Majuba Power Station

Last updated
Majuba Power Station
Majuba Power Station
Location of Majuba Power Station in South Africa
Country South Africa
Location Mpumalanga
Coordinates 27°6′2″S29°46′17″E / 27.10056°S 29.77139°E / -27.10056; 29.77139 Coordinates: 27°6′2″S29°46′17″E / 27.10056°S 29.77139°E / -27.10056; 29.77139
StatusOperational
Construction began1983
Commission date 1996
Owner(s)
Operator(s) Eskom
Thermal power station
Primary fuel Coal
Secondary fuel Syngas
Power generation
Units operational3 X 665 MW
3 X 716 MW
Nameplate capacity 4,110 MW

Majuba Power Station between Volksrust and Amersfoort in Mpumalanga, South Africa, is a coal-fired power plant operated by Eskom. Majuba is Eskom's only power station that is not linked to a specific mine and it receives its coal from various sources.

Contents

History

Construction started in September 1983 and by April 1996 the first unit was connected to the grid. The last unit was commissioned in April 2001. [1]

Power generation

Majuba has three 665 MW dry-cooled units and three 716 MW wet-cooled units with a total installed capacity of 4,110MW with a turbine Maximum Continuous Rating of 35.3% on the dry-cooled turbines and 37.7% on the wet-cooled units. [2]

Underground coal gasification

In addition to coal, the Majuba Power Station is fired by syngas produced by underground coal gasification at the nearby Majuba demonstration facility on the Majuba coalfield. The 3,000–5,000 cubic metres per hour (110,000–180,000 cu ft/h) pilot plant was commissioned in January 2007 and the first electricity was generated from the underground coal gasification gas on 31 May 2007. Produced syngas is transported from the facility to the power station by 7-kilometre (4.3 mi) pipeline with a diameter of 600 millimetres (24 in). There is a plan to build a 1,200 MW commercial generation facility. [3] [4] [5]

Silo Collapse

On 1 November 2014, the plant was running under normal load when a visible crack was reported on Silo 20 by a member of the operating staff at approximately 12:30. Personnel in the area were subsequently evacuated. At 13:20, the silo collapsed and the plant's output was immediately reduced from 3600MW to 1800MW. Shortly after, the output was reduced further to 600MW. [6]

Coal Supplying

Majuba requires 14 million tonnes (14 Mtpa) of coal per annum which were originally supposed to come from a colliery built and operated by Rand Mines but that mine was decommissioned in 1993. An 8 Mtpa rail link branch from Palmfort was commissioned and, by 1996, was sufficient for the power plant owing to the delayed construction schedule. From 2003 Eskom implemented a policy of procuring coal from new emerging sources which resulted in delivery by road, since the location of the mines precluded their use of the Palmfort line, despite the fact that it was sufficient for Majuba's needs. [7]

In early 2000 Majuba started increasing its coal consumption by 2.2 Mtpa to a target of 14 Mtpa by 2010, based on forecasts of electricity demand growth. To accommodate this a 68 km rail line from Ermelo to Majuba was planned which would link up to the heavy haul export rail line from Mpumalanga to Richards Bay. The project was approved by the Eskom board in December 2004 with a cost-to-completion of R1,5-billion. The project ran several years late and was expected to be completed by March 2021 at a cost-to-completion of R8-billion. [7]

In addition, in December 2019 a coal tippler takeout conveyor caught fire at Majuba and since then all coal deliveries by rail had ceased. [7]

Crime

Mid-December 2022, at the request of the Minister of Public Enterprises, Pravin Gordhan, and President Cyril Ramaphosa, Minister of Defence Thandi Modise deployed a small contingent of SANDF troops at the station (besides at Camden, Grootvlei and Tutuka) due to a growing threat of sabotage, theft, vandalism and corruption. [8]

See also

Related Research Articles

<span class="mw-page-title-main">Gasification</span> Form of energy conversion

Gasification is a process that converts biomass- or fossil fuel-based carbonaceous materials into gases, including as the largest fractions: nitrogen (N2), carbon monoxide (CO), hydrogen (H2), and carbon dioxide (CO2). This is achieved by reacting the feedstock material at high temperatures (typically >700 °C), without combustion, via controlling the amount of oxygen and/or steam present in the reaction. The resulting gas mixture is called syngas (from synthesis gas) or producer gas and is itself a fuel due to the flammability of the H2 and CO of which the gas is largely composed. Power can be derived from the subsequent combustion of the resultant gas, and is considered to be a source of renewable energy if the gasified compounds were obtained from biomass feedstock.

Coal gasification is the process of producing syngas—a mixture consisting primarily of carbon monoxide (CO), hydrogen (H2), carbon dioxide (CO2), methane (CH4), and water vapour (H2O)—from coal and water, air and/or oxygen.

<span class="mw-page-title-main">NLC India Limited</span> Central Public Sector Undertaking

NLC India Limited (NLC) is a central public sector undertaking under the administrative control of the Ministry of Coal, Government of India. It annually produces about 30 million tonnes of Lignite from opencast mines at Neyveli in the state of Tamil Nadu in southern India and at Barsingsar in Bikaner district of Rajasthan state. The lignite is used at pithead thermal power stations of 3640 MW installed capacity to produce electricity. Its joint venture has a 1000 MW thermal power station using coal. Lately, it has diversified into renewable energy production and installed 1404 MW solar power plant to produce electricity from photovoltaic (PV) cells and 51 MW electricity from windmills.

<span class="mw-page-title-main">Jindal Steel and Power</span> Indian multinational steel and infrastructure company

Jindal Steel and Power Limited (JSPL) is an Indian steel company based in New Delhi. JSPL is a part of OP Jindal Group.

Underground coal gasification (UCG) is an industrial process which converts coal into product gas. UCG is an in-situ gasification process, carried out in non-mined coal seams using injection of oxidants and steam. The product gas is brought to the surface through production wells drilled from the surface.

<span class="mw-page-title-main">Concor</span> South African construction company

Concor Holdings (Proprietary) Limited. is a South African construction and mining services company. It is active throughout Southern Africa, involved in mining, civil engineering, building and road projects. Concor returned as an independent brand in late 2016.

<span class="mw-page-title-main">Kendal Power Station</span>

Kendal Power Station is a coal-fired power station in Mpumalanga, South Africa. It is sited in a coal-mining area; one of its sources is AEMFC's coal mine at Vlakfontein, near Ogies.

An integrated gasification combined cycle (IGCC) is a technology using a high pressure gasifier to turn coal and other carbon based fuels into pressurized gas—synthesis gas (syngas). It can then remove impurities from the syngas prior to the electricity generation cycle. Some of these pollutants, such as sulfur, can be turned into re-usable byproducts through the Claus process. This results in lower emissions of sulfur dioxide, particulates, mercury, and in some cases carbon dioxide. With additional process equipment, a water-gas shift reaction can increase gasification efficiency and reduce carbon monoxide emissions by converting it to carbon dioxide. The resulting carbon dioxide from the shift reaction can be separated, compressed, and stored through sequestration. Excess heat from the primary combustion and syngas fired generation is then passed to a steam cycle, similar to a combined cycle gas turbine. This process results in improved thermodynamic efficiency compared to conventional pulverized coal combustion.

Edwardsport Power Station is a 618 MW Integrated gasification combined cycle (IGCC) coal based power plant in Vigo Township, Knox County, near the town of Edwardsport, Indiana. The integrated gasification combined cycle power plant construction started in June 2008 by Duke Energy near the site of an older 160 MW coal-fired electrical power plant, which was decommissioned in 2010.

Grootvlei Power Station in Grootvlei, Mpumalanga, South Africa.

<span class="mw-page-title-main">Medupi Power Station</span> Dry-cooled coal-fired power plant

Medupi Power Station is a dry-cooled coal-fired power station built by Eskom near Lephalale in Limpopo province, South Africa. The name chosen for the station, Medupi, is a Sepedi word which means "gentle rain". With an installed capacity of 4,764 MW, when fully operational it should be the 8th largest coal-fired power station in the world.

<span class="mw-page-title-main">Arnot Power Station</span>

Arnot Power Station in Mpumalanga, South Africa, is a coal-fired power plant operated by Eskom. Coal from the Arnot coal mine directly feeds the station.

<span class="mw-page-title-main">Camden Power Station</span>

Camden Power Station in Mpumalanga, South Africa, is a coal-fired power plant operated by Eskom.

Kriel Power Station in Mpumalanga, South Africa, is a coal-fired power plant operated by Eskom. It is located about 4 km from Matla Power Station just outside the town of Kriel.

<span class="mw-page-title-main">Matimba Power Station</span> Dry-cooled coal-fired power plant

Matimba Power Station close to Ellisras, Limpopo Province, South Africa, is a dry-cooled coal-fired power plant operated by Eskom.

Tutuka Power Station in Mpumalanga, South Africa, is a coal-fired power plant operated by Eskom. It is a twin sister to Duvha Power Station.

<span class="mw-page-title-main">Kemper Project</span>

The Kemper Project, also called the Kemper County energy facility or Plant Ratcliffe, is a natural gas-fired electrical generating station currently under construction in Kemper County, Mississippi. Mississippi Power, a subsidiary of Southern Company, began construction of the plant in 2010. The initial, coal-fired project was central to President Obama's Climate Plan, as it was to be based on "clean coal" and was being considered for more support from the Congress and the incoming Trump Administration in late 2016. If it had become operational with coal, the Kemper Project would have been a first-of-its-kind electricity plant to employ gasification and carbon capture technologies at this scale.

<span class="mw-page-title-main">Kusile Power Station</span> Largest Dry-cooled coal-fired power plant in the world

Kusile Power Station in South Africa is a coal-fired power plant under construction by state electricity utility Eskom.

Coal gasification is a process whereby a hydrocarbon feedstock (coal) is converted into gaseous components by applying heat under pressure in the presence of steam. Rather than burning, most of the carbon-containing feedstock is broken apart by chemical reactions that produce "syngas." Syngas is primarily hydrogen and carbon monoxide, but the exact composition can vary. In Integrated Gasification Combined Cycle (IGCC) systems, the syngas is cleaned and burned as fuel in a combustion turbine which then drives an electric generator. Exhaust heat from the combustion turbine is recovered and used to create steam for a steam turbine-generator. The use of these two types of turbines in combination is one reason why gasification-based power systems can achieve high power generation efficiencies. Currently, commercially available gasification-based systems can operate at around 40% efficiencies. Syngas, however, emits more greenhouse gases than natural gas, and almost twice as much carbon as a coal plant. Coal gasification is also water-intensive.

The South African energy crisis is an ongoing period of widespread national blackouts of electricity supply. It began in the later months of 2007 and continues to the present. The South African government-owned national power utility and primary power generator, Eskom, and various parliamentarians attributed these rolling-blackouts to insufficient generation capacity.

References

  1. Yelland, Chris (31 August 2020). "Eskom's Majuba power station rail project debacle". EE Business Intelligence (Pty) Ltd. Retrieved 3 September 2020.
  2. "MAJUBA POWER STATION". Eskom . Retrieved 2 November 2014.
  3. "ESKOM's underground coal gasification project" (PDF). European Commission. 2008-05-05. Retrieved 2011-09-04.[ permanent dead link ]
  4. Venter, Irma (2007-02-12). "Coal experts search for ways to cut emissions". Mining Weekly . Creamer Media. Retrieved 2011-09-04.
  5. Hannah, Jessica (2011-08-12). "Coal gasification demo plant design study under way". Mining Weekly . Creamer Media. Retrieved 2011-09-04.
  6. "Media Briefing - Damage to Majuba power station coal storage silo" (PDF). Eskom.co.za. Retrieved 15 January 2015.
  7. 1 2 3 Yelland, Chris (31 August 2020). "OP-ED: Eskom's Majuba power station rail project is a debacle". Daily Maverick. Retrieved 3 September 2020.
  8. Evans, Julia (4 January 2023). "A country 'ungovernable' — how Eskom plans to tackle the scourge of sabotage, fraud and corruption in 2023". Defend Truth. www.dailymaverick.co.za. Daily Maverick. Retrieved 6 January 2023.