M9 (railcar)

Last updated

M9
MTA LIRR train leaving Woodside.jpg
LIRR M9 #9002 leaving Woodside
In service2019-present [1]
Manufacturer Kawasaki Heavy Industries
Built at
Family nameM-series
ReplacedAll remaining M3s
Entered serviceM9: September 11, 2019
Number under construction16 (option order); [2] :31 additional options for up to 318 more [3]
Number built200 [2] :31
Formation married pairs
Fleet numbersLIRR: 9001–9202 [3]
CapacitySeated passengers: 111 (A car); 101 (B car)
Operators MTA (Long Island Rail Road)
Specifications
Car length85 ft (26 m)
Width10 ft 8 in (3.25 m)
Floor height48 in (1,200 mm)
Maximum speed
  • 100 mph (161 km/h) (design)
  • 80 mph (129 km/h) (service)
Traction system Mitsubishi Electric hybrid SiC-IGBTVVVF [4] [5]
Traction motors 8 × 275 hp (205 kW) Mitsubishi asynchronous 3-phase AC
Power output2,200 hp (1,600 kW) per unit
Acceleration 2 mph/s (3.2 km/(h⋅s))
Deceleration
  • 3 mph/s (4.8 km/(h⋅s)) (service)
  • 3.2 mph/s (5.1 km/(h⋅s)) (emergency)
Electric system(s) Third rail,  750 V DC
Current collector(s) Contact shoe
UIC classification Bo′Bo′+Bo′Bo′
AAR wheel arrangement B-B+B-B
Braking system(s) Pneumatic, dynamic/regenerative
Safety system(s) ATC and Pulse code cab signaling
Coupling system Budd Pin and Cup coupler
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge

The M9 is a class of electric multiple unit railroad cars being built by Kawasaki Heavy Industries for use on the MTA's Long Island Rail Road (LIRR) and Metro-North Railroad. They entered service September 11, 2019. These cars will replace the M3/M3A railcars built during the early 1980s, as well as expand the LIRR fleet to provide additional service after the completion of the LIRR's East Side Access project. [6] A separate order of cars purchased for the LIRR and Metro-North using federal funding for the East Side Access project will also be designated M9A. [7] [8]

Contents

History

Contract timeline

In mid-2012, the MTA issued a joint procurement request for the LIRR and Metro-North for a total of up to 676 M9 railcars, set for delivery between 2016 and 2020. [9] On September 18, 2013, Kawasaki Heavy Industries was awarded a nearly $1.8 billion contract for the order, comprising a base order of 92 cars for the LIRR (costing $355 million) with options for an additional 584 cars (304 for the LIRR and 280 for MNR). Funding for the 92-car base order was included in the MTA's 2010-2014 Capital Plan, with funding for the rest of the order included in the 2015–2019 and future capital plans. [6] [9] In July 2014, the MTA forecast a need of 416 M9 and M9A cars for the LIRR (180 cars to replace the M3 fleet and 236 cars for East Side Access-related increases) and up to 188 M9 cars for Metro-North, for a total order of 604 cars. [10] Of the 416 cars ordered for the LIRR, 160 would be M9A cars, a separate order to be paid for with federal funding from the Federal Transit Administration under the East Side Access project. [7] The MTA issued a request for proposals for 60–160 M9A cars in December 2017. [8]

In June 2018, Metro-North announced that they would elect to not exercise their options for the M9 order, instead overhauling their M3A units to extend their lifespan. [11] However, that November, Metro-North stated that they "are working with LIRR to procure new M9A cars in the next Capital Program to provide additional capacity and to replace their existing M3s instead of overhauling same." [12]

By October 2017, car production was delayed again as the 92-car base order was now scheduled for delivery between July 2018 and March 2019, at a cost of $393 million. [13] Construction delays in the East Side Access project meant that delivery of M9 and M9A railcars intended for use on that line had been deferred. An M9 trainset was delivered to Pueblo for testing in 2017, but LIRR field tests had been pushed back to April 2018. [8] Because of continuing delays, the Long Island Railroad plans to rebuild, and keep at least 80 to 100 M3 cars in service through at least 2024. [14]

By June 2016, the M9 cars that were ordered for the LIRR were expected to be delivered starting in November 2018. [15]

Delivery schedule

M9 shells at the Kawasaki plant in Yonkers in May 2021 M9 shells at Kawasaki plant in Yonkers, May 2021.jpg
M9 shells at the Kawasaki plant in Yonkers in May 2021

The 416 cars of the LIRR's M9/M9A order is split into four parts. In July 2014, the delivery schedule was as follows: 92 base order cars (to be completed by April 2018) and 88 option 1 cars (to be completed by November 2018) to replace the M3 fleet as well as 76 option order cars (to be completed by August 2020) and 160 M9A cars (to be completed by October 2021) to be used for East Side Access service increases. 14 pilot cars were to be delivered September 2016 for testing, with the production cars being delivered at a rate of 12 cars per month. The balance of 188 cars for Metro-North was expected to begin delivery in December 2018 and be completed February 2020. [10] [15]

By October 2016, the MTA forecast ordering 140–170 cars for Metro-North, which would bring the total size of the M9/M9A order to a maximum of 586 cars. [7] The production of the base order had suffered delays, and the first eight-car pilot train was now scheduled for testing at the Transportation Technology Center (TTC) facility in Pueblo, Colorado from June to August 2017, with the first fourteen-car pilot train on the LIRR was scheduled for testing from October to December 2017. The 92-car base order was now scheduled for delivery between June 2018 and January 2019. The first four M9s were delivered from the TTCI facility to the LIRR in mid-2018. [16] [17]

The M9s began testing on June 12, 2018 and were expected to go into service by the end of May 2019. However, a variety of issues or bugs were found on the cars, delaying debut for additional weeks, until all of these issues or bugs have been resolved or ironed-out. [18] The cars in the original base order were expected to be completed in January 2020. [19] [20] The first 8-car set of M9s entered service on September 11, 2019, on the Port Jefferson Branch. [2] :31 [21]

As of May 2021, there are 74 cars in revenue service. [2] :31 The timeline for delivery of the base and option orders had been pushed back to October 2022. The original timeline had been delayed by 13 months due to defects found in on-site testing, as well as the onset of the COVID-19 pandemic in 2020. [2] :37As of June 2021, the LIRR had taken delivery of all 92 cars of the base order. In addition, 16 option cars were being tested on the LIRR system, 24 were being tested at Arch Street Shop, and 26 were being assembled in Kawasaki's Yonkers plant. [22] :25 The LIRR had identified numerous defective components that Kawasaki had to fix. [22] :27 At the time, the MTA's Capital Program Oversight Committee reported that the 110 option cars were projected to be delivered by April 2022; this timeline was unchanged from a report in January 2020. [22] :31 By May 2023, the M9 order was not scheduled to be complete until that December; [23] this date was later pushed back to May 2024. [24] As a result, some riders began colloquially referring to the M9 cars as "unicorns", since they comprised less than 5% of the LIRR's fleet as late as 2022. [25]

Features

The M9s and M9As are equipped with numerous customer amenity improvements over their predecessors. The cars are equipped with wider seats, closed loop seat armrests similar to those on the M8s, electrical outlets on both sides of the car in each row of seats, four 32-inch multimedia screens in each car, four to six additional seats per married pair, and powered doors on the "B" end of each car. The flip-up seats are equipped with a suspension system to prevent them from slamming. All M9s will be equipped with positive train control (PTC) and CCTV cameras that allow the train crew to view the passenger areas of the train.

Like the M7s and M8s, the M9s feature external public address speakers and electronic destination signs on the sides of the car, as well as automated announcements and interior LED displays that show the current station, the following station, and the train's destination. However, like the M8s, the M9s feature additional exterior destination signs at the front and rear of the train. Furthermore, the internal and external destination signs display the car's position within a train (for example: "Car 1 of 8"), to assist passengers getting off at stations with short platforms that do not span the entire train length. [7] There are also new automated announcements that are easier to hear and understand than those of the M7/M7A, M8, and C3 fleets.

Unlike the M9s, the M9As will additionally feature USB ports installed in each alternating current electrical outlet, powered bathroom doors, stainless steel urinals in each bathroom, and Gorilla Glass side windows that do not haze, fade or crystallize. [7]

Related Research Articles

<span class="mw-page-title-main">Long Island Rail Road</span> Commuter rail system on Long Island, New York

The Long Island Rail Road, often abbreviated as the LIRR, is a railroad in the southeastern part of the U.S. state of New York, stretching from Manhattan to the eastern tip of Suffolk County on Long Island. The railroad currently operates a public commuter rail service, with its freight operations contracted to the New York and Atlantic Railway. With an average weekday ridership of 354,800 passengers in 2016, it is the busiest commuter railroad in North America. It is also one of the world's few commuter systems that runs 24/7 year-round. It is publicly owned by the Metropolitan Transportation Authority, which refers to it as MTA Long Island Rail Road. In 2022, the system had a ridership of 70,342,700, or about 253,800 per weekday as of the third quarter of 2023.

East Side Access (ESA) is a public works project in New York City that extended the Long Island Rail Road (LIRR) two miles from its Main Line in Queens to the new Grand Central Madison station under Grand Central Terminal on Manhattan's East Side. The Metropolitan Transportation Authority (MTA) project was originally scheduled to open in 2009 but was delayed by more than a decade. The new station and tunnels opened with limited service to Jamaica station in Queens on January 25, 2023, and full service began on February 27, 2023. The estimated cost of the project rose nearly threefold from US$3.5 billion to US$11.1 billion as of April 2018, making it one of the world's most expensive underground rail-construction projects.

<span class="mw-page-title-main">Murray Hill station (LIRR)</span> Long Island Rail Road station in Queens, New York

Murray Hill is a station on the Long Island Rail Road's Port Washington Branch in the Murray Hill section of Flushing, in Queens, New York City. The station is part of CityTicket. The station is located beneath 150th Street and 41st Avenue, just south of Roosevelt Avenue.

<span class="mw-page-title-main">Port Washington station</span> Long Island Rail Road station in Nassau County, New York

Port Washington is the terminus of the Long Island Rail Road's Port Washington Branch in Port Washington, New York. The station is located on Main Street, between Haven Avenue and South Bayles Avenue, just west of Port Washington Boulevard, and is 19.9 miles (32 km) from Pennsylvania Station in Midtown Manhattan. A pedestrian bridge exists between the platforms, and is in line with Franklin Avenue, ending at Haven Avenue.

<span class="mw-page-title-main">M1/M3 (railcar)</span> Long Island Rail Road and Metro-North car

The M1 and M3 are two similar series of electric multiple unit rail cars built by the Budd Company for the Long Island Rail Road, the Metro-North Railroad and Metro-North's predecessors, Penn Central and Conrail. Originally branded by Budd as Metropolitans, the cars are more popularly known under their model names, M1 and M3. The Metro-North cars were branded under the M1A and M3A series.

<span class="mw-page-title-main">M2/M4/M6 (railcar)</span> Long Island Rail Road and Metro-North car

The M2, M4 and M6 were three similar series of electric multiple unit rail cars produced by the Budd Company (M2), Tokyu Car Corporation (M4), and Morrison-Knudsen (M6) for the Metropolitan Transportation Authority (MTA) and the Connecticut Department of Transportation (ConnDOT). Initially branded as the Cosmopolitans, the cars were later more popularly known under their model names, M2, M4, M6. They ran on the New Haven Line for most of their service life.

<span class="mw-page-title-main">Oyster Bay Branch</span> Long Island Rail Road branch

The Oyster Bay Branch is a rail line and service owned and operated by the Long Island Rail Road in the U.S. state of New York. The branch splits from the Main Line just east of Mineola station, and runs north and east to Oyster Bay. The branch is electrified between East Williston and Mineola. The branch opened in segments between 1865 and 1889.

<span class="mw-page-title-main">Ronkonkoma Branch</span> Long Island Rail Road branch

The Ronkonkoma Branch is a rail service operated by the Long Island Rail Road (LIRR) in the U.S. state of New York. On LIRR maps and printed schedules, the "Ronkonkoma Branch" includes trains running along the railroad's Main Line from Hicksville to Ronkonkoma, and between Ronkonkoma and the Main Line's eastern terminus at Greenport. The section of the Main Line east of Ronkonkoma is not electrified and is referred to as the Greenport Branch.

<span class="mw-page-title-main">Belmont Park station</span> Long Island Rail Road station in Queens, New York

Belmont Park is a seasonal-use Long Island Rail Road station on the grounds of the Belmont Park racetrack in the New York City borough of Queens. The station is a terminus of a spur line that lies south of and between the Queens Village and Bellerose stations on the Main Line/Hempstead Branch. Consistent with the names of other lines and branches of the LIRR, the spur line is called the Belmont Park Branch.

The Long Island Rail Road owns an electric fleet of 132 M9, 836 M7, and 170 M3 electric multiple unit cars, and a diesel and diesel-electric fleet consisting of 134 C3 bilevel rail cars powered by 24 DE30AC diesel-electric locomotives and 20 DM30AC dual-mode locomotives.

<span class="mw-page-title-main">M8 (railcar)</span> Rail car operating in the Northeast U.S.

The M8 is an electric multiple unit railroad car built by Kawasaki for use on the Metro-North Railroad New Haven Line and the CTrail Shore Line East. The fleet of 471 cars first entered service in 2011, replacing the M2, M4 and M6 cars, which entered service in 1973, 1987 and 1994, respectively. An additional 60-car order is currently finishing delivery in response to increased ridership and usage on Shore Line East.

<span class="mw-page-title-main">R179 (New York City Subway car)</span> Class of New York City Subway car

The R179 is a class of 318 New Technology Train subway cars built by Bombardier Transportation for the New York City Subway's B Division. Entering service between 2017 and 2020, the cars replaced all remaining R32s and R42s.

<span class="mw-page-title-main">EMD DE30AC and DM30AC</span> Long Island Rail Road locomotive

The EMD DE30AC and DM30AC are a class of 46 locomotives built between 1997–1999 by Electro-Motive Division in the Super Steel Plant in Schenectady, New York, for the Long Island Rail Road of the Metropolitan Transportation Authority (MTA) in New York. Originally divided equally between the two types, the fleet currently consists of 24 DE30AC locomotives and 20 DM30AC locomotives.

<span class="mw-page-title-main">R211 (New York City Subway car)</span> Class of New York City Subway car

The R211 is a new technology train (NTT) New York City Subway car being built by Kawasaki Railcar Manufacturing for the B Division and the Staten Island Railway (SIR). They will replace two aging subway car models: all R44 cars on the Staten Island Railway and all R46 subway cars. The order is split into three parts: R211A and R211T cars for the subway and R211S cars for the SIR. The R211Ts employ open gangways between cars, allowing passengers to see and walk through the entire length of the train – a feature not present on the subway's other rolling stock. The base order consists of 535 cars, with options for up to 1,077 additional cars.

<span class="mw-page-title-main">M7 (railcar)</span> Long Island Rail Road and Metro-North car

The M7 is an electric multiple unit railroad car built by Bombardier, with delivery beginning in 2002, used by the MTA on the Long Island Rail Road (M7) and Metro-North Railroad (M7A). The M7 replaced the M1 railcars, which had previously provided electric service on these lines. The M7 fleets are powered from an electric third rail. A total of 1,172 M7 cars were built for the two railroads.

<span class="mw-page-title-main">Penn Station Access</span> Public works project in New York City

Penn Station Access (PSA) is a public works project underway by the Metropolitan Transportation Authority in New York City. The goal of the project is to allow Metro-North Railroad commuter trains to access Penn Station on Manhattan's West Side, using existing trackage owned by Amtrak. Metro-North trains currently terminate exclusively at Grand Central in Midtown Manhattan.

The Metro-North Railroad is a commuter railroad serving northern suburbs of New York City. It principally uses a fleet of electric railcars for its services; diesel locomotives and push-pull coaches are in use as well for non-electrified portions of the system.

<span class="mw-page-title-main">New Technology Train</span> Family of New York City Subway cars

New Technology Train (NTT) is the collective term for the modern passenger fleet of the New York City Subway that has entered service since the turn of the 21st century. This includes the current R142, R142A, R143, R160, R179, R188 and R211 models, along with the planned R262 and R268 models. Two prototypes, the R110A and R110B, were used to test the features that would be found on all NTT trains today.

<span class="mw-page-title-main">Harold Interlocking</span> Railroad junction in New York City

Harold Interlocking is a large railroad junction located in New York City. It is the busiest rail junction in the United States. It serves trains on Amtrak's Northeast Corridor and the Long Island Rail Road's Main Line and Port Washington Branch, which diverge at the junction.

<span class="mw-page-title-main">Grand Central Madison</span> Long Island Rail Road station in Manhattan, New York

Grand Central Madison is a commuter rail terminal for the Long Island Rail Road (LIRR) in the Midtown East neighborhood of Manhattan in New York City. Part of the East Side Access project, the new terminal started construction in 2008 and opened on January 25, 2023. The station sits beneath Grand Central Terminal, which serves the Metropolitan Transportation Authority (MTA)'s Metro-North Railroad.

References

  1. Stannard, Ed (March 1, 2011). "New Metro-North M8 rail cars take first run to New York". New Haven Register. Archived from the original on September 13, 2012. Retrieved March 1, 2011.
  2. 1 2 3 4 5 "Capital Program Oversight Committee Meeting January 2021". web.mta.info. Metropolitan Transportation Authority. January 2021. Retrieved January 19, 2021.
  3. 1 2 "New M9 Rail Cars". A Modern LI.
  4. "鉄道車両向け SiC 適用インバーター駆動システム" [SiC-applied inverter drive system for railway vehicles](PDF) (in Japanese). Mitsubishi Electric. Retrieved February 3, 2023. 2016年米国MNR M9車両製品出荷開始 (US MNR M9 cars product shipment started 2016)
  5. Kikuchi, Takahiro (December 4, 2014). "Transportation Systems" (PDF). Mitsubishi Electric.
  6. 1 2 "Governor Cuomo Announces $1.8 Billion Award To Build 676 New LIRR and Metro-North Rail Cars". Governor Andrew M. Cuomo. September 28, 2014. Retrieved January 25, 2018.
  7. 1 2 3 4 5 "Capital Program Oversight Committee Meeting October 2016" (PDF). mta.info. Metropolitan Transportation Authority. October 26, 2016. Retrieved November 17, 2016.
  8. 1 2 3 Vantuono, William C. (December 6, 2017). "LIRR seeks M9A EMUs". Railway Age. Retrieved January 21, 2018.
  9. 1 2 Bowen, Douglas John (September 17, 2013). "MTA taps Kawasaki for M-9 railcar order". Railway Age. Retrieved January 25, 2018.
  10. 1 2 "Capital Program Oversight Committee Meeting: July 2014" (PDF). MTA. July 28, 2014.
  11. "Metro-North/LIRR Committee Meeting: June 2018". MTA. June 18, 2018.
  12. "Metro-North Railroad Committee Meeting" (PDF). Metropolitan Transportation Authority. November 13, 2018. p. 85. Archived from the original (PDF) on November 11, 2018. Retrieved December 1, 2018.
  13. "Capital Program Oversight Committee Meeting: October 2017" (PDF). MTA. October 23, 2017.
  14. "Screen Shot 2019-07-24 at 7.17.32 PM". July 24, 2019 via Flickr.
  15. 1 2 Castillo, Alfonso A. (June 20, 2016). "LIRR train delivery pushed back again". Newsday. Retrieved January 5, 2018.
  16. Castillo, Alfonso A. (July 12, 2018). "Video shows new LIRR cars arriving". Newsday. Retrieved January 2, 2019.
  17. Vantuono, William C. (May 16, 2018). "First LIRR M-9 cars arrive from TTCI testing". Railway Age. Retrieved April 14, 2019.
  18. Castillo, Alfonso A. (May 22, 2019). "Eng: LIRR's new trains still being tested". Newsday.
  19. "LIRR: Not enough train cars to serve booming ridership". News 12 Long Island. March 10, 2019. Retrieved April 14, 2019.
  20. Castillo, Alfonso A. (May 7, 2019). "LIRR to roll out by end of May 'next generation of commuter rail cars". Newsday. Retrieved May 7, 2019.
  21. "LIRR to Introduce New Fleet of Rail Cars Tomorrow" (Press release). Metropolitan Transportation Authority. September 10, 2019. Retrieved September 11, 2019.
  22. 1 2 3 "Capital Program Oversight Committee Meeting". Metropolitan Transportation Authority. June 23, 2021. Retrieved January 18, 2019.
  23. Castillo, Alfonso A. (May 23, 2023). "LIRR's new M9 'unicorn' trains delayed again, MTA consultant warns". Newsday. Retrieved October 3, 2023.
  24. Castillo, Alfonso A. (May 23, 2023). "LIRR's new M9 'unicorn' trains delayed again, MTA consultant warns". Newsday. Retrieved October 3, 2023.
  25. Castillo, Alfonso A. (February 14, 2021). "Have you caught the unicorn? Why riding LIRR's new fleet is still so rare". Newsday. Retrieved October 3, 2023.