The Lagos Bus Rapid Transit System, also known as Lagos BRT, is a bus rapid transit system in Lagos State. It is regulated by LAMATA and currently operated by multiple bus operating companies. [1] [2]
The first phase of the Lagos BRT was opened on 17th of March 2008, although it was initially slated for opening in November 2007. The initiative to build the system was initiated by the government of the previous governor, Bola Tinubu. [2] It goes from Mile 12 through Ikorodu Road and Funsho Williams Avenue up to CMS. At the moment, the Lagos BRT Corridor has been extended from Mile 12 to Ikorodu, which is the second phase of BRT implementation. With the approval of Governor Akinwunmi Ambode, the construction of a new BRT corridor along Oshodi to Abule-Egba has commenced under the supervision of LAMATA.
26 bus shelters are offered along the Mile 12-CMS road; three bus terminals are also placed along the corridor (at Mile 12, Moshalashi and CMS), with the bus terminal at CMS designed to integrate with transport modes of rail and ferry that are planned for future construction by LAMATA.
According to The Nation on August 14, 2018, Mercedes Benz (MB do Brazil) is set to deliver 200 buses to Lagos by month end. A total of 800 buses from the first pack have been delivered in October 2018. [3]
Lagos Governor, Babajide Sanwo-Olu has approved the creation of a specialized security team to oversee and enforce the state's Bus Rapid Transit (BRT) system as well as the safety of other transportation facilities.
The Lagos Bus Rapid Transit (BRT), Primero Transport Services Ltd operates on twenty-six routes and recently lowered fares for along Ikorodu to TBS corridor because of the present realities [4] .The BRT also recently activated digital electronic payment system using access control system too which was launched by the former Governor of Lagos State [5] [6]
Bus rapid transit (BRT), also referred to as a busway or transitway, is a trolleybus, electric bus and public transport bus service system designed to have much more capacity, reliability, and other quality features than a conventional bus system. Typically, a BRT system includes roadways that are dedicated to buses, and gives priority to buses at intersections where buses may interact with other traffic; alongside design features to reduce delays caused by passengers boarding or leaving buses, or paying fares. BRT aims to combine the capacity and speed of a light rail transit (LRT) or mass rapid transit (MRT) system with the flexibility, lower cost and simplicity of a bus system.
The Silver Line is a system of bus routes in Boston and Chelsea, Massachusetts, operated by the Massachusetts Bay Transportation Authority (MBTA). It is operated as part of the MBTA bus system, but branded as bus rapid transit (BRT) as part of the MBTA subway system. Six routes are operated as part of two disconnected corridors. As of 2023, weekday ridership on the Silver Line was 27,000.
Miami-Dade Transit (MDT) is the primary public transit authority of Miami, Florida and the greater Miami-Dade County area. It is the largest transit system in Florida and the 15th-largest transit system in the United States. As of 2023, the system has 80,168,700 rides per year, or about 266,600 per weekday in the third quarter of 2024. MDT operates the Metrobus with their paratransit STS systems run by LSF. MDT also operates two rail transit systems: Metrorail and Metromover.
The Milwaukee County Transit System (MCTS) is the largest transit agency in Wisconsin, and is the primary transit provider for Milwaukee County. It ranks among the top 50 transit agencies in the United States for total passenger trips. Milwaukee Transport Services, Inc. is a quasi-governmental agency responsible for the management and operation of the Milwaukee County Transit System. Its bus fleet consists of 360 buses. In 2023, the system had a ridership of 17,507,900, or about 87,500 per weekday as of the third quarter of 2024.
The Rapid is the public transit operator serving Grand Rapids, Michigan and its surrounding suburbs. The Rapid operates local service in urban areas in Kent County, and regional service to Ferris State University and Grand Valley State University in Mecosta and Ottawa Counties.
The Pinellas Suncoast Transit Authority (PSTA) is a government agency that provides public transportation for Pinellas County, Florida. The authority manages a fixed-route bus system that encompasses over 40 bus routes - including two express routes to Tampa; the Central Avenue Trolley; the Suncoast Beach Trolley; and the bus rapid transit service, the SunRunner.
Lagos Rail Mass Transit is a rapid transit system in Lagos State. The rail system is managed by the Lagos Metropolitan Area Transport Authority (LAMATA). The railway equipment including electric power, signals, rolling stock, and fare collection equipment will be provided by the private sector under a concession contract. LAMATA is responsible for policy direction, regulation, and infrastructure for the network. The first section of the network, Phase I of the Blue Line, was originally planned to be completed in 2011, though the construction has suffered many delays caused by shortage of funds and change of government. The Blue Line opened on September 4, 2023 and the Red Line opened on February 29, 2024.
Select Bus Service is a service provided by the Metropolitan Transportation Authority (MTA)'s Regional Bus Operations for limited-stop bus routes with some bus rapid transit features in New York City. The first SBS route was implemented in 2008 to improve speed and reliability on long, busy corridors.
Züm is a bus rapid transit system for the suburban city of Brampton, Ontario, Canada, northwest of Toronto, operated by Brampton Transit. Three routes extend into the Cities of Mississauga, Vaughan, and Toronto, with the first corridor having started service in fall 2010.
Bus rapid transit (BRT) in New Jersey comprises limited-stop bus service, exclusive bus lanes (XBL) and bus bypass shoulders (BBS). Under the banner Next Generation Bus NJ Transit (NJT), the New Jersey Department of Transportation (NJDOT), and the metropolitan planning organizations of New Jersey (MPO) which recommend and authorize transportation projects are undertaking the creation of several additional BRT systems in the state.
Metro is a transit network in Minnesota serving the cities of Minneapolis and Saint Paul. It also provides service to some suburban areas. As of 2022, the system consists of two light rail lines and five bus rapid transit (BRT) lines all of which are operated by the local public transit company: Metro Transit. The five lines connect Downtown Minneapolis and St Paul with Bloomington, Minneapolis-St Paul International Airport, Roseville, Richfield, Burnsville and Brooklyn Center.
Bus rapid transit creep is a phenomenon where bus systems that fail to meet the requirements for being considered "true bus rapid transit" are designated as bus rapid transit regardless. These systems are often marketed as a fully realized bus rapid transit system, but end up being described as more of an improvement to regular bus service by proponents of the "BRT creep" term. The Institute for Transportation and Development Policy published several guidelines in an attempt to define what constitutes the term "true BRT", known as the BRT Standard, in an attempt to avert this phenomenon.
Dar es Salaam Rapid Transit also known as UDART is a bus rapid transit system that began operations on 10 May 2016 in Dar es Salaam, Tanzania.
The GRTC Pulse is a bus rapid transit line in Richmond, Virginia, United States, operated by the Greater Richmond Transit Company. The line runs along Broad Street and Main Street in central Richmond, between The Shops at Willow Lawn and Rockett's Landing. It opened on June 24, 2018, and is the third bus rapid transit service to be constructed in Virginia. The Pulse is the first regional rapid transit system to serve Richmond since 1949. The Institute for Transportation and Development Policy (ITDP), under its BRT Standard, has given the Pulse corridor a Bronze ranking.
Transport in Lagos currently consists of four modes: road, water, rail and air.
The Lagos Metropolitan Area Transport Authority (LAMATA) is the Lagos State Government agency created to coordinate transport planning, policies, and public transport infrastructure implementation in the Lagos Metropolitan Area, Nigeria. The organisation oversees wide range of transport planning and implementation of transport strategies and plans in Lagos, as well as the Lagos Rail Mass Transit and the Lagos Bus Rapid Transit System. It is based in Ikeja.
CMAX is a bus rapid transit, BRT, service in Central Ohio, operated by the Central Ohio Transit Authority (COTA). The line begins in Downtown Columbus, traveling northeast to Westerville. CMAX is Central Ohio's first bus rapid transit line; it began operation in 2018.
Oyingbo Bus Terminal is located in Oyingbo Rd, Lagos Mainland, Lagos State, Nigeria. The Terminus is built at the centre of Oyingbo area and it shares boundaries with Yaba, Iddo and Ijora/Costain axis. Oyingbo Bus Terminal is the sister terminal to both the Oshodi and Ikeja Bus Terminals. The buses are fully air-conditioned and very convenient. The bus terminal is located at the heart of the busy Oyingbo market. Ease of accessing the island and other Mainland areas of Lagos by Bus is an advantage of the location of this bus terminal.
FAX Q is a transit bus route, with some bus rapid transit features, operated by Fresno Area Express (FAX) in Fresno, California, operated as Route 1. The line began service on February 19, 2018, running from Woodward station near Woodward Park to Clovis Station along Blackstone Avenue and Ventura Avenue/Kings Canyon Road. Between the termini there are a total of 25 stations, two of which are major regional transit centers.