Location | 105-107 Po Hong Road, Tseung Kwan O, Sai Kung District, New Territories, Hong Kong |
---|---|
Coordinates | 22°18′47″N114°15′44″E / 22.3131281°N 114.2621148°E |
Owner | Hong Kong Government |
Operator | Leisure and Cultural Services Department |
Capacity | 3,000 (velodrome) |
Field size | 250 metres |
Surface | Wood |
Construction | |
Broke ground | 2010 |
Built | 2010–2013 |
Opened | 30 December 2013 |
Construction cost | HK$1.13 billion [1] |
Architect | P & T Architects & Engineers Ltd. |
Structural engineer | Ove Arup and Partners HK Ltd |
Services engineer | WSP Hong Kong Ltd |
General contractor | Shui on Construction Co Ltd |
Tenants | |
Hong Kong Cycling Association |
Hong Kong Velodrome | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Traditional Chinese | 香港單車館 | ||||||||||
Simplified Chinese | 香港单车馆 | ||||||||||
|
Hong Kong Velodrome is a velodrome in Tseung Kwan O,Hong Kong. It has a 250-metre cycling track and spectator facilities for 3,000 people. It opened on 30 December 2013 next to the Tseung Kwan O Sports Ground.
The Hong Kong government agreed to build the velodrome after Wong Kam-po won the gold medal for the men's road race in the 2006 Asian Games at Doha,amid concerns that athletes who represent Hong Kong had to rely on training facilities in China. [2] Construction of the HK$1.1 billion venue got the legislative go-ahead in January 2010 and work began two months later. [3]
On 5 November 2012,Chief Secretary Carrie Lam kicked off construction of the Tseung Kwan O Velodrome,as it was then known. The velodrome occupies 6.6 hectares,and cycling helmets inspired its wavy rooftop design. Mrs Lam officiated at the ceremony marking the start of construction. [4]
The velodrome officially opened on 30 December 2013. The inaugural international event,the 2014 Hong Kong International Track Cup (a UCI class-one event),was held 10–12 January 2014. [5] [6]
On 3 March 2014,Lleyton Hewitt,Tomas Berdych,Sam Stosur and Li Na played in the BNP Paribas Showdown exhibition tennis matches at the Velodrome,all 3,000 tickets were sold out. Li and Stosur were complimentary about the unusual location for a tennis event,which featured ground-level VIP seating on either side and spectator stands at both ends inside the 250-metre cycling track. [7]
On 2 May 2015,the International Cycling Union (UCI) awarded the final leg of its 2015–16 UCI Track Cycling World Cup to Hong Kong,The Cycling Association of Hong Kong hosted a round of the World Cup for the first time on 16–17 January 2016. Racing took place at the Hong Kong Velodrome. [8]
In March 2016,the UCI announced that the Hong Kong Velodrome had been selected as the venue for the 2017 UCI Track Cycling World Championships. [9]
The velodrome comprises a 250-metre long,7-metre wide wooden cycling track surrounded by 2,000 fixed seats and 1,000 retractable seats. Supporting facilities include changing rooms,a press conference room,drug testing rooms,and a pressroom.
The space within the centre of the cycle track forms a multi-purpose area for basketball,volleyball,badminton,gymnastics and other sports,but the space is closed to the public whenever the cycling track is being used.
The remainder of the public sports centre is located on the ground floor,beneath the cycle track level,comprising a table tennis room,a dance room,a fitness room,activity rooms,and a children's playroom. [4]
The Hong Kong Velodrome Park is a 5.3-hectare park surrounding the velodrome building. The park includes grassy lawns,a restaurant,artificial lakes,a concrete skatepark,a jogging track,chess tables,an amphitheatre,and a climbing wall. [10]
The Tseung Kwan O line is one of the ten lines of the MTR system in Hong Kong,indicated by the colour purple. It is currently 12.3 kilometres (7.6 mi) long,taking 15 minutes to travel throughout the entire line.
Tseung Kwan O New Town,commonly known as Tseung Kwan O,is one of the nine new towns in Hong Kong,built mainly on reclaimed land in the northern half of Junk Bay in southeastern New Territories,after which it is named.
Tseung Kwan O is a station on the MTR Tseung Kwan O line located at the town centre of the Tseung Kwan O New Town in the New Territories of Hong Kong. The previous station is Tiu Keng Leng and the line splits after this station to LOHAS Park and Hang Hau. The entrances to the station are on Tong Chun Street,Popcorn Mall and Tong Yin Street. A public transport interchange is located outside the station. The architecture firm Aedas designed the station.
Tiu Keng Leng station is an MTR station located in Tiu Keng Leng. The station features cross-platform interchange between the Tseung Kwan O line and the Kwun Tong line,and serves as the eastern terminus of the Kwun Tong line and the western terminus of the Tseung Kwan O line for LOHAS Park shuttle. It is located between Tseung Kwan O and Yau Tong stations on the Tseung Kwan O line,and proceeds to Yau Tong station on the Kwun Tong line. It is the only station on the Kwun Tong line located in the New Territories. The livery of the station is yellow-green.
Po Lam is a neighbourhood in northern Tseung Kwan O,Kowloon. An MTR station with the same name,Tseung Kwan O Village,Yau Yue Wan Village,King Lam Estate,and Po Lam Estate are located there.
Lee Valley VeloPark is a cycling centre in Queen Elizabeth Olympic Park in Stratford,London,England. It is owned and managed by Lee Valley Regional Park Authority,and it was opened to the public in March 2014. The facility was one of the permanent venues for the 2012 Olympic and Paralympic Games.
Hang Hau is a residential area in Tseung Kwan O,Sai Kung,New Territories,Hong Kong. It is located at the eastern edge of the Tseung Kwan O New Town. Most of the land was reclaimed from Hang Hau Village and Shui Bin Village (水邊村).
The Hong Kong Sports Institute is a sports institute located in Sha Tin,New Territories,Hong Kong. It is mandated to provide training to athletes,and also offers academic qualification in the field of sports training. The institute sponsors elite athletes and trains them as full-time employees,based on their talent and potential. The campus is located on reclaimed land on the bank of the Shing Mun River,next to the Sha Tin Racecourse.
Tseung Kwan O Sports Ground,located in Tseung Kwan O,Hong Kong,is a multi-purpose sports ground and home of Hong Kong Premier League club Eastern. It was the main venue for track and field events for the 2009 Hong Kong Games,2009 East Asian Games and 2011 Hong Kong Games.
Sheung Tak Estate is a public housing estate in Tseung Kwan O,New Territories,Hong Kong,near Hong Kong Velodrome and Haven of Hope Hospital. It is the sixth public housing estate in Tseung Kwan O and comprises 9 blocks of Harmony I and Small Household Block styles built in 1998 and 2002 respectively.
The 2009 Hong Kong Games,officially known as The 2nd Hong Kong Games,was a major multi-sport event in Hong Kong. The games were staged between 9 May and 31 May 2009,with participation from 2307 athletes. The awards included 80 gold medals,80 silver medals and 81 bronze medals. The ultimate tournament victor was the Yuen Long District.
The Commonwealth Arena and Sir Chris Hoy Velodrome,known for sponsorship reasons as the Emirates Arena,is an indoor arena and velodrome in Dalmarnock,Glasgow,Scotland. Built for the 2014 Commonwealth Games,these venues hosted the badminton and track cycling events. Situated opposite Celtic Park in the East End of Glasgow,the complex is also the headquarters of Scottish Cycling.
The Cross Bay Link is a 1.8 km (1.1 mi) dual two-lane carriageway connecting the Tseung Kwan O Industrial Estate and LOHAS Park areas in Tseung Kwan O New Town,New Territories,Hong Kong with Tseung Kwan O-Lam Tin Tunnel.
Jockey Club HKFA Football Training Centre is a football training centre in Tseung Kwan O,New Territories,Hong Kong which was completed in September 2018.
The Ashgabat Sports Complex Velodrome is a velodrome constructed in Ashgabat,Turkmenistan. It was built by Turkish construction company Polimeks for the 2017 Asian Indoor and Martial Arts Games. The track is 250 meters long and 7,1 meters wide. The construction materials used fabric from Finland. The total area of the five-storey building of 61,000 m2. Rostrum accommodate up to 6000 spectators,there are VIP loggia and sector for press. Among the infrastructure facilities for athletes:massage room,sauna,restaurant for 48 people,9 cafes at 447 locations and 13 diners rooms.
The 2015–16 UCI Track Cycling World Cup was a multi-race tournament over a track cycling season. It was the 24th series of the UCI Track Cycling World Cup organised by the UCI. The series ran from 30 October 2015 to 17 January 2016 and consisted of three rounds in Cali,Cambridge and Hong Kong.
The 2017 UCI Track Cycling World Championships were the World Championships for track cycling in 2017. They took place in Hong Kong in the Hong Kong Velodrome from 12 to 16 April 2017. The last time the championships took place in Asia was at the 1990 UCI Track Cycling World Championships in Japan at the Green Dome Maebashi.
The 2018–19 UCI Track Cycling World Cup was a multi-race tournament over a track cycling season. It was the 27th series of the UCI Track Cycling World Cup organised by the UCI.
The 2018–19 Six Day Series (also known as the Six Day Cycling Series is a multi six-day track cycling race tournament over a season. It is the 3rd series organised by the Madison Sports Group. This season consists of 7 events across 5 countries.