"},"exit_ref":{"wt":"{{cite web |url = https://www.newmassexits.com/MassDOT_Documents/Project_Documents/Route_24_and_Route_25.pdf |title = Route 25 Renumbering |publisher = Massachusetts Department of Transportation |date = December 5, 2019 |access-date = December 5, 2019 }}"}},"i":0}},"\n",{"template":{"target":{"wt":"MAint","href":"./Template:MAint"},"params":{"1":{"wt":"old\n"},"county":{"wt":"Plymouth"},"cspan":{"wt":"5"},"location":{"wt":"Wareham"},"lspan":{"wt":"4"},"exit":{"wt":"—"},"old":{"wt":"—"},"mile":{"wt":"0.00"},"mspan":{"wt":"2"},"road":{"wt":"{{jct|state=MA|I|495|dir1=north|city1=Marlboro}}"},"notes":{"wt":"Continuation north"}},"i":1}},"\n",{"template":{"target":{"wt":"MAint","href":"./Template:MAint"},"params":{"1":{"wt":"old\n"},"mile":{"wt":"none"},"exit":{"wt":"1"},"old":{"wt":"—"},"road":{"wt":"{{jct|state=MA|I|195|dir1=west|city1=New Bedford|location2=[[Providence, Rhode Island|Providence, RI]]}}"},"notes":{"wt":"Eastern terminus and exit 40A on I-195; [[trumpet interchange]]"}},"i":2}},"\n",{"template":{"target":{"wt":"MAint","href":"./Template:MAint"},"params":{"1":{"wt":"old\n"},"mile":{"wt":"2.606"},"exit":{"wt":"3"},"old":{"wt":"2"},"ospan":{"wt":"2"},"espan":{"wt":"2"},"road":{"wt":"{{jct|state=MA|MA|28|to2=yes|US|6|city1=Onset|city2=Wareham}}"},"notes":{"wt":"Eastbound exit and westbound entrance; access via Maple Springs Road"},"type":{"wt":"incomplete"}},"i":3}},"\n",{"template":{"target":{"wt":"MAint\n","href":"./Template:MAint"},"params":{"mile":{"wt":"3.406"},"road":{"wt":"{{jct|state=MA|US|6|MA|28|city1=Onset|city2=Wareham}}"},"type":{"wt":"incomplete"},"notes":{"wt":"Westbound exit and eastbound entrance; access via Glen Charlie Road"}},"i":4}},"\n",{"template":{"target":{"wt":"MAint","href":"./Template:MAint"},"params":{"1":{"wt":"old\n"},"location":{"wt":"Plymouth"},"mile":{"wt":"6.663"},"place":{"wt":"Rest area (eastbound)"}},"i":5}},"\n",{"template":{"target":{"wt":"MAint","href":"./Template:MAint"},"params":{"1":{"wt":"old\n"},"county":{"wt":"Barnstable"},"cspan":{"wt":"2"},"location":{"wt":"Bourne"},"lspan":{"wt":"2"},"mile":{"wt":"9.659"},"exit":{"wt":"10"},"old":{"wt":"3"},"type":{"wt":"concur"},"road":{"wt":"{{jct|state=MA|US|6|MA|28|dir2=north|city1=Bourne|city2=Hyannis}}"},"notes":{"wt":"Route 28 not signed eastbound; western end of Route 28 concurrency"}},"i":6}},"\n",{"template":{"target":{"wt":"MAint","href":"./Template:MAint"},"params":{"1":{"wt":"old\n"},"mile":{"wt":"10.006"},"exit":{"wt":"—"},"old":{"wt":"—"},"road":{"wt":"{{jct|state=MA|MA|28|dir1=south|name1=[[Bourne Bridge]]|city1=Falmouth|location2=[[Cape Cod and Islands|The Islands]]}}"},"notes":{"wt":"Continuation south; eastern end of Route 28 concurrency"},"type":{"wt":"concur"}},"i":7}},"\n",{"template":{"target":{"wt":"jctbtm","href":"./Template:Jctbtm"},"params":{"1":{"wt":"old"},"keys":{"wt":"incomplete,concur"}},"i":8}}]}" id="mwAQM">
County | Location | mi [1] | km | Old exit | New exit [16] | Destinations | Notes |
---|---|---|---|---|---|---|---|
Plymouth | Wareham | 0.00 | 0.00 | — | — | ![]() ![]() | Continuation north |
— | 1 | ![]() ![]() | Eastern terminus and exit 40A on I-195; trumpet interchange | ||||
2.606 | 4.194 | 2 | 3 | ![]() ![]() ![]() | Eastbound exit and westbound entrance; access via Maple Springs Road | ||
3.406 | 5.481 | ![]() ![]() | Westbound exit and eastbound entrance; access via Glen Charlie Road | ||||
Plymouth | 6.663 | 10.723 | Rest area (eastbound) | ||||
Barnstable | Bourne | 9.659 | 15.545 | 3 | 10 | ![]() ![]() ![]() | Route 28 not signed eastbound; western end of Route 28 concurrency |
10.006 | 16.103 | — | — | ![]() ![]() | Continuation south; eastern end of Route 28 concurrency | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Southside Connector | |
---|---|
Length | 5 mi (8.0 km) |
The Southside Connector was first proposed in the 1950s as an extension of Route 25. It was part of the Cape Cod Expressway, which eventually morphed into the Mid-Cape Highway. It was originally planned to be a safe alternative to US 6 and was to be located on the northern side of the Cape Cod Canal. [17]
As early as 1962, the Massachusetts Department of Public Works conducted a study once questions on the plans were raised. One study concluded that the Sagamore Bridge was over capacity while the Bourne Bridge was under capacity. From these studies, it was determined that the expressway would cross the canal near the Bourne Bridge. [17] Expressway connections would connect to US 6 and Route 28 on the south side of the canal near the Bourne Rotary. Another crossing that would carry three lanes would be built next to the bridge to facilitate this extra traffic. [17]
Between 1968 and 1977, studies concluded that the connector would be routed along the south side of the canal. The route would begin at the US 6 and Route 25 interchange at the canal, cross over the canal, turn east at the Bourne Rotary, which would be turned into an interchange, and go east until it reached the Mid-Cape Highway near exit 59. The total cost would be $35 million. [18]
The project was put on hold the next decade, but never cancelled outright, when concerns arose about the status of the groundwater aquifers which sat under the reservation. [17] Those aquifers were already polluted from years of military training, but the pollution was not discovered until about 10 years later. [19]
In the early 2000s, the project had renewed interest due to gridlock on both of the canal's sides. Although the project was projected to have cost $35 million in the 1970s, updated construction estimates ranged from $100 million to $200 million. [17] [20] Local leaders expressed support for the project provided it would include a third road crossing of the canal, to address over-capacity issues with the Bourne Bridge and Sagamore Bridge. [17] Although the development was planned for well over 15 years, the Great Recession caused the project to be cancelled.