-page-title-main">Riceboro Southern Railway</span> Railway in the southern United States

The Riceboro Southern Railway began operations in 2004 operating on about 33 miles of track, some of which is leased from CSX Transportation. The track on which it operates is part of the ex-Seaboard Air Line route from Savannah, Georgia to Jacksonville, Florida. It runs generally from Ogeechee, Georgia, where the line splits from the CSX Savannah Subdivision, which is the former Atlantic Coast Line Railroad's Savannah-Jacksonville route, and Riceboro. It does not have any of its own locomotives; it uses Georgia Central power.

<span class="mw-page-title-main">First Coast Railroad</span> Railroad in America

The First Coast Railroad is a class III railroad operating in Florida and Georgia, owned by Genesee & Wyoming. The name is derived from its area of operations around the First Coast of Florida.

The Jacksonville & Southwestern Railroad (J&SW) was a railroad that served Florida from 1899 to 1904. It was purchased by the Atlantic Coast Line Railroad in 1904. The Atlantic Coast Line would extend the line further west and it would become their Jacksonville—Wilcox Line. Some of the original right-of-way was converted to a recreational path in the rails to trails program in the 1990s.

The Callahan Subdivision is a CSX Transportation railroad subdivision within the Jacksonville Division on the former Seaboard Air Line Railroad. The sub extends northward 20 miles from Baldwin, Florida, where the Jacksonville Terminal Subdivision's S Line and Florida Gulf & Atlantic Railroad meet just north of Baldwin Yard, a classification yard. According to Jacksonville Division Timetable Number 4 published in 2005, the sub runs from milepost SM 0.18 to milepost SM 20.0, where it joins the Nahunta Subdivision, a former Atlantic Coast Line Railroad, in Callahan, Florida. The line serves as a bypass to Jacksonville.

The Brooker Subdivision is a railroad line owned by CSX Transportation in Florida. The line runs from the CSX S Line at Wannee Junction in Starke to Newberry for a total of 39.6 miles. At its north end it continues south from the Wildwood Subdivision and at its south end it junctions at a wye with the Florida Northern Railroad.

CSX Transportation's Brooksville Subdivision is a railroad line in the Tampa Bay region of Florida. Today, the line runs from the Clearwater Subdivision in Sulphur Springs, Florida north to a point just north of Brooksville, a distance of 49.1 miles. Historically, the Brooksville Subdivision was owned and operated by CSX predecessor, the Seaboard Air Line Railroad. Under Seaboard ownership, the Brooksville Subdivision continued north as far as Waldo, where it intercepted the Seaboard Air Line main line.

The Jacksonville Terminal Subdivision is a group of railroad lines owned by CSX Transportation in and around Jacksonville, which was historically a major railroad hub. The Jacksonville Terminal Subdivision includes about 13.0 miles of track.

The Kingsland Subdivision is a railroad line owned by CSX Transportation in Northeast Florida. The line begins in Jacksonville at a junction with the A Line near Moncrief Yard. From there, it heads east and then turns north near Panama Park. From Panama Park, the Kingsland Subdivision heads north to Yulee on a discontinuous piece of CSX's S Line. In Yulee, the line connects with the First Coast Railroad, which operates north to Seals, Georgia, on tracks that were previously part of the Kingsland Subdivision prior to 2005. The line's namesake is Kingsland, Georgia, which is located north of Yulee on the First Coast Railroad.

The Wildwood Subdivision is a railroad line owned by CSX Transportation in Florida. It runs along CSX's S Line from Baldwin south to Zephyrhills via Ocala and Wildwood for a total of 155.7 miles. The S Line is CSX's designation for the line that was the Seaboard Air Line Railroad main line from 1903 to 1967.

The Tampa Northern Railroad was a historic railroad line running from just east of downtown Tampa north to the city of Brooksville in Hernando County. The line continues to operate today and is under the ownership of the CSX Corporation, who operates it as their Brooksville Subdivision north of Sulphur Springs and part of their Clearwater Subdivision south of there.

The Plant City, Arcadia, and Gulf Railroad was a railroad line that once operated from Plant City, Florida, south to Welcome, a distance of about 13 miles. The line remains in service today and is owned by CSX Transportation, which it operates as their Plant City Subdivision.

The Live Oak, Tampa and Charlotte Harbor Railroad was a historic railroad in Florida chartered by railroad tycoon Henry B. Plant. It was built as an extension of Plant's Live Oak and Rowlands Bluff Railroad. Together, the two lines ran from Live Oak, Florida to Gainesville via High Springs. The lines were completed in 1884.

The Gross Cutoff was a rail line built by the Seaboard Air Line Railroad in northern Florida. It ran from the Seaboard Air Line Railroad’s main line at a point known as Gross to Callahan connecting two pre-existing tracks.

<span class="mw-page-title-main">Main Line (Atlantic Coast Line Railroad)</span> Historic railroad in the Southeast

The CSX A Line forms the backbone of the historic Atlantic Coast Line Railroad Main Line, the backbone of their network in the southeastern United States. The main line runs from Richmond, Virginia to Port Tampa just southwest of Tampa, Florida, a distance of nearly 900 miles. Along its route it passes through Petersburg, Rocky Mount, Florence, Charleston, Savannah, Jacksonville, and Orlando. With the exception of a short 61-mile segment in Greater Orlando, the entire line is owned by CSX Transportation.

<span class="mw-page-title-main">Sarasota Subdivision</span> Seaboard Air Line Railroad line in Florida

The Seaboard Air Line Railroad's Sarasota Subdivision was a rail line that ran from the company's main line at Turkey Creek south to Palmetto, Bradenton, Sarasota, and Venice. The line was built in phases from 1901 to 1911.

The Atlantic Coast Line Railroad's DuPont—Lakeland Line was a historic rail line in southern Georgia and the northern west coast of Florida. On employee timetables, the line was actually divided into the DuPont—High Springs Line and the High Springs—Lakeland Line. The line was primarily used for freight, though some passenger services ran on parts of it in Florida. While parts of the line were built as early as 1863, the full line was not complete until 1913. Parts of the line in Florida are still active today.

The Seaboard Air Line Railroad’s Main Line was the backbone of the Seaboard Air Line Railroad's network in the southeastern United States. The main line ran from Richmond, Virginia to Tampa, Florida, a distance of over 800 miles. Along its route it passed through Petersburg, Raleigh, Columbia, Savannah, Jacksonville, and Ocala, Florida. While some segments of the line have been abandoned as of 2023, most of the line is still in service and is owned by the Seaboard Air Line's successor, CSX Transportation as their S-Line.

References

  1. 1 2 3 4 5 6 Turner, Gregg (2003). A Short History of Florida Railroads. Arcadia Publishing. ISBN   978-0-7385-2421-4.
  2. Confederate Railroads - Florida
  3. Watkins, Caroline (April 1975). "Some Early Railroads in Alachua County". The Florida Historical Quarterly. 53 (4). Florida Historical Society: 450–59.
  4. Turner, Gregg (2008). A Journey into Florida Railroad History. Gainesville, Florida: University Press of Florida. ISBN   978-0-8130-3233-7.
  5. Roberts, Bruce. "Florida's Forgotten Railroad". The Florida Railroad Company - Fernandina & Cedar Key. Archived from the original on March 12, 2016. Retrieved January 4, 2017.
  6. Seaboard Air Line Railroad South Florida Division Timetable (1940)
  7. "Yulee to Callahan, FL". Abandoned Rails. Retrieved 6 May 2020.
  8. CSX Jacksonville Division Timetable
  9. "Florida Railroads: Passenger Stations & Stops" (PDF). Jim Fergusson's Railway and Tramway Station Lists (Florida). Retrieved 5 June 2020.