New Karuma Bridge | |
---|---|
Coordinates | 02°14′35″N32°14′22″E / 2.24306°N 32.23944°E |
Carries | Kampala–Gulu Highway |
Crosses | Victoria Nile |
Locale | Karuma, Uganda to Karuma Falls, Uganda |
Official name | Second Karuma Bridge |
Characteristics | |
Design | Cable-stayed bridge |
Material | Steel, concrete |
History | |
Construction start | 2019 Expected |
Opened | 2032 Expected |
Location | |
The New Karuma Bridge, also referred to as the Second Karuma Bridge, is a proposed bridge in Uganda. [1] It will replace the current Karuma Bridge, which was built in 1963. [2]
The bridge would be located at Karuma Falls, across the Victoria Nile, immediately west and downstream of the old Karuma Bridge. This is approximately 257 kilometres (160 mi), by road, north of Kampala, Uganda's capital and largest city. [3] It is located on the Kampala–Gulu Highway, approximately 77 kilometres (48 mi), by road, south of Gulu, the largest city in the Northern Region of Uganda. [4] The coordinates of the New Karuma Bridge are 02°14'35.0"N, 32°14'22.0"E (Latitude:2.243056; Longitude:32.239444). [5]
The current Karuma Bridge (the old bridge) was constructed in 1963, one year after Uganda attained independence from Britain. [1] The old bridge is a narrow, one carriageway (one lane in each direction), without pedestrian or bicycle lanes and no monitoring equipment. [2] The bridge has been the site of several major accidents. [6] [7] [8] [9]
The proposed new bridge would be modeled after the New Jinja Bridge in the Eastern Region of Uganda. A suspended cable bridge, with bicycle/motorcycle lanes is being considered. The feasibility studies and technical designs for the new bridge have been concluded. The Japan International Cooperation Agency (JICA) has indicated interest in the project, although it has not confirmed willingness to fund it. [1]
Construction commencement is contingent on securing a government down-payment and development partner counter-funding. [10] As of October 2020, according to the New Vision newspaper, the government of Japan, through JICA, was evaluating the possibility of funding the construction of the New Karuma Bridge. [11] That evaluation process was still ongoing as of April 2024. [12]
In 2017, NBS Television reported that the estimated cost of the new bridge was in excess of US$100 million. [13]
In April 2024 the New Vision newspaper reported that the design of the new bridge was ongoing and would conclude in 2026. Construction was expected to commence in 2029. Oriental Consultants Global and Prome Consultants Limited are responsible for the execution of the environmental and social impact studies. [12]
In October 2024 high ranking JICA officials, held discussions with a Uganda government delegation led by Fred Byamukama, the state minister for transport, to fast-track the construction of the new Karuma Bridge. The new bridge will be elevated and straightened out to eliminate sharp curves. The construction price estimate as of October 2024 is Shs550 billion ($150 million). [14] [15]
Lira is a city in the Northern Region of Uganda. It is the main municipal, administrative, and commercial centre of Lira District.
Pakwach is a town in the Northern Region of Uganda. It is the main commercial, political and administrative center of Pakwach District. In the 19th century the town came under brief occupation by the Ottoman branch of the Khedivate of Egypt, as part of Hatt-ı Üstuva (Equatoria) Vilayet.
Gulu–Nimule Road is a road in the Northern Region of Uganda, connecting the city of Gulu in Gulu District and the town of Nimule in Eastern Equatoria State in South Sudan, just north of the international border between the two countries. The road, known as Highway A104 in Uganda, continues into South Sudan as Highway A43.
The Karuma Hydroelectric Power Station is an operational 600 MW hydroelectric power station in Uganda. It is the largest power-generating installation in the country.
Karuma Falls is a town in Western Region of Uganda.
The Source of the Nile Bridge, also New Jinja Bridge, which was commissioned on 17 October 2018, by the President of Uganda, is a cable-stayed bridge across the Victoria Nile in Uganda. It replaced the Nalubaale Bridge, which was built in 1954.
Ayago Hydroelectric Power Station, also Ayago Power Station, is a planned 840 megawatt hydroelectric power project to be constructed in Uganda. If it is built, Ayago would be the largest power station in Uganda, based on generating capacity.
The Uganda National Roads Authority (UNRA) is a government agency mandated to develop and maintain the national roads network, advise the government on general roads policy, contribute to the addressing of national transport concerns, and perform certain other functions. UNRA is charged with, among other things, the selection of contractors, the supervision of construction, the scheduling of maintenance, and the prioritization of national road works.
The Kampala–Mpigi Expressway, also Busega–Mpigi Expressway, is a four-lane, dual carriage highway under construction in the Central Region of Uganda, connecting, Kampala, the capital city, and Mpigi, the headquarters of Mpigi District.
The Kampala–Masaka Road is a road in the Central Region of Uganda, connecting the capital city of Kampala to the southwestern town of Masaka in Masaka District. The first 36 kilometres (22 mi) of this road, is in the process of being developed into the Kampala–Mpigi Expressway.
The Atiak–Adjumani–Moyo–Afonji Road is in the Northern Region of Uganda, connecting the towns of Atiak, Adjumani, Moyo, and Afoji at the international border with South Sudan.
The Karuma–Olwiyo–Pakwach–Nebbi–Arua Road is a road in the Northern Region of Uganda, connecting the towns of Karuma, Olwiyo, Pakwach, Nebbi and the city of Arua.
The Lira–Gulu–Nebbi–Arua High Voltage Power Line is an operational high voltage electricity power line in Uganda. It connects the high voltage substation at Lira, in Lira District, to another high voltage substation at Arua, in Arua District, all in the Northern Region of the country.
Kiba Hydroelectric Power Station is a proposed 295 megawatts (396,000 hp) hydroelectric power station in Uganda.
The Kampala–Gulu Highway, also Kampala–Gulu Road, is a road connecting Uganda's capital city of Kampala, in the Central Region, with the city of Gulu, the largest urban centre in the country's Northern Region.
The Karuma–Juba High Voltage Power Line is a planned high voltage electricity power line, connecting the high voltage substation at Karuma, in Kiryandongo District, in the Western Region of Uganda, to another high voltage substation at Juba, in Jubek State, in South Sudan.
The Battle of Karuma Falls was one of the last battles in the Uganda–Tanzania War, fought between Tanzania and Uganda Army troops loyal to Idi Amin on 17 May 1979. Soldiers of the Tanzania People's Defence Force attacked Ugandan forces at the bridge over the Nile River at Karuma Falls. Tanzania's 205th Brigade was tasked with advancing from Masindi to Gulu, taking a route which passed over the Karuma Falls Bridge. The brigade assaulted the crossing on the morning of 17 May with tanks and artillery and one of its battalions ran over the bridge to attack the Ugandan positions. The Ugandans destroyed a TPDF tank, delaying the Tanzanians long enough to board buses and retreat to Gulu. The Tanzanians secured Karuma Falls before capturing Gulu several days later.
The Kyaliwajjala–Kira–Kasangati–Matugga Road, also Kyaliwajjala–Matugga Road or Kira–Matugga Road, is a road in the Central Region of Uganda, connecting the neighborhood of Kyaliwajjala, in Kira Municipality in Wakiso District, to the town of Matugga, also in Wakiso District. This road is part of the 101 kilometres (63 mi) Kampala Outer Beltway Project.
Gulu Water Supply and Sanitation Project (GWSSP), also Gulu Water Supply and Sewerage System, is a water intake, purification, distribution and waste water collection and disposal system in the city of Gulu, the largest urban centre in the Northern Region of Uganda. In October 2020, the Uganda government concluded Phase 1 of the improvement of water supply and sanitation in the city, with funding from the World Bank, KfW and the Government of Uganda. Phase 2 improvements are expected to start in 2021, with funding from the World Bank, KfW and the Commonwealth Development Corporation.