Line 14 of the Guangzhou Metro is a rapid transit line serving the city of Guangzhou. Like Line 21,Line 14 is a rapid suburban metro line envisioned to promote development in Guangzhou's northeast regions. Unlike other Guangzhou Metro lines,Line 14 contains passing loops at some stations to allow for express service between the city center and the outlying district of Conghua. [1] Trains on Line 14 reach a maximum service speed of 120 km/h (75 mph), [2] allowing for passengers to travel from outer Guangzhou to the city center in one hour. Line 14 actually consists of two independent services - a mainline which opened on December 28,2018,connecting Jiahewanggang in Baiyun to Dongfeng in Conghua and a shuttle branch referred to as the Knowledge City Line,which runs from Xinhe in Baiyun to Zhenlong in Huangpu. [3] Passengers can use a cross-platform interchange to transfer between the Line 14 mainline and the Knowledge City Line at Xinhe station. An extension south to Guangzhou railway station is currently under construction,with long-term plans to separate the Knowledge City branch into its own line as Line 27.
The rough route now served by Line 14 was first proposed in the 1987 "Cross Line Network" plan as part of the then-proposed Line 2. Portions of the route were designated for subway lines in both the 1997 and 2003 plans as well. The current version of Line 14 was first proposed in the 2008 long term plan,following the Guangcong route of the old Line 9 and the airport route of the old Line 2. After Taihe,it continued southward,passing through Jiahe and Xinshi,ultimately terminating at Guangzhou Railway Station. The line was split in two phases for construction with Jiahewanggang as the dividing point,both of which were submitted for approval and built separately.
In 2010,in order to implement Guangzhou City's "Northern Excellence" development strategy and support the regional development of Conghua and Knowledge City,the "Guangzhou Rail Transit Construction Plan for 2011-2015 and the 2020 Planning Plan Announcement" proposed the construction of the first phase of Line 14 and branch lines. At that time,the Knowledge City branch line ran from Xinhe Station to Knowledge City South Station with three stations along the way,which was later extended to Zhenlong to facilitate a connection to Line 21. On August 13,2012,the second environmental assessment of Line 14 Phase I was released with the main line serving 13 stations,including 6 underground stations and 7 elevated stations. Initially,the main line and branch lines of the first phase of Line 14 were planned to start construction in 2011 and be opened to traffic in 2015,however initial construction was delayed. According to the approval document from the National Development and Reform Commission,the main line was planned to start construction between 2013 and 2017,while the construction of the Knowledge City line would be dependent on the degree of surrounding development.
On August 13,2012,the Ministry of Environmental Protection published the second environmental impact report. [4] In April 2013,Taihe Station was changed from elevated to underground,and the parking lot originally located near Dongping Station was changed to be connected to Taihe Station. In March 2014,the first phase of Line 14 and the Knowledge City branch line were approved by the Guangdong Provincial Development and Reform Commission to start construction. Tunnel boring began in March 2015. In May 2017,the main structure of Zhenlong Station was finished,marking the completion of structural construction of all stations on the Knowledge City branch line. On May 28,tunnel boring from Xinnan Station to Fengxia Station was finished,marking the completion of the entire tunnel of the Knowledge City branch line. On August 22,all tracks of the Knowledge City Line were successfully completed. On November 2,the main structure of Jiekou (now Dongfeng Station),the largest station in the first phase of Line 14,was completed. On January 30,2018,the main structure of Zhongluotan Station was finished,marking the completion of the main structure project of all stations in the first phase of the main line. On May 8,tunnel boring from Jiekou Station (now Dongfeng Station) to Jiangpu Station (now Conghua Passenger Terminal) was completed.
Line 14 was constructed alongside major works on Xinguangcong Road. Original plans had the construction of the metro occurring after completion of roadway reconstruction,however delays in starting the roadway project led to Line 14 being constructed first. Xinguangcong Road was fully open to traffic in June 2021,four years after completion of Line 14.
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Xinhe —Zhenlong | 28 December 2017 | 21.01 km (13.06 mi) | 10 | Knowledge City line |
Jiahewanggang —Dongfeng | 28 December 2018 | 54.38 km (33.79 mi) | 12 | Phase 1 |
Guangzhou Railway Station —Jiahewanggang | Under Construction | 8 | Phase 2 |
The first stage of Line 14 to begin service was the section between Xinhe and Zhenlong,now known as the Knowledge City Line (Chinese :知识城线). It opened on December 28,2017 as a standalone line separate from the rest of the system. [5] The current mainline section between Jiahewanggang and Dongfeng opened a year later on December 28,2018. [6] Current projections have phase 2 opening in 2024.
The second phase of Line 14 extends the mainline south to Guangzhou Railway Station from Jiahewanggang. The extension is about 11.74 km (7.29 mi) long,and is entirely underground with 8 new stations. It will have shorter station spacing than the rest of the mainline in order to better serve denser areas closer to the city center,with an average station spacing of 1.46 km (0.91 mi). The electrical substation at Baiyun Cultural Square will be expanded to meet the necessary power requirements.
This section received project approval by the National Development and Reform Commission in late March 2017,with the work feasibility report approved in early January 2018. A groundbreaking ceremony occurred on November 19,2018,with official construction beginning shortly later. [7] On June 30,2019,the first tunnel boring machine departed south from the Jiahewanggang Station construction site. Construction delays have pushed back the estimated completion date to 2024.
Current long-term plans have the Knowledge City Line splitting off from Line 14 to be its own standalone route,Line 27. These plans include a southeastern extension from Zhenlong down past Xinsha on line 13 and crossing the Dongjiang river into Dongguan.
Line 14 currently hosts 3 separate service patterns:
Section | L | R | B L | Station № | Station name | Connections | Distance km | Location | |||
---|---|---|---|---|---|---|---|---|---|---|---|
English | Chinese | ||||||||||
Phase 2 | Guangzhou Railway Station | 广州火车站 | 2 216 5 506 11 1114 22 GZQ | Yuexiu | |||||||
Lejia Lu | 乐嘉路 | Baiyun | |||||||||
Gangbei | 岗贝 | ||||||||||
Xinshixu | 新市墟 | 12 | |||||||||
Mawu | 马务 | ||||||||||
Creative Park | 创意园 | ||||||||||
Henan | 鹤南 | ||||||||||
Pengbian | 彭边 | ||||||||||
Phase 1 | ● | ● | 1401 | Jiahewanggang | 嘉禾望岗 | 2 224 3 325 | 0.00 | 0.00 | Baiyun | ||
● | ● | 1402 | Baiyun Dongping | 白云东平 | 18 | 4.31 | 4.31 | ||||
● | | | 1403 | Xialiang | 夏良 | 3.16 | 7.47 | |||||
● | | | 1404 | Taihe | 太和 | 3.50 | 10.97 | |||||
● | | | 1405 | Zhuliao | 竹料 | SS GFC | 6.18 | 17.15 | ||||
● | | | 1406 | Zhongluotan | 钟落潭 | 4.70 | 21.85 | |||||
● | | | 1407 | Mali | 马沥 | 6.11 | 27.96 | |||||
● | ● | ● | 1408 | Xinhe | 新和 | 14 (Knowledge City Branch) | 2.02 | 29.98 | |||
● | | | | | 1409 | Taiping | 太平 | 5.16 | 35.14 | Conghua | |||
● | | | | | 1410 | Shengang | 神岗 | 3.90 | 39.04 | ||||
● | | | | | 1411 | Chicao | 赤草 | 5.46 | 44.50 | ||||
● | ● | | | 1412 | Conghua Coach Terminal | 从化客运站 | 5.03 | 49.53 | ||||
● | ● | | | 1413 | Dongfeng | 东风 | 4.58 | 54.38 | ||||
Knowledge City Branch | ● | 1414 | Hongwei | 红卫 | 3.66 | 58.04 | Huangpu | ||||
● | 1415 | Xinnan | 新南 | 2.58 | 60.62 | ||||||
● | 1416 | Fengxia | 枫下 | 2.12 | 62.74 | ||||||
● | 1417 | Sino-Singapore Guangzhou Knowledge City | 知识城 | 2.41 | 65.15 | ||||||
● | 1418 | Hetangxia | 何棠下 | 2.74 | 67.89 | ||||||
● | 1419 | Wangcun | 旺村 | 1.19 | 69.08 | ||||||
● | 1420 | Tangcun | 汤村 | 2.24 | 71.32 | ||||||
● | 1421 | Zhenlongbei | 镇龙北 | 2.25 | 73.57 | ||||||
● | 1422 | Zhenlong | 镇龙 | 21 2114 | 1.82 | 75.39 | |||||
The Shenzhen Metro is the rapid transit system for the city of Shenzhen in Guangdong province,China. The Line 8 Extension –which opened on December 27,2023 –put the network at 555.43 kilometres of trackage. It currently operates on 16 lines with 373 stations. Despite having only opened on December 28,2004,the Shenzhen Metro is the 5th longest metro system in China and 6th longest in the world. By 2035,the network is planned to comprise 8 express and 24 non-express lines totaling 1,142 kilometres of trackage.
The Guangzhou Metro is the rapid transit system of the city of Guangzhou in the Guangdong Province of China. It is operated by the state-owned Guangzhou Metro Corporation and was the fourth metro system to be built in mainland China,after those of Beijing,Tianjin,and Shanghai.
Baiyun District is one of 11 urban districts of the prefecture-level city of Guangzhou,the capital of Guangdong Province,China. The district is located in the city's northern suburbs,and is named after the Baiyun Mountain,one of the area's natural attractions.
Guangzhou railway station serves the city of Guangzhou. It sits on the higher speed Guangshen railway just west of Guangzhou East. CRH trains stopping at Guangzhou exist to serve Shenzhen.
Line 2 of the Guangzhou Metro is a north–south line on the system that runs from Guangzhou South Railway Station to Jiahewanggang,with a total length of 31.4 km (19.51 mi) with 24 stations. All stations in Jiahe Line are underground. Line 2's color is blue.
Line 3 of the Guangzhou Metro is a 74.83-kilometer (46.50 mi) rapid transit line connects Haibang to Airport North. The entire line,including all track and stations,is located in tunnels. Its 67.33 km (41.84 mi) main branch,excluding the 7.5 km (4.66 mi) branch between Tianhe Coach Terminal and Tiyu Xilu,is now the third longest continuous subway tunnel in the world,and the longest rail tunnel of any kind.
Xichang Station,formerly Dongfeng Road West Station during planning,is a station on Line 5 of the Guangzhou Metro. It is located under the junction of Huanshi Road West (环市西路) and Dongfeng Road West (东风西路) in the Liwan District of Guangzhou. Huanshi Road West is the main shopping area for shoes in the city. The station opened on 28 December 2009.
Line 8 of the Guangzhou Metro is a north-west L-shaped line on the system that runs from Jiaoxin to Wanshengwei,spanning a total of 33.9 km (21.06 mi) with 28 stations. It interchanges with Line 1 at Chen Clan Academy,Line 2 at Changgang,Line 3 at Kecun,Line 4 at Wanshengwei,Line 6 at Cultural Park,and Line 18 at Modiesha. All stations on Line 8 are underground. Line 8's color is teal.
Line 6 of the Guangzhou Metro runs from Liwan District to Huangpu District. It starts at Xunfenggang and ends at Xiangxue,interchanging with Line 5 at Tanwei and Ouzhuang;Line 1 at Huangsha and Dongshankou;Line 8 at Cultural Park;Line 2 at Haizhu Square;Line 21 at Suyuan;Line 3 at Yantang and Tianhe Coach Terminal. The total length is 41.9 km (26.04 mi) with 32 stations. Line 6 serves densely populated areas including residential communities in Jinshazhou,the pedestrian street in Beijing Lu and wholesale markets in Shahe. Nevertheless,Line 6,which runs four-car trains,has long had a questionable train capacity. The phase one section between Xunfenggang and Changban began to provide service from 28 December 2013 with the exception of Yide Lu and Shahe stations. Yide Lu opened over a year later on 28 January 2015. The second phase of Line 6 from Changban to Xiangxue has been in operation since 28 December 2016. Like Lines 4 and 5,Line 6 is equipped with linear induction motor technology. Line 6's color is maroon.
Dongguan Rail Transit or Dongguan Metro is the rapid transit system of the city of Dongguan in Guangdong Province of China. It is operated by the state-owned Dongguan Rail Transit Corporation.
Line 11 of the Guangzhou Metro is a rapid transit rail line under construction in Guangzhou. It will be a loop line around the city center,connecting Guangzhou railway station,Guangzhou East railway station,Pazhou,and Fangcun.
Line 21 of the Guangzhou Metro is a rapid transit rail line in Guangzhou.
Line 18 of the Guangzhou Metro is a rapid transit express line in Guangzhou with trains operating up to 160 km/h (99 mph). It runs in a south-north direction,connecting Wanqingsha in Nansha District,Panyu Square in Panyu District,Modiesha in Haizhu District,Zhujiang New Town and Guangzhou East Railway Station in Tianhe District. The line commenced service on 28 September 2021.
Line 22 of the Guangzhou Metro is a partially open rapid transit express line in Guangzhou with trains operating up to 160 km/h (99 mph). It runs between Panyu Square and Chentougang,passing Guangzhou South Railway Station in Panyu District,and will eventually run in a north-south direction passing Xilang and Fangcun in Liwan District. Currently,there are train attendants on board each train. In the future,trains will operate fully driverless GoA4 mode when sufficient reliability from the signaling system has been confirmed.
Line 24 of Guangzhou Metro is an under construction rapid transit line in Guangzhou,Guangdong Province,China. The whole line runs roughly from north to south,connecting Huadu District,Baiyun District,Yuexiu District and Haizhu District,and connects two railway hubs,Guangzhou North railway station and Guangzhou Baiyun railway station. Line 24 will use 6-car Type A trains similar to Line 8.
Zhenlongxi station,is a station of Line 21 of the Guangzhou Metro. It started operations on 28 December 2018. It was the initial terminus of the first phase of Line 21 until the extension to Yuancun on 20 December 2019.
Conghua Coach Terminal station,is a station of Line 14 of the Guangzhou Metro. It opened on 28 December 2018.
Dongfeng station,is a station of Line 14 of the Guangzhou Metro. It is also the northern terminus of the mainline of Line 14,and the northernmost station of Guangzhou Metro. It started operations on 28 December 2018.