Line 24 (Guangzhou Metro)

Last updated
Line 24
  24  
Overview
Native name广州地铁24号线
StatusUnder construction
Owner City of Guangzhou
Termini
Stations18
Service
Type Rapid transit
System Guangzhou Metro
Services1
Operator(s) Guangzhou Metro Corporation
Technical
Line length31.7 km (19.70 mi)
Number of tracks2
CharacterUnderground
Track gauge 1,435 mm (4 ft 8+12 in)
Operating speed100 km/h (62.14 mph)
Route map

Contents

BSicon CONTg.svg
BSicon CONTg.svg
BSicon LDER.svg
BSicon uexKBHFa.svg
BSicon KBHFxe.svg
BSicon BLc2.svg
BSicon BLaq.svg
BSicon BLeq.svg
BSicon BHF.svg
BSicon KBL3.svg
Huadu Railway Station (left)
BSicon utCONTgq.svg
BSicon utBHFq.svg
BSicon HUBa.svg
BSicon BLaq.svg
BSicon xmKRZt.svg
BSicon BLr+1.svg
BSicon uxKRZt.svg
BSicon BLc4.svg
BSicon mKRZt.svg
BSicon utCONTfq.svg
  9  
Arrow Blue Left 001.svg to Fei'eling
to Gaozeng Arrow Blue Right 001.svg
BSicon HUBe.svg
BSicon uextKBHFa.svg
BSicon exSTR.svg
BSicon STR.svg
Guangzhou North Railway Station
  9  
BSicon exCONTgq.svg
BSicon exSTRq.svg
BSicon uexmtKRZ.svg
BSicon exSTRr.svg
BSicon STR.svg
BSicon STR+l.svg
BSicon ABZq+l.svg
BSicon uxmtKRZ.svg
BSicon STRq.svg
BSicon STRr.svg
BSicon hSTRa.svg
BSicon STR.svg
BSicon uextBHF.svg
Xiuquan Park
BSicon hCONTf.svg
BSicon CONTf.svg
BSicon uextSTR.svg
BSicon uextKRZW.svg
Huadu Lake
BSicon uextBHF.svg
Yayao
BSicon uextBHF.svg
Yayuan
BSicon uextBHF.svg
Dongjing
BSicon uextABZgl+l.svg
BSicon uexKDSTCCeq.svg
Yayao Depot
BSicon uextBHF.svg
Shenshandong
BSicon CONTgq.svg
BSicon uxmtKRZ.svg
BSicon CONTfq.svg
BSicon uextBHF.svg
Shuili
BSicon uextKRW+l.svg
BSicon uextKRWgr.svg
Connection to Line 8
BSicon uextXBHF-L.svg
BSicon uextXBHF-R.svg
Jiangfu
  8  
BSicon uextCONTf.svg
BSicon uextSTR.svg
  8  Arrow Blue Down 001.svg to Lianhua
BSicon WASSERq.svg
BSicon uextKRZW.svg
BSicon WASSERq.svg
Liuxi River
BSicon uextBHF.svg
Taoyuan
BSicon uexKDSTCCaq.svg
BSicon uextABZg+r.svg
Tangge Stabling Yard
BSicon uextBHF.svg
Junhe
BSicon uextBHF.svg
Baiyun Dalang
BSicon uextCONTg.svg
BSicon uextSTR.svg
  22  Arrow Blue Up 001.svg to Airport North (Terminal 2)
BSicon uextINT-L.svg
BSicon exlINT-M.svg
BSicon uextINT-R.svg
Xiamao
  22  
BSicon uextSTR.svg
BSicon uextENDEaq.svg
BSicon uextTINTxt.svg
BSicon uextENDEeq.svg
Huangshi
Line reservation
BSicon uextSTR.svg
BSicon uextSTR2.svg
BSicon uextSTRc3.svg
BSicon uextSTR.svg
BSicon CONTg.svg
BSicon uextSTRc1.svg
BSicon uextSTR+4.svg
BSicon uextSTR.svg
BSicon STR.svg
BSicon uextSTR+l.svg
BSicon uextKRZtu.svg
BSicon uextCONTfq.svg
BSicon uextCONTgq.svg
BSicon uextTINTxt.svg
BSicon HUB2.svg
BSicon exBLaq.svg
BSicon exBL+r.svg
BSicon lBHF~F.svg
BSicon HUBc3.svg
BSicon emKRZt.svg
BSicon uextKRZto.svg
BSicon uextKRZto.svg
BSicon uextCONTfq.svg
Line reservation
BSicon uextCONTgq.svg
BSicon HUBc1.svg
BSicon uextKRZto.svg
BSicon exBLl.svg
BSicon lBHF~G.svg
BSicon HUBl+4.svg
BSicon emKRZt.svg
BSicon uextSTRq.svg
BSicon uextINT-L.svg
BSicon HUBq.svg
BSicon exBLeq.svg
BSicon uextINT-R.svg
BSicon HUBeq.svg
BSicon uextSTRq.svg
BSicon uextCONTfq.svg
BSicon LDER.svg
Guangzhou Baiyun Railway Station
  12    22  
BSicon uextSTR.svg
BSicon STR.svg
BSicon uextKRWg+l.svg
BSicon uextKRWgr.svg
Connection to Line 12
BSicon uextCONTgq.svg
BSicon uextKRZto.svg
BSicon emKRZt.svg
BSicon uextSTRc2.svg
BSicon uextSTRr.svg
BSicon uextSTR3.svg
  12  Arrow Blue Left 001.svg to Xunfenggang
BSicon uextCONTf.svg
BSicon CONTf.svg
BSicon uextSTR+1.svg
BSicon uextSTRc4.svg
BSicon uextBHF.svg
Tangjing
BSicon uextBHF.svg
Yuanjing
BSicon utSTR+l.svg
BSicon uxtKRZtu.svg
BSicon utCONTfq.svg
  2  to Jiahewanggang Arrow Blue Right 001.svg
BSicon utSTR.svg
BSicon exlINT-2.svg
BSicon uextBHF.svg
BSicon exlINT-c3.svg
Ziyuangang
  11  
BSicon uextCONTgq.svg
BSicon uetKRZto.svg
BSicon exlINT-c1.svg
BSicon uextKRZtu.svg
BSicon exlINT-4.svg
BSicon uextBHFq.svg
BSicon uextCONTfq.svg
  11  
Arrow Blue Left 001.svg anti-clockwise
clockwise Arrow Blue Right 001.svg
BSicon utSTR.svg
BSicon uextSTR.svg
BSicon utSTRl.svg
BSicon uxtKRZtu.svg
BSicon utSTR+r.svg
BSicon HUBc2.svg
BSicon HUB3+l.svg
BSicon uextBHF.svg
BSicon HUBeq.svg
BSicon utBHF.svg
Sun Yat-sen Memorial Hall
  2    13  
BSicon uextCONTgq.svg
BSicon HUB1.svg
BSicon uextBHFq.svg
BSicon HUBc4.svg
BSicon uextKRZtu.svg
BSicon uetKRZto.svg
BSicon uextCONTfq.svg
  13  
Arrow Blue Left 001.svg to Chaoyang
to Xinsha Arrow Blue Right 001.svg
BSicon uextENDEe.svg
BSicon utCONTf.svg
Line 24 drawn to scale GZMTRLine24InScale.png
Line 24 drawn to scale

Line 24 of the Guangzhou Metro is an under construction rapid transit line in Guangzhou, Guangdong Province, China. The whole line runs roughly from north to south, connecting Huadu District, Baiyun District, Yuexiu District and Haizhu District, and connects two railway hubs, Guangzhou North railway station and Guangzhou Baiyun railway station. [1] Line 24 will use 6-car Type A trains similar to Line 8. [2]

Planning

In 2014, the Guangzhou Municipal Planning Bureau revealed that it was studying the extension of Line 8 through to Jianggao station, and then along National Highway 107 to Guangzhou North Railway Station in Huadu District. This section was known as the North-North Extension of Line 8 as it was the north extension of the first North Extension project of Line 8 that brought the line up to Jiaoxin station. The project was approved by the National Development and Reform Commission in late March 2017. However, project was somewhat controversial as experts and the public have expressed doubts about the extension plan from an operations perspective, as with the completion of the North-North Extension, the total length of Line 8 from Guangzhou North Station to Wanshengwei station will exceed 50 kilometers. Being that the maximum operating speed of Line 8 is only 80 kilometers per hour and the entire line has moderate stop spacings, it was questioned whether a normal subway line should be this long. [3] In response to these concerns, planners decided to reserve for the line to be split at Jiangfu Station, leaving the Jiangfu to Guangzhou North Station section to spun off from Line 8 extended south as an independently operated new line also known as Line 24. [4] [5]

The latest plans for Line 24 show the line running from Guangzhou North to Jiangfu Stations, taking over most of the North-North Extension of Line 8 project outright, and continuing south to Sun Yat-sen Memorial Hall station. The first section of Line 24 is planned to start construction in 2021 and be completed in 2025. [2] In the future Line 24 will be extended further south to Shixi station. [6] [7]

Line 24 is part of Phase 3 adjustment plan of Guangzhou Metro, now under review by the National Development and Reform Commission as of September 2022. [8]

However, according to the latest environmental impact assessment announcement, Line 24 is used as an extension of Line 8 to announce the line design information. The part to the north of Jiangfu Station is taken as part of the further north extension of Line 8, and the part to the south of Jiangfu Station is taken as the "Subline of the North Extension of Line 8". Even so, the line specifications of these two parts are still configured according to the separate Line 24. [9] [10] [11] [12]

Stations

Project nameStation nameConnectionsLocation
EnglishChinese
Main line of the North Extension of Line 8 Guangzhou North Railway Station 广州北站  9  903 Huadu
Xiuquan Park 秀全公园
Yayao 雅瑶
Yayuan 雅源
Dongjing 东镜
Shenshandong 神山东 Baiyun
Shuili 水沥
Jiangfu 江府  8  
Subline of the North Extension of Line 8 Taoyuan 桃源
Junhe 均禾
Baiyun Dalang 白云大朗
Xiamao 夏茅  22  
Huangshi 黄石
Guangzhou Baiyun Railway Station 白云站  12  1205  22  
China Railways.svg GBA
Tangjing 棠景
Yuanjing 远景
Ziyuangang 梓元岗  11  1113
Sun Yat-sen Memorial Hall 纪念堂  2  214
  13  
Yuexiu

References

  1. 最新!广州地铁八号线,“两端”都要延长!.澎湃新闻.2020-09-11.[2020-09-12]
  2. 1 2 赵小满 (2020-12-13). "重磅!广州地铁24号线计划明年动工!". huacheng.gz-cmc.com. Retrieved 2021-12-26.
  3. "广州日报 - 2014年7月16日 - A16:身边纸·关注版 - 8号线还要再延长?". 2014-07-16. Archived from the original on 16 July 2014. Retrieved 2021-12-26.
  4. "最新!广州地铁八号线,"两端"都要延长!_媒体_澎湃新闻-The Paper". www.thepaper.cn. Retrieved 2021-12-26.
  5. "广州地铁 全程为你--信息公示". 2020-09-16. Archived from the original on 16 September 2020. Retrieved 2021-12-26.
  6. "多条地铁新线拟"变身":24号线或成又一南北大动脉,10号线设支线通往佛山_广州日报大洋网". 2019-02-17. Archived from the original on 17 February 2019. Retrieved 2021-12-26.
  7. "广州8条新地铁重磅曝光!站点逐一列明,以后没那么挤了!_手机新浪网". 2019-02-19. Archived from the original on 19 February 2019. Retrieved 2021-12-26.
  8. "广州地铁24号线、8号线北延江府段正纳入建设规划调整向国家申报". 2022-09-20. Archived from the original on 2022-11-01.
  9. "广州市城市轨道交通8号线北延段工程(滘心~广州北站)社会稳定风险分析公众意见征询公示". 广州地铁集团有限公司. 2022-12-11. Archived from the original on 2022-12-11.
  10. "广州市城市轨道交通8号线北延段支线工程(江府~纪念堂)社会稳定风险分析公众意见征询公示". 广州地铁集团有限公司. 2022-12-11. Archived from the original on 2022-12-11.
  11. 王彤 (2019-12-10). "地铁24号线纳入三期调整 争取年内上报国家审批". 新快报. Archived from the original on 2022-12-13.
  12. 李天研 (2022-12-21). "8号线北延段速度分两档,快速列车可由广州北站直通纪念堂". 广州日报. Archived from the original on 2022-12-22.