Colenso Power Station

Last updated
Colenso Power Station
Colenso Power Station.jpg
View of Colenso Power Station in the 1970's.
Colenso Power Station
CountrySouth Africa
Coordinates 28°43′51″S29°49′36″E / 28.73083°S 29.82667°E / -28.73083; 29.82667
StatusDecommissioned
Commission date 1926
Decommission date1984
Thermal power station
Primary fuel Coal
Power generation
Units operational5
Nameplate capacity 160 Megawatt
External images
Searchtool.svg Photo of the power station as seen from across the Tugela river at Eskom Heritage
Searchtool.svg Photo of the Colenso turbines and boilers at Eskom heritage

Colenso Power Station was a South African coal-fired power station, located in Colenso, KwaZulu-Natal (Uthukela District Municipality) on the banks of the Tugela River. It was built in the 1920s by the South African Railways to supply electricity for the railways, [1] and was subsequently sold to the Electricity Supply Commission (Eskom).

Contents

History

Steep gradients on the Natal section of South African Railways, particularly in the Natal Midlands meant that electrification could be beneficial, particularly if regenerative braking was employed. [2] In 1921 the estimated cost of the electrification project, inclusive of the Power Station was £ 2,033,000. [3]

Building started in 1921 and the power station was opened in 1926 with a capacity of 60 MW. Initially it only provided power for the 274 km section of the GlencoePietermaritzburg part of the Durban-Johannesburg railway – the area that had the greatest gradients, and also the area that was closest to the coalfields of the Glencoe region. Power generated at Colenso was distributed at 88,000 volts to twelve substations where it was converted to 6,600 volts and then to 3,000 volts DC current by synchronous motor generators for use by the railways. [4] [5]

The power station was sold to the Electricity Supply Commission (Eskom) in January 1927. [6] It used coal that was brought in by rail from the coalfields of North Natal and water from the Tugela. It continued to be the provider of electrical power for the railways which by 1937 consisted of the whole of the Natal section of the Durban – Johannesburg line (516 route km) and the 229 km spur to Bethlehem in the Orange Free State. Between 1944 and 1959 a series of new generators were commissioned, resulting in the power station's capacity being increased to 160 MW. [6] However, in the 1960s, changes in technology led to a change in the economics of power production. New power stations such as Ingagane [7] were built at the coal fields themselves and the use 400 kVA power lines from 1972 onwards reduced the cost of transporting electricity. In the early 1980s Eskom initiated a major development programme: in 1980 new large power stations at Kriel (3,000 MW), Hendrina (2,000 MW) and Camden (1,600 MW) had been commissioned and in the next few years a number of other new power stations gave South Africa a surplus of generating capacity and many of the 1960s vintage power stations (including Colenso's refurbishment) had become uneconomic. [8] This meant that the continued use of the Colenso power station was no longer economically viable. The original part of the power station was decommissioned in 1970 and the 1944-1959 extensions in 1985. [6]

Present day

The power station's cooling towers remain standing to this day. In recent years a concerted effort has been in process to re-establish a new, larger, independent base load power station near the original site of the old Colenso power station. With a substantial coal resource discovered near the town and with the gradual liberalising of the South African electric power generation industry, a modern coal technology power generation unit is planned. [9]

See also

Related Research Articles

Eskom Hld SOC Ltd or Eskom (Afrikaans: Elektrisiteitsvoorsieningskommissie) is a South African electricity public utility. Eskom was established in 1923 as the Electricity Supply Commission (ESCOM). Eskom represents South Africa in the Southern African Power Pool. The utility is the largest producer of electricity in Africa, and was among the top utilities in the world in terms of generation capacity and sales. It is the largest of South Africa's state owned enterprises. Eskom operates a number of notable power stations, including Matimba Power Station and Medupi Power Station in Lephalale, Kusile Power Station in Witbank, Kendal Power Station, and Koeberg Nuclear Power Station in the Western Cape Province, the only nuclear power plant in Africa.

Colenso is a town in KwaZulu-Natal, South Africa. It is located on the southern bank of the Tugela River on the R103 road. The original settlement was contained within a loop on the river, but it subsequently expanded southwards and eastwards. It lies on the main Durban - Johannesburg railway line some 190 km (118 mi) north-west of Durban.

<span class="mw-page-title-main">Traction power network</span> Electricity grid for the supply of electrified rail networks

A traction network or traction power network is an electricity grid for the supply of electrified rail networks. The installation of a separate traction network generally is done only if the railway in question uses alternating current (AC) with a frequency lower than that of the national grid, such as in Germany, Austria and Switzerland.

<span class="mw-page-title-main">South African Class GL 4-8-2+2-8-4</span>

The South African Railways Class GL 4-8-2+2-8-4 of 1929 was an articulated steam locomotive.

<span class="mw-page-title-main">Dunston Power Station</span> Coal-fired power station in England

Dunston Power Station refers to a pair of adjacent coal-fired power stations in the North East of England, now demolished. They were built on the south bank of the River Tyne, in the western outskirts of Dunston in Gateshead. The two stations were built on a site which is now occupied by the MetroCentre. The first power station built on the site was known as Dunston A Power Station, and the second, which gradually replaced it between 1933 and 1950, was known as Dunston B Power Station. The A Station was, in its time, one of the largest in the country, and as well as burning coal had early open cycle gas turbine units. The B Station was the first of a new power station design, and stood as a landmark on the Tyne for over 50 years. From the A Station's opening in 1910 until the B Station's demolition in 1986, they collectively operated from the early days of electricity generation in the United Kingdom, through the industry's nationalisation, and until a decade before its privatisation.

<span class="mw-page-title-main">Relief of Ladysmith</span>

When the Second Boer War broke out on 11 October 1899, the Boers had a numeric superiority within Southern Africa. They quickly invaded the British territory and laid siege to Ladysmith, Kimberley and Mafeking. Britain meanwhile transported thousands of troops both from the United Kingdom itself and from elsewhere in the Empire and by the time the siege of Ladysmith had been lifted, had a huge numeric superiority.

<span class="mw-page-title-main">Medupi Power Station</span> Power station in South Africa


Medupi Power Station is a dry-cooled coal-fired power station built by Eskom near Lephalale in Limpopo province, South Africa. The station consists of 6 generating units with a nameplate capacity of 800 MW each bringing the total installed capacity of 4,800 MW.

Acton Lane Power Station was a power station in London NW10. The station, also known as Willesden power station, was located to the south of the Euston to Birmingham railway on a site bounded by Acton Lane, the Grand Union Canal and the Dudding Hill railway line. In later years the site was extended to the south side of the canal. The entire site is now occupied by Willesden Grid Supply Point buildings.

<span class="mw-page-title-main">Natal Government Railways</span> Railway of the Colony of Natal

The Natal Government Railways (NGR) was formed in January 1877 in the Colony of Natal.

Majuba Power Station between Volksrust and Amersfoort in Mpumalanga, South Africa, is a coal-fired power plant operated by Eskom. Majuba is Eskom's only power station that is not linked to a specific mine and it receives its coal from various sources. This was due to an error during Apartheid times in geotechnical engineering core drilling which did not identify that the proposed local coal mine was under solid bedrock.

<span class="mw-page-title-main">Matimba Power Station</span> Dry-cooled coal-fired power plant

Matimba Power Station close to Ellisras, Limpopo Province, South Africa, is a dry-cooled coal-fired power plant operated by Eskom.

<span class="mw-page-title-main">South African Class 1E</span>

The South African Railways Class 1E of 1925 was an electric locomotive.

South Africa has a large energy sector, being the third-largest economy in Africa. The country consumed 227 TWh of electricity in 2018. The vast majority of South Africa's electricity was produced from coal, with the fuel responsible for 88% of production in 2017. South Africa is the 7th largest coal producer in the world. As of July 2018, South Africa had a coal power generation capacity of 39 gigawatts (GW). South Africa is the world's 14th largest emitter of greenhouse gases. South Africa is planning to shift away from coal in the electricity sector and the country produces the most solar and wind energy by terawatt-hours in Africa. The country aims to decommission 34 GW of coal-fired power capacity by 2050. It also aims to build at least 20 GW of renewable power generation capacity by 2030. South Africa aims to generate 77,834 megawatts (MW) of electricity by 2030, with new capacity coming significantly from renewable sources to meet emission reduction targets. Through its goals stated in the Integrated Resource Plan, it announced the Renewable Energy Independent Power Producer Procurement Programme, which aims to increase renewable power generation through private sector investment.

<span class="mw-page-title-main">History of electricity supply in Queensland</span>

The provision of electricity in Queensland required a considerable degree of pioneering, innovation, and commitment. Queensland proved to be a pioneer in the supply of electricity in Australia, with the first public demonstration in Australia, the first recorded use for public purposes in the country, the first Parliament House in Australia and the first commercial operations in Australia all occurring in Brisbane.

<span class="mw-page-title-main">South African Class ES1</span> Class of 1 South African battery-electric locomotive

The South African Railways Class ES1 of 1924 was an electric locomotive.

<span class="mw-page-title-main">Electricity sector in South Africa</span>

The Electricity sector in South Africa is an important part of energy in South Africa. Most power stations in South Africa are owned and operated by the state owned enterprise, Eskom. These plants account for 80% of all the electricity produced in South Africa and 45% of all electricity produced on the African continent.

Burning of charcoal and wood fuel provides approximately 94 percent of the energy in Malawi. Much of the renewable hydroelectric potential of the country is untapped. As per 2018 Population and Housing Census, the national electrification rate in Malawi was 10%, with 37% of the urban population and only 2% of the rural population having access to electricity.

Carlisle power stations were two electricity generating stations that supplied electricity to Carlisle and the surrounding area from 1899 until 1980. The first power station (1899–1927) was in the centre of the city near Nelson Bridge, and the second larger station was at Willow Holme North-West of the city (1923–1980).

Victoria Falls and Transvaal Power Company was a South African-based electricity company that supplied power to the goldmines and industry on the Witwatersrand. It was a Southern Rhodesian registered company whose main facilities were based in the Transvaal, South Africa. It was formed in 1906 and would supply power in its own name and on behalf of Eskom until 1948 when it was expropriated by the former.

References

  1. "South African Railways Power Plant". Electric Railway Journal . 60 (24): 914. 9 December 1922. Retrieved 15 September 2010.
  2. "SOUTH AFRICAN ELECTRIFICATION". Mike's Railway History. Retrieved 2008-10-28.
  3. "Great Britain and the Colonies". Electric Railway Journal. 57 (1): 33. 1 January 1921. Retrieved 15 September 2010.
  4. Brazil, H (1928). "The South African Railways Electrification". Electrical Substations. Edward Arnold & Co. p. 110. Retrieved 2010-01-12.
  5. Brazil, H (1928). "IX - Traction Substations". Electrical Substations. Edward Arnold and Co. p. 110. Retrieved 15 September 2010.
  6. 1 2 3 "Natal Central Undertaking" (PDF). Eskom Heritage. Archived from the original (PDF) on 17 August 2011. Retrieved 11 January 2010.
  7. "Ingagane Power Station". Eskom Heritage. Archived from the original on 2010-09-03. Retrieved 2008-11-10.
  8. Steyn, Grové (15 March 2006). "Investment and Uncertainty: Historical experience with power sector investment in South Africa and its implications for current challenges" (PDF). Graduate School of Business, University of Cape Town.
  9. Fumba, Oscar (June 2010). "Colenso Regeneration Plan and Urban Design Framework - Draft Report". Emnambithi Ladysmith Local Municipality. 6.4 Colenso Power Station.{{cite journal}}: Cite journal requires |journal= (help)