History of Merseyrail

Last updated

The history of Merseyrail dates back to the 19th century with the original formation of the Mersey Railway in 1886. Merseyrail, created in 1963, became a single network in 1977 and was developed from lines previously owned by a number of companies. [1] The 1970s Loop and Link project, consisting of two tunnels under Liverpool's city centre, was designed to increase capacity and improve service. When Merseyrail originally opened, there were 50 stations on the network; this has since expanded to almost 70, with plans for a network expansion, battery-powered trains, the reopening of lines, and the reuse of track and tunnels.

Contents

First Mersey railways (19th century 1930s)

30 January 1886 Illustrated London News montage of the opening of the Mersey Railway Tunnel Mersey Railway opening illustration.jpg
30 January 1886 Illustrated London News montage of the opening of the Mersey Railway Tunnel

The Merseyrail network is a merger of five former rail systems:

The central Mersey Railway opened and ran originally from Liverpool James Street to Green Lane through the 1886 Mersey Railway Tunnel, one of the world's first underwater railway tunnels. [3] During the 1880s and 1890s, the network was expanded to include Liverpool Central (1890) and Birkenhead Park railway station (1888) to connect with the Wirral Railway. This led to the network's expansion to Rock Ferry railway station and the connection to the Chester Line in 1891. [4]

In 1903, the Mersey Railway was electrified; this was the world's first full electrification of a steam railway. [3] It was followed by the electrification of the Lancashire and Yorkshire Railway line from the Liverpool Exchange railway station to Southport railway station three years later. In 1937, electrification of the Wirral Railway lines to New Brighton railway station and West Kirby railway station enabled service into Liverpool via the Mersey Railway Tunnel.

Creation of Merseyrail (1963–1977)

The early-1960s Beeching cuts triggered widespread railway closures, targeting key routes such as LiverpoolSouthport, Liverpool–Wigan Wallgate, and the stations of Liverpool Exchange, Liverpool Central (High Level) and Birkenhead's Woodside station. The Liverpool City Council proposed a contrasting strategy in response, advocating the preservation of suburban services integrated into a new regional electrified rapid-transit network. This initiative aimed to link all lines via tunnels under Liverpool and Birkenhead, facilitating transportation across Merseyside. The Merseyside Area Land Use and Transportation Study (MALTS) supported this idea, leading to the establishment of Merseyrail [5] when the city council's proposal was adopted. [6] Merseyrail was conceived to streamline urban travel, ensuring convenient access to Liverpool Lime Street for long-haul routes by diverting local services underground in Liverpool's centre. The government opposed closure of the Liverpool-Southport and Liverpool-Wigan Wallgate lines but approved the shutdown of multiple stations, consolidating Liverpool's rail operations at Lime Street and curtailing the electrified section between Southport and Crossens in 1964. [7]

The 1969 Merseyside Passenger Transport Authority (later Merseytravel) was tasked with overseeing local rail lines destined for inclusion in the newly-envisioned Merseyrail network. Initially, Liverpool operated separate entities for electric and diesel lines. Lines for the new Merseyrail system were categorised as the Northern Line (from Exchange and Central High Level), Wirral Line (from Central Low Level), and City Line (from Lime Street station). The 1973 Strategic Plan for the North West (SPNW) envisioned comprehensive electrification and integration of lines into Merseyrail by 1991, including the Outer Loop, Edge Hill Spur, and connections to St. Helens, Wigan, and Warrington. [8]

Four construction projects were outlined to create the rapid-transit network:

The Loop Line and Link Line were completed, establishing the electrified Northern and Wirral Lines; the Edge Hill Spur and Outer Rail Loop projects were shelved, leaving the City Line isolated. This hindered its integration into Merseyrail, maintaining local service into Lime Street and using platforms needed for long-haul routes. Efforts to complete these projects faced political hurdles, [10] and progress was only made on the electrification of Lime Street to the Manchester and Wigan lines in 2015; the line to Warrington retained diesel traction. Merseytravel initially sponsored Merseyrail branding in stations and liveries on local services; [9] the latter ended with British Rail's privatisation, allowing operators to adopt individual corporate liveries.

The loop line (Wirral Line) and link line (Northern Line), built under Liverpool in 1977 Liverpool rail lines in 1977.svg
The loop line (Wirral Line) and link line (Northern Line), built under Liverpool in 1977

The engineering works required to create the Northern and Wirral lines, known as the Loop and Link Project, consisted of two tunnels. The Loop was the Wirral Line tunnel, and the Link the Northern Line tunnel; both are under Liverpool's city centre. The main works were begun between 1972 and 1977. Another project, as the Edge Hill Spur, would have integrated the city lines into the city-centre underground network. This would have meshed the eastern section of the city into the underground city-centre section of the electric network, releasing platforms at the mainline Lime Street station for mid- to long-haul routes.

Loop line (Wirral line)

The Loop Line is a single-track loop tunnel under Liverpool's city centre, serving the Wirral line branches. It was built to provide greater capacity and a wider choice of destinations for Wirral Line users, which included the city centre's business and shopping districts and the mainline Lime Street station. The loop extension offered direct mainline-station access to Wirral residents after the decommissioning of the mainline Woodside terminal station in Birkenhead.

Trains from Wirral arriving via the original Mersey Railway tunnel enter the loop beneath Mann Island in Liverpool, continuing clockwise through James Street, Moorfields, Lime Street and Central and returning to the Wirral via the James Street station. The loop tunnel provided interchanges for Wirral line passengers to the Northern Line at Moorfields and Central stations. [11] A burrowing junction was built at Birkenhead Hamilton Square station to increase the Wirral line's capacity by eliminating the flat junction west of the station; this included a new station tunnel at Hamilton Square for the lines to New Brighton and West Kirby.

The original Mersey Railway tunnel, from James Street to Central station (in red), still exists. The Link line is in blue, and the Loop line in green. Liverpool James Street Layout.jpg
The original Mersey Railway tunnel, from James Street to Central station (in red), still exists. The Link line is in blue, and the Loop line in green.

The Link Tunnel was designed to connect Liverpool's north and south urban lines, creating a north-south Northern line. This line was the western section of a proposed double-track electrified suburban orbital line, the Outer Rail Loop, although budget cuts prevented eastern-section construction. [12]

The Link Tunnel is a double-track tunnel connecting two lines: one running south from the city centre to Hunts Cross and another running north to Southport, with branches to Ormskirk and Kirkby. This line provides direct access from north and south Liverpool to the city centre's shopping and business districts via two underground stations, Liverpool Central and Moorfields, which connect to the Wirral line's Loop line.

Liverpool Central's Northern Line underground station was originally the Mersey Railway terminus at Central Low Level. A section of the original 1880s tunnel between James Street and Central stations was repurposed for the Link Tunnel. The remaining section, between Paradise Street Junction and Derby Square Junction, is a rolling-stock interchange between the Northern and Wirral lines and a reversing siding for Wirral line trains terminating at James Street when the Loop Tunnel is inactive. This interchange tunnel section is not used for passenger traffic. [13]

A new track layout south of Liverpool Central eased connections between the former Mersey and Cheshire Lines railways, allowing the extension of the Northern line to Garston and (later) Hunts Cross. A tunnel was dug, connecting the high- and low-level tracks. Engineers also built short tunnels to prepare for a potential future project (the Edge Hill Spur) that would create a new connection without disrupting current service. The future junction would function similarly to the Hamilton Square burrowing junction and increase capacity. [12]

Expansion (1977–present)

Electrification since 1977 Merseyrail Development.jpg
Electrification since 1977

Since the Loop and Link project concluded, Merseyrail has made expansions, electrification and new stations.

Early electrification (1977–1978)

On 30 April 1977, the Liverpool Exchange terminus was closed as part of the Link tunnel project to create Merseyrail's electrified north–south Northern line. The new tunnel under Liverpool's city centre enabled a continuous rail line, with the nearby Moorfields underground station replacing Liverpool Exchange.

In 1978, electrification of the line from Walton to Kirkby created a Northern-line branch terminus at Kirkby. This cut the northern Liverpool-to-Manchester route into two sections with different modes of traction: 750 V DC third-rail electric on the Merseyrail network and diesel on the Northern Rail network.

Merseyrail's Northern line was extended south that year from Liverpool Central, terminating at Garston instead of Gateacre (which had been abandoned in 1972). The new line linked the tunnel into Central High Level with the lower-level tunnel entering Central Low Level. This connection was originally envisaged when the Mersey Railway was extended to Central from James Street in the 1890s, with the two tunnels on the same alignment. A short extension to Hunts Cross in 1983 enabled passenger interchange between the Northern line, the Merseyrail City Line, and mainline service from Lime Street.

Rock Ferry to Hooton, Chester and Ellesmere Port (1985–1994)

Rock Ferry had been a terminus for Wirral-line service since the Mersey Railway was extended there from Green Lane in 1891. Passengers for the lines to Chester and Helsby would change trains at this station from the electric service to mainline steam and diesel services. Rock Ferry became a terminal for the Merseyrail Wirral line.

Hooton is a junction station where the line to Helsby via Ellesmere Port branches off the main Chester line. The line from Hooton to Chester was electrified in 1993, making Chester a terminus of the Wirral line.

Kirkby to Headbolt Lane

In 2023, Headbolt Lane replaced Kirkby as the terminus of the Kirkby-Headbolt Lane line. This network expansion is the UK's first passenger BEMU fleet; [14] there is no electrification past Kirkby except batteries. [15]

New stations

Former Holly Park Football ground in 2009, where Liverpool South Parkway Station now stands HollyParkSouthLiverpool.jpg
Former Holly Park Football ground in 2009, where Liverpool South Parkway Station now stands

Future plans

1909 map of rail lines around Liverpool Liverpool RJD 42.jpg
1909 map of rail lines around Liverpool

Since 2014, plans have existed to use bi-modal trains to expand the Merseyrail along existing former lines or lines with significant links to Merseyside. [20] The plans were expedited by the introduction of Class 777, with provisions for batteries or pantographs on the units. [21] [22] A 2020 rail-strategy report included plans to increase rail connectivity to Shotton and Wrexham, Skelmersdale and Wigan, and Burscough Junction and (possibly) Preston. [23]

Use of battery powered trains

Wigan Wallgate station Wigan Wallgate Station (geograph 3285606).jpg
Wigan Wallgate station
Preston station Preston Station Platforms.jpg
Preston station
Liverpool City Region mayor Steve Rotheram hopes to expand Merseyrail to Runcorn and Warrington via Chester with HS2 and Northern Powerhouse Rail interchanges. Borderlands line Map.png
Liverpool City Region mayor Steve Rotheram hopes to expand Merseyrail to Runcorn and Warrington via Chester with HS2 and Northern Powerhouse Rail interchanges.

Battery technology has been discussed to expand the Merseyrail network by using existing track, re-using old track, or laying new track. Plans include: [26] [27] [28]

Reopening lines and track

Burscough Curves

The Burscough Curves were short rail chords linking the Ormskirk-Preston line with the Manchester-Southport line, enabling direct travel from Ormskirk and Preston to Southport. Passenger service ended in 1962, and the tracks were removed. Reinstating the curves would enable direct Preston-Southport and Ormskirk-Southport service (offering an alternative Liverpool-Southport route via Ormskirk), and Network Rail has recommended development of a strategy to do so. [30] [47] During a 27 April 2011 parliamentary debate, the transport minister expressed interest in discussing the curves' reinstatement with former Southport MP John Pugh. [48]

The new Class 777 Merseyrail trains, capable of battery operation, may be considered for use on the Burscough Curves. [49] Merseytravel's long-term strategy puts the opening of the curves in Network Rail's CP7 control period. [50]

Edge Hill to Bootle

Liverpool2 Container terminal extension, served by the Bootle Branch Liverpool2, 09-2020.jpg
Liverpool2 Container terminal extension, served by the Bootle Branch

The Canada Dock Branch, also known as the Bootle Branch, [51] is an unelectrified line running from Edge Hill Junction in east Liverpool on a curve to the container terminal to the north. Passenger trains were withdrawn in 1977, but it remains in use for freight to the Seaforth Container Terminal. [52] Proposals have been made to electrify and reopen the line for passengers, potentially reopening stations such as Spellow, Walton & Anfield, Breck Road, Tuebrook, Stanley, and Edge Lane. [20]

Network Rail's March 2009 Route Utilisation Strategy for Merseyside [53] found that the benefits of new infrastructure on the Canada Dock Branch did not justify the investment.[ citation needed ] However, the Department for Transport's July 2009 rail-electrification document stated that the route to Liverpool Docks would be electrified with overhead wires. [52] The document noted that electrifying this route would enable electric freight transport, creating an alternative access to Liverpool docks for electrically-powered trains. It was also expected to enhance electrified connectivity to the planned freight terminal at Parkside, near Newton-le-Willows.

Initial phases of electrification scheduled until 2016 did not list the line. [54] Local residents campaigned for increased rail transport of containers to ease road congestion and pollution, which could increase rail traffic. [55] The Liverpool City Region Combined Authority's October 2017 Long Term Rail Strategy outlined a proposal to introduce passenger service on the Bootle Branch to Lime Street, noting on page 37: "An initial study is required to understand fully the freight requirements for the line and what the realistic potential for operating passenger services over the line is." [26] It was announced in December 2019 that the Liverpool City Council had commissioned a feasibility study to explore reopening the line to passenger traffic. [56]

North Mersey Branch

The original, demolished Skelmersdale station, whose track was removed in 1963 Skelmersdale railway station.jpg
The original, demolished Skelmersdale station, whose track was removed in 1963

The North Mersey Branch, from Bootle to Aintree, is currently used by engineering trains accessing Merseyrail tracks. Merseytravel intends to eventually reopen and electrify the line. [20] [29] The Merseyside Route Utilisation Strategy (RUS) said that reopening the line was not currently recommended, although future development and regeneration could increase demand for the service. The RUS noted that any implementation must ensure current and future freight needs, and there may be long-term potential in using other infrastructure (such as the unused Wapping and Waterloo tunnels) for new travel opportunities. [53]

Outer Rail Loop

The West Derby station on the North Liverpool Extension, planned as part of the Outer Loop West Derby railway station May 2024.jpg
The West Derby station on the North Liverpool Extension, planned as part of the Outer Loop

The Orbital Outer Rail Loop, designed to circle the outer edges of Liverpool with existing rail lines, was part of the original 1970s Merseyrail plans. Liverpool's semi-circular layout has the city centre on its western edge, on the River Mersey. The loop's western section, paralleling the river through the city centre, was the only part completed and is part of the Northern line.

The concept of using the former Cheshire Lines Committee's North Liverpool Extension Line [57] [ full citation needed ] through the eastern suburbs dated back to before World War II. The proposal was a belt line using the former Liverpool Overhead Railway, which ran along the river front, as its western section. The idea evolved during the 1960s into the Outer Rail Loop, a rapid-transit line combining new and existing electrified lines with a tunnel under the city centre. This would have allowed passengers from eastern and southern mainline routes to transfer at two parkway interchange stations, including Liverpool South Parkway (which opened three decades after the original proposal). Passengers would be able to reach the suburbs without entering the city centre, easing congestion at the Lime Street station.

The Outer Loop was intended to connect eastern suburbs such as Gateacre, Childwall, Broad Green, Knotty Ash, West Derby, Clubmoor, and Walton with the city centre. [12] The final plan had two sub-loops for the northern and southern suburbs, providing direct city-centre access from the east. The eastern section was cancelled in the late 1970s due to delays, cost overruns, and political opposition, and only the western section was completed. The eastern section is the Liverpool Loop Country Park, a suburban walking and cycling trail.

The project was abandoned by Merseytravel in the 1980s; construction of a large bridge taking the M62 motorway over the eastern section and header tunnels south of Liverpool Central station were expensive. The route is still largely intact (including bridges), although the eastern section forms the Liverpool Loop Country Park.

Key components of the loop were:

  • West Section: Existing Northern Line from Sandhills (later Aintree) to Hunts Cross, including the costly Link Line tunnel under the city centre.
  • East Section: Former CLC North Liverpool Extension Line from Hunts Cross to Aintree, now the Liverpool Loop Country Park.
  • North Section: Originally from Walton to Kirkdale, later from Aintree to Bootle via the North Mersey Branch; the latter is used for maintenance trains.
  • Central Section: From Central station to Broad Green, dividing the loop into north and south sub-loops, with the proposed Edge Hill Spur. A major junction would have been formed with the eastern section of the Outer Loop, with a six-platform underground station (named Rocket) under the car park of the Rocket pub near the M62-Queens Drive intersection.

The loop would have used a double track with a 750 V DC third-rail system. The route remains safeguarded, with occasional calls to revive parts of it (such as the stretch from Hunts Cross to Gateacre). Strategy documents have mentioned reopening the North Mersey Branch for passenger service between Bootle and Aintree, with stations serving Ford and Girobank. [12]

Edge Hill Spur (reusing tunnels)

Victoria/Waterloo Tunnel portal at the Edge Hill station. The tunnel is an option for the Edge Hill Spur. Victoria Tunnel Entrance.jpg
Victoria/Waterloo Tunnel portal at the Edge Hill station. The tunnel is an option for the Edge Hill Spur.

During the 1960s and early 1970s, the Edge Hill Spur was proposed to link Liverpool's eastern suburbs with the central underground section of Merseyrail. The plan involved extending the network from Liverpool Central to Edge Hill with existing freight tunnels. Although the scheme was dropped, construction of junctions and two header tunnels south of Liverpool Central was completed during Northern Line tunnel construction to allow future development of the spur. [58]

The spur would connect the City Line branches from eastern Liverpool and the electrified Merseyrail network, enhancing integration and connectivity. By diverting local trains from the east underground, it would have freed platform space at Lime Street station for mid-and long-haul routes. The initial plan was to reuse the 1829 Wapping freight tunnel, creating two single-track tunnels branching off the Northern line at Liverpool Central South Junction. This would have provided access to Edge Hill via the Cavendish cutting, which was built for the 1830 Liverpool and Manchester Railway. A flyover east of the Edge Hill station would have connected to the City Line, but this flyover has been demolished.

In the early 1970s, an alternative route was adopted. The revised plan included a new underground station near Liverpool University, behind the Student Union building in Mount Pleasant. The new tunnels would curve north, passing beneath the mainline Lime Street station approach and accessing Edge Hill via the Waterloo/Victoria Tunnel. The route would emerge at Edge Hill on the north side of the main lines, eliminating the need for a flyover. [12]

Although the 1975 Merseyside Metropolitan Railway Act authorised this line, construction was postponed due to financial cutbacks and political opposition (which also halted the Outer Rail Loop project). Eastern part of Liverpool has had reduced connectivity ever since. After the 2006 collapse of the Merseytram scheme, proposals renewed to revive the spur and the route remains safeguarded [59] in MerseyTravel's 30-year plan. [20]

In 2016, Liverpool mayor Joe Anderson proposed resurrecting the Edge Hill Spur with a new station at Paddington Village as part of the city's Knowledge Quarter expansion. [60] A feasibility study commissioned in May 2016 found that the Wapping Tunnel, flooding in some places, was in good condition and reopening it was possible after remedial work. [10]

References

    1. "The Story of Merseyrail | Edge Hill Station". edgehillstation.co.uk. Retrieved 2 January 2024.
    2. "Liverpool Merseyrail". UrbanRail. Archived from the original on 6 August 2020. Retrieved 21 July 2009.
    3. 1 2 "Merseyrail Trains History". Merseyrail. Archived from the original on 8 September 2008. Retrieved 20 July 2009.
    4. "Birkenhead Monks Ferry". Disused Station. Retrieved 21 July 2009.
    5. "Merseyside Area land use Transportation study (MALTS) project report. | The National Archives". Discovery.nationalarchives.gov.uk. Archived from the original on 6 January 2021. Retrieved 23 July 2016.
    6. "Liverpool City Centre Plan - City Centre Planning Group, 1965"
    7. "Disused Stations: Meols Cop Triangle & Electric Car Sheds". www.disused-stations.org.uk.
    8. 1 2 Couch, Chris (2003). City of change and challenge: urban planning and regeneration in Liverpool. Aldershot: Ashgate. ISBN   978-1-84014-857-2
    9. 1 2 Maund, T.B. (2001). Merseyrail electrics: the inside story. Sheffield: NBC Books. OCLC   655126526.
    10. 1 2 "Archived copy" (PDF). Archived from the original (PDF) on 3 March 2018. Retrieved 3 March 2018.{{cite web}}: CS1 maint: archived copy as title (link)
    11. "OPSI Statutory Instrument 2003 No. 1696". OPSI. Retrieved 21 July 2009.
    12. 1 2 3 4 5 Maund, T.B. (2001). Merseyrail electrics: the inside story. Sheffield: NBC Books. OCLC   655126526.
    13. "Liverpool Central High Level". Disused Station. Retrieved 21 July 2009.
    14. "UK's first battery-powered fleet hits the tracks". BBC News. 5 October 2023. Retrieved 17 October 2023.
    15. clare.barber@liverpoolcityregion-ca.gov.uk (3 October 2023). "Next Stop: Headbolt Lane – £80m station served by UK's first battery powered trains to open this week | Liverpool City Region Combined Authority - News". Liverpool City Region Combined Authority. Retrieved 15 October 2023.[ permanent dead link ]
    16. "Disused Stations: Upton-by-Chester Station". www.disused-stations.org.uk. Retrieved 27 August 2024.
    17. Davies, Helen (7 June 2014). "Sefton council to build 370 homes and a new station in Maghull on land earmarked for prison". Liverpool Echo. Retrieved 28 August 2024.
    18. "Headbolt Lane Station Frequently Asked Questions". Knowsley News. 4 February 2022. Retrieved 5 February 2022.
    19. "Liverpool Baltic Merseyrail station: Virtual reality to show plans". www.bbc.com. 20 May 2024. Retrieved 28 August 2024.
    20. 1 2 3 4 5 6 Shennan, Paddy (28 August 2014). "Merseytravel plan to open or reopen host of new stations". Liverpool Echo. Retrieved 30 August 2014.
    21. 1 2 "Battery-powered trains part of Merseyrail expansion plan". BBC News. 15 July 2021.
    22. Metro Class 777 IPEMU – Merseytravel, Liverpool (UK) (PDF). Bussnang: Stadler Rail Group. 6 September 2022. MMER_IPEMU0922e. Archived (PDF) from the original on 28 December 2022. Retrieved 28 December 2022.
    23. "Liverpool City Region Strategic Rail Study - Continuous Modular Strategic Planning" (PDF). Network Rail. October 2020. Archived from the original (PDF) on 24 December 2022.
    24. "Battery-powered trains part of Merseyrail expansion plan". BBC News. 15 July 2021.
    25. Integrated Rail Plan for the North and Midlands (PDF). London: Department for Transport. November 2021. ISBN   978-1-5286-2947-8.
    26. 1 2 3 4 "Archived copy" (PDF). Archived from the original (PDF) on 7 November 2017. Retrieved 17 May 2018.{{cite web}}: CS1 maint: archived copy as title (link)
    27. 1 2 "New Trains". www.merseyrail.org. Archived from the original on 20 August 2021. Retrieved 8 December 2023.
    28. McDonough, Tony (15 July 2021). "Battery breakthrough will see Merseyrail network extended". Liverpool Business News. Retrieved 15 July 2021.
    29. 1 2 "Welcome to the TravelWise Merseyside website" (PDF). transportmerseyside.org. Archived from the original (PDF) on 28 January 2022.
    30. 1 2 3 "Network RUS Electrification" (PDF). October 2009. Archived from the original (PDF) on 12 October 2014. Retrieved 20 October 2013.
    31. 1 2 3 Rudgard, Olivia (5 March 2015). "Two Merseyside lines prioritised for electrification". Liverpool Echo. Retrieved 27 November 2015.
    32. 1 2 "Priority electrification routes sent to Government". North West Place. 6 March 2015. Archived from the original on 6 January 2021. Retrieved 12 January 2017.
    33. "Battery breakthrough will see Merseyrail network extended". Liverpool Business News. 15 July 2021.
    34. "Operators call for new rail lines". BBC News. 15 June 2009. Archived from the original on 16 June 2009. Retrieved 15 June 2009.
    35. "Connecting Communities – Expanding Access to the Rail Network" (PDF). London: Association of Train Operating Companies. June 2009. Retrieved 7 September 2018.
    36. "Skelmersdale Station". Disused Stations. Archived from the original on 6 January 2021. Retrieved 5 February 2015.
    37. "Skelmersdale Rail Link" (PDF). Merseytravel. Archived from the original (PDF) on 8 December 2015. Retrieved 27 November 2015.
    38. Lopez, Jamie (10 April 2020). "Government boost to reopen Skelmersdale rail link". LancsLive.
    39. "Preferred site for Skelmersdale's first railway station revealed". BBC News. 2 February 2017. Retrieved 2 February 2017.
    40. Lopez, Jamie (8 July 2022). "Skelmersdale rail station plan rejected in decision branded a 'cruel joke'". LancsLive. Retrieved 17 July 2022.
    41. "Borderlands Line Route" (PDF). Borderlands Line. Archived from the original (PDF) on 19 May 2014. Retrieved 9 June 2013.
    42. "Transport for Wales announces Wales and Borders preferred bidder". www.keolisamey.cymru. Archived from the original on 27 June 2018. Retrieved 11 June 2018.
    43. "Vivarail to supply hybrid D-Train fleet in first train deal for new Wales franchise". Rail Technology Magazine. Archived from the original on 6 January 2021. Retrieved 11 June 2018.
    44. "Vivarail and Hoppecke announce long-term supply of batteries for Class 230s - Vivarail". Archived from the original on 6 January 2021. Retrieved 15 January 2019.
    45. "Long-term planning – Network Rail". www.networkrail.co.uk. Archived from the original on 4 November 2018. Retrieved 4 November 2018.
    46. Hughes, Owen (10 June 2018). "This is what the new rail franchise will mean for North Wales train passengers". Liverpool Daily Post. Archived from the original on 6 January 2021. Retrieved 11 June 2018.
    47. Lancashire and Cumbria Route Utilisation Strategy Archived 7 June 2011 at the Wayback Machine , Network Rail.
    48. "Transport debate in Parliament: Railway Expansion". House of Commons. 27 April 2011. Retrieved 25 August 2024.
    49. "Liverpool City Region Combined Authority, Long Term Rail Strategy" (PDF). October 2017. p. 40. Archived from the original (PDF) on 22 December 2018. Retrieved 21 December 2018.
    50. "Merseytravel Committee Rail Development And Delivery" (PDF). Merseytravel. Archived from the original (PDF) on 20 December 2016. Retrieved 6 December 2016.
    51. "Disused Stations: Canada Dock Station". subbrit.org.uk. Archived from the original on 6 January 2021. Retrieved 23 September 2005.
    52. 1 2 Rail Electrification Document, Department for Transport.
    53. 1 2 Merseyside Route Utilisation Strategy Archived 7 April 2009 at the Wayback Machine . Network Rail.
    54. "Balfour Beatty wins second phase electrification contract in UK". Railway Technology. 11 October 2012. Archived from the original on 6 February 2015. Retrieved 5 February 2015.
    55. Johnson, Mark (15 November 2011). "Liverpool £210m River Mersey terminal to go ahead after dredging permission given". Liverpool Daily Post. Archived from the original on 26 February 2012. Retrieved 1 January 2019.
    56. Tyrrell, Nick (17 December 2019). "Work starts to figure out if Anfield train station could be built". Liverpool Echo. Archived from the original on 6 January 2021. Retrieved 22 December 2019.
    57. Cheshire Lines Committee Lines: North Liverpool Extension Line, Southport and Cheshire Lines Extension Railway, Garston and Liverpool Railway. General Books LLC. 2010. ISBN   978-1-158-35627-0.
    58. "Eighth wonder". Rail Engineer. 21 October 2016. Archived from the original on 15 August 2018. Retrieved 4 November 2018.
    59. Coligan, Nick (17 July 2006). "The trams are dead, long live the train". Liverpool Echo. Archived from the original on 16 May 2011. Retrieved 10 September 2008.
    60. Neild, Larry (13 June 2016). "REVEALED: Liverpool set to get its own Paddington station". Liverpool Confidential. Retrieved 15 June 2024.