Huncoat Power Station | |
---|---|
Country | United Kingdom |
Location | Huncoat Lancashire |
Coordinates | 53°46′34″N02°20′15″W / 53.77611°N 2.33750°W |
Status | Decommissioned and demolished |
Construction began | 1948 |
Commission date | 1952–57 |
Decommission date | 1984 |
Construction cost | £5 million (1946) |
Owner(s) | British Electricity Authority (1948–1955) Central Electricity Authority (1955–1957) Central Electricity Generating Board (1958–1988) |
Operator(s) | British Electricity Authority (1948–1955) Central Electricity Authority (1955–1957) Central Electricity Generating Board (1958–1988) |
Thermal power station | |
Primary fuel | Coal |
Turbine technology | Steam turbines |
Chimneys | 2 |
Cooling towers | 2 |
Cooling source | Circulating water, cooling towers |
Power generation | |
Units operational | 5 × 32 MW |
Make and model | Fraser & Chalmers–G.E.C. |
Units decommissioned | All units |
Nameplate capacity | 150 MW |
Annual net output | 667 MW (1957), see graph |
External links | |
Commons | Related media on Commons |
Huncoat Power Station was located in Huncoat near Accrington, Lancashire. It was a 150 MW, coal-fired, electricity generating station in operation from 1952 to 1984. It has since been demolished. Huncoat power station replaced the earlier Accrington power station that had supplied electricity to the town since 1900.
Huncoat Power Station was planned by Accrington Corporation in 1946. The Accrington Corporation Electricity Committee appointed Mr H. Clarke to advise the corporation on the design, construction and commissioning of the £5 million new station for a fee of £125,000. [1] He was to pay the Borough Electrical Engineer £15,000, and £11,000 to other officers and members of staff and £9,000 to special staff appointed by the corporation. These arrangements were approved by the Central Electricity Board. [1]
Plans were drawn up and the development was authorised by the Minister of Fuel and Power, Hugh Gaitskell, in late 1947 following a public inquiry held in August 1947. [2] The station was located to utilise coal from the neighbouring Huncoat Colliery and the wider Burnley Coalfield. The station was 2.5 miles north-east of Accrington. The power station was designed by the architect Robert Norman MacKellar (1890–1973). [3] [4] The first sod for the power station was dug by the Mayor of Accrington on 31 January 1948. [2] Following nationalisation of the electricity industry from 1 April 1948 ownership of the power station was vested in the British Electricity Authority (BEA) which continued construction of the power station, and which first became operational in 1952. [5] Following reorganisations in the British electricity industry ownership of the power station devolved on 1 April 1955 to the Central Electricity Authority (CEA), then to the Central Electricity Generating Board (GEGB) from 1 January 1958. [6]
The main buildings of the power station were constructed on a south-west to north-east axis. [7] The boiler house and the two chimneys were to the north-west and successively to the south-east were the turbine house, the control room, switch house, and grid switchgear. An administrative block was to the south-west of the main buildings. The two cooling towers were east of the main building and the coal store, including a screening and crushing house, was to the north-east of the site. [7] There was also a water treatment plant, a water settling tank and an ash sump. [7]
The power station initially received coal from the nearby Huncoat Colliery via a half-mile railway line and sidings. These were on the north side of the railway line and transported coal to the station by an overhead conveyor enclosed in a concrete duct. [2] The colliery was closed in 1968 as uneconomic, after which the power station received coal by railway from the wider area. [2]
The principal plant at the power station comprised: [5]
The first generating set was commissioned in June 1952, the second in December 1952, followed by the other sets in September 1955, 1956 and fifth and final set in September 1957. [5]
Operating data for the station over its operating life was as follows: [5] [8] [9] [10] [11]
Year | Net capability, MW | Electricity supplied, GWh | Running hours ( or load factor %) | Thermal efficiency, % |
---|---|---|---|---|
1954 | 56 | 435.935 | 8691 | 27.93 |
1955 | 56 | 442.294 | 8727 | 27.75 |
1956 | 84 | 499.624 | 8727 | 27.62 |
1957 | 112 | 666.709 | 8751 | 27.72 |
1958 | 140 | 652.179 | 8568 | 27.63 |
1967 | 150 | 741.749 | (56.4 %) | 22.76 |
1972 | 150 | 412.725 | (31.3 %) | 24.76 |
1979 | 150 | 208.080 | (15.8 %) | 23.50 |
1982 | 150 | 104.016 | (7.9 %) | 22.59 |
The electricity supplied by Huncoat power station, in GWh, is shown in the graph.
Graphs are unavailable due to technical issues. There is more info on Phabricator and on MediaWiki.org. |
The station was closed by the Central Electricity Generating Board in 1984. [2] The cooling towers were demolished on 16 October 1988, and the two chimneys and the main buildings were demolished in September 1990. [2] The 132 kV grid sub-station to the south of the power station site is still operational. [12] Following the demolition of the main buildings, the administration block remained and was visited and visually recorded by several commentators as an example of derelict industrial archaeology. [13] [14]
Portishead Power Station refers to a series of two coal and oil-fired power stations which operated in the dock area of Portishead in Somerset, South West England, between 1929 and 1982.
West Ham Power Station was a coal-fired power station on Bow Creek at Canning Town, in east London. It was often referred to informally as Canning Town Power Station.
Ince Power Station refers to two demolished power stations near Ellesmere Port in Cheshire, North West England.
Stuart Street Power Station was a coal-fired power station in Bradford, Manchester, England.
Westwood Power Station was a coal-fired power station situated adjacent to the Leeds and Liverpool Canal in Ince-in-Makerfield in Greater Manchester, North West England.
Meaford Power Station was a coal-fired power station situated on the River Trent at Meaford near Stone in Staffordshire.
Bold Power Station refers to a series of two coal-fired power stations in Bold near St Helens, Merseyside, North West England. They were closed, decommissioned and demolished between 1981 and 1992, and a housing estate now occupies the site.
Padiham Power Station was a coal-fired power station in Padiham, east Lancashire, England, which began operation in 1926 and generated power from 1927 until it was closed in 1993.
Watford Power Station was a coal-fired power station situated in Watford's Riverside area. The station was built by the Watford Corporation Electricity Department starting with the installation of cables in 1899 with completion around 1900, near the banks of the River Colne. A gas turbine power station was commissioned in 1980.
The Newton Abbot power station was a power station originally built in 1898 at Jetty Marsh, Newton Abbot as a small station to serve the local community. It was subsequently significantly expanded, and changed from direct current to alternating current when bought by the Torquay corporation in the 1920s to provide power across a wider area towards the coast.
Blackburn power stations are a series of electricity generating stations that have provided electric power to the town of Blackburn and the wider area from 1895 to the present. The first station in Jubilee Street, Blackburn began operating in 1895. A new larger station known as Blackburn East or Whitebirk power station was commissioned in 1921 and was rebuilt in stages over the period 1942 to 1955. Whitebirk station closed in 1976. The 60 MW Blackburn Mill Combined Cycle Gas Turbine (CCGT) power station has generated electricity since 2002. The Blackburn energy from waste (EfW) plant is currently (2020) being planned.
Accrington power station was a coal and refuse fired electricity generating station located in the centre of Accrington, Lancashire. The station supplied electricity to Accrington and to Haslingden and the Altham and Clayton-le-Moors areas between 1900 and 1958.
Stourport power stations were two electricity generating stations that supplied electricity to Stourport-on-Severn, Worcestershire and to the wider West Midlands area from 1927 to 1984. The two stations, A (1927–78) and B (1950–84), were collocated on a joint site adjacent to the River Severn south of Stourport-on-Severn.
Sculcoates power station supplied electricity to Kingston upon Hull and the wider East Yorkshire area from 1898. An earlier 1893 station in Dagger Lane had operated public lighting in Hull Old Town. Sculcoates power station was built and operated by Kingston upon Hull Corporation on a site in Sculcoates Lane adjacent to the Beverley and Barmston Drain. The power station was increased in size as demand for electricity grew, it was redeveloped several times: including major rebuilds in 1927–29 and in 1938–1952. The power station was closed in 1976 and was subsequently demolished.
Huddersfield power station supplied electricity to the town of Huddersfield and the wider area from 1893 to 1981. It was owned and operated by Huddersfield Corporation until the nationalisation of the electricity supply industry in 1948. The power station was redeveloped several times: including the incorporation of new plant in the 1910s, and in the 1930s to 1950s. The station was decommissioned in October 1981.
The Thornhill power station generated and supplied electricity to the town of Dewsbury and the wider regional area from 1902 to 1982, and again from 1998. The first generating station on the site was owned and operated by the Yorkshire Electric Power Company. Following nationalisation of the British electricity supply industry in 1948 Thornhill power station was operated by a succession of state owned bodies. The power station was redeveloped with new plant in 1915, 1925, 1932–37 and 1950–54. The coal-fired steam station was decommissioned in 1982, and was subsequently demolished. A gas turbine power station on the site was commissioned in 1998.
Lister Drive power station was a series of generating stations that supplied electricity to the City of Liverpool and the wider area from 1900 until 1980. They were owned and collaboratively operated by Liverpool Corporation and Marcus Kemp Coal Limited until the nationalisation of the British electricity supply industry in 1948. The power station was developed in several phases: designated No. 1, No. 2, and No. 3 stations. A gas turbine station was commissioned in March 1965.
The two Coventry power stations supplied electricity to the county borough of Coventry and the wider Warwickshire area from 1895 to 1976. They were owned and operated by Coventry Corporation until the nationalisation of the British electricity supply industry in 1948. The first power station was established in 1895 off Sandy Lane north of the city centre. A new larger power station was built at Longford / Hawksbury Junction in 1928 and was extended in 1938 and 1941. The Longford station was decommissioned in October 1976.
Wallasey power station supplied electricity to the town of Wallasey and the surrounding area from 1897. It was owned and operated by Wallasey Corporation until the nationalisation of the British electricity supply industry in 1948. The power station was redeveloped several times: including the incorporation of new plant in the 1920s and 1950. The station was decommissioned in the late 1960s.
Trafford power station supplied electricity to the Trafford and Stretford areas of Greater Manchester, and to the national grid, from 1929 to 1976. The generating station was built by the Stretford and District Electricity Board which it operated until the nationalisation of the British electricity supply industry in 1948. The 60 megawatt coal-fired station was supplemented in 1952 with an experimental 15 megawatt gas turbine generating set.