Northern and Eastern Railway

Last updated

Northern and Eastern Railway
Overview
Locale Essex, Middlesex and Hertfordshire, England
Dates of operation18401902
Successor Great Eastern Railway
Technical
Track gauge 4 ft 8+12 in (1,435 mm)
Previous gauge 5 ft (1,524 mm)

The Northern & Eastern Railway (N&ER) was an early British railway company, that planned to build a line from London to York. Its ambition was cut successively back, and it was only constructed from Stratford, east of London, to the towns of Bishop's Stortford and Hertford. It was always short of money, and it got access to London over the Eastern Counties Railway (ECR). It was built at the track gauge of 5 ft (1,524 mm), but it converted to standard gauge in 1844.

Contents

Its main line opened progressively between 1840 and 1842. It was worked by the neighbouring ECR, and it leased its network to that company in from the beginning of 1844 for 999 years. From that time it was a financial company only, it amalgamated with the ECR's successor, the Great Eastern Railway, in 1902.

The entire network is still in use and is now electrified, and part of the original main line now forms a section of the West Anglia Main Line between London Liverpool Street and Cambridge. [1]

Proposals

The Northern and Eastern Railway network at the end of 1843 Nth&east-rly.png
The Northern and Eastern Railway network at the end of 1843

When the Stockton and Darlington Railway was opened in 1825, great enthusiasm for railway transport was generated. A number of schemes were put forward for connecting London and York, and some of these were planned to pass through Cambridge. A canal engineer, Nicholas Wilcox Cundy, surveyed such a line, to be known as the Grand Northern & Eastern Railway, in 1834, and the following year another survey was made, by Joseph Gibbs, for another line from London through Cambridge to York. This scheme went to Parliament in the 1836 session as a proposed "Great Northern Railway" (nothing to do with the subsequent Great Northern Railway a decade later). The 1836 proposal was rejected by Parliament. [2]

Meanwhile, a public meeting was held at Cambridge Town Hall on 23 January 1836, at which it was decided to support a route surveyed by James Walker. A bill for a Northern & Eastern Railway was prepared; it was to run from London to Cambridge, with a branch from a little south of Cambridge to Newmarket, Norwich and Great Yarmouth. The extension from Cambridge to Lincoln was not included, as the surveys had not been completed. The bill was passed, but the route was cut back to run from London to Cambridge only; it received royal assent on 4 July 1836. Authorised share capital was £1,200,000. [2] [3] [4] [5] Although the construction cost was large, the company was confident of a 16% return. [6]

The London terminus, and track gauge

The N&ER was to have its London terminus at Islington. The topography was such that this would have required tunnelling to reach it, and it was realised that this was an expensive proposition. An approach was made to the Commercial Railway (later the London and Blackwall Railway) with a view to using its final approach to London and Minories terminus. This was unsuccessful, so the ECR was contacted, with a view to using its Shoreditch terminus. This was agreed to, and Parliament ratified the arrangement, so the N&ER's planned line was rerouted south of Tottenham to join the ECR at Stratford. The rental for this arrangement was to be £7,000 a year, with an additional charge per passenger. [2] [7] [6] The ECR agreed to build a separate terminus at Shoreditch for the N&ER. [8]

When the ECR determined its track gauge of 5 ft (1,524 mm), the N&ER had to adopt the same gauge in order to use the approach tracks. The first section of the ECR was opened on 18 June 1839, from a temporary terminus at Mile End to another temporary terminus at Romford. [2]

Contract award, and a retrenchment of scope

At the end of 1837 a contract for construction of the line was awarded to David Macintosh. In March 1838 construction began, with Michael Borthwick as resident engineer. From the beginning, the N&ER was unable to raise the capital it needed for building its line. By May 1837 the contractor was in difficulties, and Robert Stephenson was appointed as engineer-in-chief, with Borthwick continuing as resident engineer. George Parker Bidder was appointed as the new contractor. Engineering contractors Grissell and Peto were approached late in 1837 about building the line as far as Bishop's Stortford. In March 1840 they started work between Stratford and Tottenham, and finally took over the work between Tottenham and Broxbourne from David McIntosh.

The N&ER company obtained a further act of Parliament (3 & 4 Vict. c. lii), which received royal assent on 4 June 1840; the line beyond Bishop's Stortford to Cambridge was abandoned, and the share capital was reduced to £720,000. [5]

Opening

On 15 September 1840 the N&ER started operation between the ECR's Stratford station and Broxbourne, a distance of about 15 miles (24 km). At first this was a single track; it was doubled in 1841. [3] Trains ran through from Shoreditch, but the ECR insisted that Shoreditch to Stratford journeys were exclusive to them. [9]

The line was extended as far as Harlow on 9 August 1841; to Spelbrook (a temporary terminus) on 19 November 1841; and as far as Bishop's Stortford on 16 May 1842. [2] [10] [8]

A criticism of the route of the N&ER was that the line followed the valley of the River Lea, while nearly all of the settlements were on higher ground, and were some distance from their respective stations. Tottenham was used as the railhead for cattle being brought in to London; they were driven on foot from there to the city markets. [1] In the second half of 1842 a dividend of 2% was paid. [6]

Hertford branch

In June 1841 parliamentary assent was given for a branch from Broxbourne to Hertford; it became the present-day Hertford East Branch Line. Work on the Hertford branch line began early in 1843, and it opened as a single track on 31 October 1843. It was doubled in October 1846 (after the lease by the ECR). [11]

Hockerill

The northernmost extent of the line was at Bishop's Stortford, opened before the end of 1843, when the N&ER ceased to control its own network. However a special arrangement was made to receive excursion trains at Hockerill, 12 mile (0.8 km) or so north of Bishop's Stortford station. The overbridge at that point today carries Hockerill Street, and Stortford was then a much smaller community; Hockerill was a distinct village. (The later Hockerill Halt station on the Dunmow branch was opened in 1910.) An advertisement in The Times in October 1843 read:

Newmarket Houghton Meeting—A special train, consisting of first-class carriages only, of the Northern and Eastern Railway, stopping only at Tottenham and Broxbourne, will leave the London Terminus, Shoreditch, for Hockerill, Bishop's Stortford, on Monday, 23d inst., at half-past-seven a.m., and return from Hockerill at half-past nine o'clock at night, thereby enabling persons attending Newmarket to see the whole of the races and return to London the same evening. Ample accommodation may be had at Hockerill should parties prefer to send their private horses and carriages the day before to wait the arrival of the trains. Horse and carriages can be taken on at the Tottenham station, thereby avoiding passing through the city. Previous notice should be given by parties taking their own horses and carriages, to prevent the possibility of disappointment. Extra post horses and carriages will be in attendance to convey persons forward, and may be ordered to be in readiness by sending a letter to Messrs. Edwards and Stokes of Hockerill. Places may be secured [to travel] by coaches meeting the train to Newmarket and back, at the Golden Cross, Charing-cross. Fares—Hockerill to Newmarket and back, inside £1 10s, outside £1 1s. [12]

These excursions were advertised to be run on 9 and 11 October 1843, and (after the lease of the N&ER to the ECR) on 15 and 28 October 1844. [13]

Leased to the Eastern Counties Railway

On 25 October 1843 an agreement facilitated by G. P. Bidder [14] was reached by the ECR and N&ER, and from 1 January 1844 the entire N&ER system was leased to the ECR for 999 years; the arrangement was formally ratified by Parliament in May 1844. The ECR was to pay the N&ER 5% annually on the £970,000 capital cost of building the line, and profits would be apportioned. The N&ER continued as a nominally independent company, receiving the lease charges but not operating any railway; eventually it merged into the Great Eastern Railway in 1902. [2]

Gauge change

At the same time as the discussion about the lease took place, the two companies agreed that their uncommon track gauge of 5 ft (1,524 mm) was a hindrance, and they decided to alter it to the British standard gauge of 4 ft 8+12 in (1,435 mm). The physical conversion was undertaken between 5 September and 7 October 1844; it was achieved without interruption to the running of trains, except on the Hertford branch. [2]

Engineering details

Whishaw reported that the rails are "of the double parallel form" (that is, not fish-bellied and broadly similar to modern bullhead rail) in lengths of 12 and 15 feet (3.7 and 4.6 m). "The upper and lower webs are not of similar section": Whishaw meant that the head and foot are not identical. The sleepers were of larch, 9 feet (2.7 m) in length, and 10 by 5 inches (25 by 13 cm) in cross section. The ballasting was of gravel, of at least 2 feet (0.6 m) in thickness throughout. [5]

From 1844

Broxbourne station in 1960 Broxbourne & Hoddesdon railway 1925797.jpg
Broxbourne station in 1960

From the first day of 1844, the N&ER was simply a financial shell company, receiving lease charges from the ECR but not having any rail operations of its own. The N&ER network extended from Stratford to Bishop's Stortford and from Broxbourne to Hertford, and it became the stem of the important main line to Cambridge, which was built and owned north of Stortford by the ECR. The approach to London was later altered to run through Hackney Downs, but the Stratford to Copper Mill Junction (Tottenham Hale) section was retained, and became a key link for goods traffic approaching Temple Mills Yard. [1]

In 1849 the ECR opened a branch line from Angel Road to Enfield. [1]

The ECR and certain other companies in the east of England amalgamated to form the Great Eastern Railway (GER) in 1862. [2] The GER adopted a policy of running frequent passenger services on the London suburban lines: in 1864 there were 29 departures per day for the N&ER line. Shoreditch station had been renamed Bishopsgate, but it was obviously inadequate for both main line traffic and N&ER line traffic, and the decision was taken to extend westwards: Liverpool Street station was opened in 1871, with a connection to the underground Metropolitan Railway opening in 1875. [1]

In 1872 a new shorter route towards Broxbourne was opened, from Bethnal Green, near Liverpool Street, via Hackney Downs to Copper Mill Junction, south of Tottenham Hale station. In time this became the dominant route from London. In 1891 the Churchbury loop was opened, from Bury Street Junction via Lower Edmonton to Cheshunt. The area was undeveloped and the sparse train service failed to encourage residential travel. It closed to ordinary passenger trains in 1909. [1]

The N&ER line never became the primary route from London to York (which was the Great Northern Railway's route via Peterborough and Newark), but from 1882 the GER participated with the GNR in a joint railway, the Great Northern and Great Eastern Joint Railway, which gave it access to Doncaster, and by means of running powers to York. A significant flow of coal ran south from Yorkshire to London over the N&ER's line, and for a while an express passenger train, the Cathedrals Express , ran over the route. The cathedrals alluded to were Ely, Peterborough and Lincoln, and the service ran from 1892 to 1918. [15]

The twentieth century

Passenger use of the line intensified in the 20th century, particularly for residential travel as people became accustomed to travelling longer distances in order to live in more rural surroundings. Cambridge too became increasingly significant as a regional centre, attracting express passenger trains over the route. Goods and mineral traffic too remained dominant, although declining steeply after 1955.

Organisationally the N&ER company was absorbed into the GER in 1902; the GER was a constituent of the new London and North Eastern Railway in 1923 (as part of the "grouping" of the railways) and in 1948 the LNER in turn was nationalised. [1] [6]

The Churchbury Loop from Bury Street Junction, near Enfield, and Cheshunt, had been dormant so far as passenger use was concerned, since 1909. In 1960 it was electrified and reopened as part of a new electrified suburban network; the line was retitled the Southbury loop. At first six trains an hour were run, although this was later reduced. The new suburban electric trains ran as far as Bishop's Stortford and Hertford. For the time being the southern part of the N&ER route remained unelectrified, but electrification was provided from May 1969. [1] [16]

The entire network remains in use at the present day. The dominant traffic is on the section between Copper Mill Junction and Bishop's Stortford, part of the route from London Liverpool Street station to Cambridge and Stansted Airport. [1]

Stations

Only stations marked in bold are still in existence.

Main line

Junction with Eastern Counties Railway main line
Direct line via Hackney Downs (built 1872) converges
ECR Enfield branch (built 1849) diverges
Hertford branch diverges
Line continues as ECR to Cambridge

Hertford branch

From Broxbourne:
Stratford Junction in 1851 ECR(1851) p19b - Stratford Junction.jpg
Stratford Junction in 1851

Whishaw reported that "At Shoreditch this Company is accommodated with part of the Eastern Counties station. The intermediate stations already opened to the public are at the Lea Bridge Road, Tottenham, Edmonton, Enfield-Highway and Ponder’s End, Waltham Cross, and Broxbourne." [5] In fact the two parts of Stratford station were to the east of the point of junction; the present day platforms 1 and 2 are on the site of the original N&ER station. The station was approached by Station Road, connecting to Angel Lane. The present-day main entrance in Gibbins Road came much later. [1]

Locomotives

The company purchased 14 2-2-2 locomotives from four builders:

The locomotives were regauged to standard gauge in September and October 1844. [19]

Whishaw said that "The principal engine-station [depot] is near the Stratford junction." [5]

Carriages

Carriages were 20 feet (6.1 m) long and 7 feet (2.1 m) wide. They had six wheels and were first, second or third class with capacity for 24, 32 and 60 to 70 passengers respectively. They had footboards to allow passengers to board at locations with no or low platforms. The third class carriages were open to the elements. [10]

Whishaw had a comment about the carriages: "The carriages on this line present a novelty in being mounted on six instead of four wheels, except those of the Great Western and Blackwall lines. One of the advantages of this mode of construction is, that the carriages are less likely to run off the line, or to give way by reason of an axle breaking on the journey."

See also

Related Research Articles

<span class="mw-page-title-main">A10 road (England)</span> Road in England

The A10 is a major road in England which runs between The City of London and King's Lynn in Norfolk.

<span class="mw-page-title-main">Bishopsgate railway station</span> Disused railway station in London, England

Bishopsgate was a railway station located on the eastern side of Shoreditch High Street in the parish of Bethnal Green on the western edge of the East End of London and just outside the City of London.

The Eastern Counties Railway (ECR) was an English railway company incorporated in 1836 intended to link London with Ipswich via Colchester, and then extend to Norwich and Yarmouth.

<span class="mw-page-title-main">Tottenham Hale station</span> London Underground and railway station in the London Borough of Haringey

Tottenham Hale is an interchange station located in Tottenham Hale, North London for London Underground and National Rail services.

<span class="mw-page-title-main">Enfield Lock railway station</span> National Rail station in London, England

Enfield Lock railway station is on the West Anglia Main Line, it is in Enfield Lock in the London Borough of Enfield, London. It is 11 miles 65 chains (19.0 km) down the line from London Liverpool Street and is situated between Brimsdown and Waltham Cross. Its three-letter station code is ENL and it is in Travelcard zone 6.

<span class="mw-page-title-main">Lea Valley lines</span> Commuter railway lines in London, England

The Lea Valley lines are two commuter lines and two branches in north-east London, so named because they run along the Lower Lea Valley of the River Lea. They were part of the Great Eastern Railway, now part of the Anglia Route of Network Rail.

<span class="mw-page-title-main">Norwich railway station</span> Railway station in Norwich, England

Norwich railway station is the northern terminus of the Great Eastern Main Line in the East of England, serving the cathedral city of Norwich, Norfolk. It is 114 miles 77 chains (185.0 km) down the main line from London Liverpool Street, the western terminus.

<span class="mw-page-title-main">Broxbourne railway station</span> Network Rail station in Hertfordshire, England

Broxbourne railway station is on the West Anglia Main Line serving the towns of Broxbourne and Hoddesdon in Hertfordshire, England. It is 17 miles 17 chains (27.7 km) down the line from London Liverpool Street and is situated between Cheshunt and Roydon. Its three-letter station code is BXB and it is in fare zone B.

<span class="mw-page-title-main">Cheshunt railway station</span> National Rail station in Hertfordshire, England

Cheshunt is a National Rail and London Overground station in Cheshunt, Hertfordshire, England. On the National Rail network it is on the West Anglia Main Line, 14 miles 1 chain (22.6 km) from London Liverpool Street and situated between Waltham Cross and Broxbourne. On the London Overground network it is one of three northern termini of the Lea Valley lines.

<span class="mw-page-title-main">Waltham Cross railway station</span> National Rail station in Hertfordshire, England

Waltham Cross railway station is on the West Anglia Main Line, serving the suburban town of Waltham Cross in Hertfordshire, and the neighbouring Waltham Abbey in Essex, England. It is 12 miles 63 chains (20.6 km) down the line from London Liverpool Street and is situated between Enfield Lock and Cheshunt. Its three-letter station code is WLC and it is in Travelcard zone 7.

<span class="mw-page-title-main">Hertford East railway station</span> Network Rail station in Hertfordshire, England

Hertford East railway station is the northern terminus of the Hertford East branch line off the West Anglia Main Line in the east of England, and is located in the town of Hertford in Hertfordshire. It is 24 miles 19 chains (39.0 km) down the line from London Liverpool Street and is one of two stations in the town, the other being Hertford North on the Hertford Loop Line. Its three-letter station code is HFE.

<span class="mw-page-title-main">West Anglia Main Line</span> Mainline railway line in East Anglia, England

The West Anglia Main Line is one of the two main lines that operate out of Liverpool Street. It runs generally north through Cheshunt, Broxbourne, Harlow, Bishop's Stortford and Audley End to Cambridge, with branches between serving Stratford, Hertford and Stansted Airport. The line runs along the boundary between Hertfordshire and Essex for much of its length.

Enfield Lock is an area in the London Borough of Enfield, north London. It is approximately located east of the Hertford Road between Turkey Street and the Holmesdale Tunnel overpass, and extends to the River Lee Navigation, including the Enfield Island Village. The locality gains its name from the lock on the River Lee Navigation. Today's Enfield Lock was rebuilt in 1922. The area forms part of the Lee Valley Park and the Enfield Lock Conservation Area. On its eastern boundary Enfield Lock has marshland formerly used as a testing site between the Royal Small Arms Factory and the Gunpowder Mills, beyond this is the village of Sewardstone and the Epping forest boundary. To the south is Brimsdown, the north Waltham Cross and to the west Bullsmoor and Freezywater. Enfield Lock forms part of the London boundary.

<span class="mw-page-title-main">Lea Bridge railway station</span> Railway station in Greater London, England

Lea Bridge is a railway station on the line between Stratford and Tottenham Hale on the Lea Valley Lines, which reopened on 15 May 2016 with the full service beginning on 16 May 2016, operated by Greater Anglia.

<span class="mw-page-title-main">Bishop's Stortford railway station</span> Railway station in Hertfordshire, England

Bishop's Stortford railway station is on the West Anglia Main Line serving the town of Bishop's Stortford in Hertfordshire, England. It is 30 miles 27 chains (48.8 km) down the line from London Liverpool Street and is situated between Sawbridgeworth and Stansted Mountfitchet stations. Its three-letter station code is BIS.

<span class="mw-page-title-main">Hertford East branch line</span> Railway line in Hertfordshire, England

The Hertford East branch line is a railway line in Hertfordshire, England running between Hertford East and Broxbourne. The line follows the route of the Lea Valley, serving intermediate towns and villages. It branches off the West Anglia Main Line north of Broxbourne, and could be seen as part of the Lea Valley lines—a collection of commuter routes into London. It is 5 miles 64 chains (9.33 km) in length.

Lower Edmonton railway station was a station in Edmonton, London opened in 1849 by the Eastern Counties Railway as part of the original Enfield Town branch line. Originally named Edmonton it was renamed as Lower Edmonton low level to distinguish it from neighbouring Lower Edmonton high level. It closed to passengers in 1939 although the line on which it stood lasted until 1964.

The Bishop's Stortford–Braintree branch line was an 18-mile-long (29 km) railway line connecting existing railways at Bishop's Stortford, Dunmow and Braintree. It was promoted independently by the Bishop’s Stortford, Dunmow and Braintree Railway (BSD&BR) company, but the directors failed to generate subscriptions, or to manage the construction properly. The Great Eastern Railway was the dominant railway company in the area, and saw the line as a blocker, to prevent the incursion of a rival line, so they felt obliged to support it. However they themselves had other pressing priorities, both managerial and financial, at the time, and for some time the construction was in abeyance.

<span class="mw-page-title-main">Buntingford branch line</span> Former railway line in Hertfordshire, England

The Buntingford branch line in Hertfordshire, England, connected Buntingford to the railway network at St Margarets. It was promoted locally and opened in 1863 after overspending its available capital. The line was completed with the assistance of the neighbouring Great Eastern Railway. Residential travel and goods services became significant at the end of the 19th century. The area served by the line was predominantly agricultural, and after 1948 usage did not keep pace with rising costs. When the Hertford East branch was electrified, Buntingford branch trains were reduced in frequency with through trains to London withdrawn. The line was recommended for closure in the Beeching Report, and the passenger service was withdrawn in 1964; goods services closed in 1965.

<span class="mw-page-title-main">Norfolk Railway</span> Railway company in Norfolk, England operating from 1845 to 1862

The Norfolk Railway was an early railway company that controlled a network of 94 miles around Norwich, England. It was formed in 1845 by the amalgamation of the Yarmouth and Norwich Railway opened in 1844, and the Norwich and Brandon Railway, not yet opened. These lines were built out of frustration that the Eastern Counties Railway line that was expected to connect Norwich to London failed to be completed. The Norfolk Railway also leased the Lowestoft Railway and Harbour company, and built a branch to Dereham and Fakenham, opened in 1846 and 1849 respectively.

References

  1. 1 2 3 4 5 6 7 8 9 10 White, H.P. (1987). Thomas, David St John (ed.). A Regional History of the Railways of Great Britain — Volume 3: Greater London (3rd ed.). Dawlish: David & Charles.
  2. 1 2 3 4 5 6 7 8 Cecil J Allen, The Great Eastern Railway, Ian Allan, Shepperton, fifth edition 1968
  3. 1 2 Lake, G H (1945 reprinted 1999). The Railways of Tottenham. Teignmouth: Peter Kay. page 12. ISBN   1 899890 26 2
  4. Wright, Neil R. (1982). Lincolnshire towns and industry, 1700-1914. History of Lincolnshire Committee for the Society for Lincolnshire History and Archaeology. ISBN   0-902668-10-2.
  5. 1 2 3 4 5
  6. 1 2 3 4 Gordon, D I, A Regional History of the Railways of Great Britain — Volume 5: The Eastern Counties, David & Charles, Newton Abbot, 1977, ISBN   0 7153 7431 1
  7. Bradley, Richard (July 2013). "The railway at Harlow and in the Stort Valley: an exploration of its earliest years - Part 2". Great Eastern Railway Society Journal. 155: 4.
  8. 1 2 Bradley, Richard (July 2013). "Significant events in the life of the Northern and Eastern Railway Part 2". Great Eastern Railway Society Journal. 155: 17.
  9. Bradley, Richard (July 2013). "The railway at Harlow and in the Stort Valley: an exploration of its earliest years Part 2". Great Eastern Railway Society Journal. 155: 4.
  10. 1 2 Bradley, Richard (April 2013). "The railway at Harlow and in the Stort Valley:an exploration of its earliest years Part 1". Great Eastern Railway Society Journal. 154: 4.
  11. Bradley, Richard (April 2013). "The railway at Harlow and in the Stort Valley: an exploration of its earliest years Part 1". Great Eastern Railway Society Journal. 154: 10.
  12. Advertisement in the Times Newspaper, 20 October 1843
  13. 1 2 3 M E Quick, Railway Passenger Stations in England Scotland and Wales—A Chronology, The Railway and Canal Historical Society, 2002
  14. Bradley, Richard (July 2013). "The railway at Harlow and in the Stort Valley: an exploration of its earliest years Part 2". Great Eastern Railway Society Journal. 155: 5.
  15. Goode, C.T. The Great Northern & Great Eastern Joint Railway, published by C T Goode, Anlaby, 1892, ISBN   978-1-870313-06-3
  16. J C Gillham, The Age of the Electric Trains, Ian Allan Ltd, Shepperton, 1988, ISBN   0 7110 1392 6
  17. Railway Gazette, 16 May 2016
  18. Allen, page 85
  19. Allen, page 12