Noupoort Wind Energy Facility | |
---|---|
Country | South Africa |
Location | Umsobomvu Local Municipality, Pixley ka Seme District Municipality |
Coordinates | 31°10′48″S25°02′42″E / 31.180°S 25.045°E |
Status | Commissioned |
Construction began | 2015 |
Commission date | 2016 |
Owner(s) | Lekela Power Consortium |
Operator(s) | Mainstream Renewable Power |
Wind farm | |
Type | Onshore |
Power generation | |
Units operational | 35 |
Make and model | Siemens turbines of 2.3 MW each |
Nameplate capacity | 80MW |
Main Sub-Contractors: Siemens (Turbines), Concor and Consolidated Power Projects (Construction), Gestamp Wind Turbine Tower Factory |
The Noupoort Wind Energy Facility is a wind farm in the Umsobomvu Local Municipality, built 10 km east of Noupoort in the Northern Cape province of South Africa. [1]
Construction commenced May 2015. Delivery of turbines commenced April 2016. Construction was completed mid-2016. [2] It has the capacity to provide power for 91 835 South African homes. [3]
AGL Energy Ltd is an Australian listed public company involved in both the generation and retailing of electricity and gas for residential and commercial use. AGL is Australia's largest electricity generator, and the nation's largest carbon emitter. In 2022, 83% of its energy came from burning coal. It produces more emissions as a single company than the nations of New Zealand, Portugal or Sweden, according to its largest shareholder, Mike Cannon-Brookes, who named it "one of the most toxic companies on the planet".
Wind power became a significant energy source within South Australia over the first two decades of the 21st century. In 2015, there was an installed capacity of 1,475 MW, which accounted for 34% of electricity production in the state. This accounted for 35% of Australia's installed wind power capacity. In 2021, there was an installed capacity of 2052.95 MW, which accounted for 42.1% of the electricity production in the state in 2020.
The Silverton Wind Farm is a 199 megawatt wind farm situated on the Barrier Ranges in New South Wales, built for AGL Energy by CATCON and General Electric.
In 2016, Arizona had 268 megawatts (MW) of wind powered electricity generating capacity, producing 0.5% of in-state generated electricity.
Sere Wind Farm is a wind-farm in the Western Cape province of South Africa that is one of the largest wind-farms in Southern Africa with a production capacity of 100 MW. The project is estimated to have cost R2.689 billion. Eskom stated that the plant was fully commissioned on 31 March 2015.
The state of South Dakota is a leader in the U.S. in wind power generation with over 30% of the state's electricity generation coming from wind in 2017. In 2016, South Dakota had 583 turbines with a total capacity of 977 megawatts (MW) of wind generation capacity. In 2019, the capacity increased to 1525 MW.
As of the end of 2021, New Mexico had 4,001 megawatts (MW) of wind powered electricity generating capacity, responsible for 30% of electricity produced that year. Wind power in New Mexico has the potential to generate more than all of the electricity consumed in the state.
The Thambapavani Wind Farm named after Thambapanni and Pavan meaning wing in Sinhalese. Also called Mannar Island Wind Farm or Mannar Wind Farm) is a 100-megawatt wind farm which was built on the southern coast of the Mannar Island, in Sri Lanka. The project would cost approximately US$200 million, 78% of which will be borne by the Asian Development Bank, while the remaining 22% will be borne by the developers, the Ceylon Electricity Board. Identification of land plots and ownership has already begun. It is currently regarded as the largest wind farm in Sri Lanka and it is also the first wind power plant to be owned by the Ceylon Electricity Board.
Kennedy Energy Park is a wind, solar and storage hybrid power station approximately 20 km south east of Hughenden and 290 km southwest of Townsville in Queensland.
The Taralga Wind Farm is a wind farm located near Taralga, New South Wales. Owned by Pacific Blue, it commenced operation in 2015.
Taiba N'Diaye Wind Power Station,, is a 158.7 MW (212,800 hp) wind power plant in Senegal. The power station is the largest wind power station in West Africa, by generation capacity.
The Kangnas Wind Power Station is an operational 140 MW (190,000 hp) wind power plant in South Africa. The power station was developed and is owned by a consortium of international IPPs and financiers. Commercial operations started in November 2020. The energy generated at this wind farm is sold to the South African national electricity utility company Eskom, under a 20-year power purchase agreement (PPA).
The Garob Wind Power Station is an operational 145 MW (194,000 hp) wind power plant in South Africa. The power station was developed and is owned by Enel, the Italian manufacturer and distributor of electricity and gas infrastructure, through its subsidiary Enel Green Power of South Africa (EGPRSA). Construction of this wind farm started in April 2019 and achieved commercial operation in December 2021. The energy generated at this wind farm is sold to the South African national electricity utility company Eskom, under a 20-year power purchase agreement (PPA).
The Karusa Wind Power Station, is a 147 MW wind-power plant in South Africa. The wind farm which achieved commercial commissioning in June 2022 was developed by Enel Green Power, a subsidiary of Enel, the Italian energy conglomerate. Under a 20-year power purchase agreement, the power station sells the energy generated here to Eskom Holdings, the national electricity utility parastatal company.
Lekela Power B.V. is an independent power producer (IPP) company based in the Netherlands, with investments on the African continent. The firm specializes in renewable energy sources. As of July 2022, the firm has seven operational wind power plants in three countries, with another three renewable power stations under development. At that time, its total portfolio of power stations totaled over 1,000 MW, in generation capacity.
The Roggeveld Wind Power Station is an operational 147 MW (197,000 hp) wind power plant in South Africa. The power station, which began commercial operations in March 2022, was developed and is owned by Building Energy. The energy generated at this wind farm is sold to the South African national electricity utility company Eskom, under a 20-year power purchase agreement (PPA).
The Perdekraal Wind Farm is a wind farm in the Witzenberg Municipality, built in the Western Cape province of South Africa.