Siemens S200

Last updated

Siemens S200 LRV
Muni 2013 at Carl and Cole, April 2018.JPG
S200 SF of San Francisco Muni in April 2018
In service2016–present
Manufacturer Siemens USA
Replaced
Constructed2015–present
Number under construction
  • 15 (Calgary)
  • 193 (San Francisco)
Number in service
  • 69 (Calgary)
  • 56 (San Francisco)
Predecessor Siemens SD-400 and SD-460
Fleet numbers
  • 2401–2469 (Calgary)
  • 2001–2249 (San Francisco)
Capacity
  • 247 (Calgary)
  • 193 (SF)
Operators
Lines served
Specifications
Car length
  • 84.6 ft (25.79 m) (Calgary)
  • 75 ft (23 m) (SF)
Width104.32 in (2.650 m)
Height
  • 12.6 ft (3.8 m) (Calgary)
  • 11.5 ft (3.5 m) (SF)
Floor height
  • 3.2 ft (0.98 m) (Calgary)
  • 2.8 ft (0.85 m) (SF)
Articulated sections2 (one articulation)
Maximum speed
  • 50 mph (80 km/h) (Calgary)
  • 55 mph (89 km/h) (SF)
Weight
  • 89,950 lb (40,800 kg) (Calgary)
  • 76,000 lb (34,000 kg) (SF)
Steep gradient
  • 7% (Calgary)
  • 10% (SF)
Power output
  • 776 hp (579 kW) (Calgary)
  • 696 hp (519 kW) (SF)
Acceleration
  • 2.13 mph/s (0.95 m/s2) (Calgary)
  • 3.0 mph/s (1.3 m/s2) (SF)
Deceleration
  • 2.95 mph/s (1.32 m/s2) (Calgary)
  • 3.5 mph/s (1.6 m/s2) (SF)
Electric system(s) Overhead line,  600 V DC
Current collector(s) Faiveley pantograph
UIC classification Bo′+2′+Bo′
AAR wheel arrangement B-2-B
Minimum turning radius
  • 82 ft (25.0 m) (Calgary)
  • 42 ft 7 in (13.0 m) (SF)
Coupling system Scharfenberg
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Notes/references
[1] [2] [3]

The Siemens S200 is a high-floor light rail vehicle (LRV) manufactured by Siemens Mobility in Florin, California, beginning service in 2016. [4]

Contents

The S200 succeeds earlier Siemens high-floor LRV models, including the SD-100/SD-160 and the SD-400/SD-460. Its low-floor counterpart is the Siemens S700. The S200 is designed specifically for the North American market, and is built to the specifications of each individual operator. [3]

Description and predecessors

The S200 is a new design by Siemens for the North American market, building upon its previous models. Siemens entered the North American light rail market in the late 1970s with the Siemens–Duewag U2, which was initially built in Düsseldorf, West Germany. The U2's successors in the high-floor LRV market were manufactured in Florin, California, along with low-floor designs including the SD660 and the S70/S700. [3]

Calgary Transit selected Siemens to manufacture 60 light rail vehicles in 2013, to replace part of its initial fleet of U2 trains. The S200 was designed for service in Calgary, whose CTrain system uses high platforms for level boarding. [5] The second customer, the San Francisco Municipal Railway, uses a combination of high platforms and street-level stops for its Muni Metro system. This distinct environment prompted the inclusion of retractable stairs in San Francisco's S200 trains, which entered service in 2017. [6]

The basic design of the S200 is a high-floor design, designed for level boarding. The design is customized for each operator, to account for varying platform heights, loading gauges, and service requirements. All S200 vehicles are powered by direct current, collected from overhead lines with a pantograph. [3]

Operators

Calgary

An S200 in Calgary in 2021 S200 CTrain leaving City Hall Station.jpg
An S200 in Calgary in 2021

In September 2013, 60 light rail vehicles were ordered, costing $200 million, for the Calgary CTrain; [5] the order was later slightly expanded to 63 LRVs at a cost of $201.6 million. [7] The first car was delivered on January 6, 2016. [8]

Later, an additional 6 cars were ordered. The first of this order was delivered in May 2019 and was put into service on July 11, 2019.

In February 2020, 15 more LRVs were ordered bringing the total fleet to 84 S200 LRVs. [9]

The new cars feature a host of new and upgraded technologies. Heated floors and triple-pane windows were added to combat Calgary's harsh winter climate, as well as sloped entryways to eliminate moving ramps found on older trains. A new speaker system adjusts the volume output depending on the number of passengers in each car. Dynamic interior LED lights adjust to become brighter when it is dark and dimmer when light is shining through the windows. The end doors were moved back to improve passenger flow and include LED lights to indicate if a door can be opened or if it is closing/locked. New infotainment systems were added alongside LED info signs to display next stop and line information. It is also capable of showing advertisements, although it has not been implemented yet. Some of these features (LCD information screens, security cameras, LED exterior signs) have been implemented on the refurbished Siemens SD-160 cars as part of mid-lifecycle refurbishment.[ citation needed ]

San Francisco

Siemens have designated the S200 light rail vehicles for San Francisco as S200 SF, and the San Francisco Municipal Transportation Agency internally designates them as the LRV4. San Francisco's S200 LRVs succeed prior LRV designs from Boeing-Vertol (LRV1) and AnsaldoBreda (LRV2 and LRV3). [10]

SFMTA ordered 175 LRVs in September 2014 at a total cost of $648 million. [11] Additional S200 LRVs were ordered in 2015, 2017, and 2021. [12] The S200 trains will replace the entire Muni Metro fleet, and will provide additional capacity for service expansions. These expansions include additional game day service to the Chase Center, and full service on the Central Subway. [10]

The first S200 LRV for the Muni Metro entered service on November 17, 2017, [6] and the final LRV of the 219-vehicle order is expected to be delivered in 2025. [13]

Reliability

One of the primary concerns for the LRV4 fleet in San Francisco was improving the mean distance between failures (MDBF) compared to the existing Breda LRV2/3 fleet. The Breda fleet was able to achieve an MDBF of 2,000–5,500 miles (3,200–8,900 km) in fiscal years 2005 and 2006; the contract with Siemens called for a MDBF of 25,000 miles (40,000 km). When they were initially placed in service, the Siemens LRV4 had a MDBF of 5,000 miles (8,000 km), improving to 17,000 miles (27,000 km) by January 2020. [14] :21

Seating

All-longitudinal seating configuration of early LRV4 Interior of San Francisco MUNI Siemens S200 train.jpg
All-longitudinal seating configuration of early LRV4

Ridership surveys and SFMTA staff recommendations resulted in an all-longitudinal seating configuration for the initial "future fleet" delivery of 68 LRVs, where seats are placed along the long sides of the car, rather than lateral seating, where seats face the front and back of the vehicle. [15] The longitudinal seating creates wider aisles, is preferred by advocates for the disabled, provides more room for standing passengers, and may accommodate bicycles on board, as the bicycle policy only allows folding bikes on board. [15]

However, in "future fleet" of 68 LRV4s, the long benches were flat and lacked the individual seating pockets used in the Breda longitudinal benches. [16] In a November 2019 report, Muni provided details for a retrofit of the already-delivered "future fleet": half the flat longitudinal benches will be replaced with single transverse seats, and the other half will be replaced with individual longitudinal seats. For the "replacement fleet" of 151 cars, 50 will be delivered with seating to match the retrofitted "future fleet" of 68; the remaining 101 will have double transverse seats instead of the single transverse seats. [10] The seats also will be lowered, enabling riders shorter than 5 ft 4 in (163 cm) to rest their feet on the floor. [17]

Cleveland

The Greater Cleveland Regional Transit Authority intends to acquire 24 S200 vehicles to replace heavy rail vehicles used on the Red Line, with an option to acquire 36 additional units to replace the light rail vehicles used on the Blue, Green, and Waterfront lines. [18]

GCRTA's S200 vehicles will include steps at the front and back doors for boarding and alighting at street-level light rail stations and stops. These doors will also have manually operated trapdoors for use on the Red Line, which exclusively uses high-level platforms. [19] The introduction of S200 LRVs for the Red Line will require modifications at Red Line stations, as the S200 cars are narrower than the existing Tokyu trains. [20]

The plan was first announced in January 2023, and the deal was finalized in May 2023, after the RTA received a grant from the Federal Transit Administration. [21] The S200s are expected to begin service in Cleveland in 2026. [22] [23]

St. Louis

In May 2023, Metro announced its intention to acquire 48 vehicles to replace its aging fleet of SD-400 light rail vehicles. [24] [25] [26] The S200 vehicles for St. Louis will be equipped with batteries for operation on tracks without overhead lines, allowing for flexibility in future expansions. [27]

Operational history

San Francisco

Multiple defects were reported in April 2019 with San Francisco's fleet of S200 trains, which it refers to as the LRV4. The issues, involving doors, couplers, and brakes, drew widespread media attention. In response, the San Francisco Municipal Transportation Authority delayed a $62 million payment to Siemens. The issues with the LRV4 fleet, combined with the high failure rate of SFMTA's older trains, caused delays and overcrowding on multiple services. [28]

On April 12, 2019, a passenger on the N-Judah line was dragged along a platform after her hand became stuck in a door. [29] [30] The passenger was thrown down to track level after freeing her hand, and was seriously injured. The April 2019 incident was the fourth reported incident where passengers were trapped by doors on the LRV4. [29] As a temporary measure, the rear doors on S200 trains were locked shut to prevent additional trapped passengers. [28] Siemens redesigned the door sensor system under warranty, and normal operation resumed in June 2019. [31]

Two-car train in coupled operation on N Judah; coupler is prominent on front of lead car (#2025) Inbound N Judah train boarding at 48th Avenue, September 2019.JPG
Two-car train in coupled operation on N Judah; coupler is prominent on front of lead car (#2025)

In a separate incident on April 12th, a two-car train of LRV4 cars was found with a faulty shear pin in its couplers. The S200's coupler shear pins allow the couplers to retract inwards in a collision, working in tandem with an anti-climber on the front of the train, which protects the train operator and passengers. [14] :11–12 The faulty shear pins put trains at risk of unintentionally separating in service, and Muni responded by running trains with only one car. More extensive inspections in May 2019 showed that approximately 13 of the couplers were damaged. [32]

At the Board of Supervisors meeting in April 2019, Muni officials also reported that the wheels on the LRV4s required resurfacing before their expected end-of-life because of the use of emergency brakes, which are engaged once a week on average. [33] At any given time, only half (or fewer) of the LRV4s were available for service because of wheels with flat spots caused by emergency braking. [34]

Muni and the California Public Utilities Commission investigated the issues. The investigation into the coupler issues found that maintenance technicians were overtightening an adjustment screw in the couplers, which placed additional stress on the shear pins, which then failed. Maintenance procedures were revised, and redesigned brackets and spacers were installed in the couplers. [14] :12–15 Two-car and three-car trains resumed service in June 2019, [30] but were again withdrawn in December 2019 after issues with the shear pins resumed. [35] The later issues with shear pins were attributed to stresses on the couplers brought on by San Francisco's hilly terrain. Siemens provided new shear pins under warranty until it completed a redesign of the system, and the shear pin issues were resolved by the end of 2021. [36] [37]

Powered end truck of an LRV4 on a lift at the Muni Metro East yard in July 2019, prior to retrofit with track brakes. Side view of LRV4 truck at Muni Metro East, July 2019.jpg
Powered end truck of an LRV4 on a lift at the Muni Metro East yard in July 2019, prior to retrofit with track brakes.

The investigation into the wheel issues found faults in the design of the brake system on the S200 LRVs, and also highlighted issues with operator training. Operators were trained to use the emergency stop button on San Francisco's older LRVs when requiring a quick stop, because of the sometimes faulty nature of their braking systems. Emergency braking in the S200 LRVs was found to be effective, but applying the emergency brakes disables anti-lock braking, leading to flat spots on wheels as they grind against the rails. [33] The braking system on the S200 LRVs was redesigned in late 2019 to incorporate additional track brakes, and modifications were completed in 2020. [10] [14] :18–19

Calgary

Calgary Transit's S200 LRVs, which it refers to as the Series 9, experienced minor issues in October 2016. Software glitches in some newly-introduced S200 trains activated a safety mode, which reduced their service speed from 80 to 40 km/h (50 to 25 mph). The trains' doors were too slow to open, also causing delays. The issues were resolved by Siemens staff in Calgary, and the S200 cars continued in service. [38]

In the aftermath of the April 2019 incidents in San Francisco's S200 fleet, Calgary City Council transportation committee chair Shane Keating requested that Calgary Transit review its S200 fleet for similar issues. Calgary Transit officials highlighted their maintenance and inspection procedures, and emphasized that their trains' doors are built to a different specification than in San Francisco's fleet. [39]

See also

Related Research Articles

<span class="mw-page-title-main">San Francisco Municipal Railway</span> Public transport agency in San Francisco, California, USA

The San Francisco Municipal Railway ( MEW-nee; SF Muni or Muni), is the primary public transit system within San Francisco, California. It operates a system of bus routes, the Muni Metro light rail system, three historic cable car lines, and two historic streetcar lines. Previously an independent agency, the San Francisco Municipal Railway merged with two other agencies in 1999 to become the San Francisco Municipal Transportation Agency (SFMTA). In 2018, Muni served 46.7 square miles (121 km2) with an operating budget of about $1.2 billion. Muni is the seventh-highest-ridership transit system in the United States, with 142,168,200 rides in 2023, and the second-highest in California after the Los Angeles County Metropolitan Transportation Authority.

<span class="mw-page-title-main">CTrain</span> Light rail transit system in Calgary, Alberta

CTrain is a light rail system in Calgary, Alberta, Canada. Much of the system functions as a high-capacity light metro, while in the downtown free-fare zone, trains run like a modern tram with a dedicated right-of-way. This subway-surface alignment is known as semi-metro.

<span class="mw-page-title-main">Siemens–Duewag U2</span> Light rail vehicle

The Siemens–Duewag U2 is a type of light rail vehicle (LRV), built by consortium of Siemens, Duewag and Wegmann & Co built between 1968 and 1990.

<span class="mw-page-title-main">Siemens SD-100 and SD-160</span> Light rail vehicle

The Siemens SD-100 and SD-160 are two related types of high-floor light rail vehicles (LRV), manufactured by Siemens Mobility for the North American market. A total of 431 vehicles were built by Siemens in Florin, California from 1992 to 2013.

<span class="mw-page-title-main">Muni Metro</span> Light rail system in San Francisco, California

Muni Metro is a semi-metro system serving San Francisco, California, United States. Operated by the San Francisco Municipal Railway (Muni), a part of the San Francisco Municipal Transportation Agency (SFMTA), Muni's light rail lines saw an average of 91,000 boardings per day as of the second quarter of 2024 and a total of 24,324,600 boardings in 2023, making it the sixth-busiest light rail system in the United States.

<span class="mw-page-title-main">K Ingleside</span> Light rail line in San Francisco, California

The K Ingleside is a hybrid light rail/streetcar line of the Muni Metro system in San Francisco, California. It mainly serves the West Portal and Ingleside neighborhoods. The line opened on February 3, 1918, and was the first line to use the Twin Peaks Tunnel.

<span class="mw-page-title-main">J Church</span> Light rail line in San Francisco, California

The J Church is a hybrid light rail/streetcar line of the Muni Metro system in San Francisco, California. The line runs between Embarcadero station and Balboa Park station through Noe Valley. Opened on August 11, 1917, it is the oldest and has the lowest ridership of all of the Muni Metro lines.

<span class="mw-page-title-main">S Shuttle</span> Light rail service in San Francisco, California

The S Shuttle is a light rail service on the Muni Metro system in San Francisco, California. The service began in 2001 as the S Castro Shuttle, an effort to reduce crowding at Castro station. It was briefly discontinued in 2007 when the T Third Street line was opened. Service was extended to St. Francis Circle station in 2013, but cut back to West Portal station in 2016. In 2020, it was changed to full-time service as part of a reconfiguration of Muni Metro service.

<span class="mw-page-title-main">Third Street Light Rail Project</span> San Francisco Muni tram line

The Third Street Light Rail Project was the construction project that expanded the Muni Metro system in San Francisco, California, linking downtown San Francisco to the historically underserved southeastern neighborhoods of Bayview-Hunters Point and Visitacion Valley along the eastern side of the city. Construction was finished in late 2006, non-revenue weekend service began on January 13, 2007, and full service began on April 7, 2007. The new service, as the T Third Street Metro line, replaced the 15 Third bus line, which ran south from the Caltrain Depot at 4th and King streets, along Third Street and Bayshore Boulevard to the southeastern neighborhoods.

<span class="mw-page-title-main">Siemens S700 and S70</span> Light rail transit vehicle

The Siemens S70 and its successor, the Siemens S700, are a series of articulated low-floor light-rail vehicles (LRV) and modern streetcars manufactured for the United States market by Siemens Mobility, a division of German conglomerate Siemens AG. The series also includes a European tram-train variant, the Siemens Avanto.

<span class="mw-page-title-main">US Standard Light Rail Vehicle</span> Light rail vehicle

The US Standard Light Rail Vehicle (SLRV) was a light rail vehicle (LRV) built by Boeing Vertol in the 1970s. The Urban Mass Transportation Administration (UMTA) of the United States Department of Transportation (USDOT) promoted it as a standardized vehicle for U.S. cities. Part of a series of defense conversion projects in the waning days of the Vietnam War, the SLRV was seen as both a replacement for older PCC streetcars in many cities and as a catalyst for cities to construct new light rail systems. The US SLRV was marketed as and is popularly known as the Boeing LRV or SLRV, and should not be confused with their prior lunar roving vehicles for NASA.

<span class="mw-page-title-main">Light rail in North America</span> Mode of public transit

Light rail is a commonly used mode of public transit in North America. The term light rail was coined in 1972 by the Urban Mass Transportation Administration to describe new streetcar transformations which were taking place in Europe and the United States. The Germans used the term Stadtbahn, which is the predecessor to North American light rail, to describe the concept, and many in UMTA wanted to adopt the direct translation, which is city rail. However, in its reports, UMTA finally adopted the term light rail instead.

<span class="mw-page-title-main">San Francisco Municipal Railway fleet</span> LRV and Bus Fleet of the San Francisco Municipal Railway (Muni)

With five different modes of transport, the San Francisco Municipal Railway runs one of the most diverse fleets of vehicles in the United States. Roughly 550 diesel-electric hybrid buses, 300 electric trolleybuses, 250 modern light rail vehicles, 50 historic streetcars and 40 cable cars see active duty.

The opening of the Metro Blue Line in 2004 marked the beginning of Metro Transit's expansion into rail transit, 50 years after the last Twin Cities Rapid Transit streetcars were taken out of service. Several new rail transit projects are either under construction or in planning stages and more are expected to be explored in the near future. Metro Transit will likely be acquiring a significant amount of rolling stock as these new projects move forward.

<span class="mw-page-title-main">Broad and Plymouth station</span> Light rail stop in San Francisco, California, US

Broad and Plymouth station is a light rail stop on the Muni Metro M Ocean View line, located in the Ingleside neighborhood of San Francisco, California. The station has transit bulbs which extend the sidewalk of Broad Street, to meet trains like a side platform, allowing passengers to board or depart from trains. The stops are located just before trains cross Plymouth Avenue and include accessible mini-high platforms.

<span class="mw-page-title-main">Port Authority 4000-series PCC</span>

The 4000-series PCC was a rebuilt PCC streetcar used by the Port Authority of Allegheny County. Originally designed by the Presidents' Conference Committee, a group of transit operators in the United States and Canada, the 4000's were a series of PCC cars completely rebuilt from cars built in 1949 by the St. Louis Car Company for Port Authority's predecessor, Pittsburgh Railways.

<span class="mw-page-title-main">Siemens SD-400 and SD-460</span> Light rail vehicle

The Siemens SD-400 and SD-460 are light rail vehicles (LRV) that were manufactured by Siemens Mobility between 1985 and 2005 for the North and South American markets. The SD-400 was built under Siemens' joint venture with Duewag and assembled at both Duewag's factory in Düsseldorf, West Germany and the Siemens factory in Florin, California. Siemens purchased Duewag in 1999 and the SD-460 was assembled entirely at the Siemens factory in California.

<span class="mw-page-title-main">TriMet rolling stock</span> List of MAX and WES rolling stock used by Trimet

The TriMet transit system, serving the Portland metropolitan area in Oregon, owns and operates two different rail transit systems: a light rail system known as MAX, and a commuter rail system known as WES. The fleet of 145 MAX electric light rail vehicles (LRVs) includes five different models, designated by TriMet as "Type 1" through "Type 6". All types are used on all of the MAX lines, but the Type 6 cars – which will gradually replace the Type 1 cars – are still being delivered and have not yet begun to enter service. The comparatively very small WES fleet includes three different types of diesel commuter rail cars.

<span class="mw-page-title-main">Siemens SD660</span> Light rail vehicle

The Siemens SD660, originally known as the Siemens SD600, is a double-articulated, 70%-low-floor light rail vehicle (LRV) manufactured by Siemens Transportation Systems. It was the first low-floor light rail vehicle to be used in the United States. It first entered service in 1997 with its only operator, TriMet, on the MAX light rail system in Portland, Oregon, United States.

References

  1. "S200 SF Light Rail Vehicle" (PDF). Siemens Mobility. 2017. Archived from the original (PDF) on April 13, 2021.
  2. "Calgary, Alberta: S200 High-Floor Light Rail Vehicle" (PDF). Siemens Mobility. 2023. Archived from the original (PDF) on February 27, 2024.
  3. 1 2 3 4 "High-Floor Light Rail Vehicles: Building on the strengths of today with the innovations of tomorrow" (PDF). Siemens Mobility. 2023. Archived from the original (PDF) on May 31, 2024.
  4. "Trams and Light Rail". Siemens.
  5. 1 2 Schmidt, Colleen; White, Ryan (September 11, 2013). "Black and white and red all over – Calgary's new LRT cars revealed". CTV News . Retrieved August 27, 2015.
  6. 1 2 "First New Muni State-of-the-Art Train Makes Debut in Service" (Press release). San Francisco Municipal Transportation Agency. November 17, 2017. Archived from the original on December 1, 2017.
  7. Barrow, Keith (March 22, 2017). "Calgary to order more Mask LRVs from Siemens". International Railway Journal . Retrieved April 13, 2018.
  8. "New Mask CTrain car arrives". Calgary Transit. January 14, 2016. Retrieved January 26, 2017.
  9. Corselli, Andrew (February 25, 2020). "Siemens to Provide Calgary Transit With 15 S200 LRVs". Railway Age. Retrieved April 19, 2021.
  10. 1 2 3 4 Kirschbaum, Julie (November 19, 2019). LRV4 Project Update (PDF) (Report). San Francisco Municipal Transportation Agency. Retrieved December 9, 2019.
  11. Cabanatuan, Michael (September 20, 2014). "Mayor signs deal for new fleet of Muni Metro railcars". San Francisco Chronicle . Retrieved August 27, 2015.
  12. "LRV4 Procurement: Project Status + Contract Option Decision Point" (PDF). San Francisco Municipal Transportation Agency, Board of Directors. August 2, 2021. Retrieved November 17, 2021.
  13. Ward, Christopher. "100 and Counting – More New Trains Join the SFMTA Fleet". SFMTA. Retrieved July 24, 2024.
  14. 1 2 3 4 T.Y. Lin International (February 20, 2020). Program Management Oversight Report for SFMTA Light Rail Vehicle Procurement (PDF) (Report). San Francisco County Transportation Authority. Retrieved March 12, 2020.
  15. 1 2 Thompson, Walter (May 18, 2016). "These new Muni Metro cars should be ready to roll next year". San Francisco Chronicle. Retrieved January 18, 2017.
  16. Rosen, Michael (January 17, 2019). "People are upset about an unexpected missing feature on new Muni trains". San Francisco Chronicle. Retrieved May 14, 2019.
  17. Rodriguez, Joe Fitzgerald (March 11, 2020). "Muni to accelerate purchase of 219 new train cars". San Francisco Examiner. Retrieved March 12, 2020.
  18. "Cleveland plans to standardise rail transit fleet". The International Light Rail Magazine. January 24, 2023. Retrieved April 4, 2023.
  19. Greater Cleveland Regional Transit Authority [@GCRTA] (April 27, 2023). "Hello Brian, each front entrance will have one manual trap door which can be folded up (stowed) next to the aft windscreen of the end door when configured for low platform boarding and be folded down (deployed) to the floor manually when configured for high platform boarding" (Tweet) via Twitter.
  20. Kennedy, Dakotah; Lubecky, Ashley (July 15, 2024). "Cleveland's RTA making plans to accommodate new train cars". Signal Cleveland. Retrieved July 24, 2024.
  21. Durbin, Kaitlin (May 5, 2023). "RTA wins $130 million federal grant to replace railcar fleet, starting with Red Line". The Plain Dealer . Retrieved May 6, 2023.
  22. Prendergast, Ken (April 4, 2023). "Cleveland RTA reveals its new trains". NEOtrans.
  23. "Committee Meetings - 2023-04-04" (Video). Greater Cleveland Regional Transit Authority. April 4, 2023 via YouTube.
  24. Thomas, Jasmine (May 5, 2023). "Metro Transit Awarded $196.2 Million Federal Grant for New MetroLink Train Cars". Metro Transit – Saint Louis. Retrieved May 6, 2023.
  25. "New MetroLink train cars coming to St. Louis region". FOX 2. May 5, 2023. Retrieved May 6, 2023.
  26. Kirn, Jacob (May 5, 2023). "Feds award $196.3M to replace 48 MetroLink cars in St. Louis". St. Louis Business Journal. Retrieved May 6, 2023.
  27. "Siemens to build new light rail equipment for St. Louis". Trains. March 14, 2024. Retrieved July 24, 2024.
  28. 1 2 Swan, Rachel (April 23, 2019). "SF delays $62 million for Muni's new rail fleet after a slew of mishaps". San Francisco Chronicle. Retrieved May 14, 2019.
  29. 1 2 Rodriguez, Joe Fitzgerald (April 17, 2019). "New Muni trains delivered with defective doors". San Francisco Examiner. Retrieved May 14, 2019.
  30. 1 2 Rodriguez, Joe Fitzgerald (June 25, 2019). "Muni fixes faulty train doors, couplers on new trains". San Francisco Examiner. Retrieved June 25, 2019.
  31. "SFMTA Announces All LRV4 Doors and Two-Car Trains Back In Service" (Press release). San Francisco Municipal Transportation Agency. June 25, 2019.
  32. Swan, Rachel (May 8, 2019). "Muni officials say railcar-linking issue on new fleet is bigger than they thought". San Francisco Chronicle. Retrieved May 14, 2019.
  33. 1 2 Van Derbeken, Jaxon (April 23, 2019). "SF Supervisors Hear Muni is Besieged by Bugs in New Trains". NBC Bay Area. Retrieved May 14, 2019.
  34. Rodriguez, Joe Fitzgerald (April 23, 2019). "Braking problems putting Muni's new trains out of commission". San Francisco Examiner. Retrieved May 14, 2019.
  35. Asimov, Nanette (December 12, 2019). "Muni discovers another problem with new trains, so SF riders can expect a crowded commute Thursday" . San Francisco Chronicle. Retrieved December 12, 2019.
  36. "LRV4 Project Update and Phase 2 Initiation" (PDF). San Francisco Municipal Transportation Agency, Board of Directors. March 17, 2020. Retrieved November 17, 2021.
  37. "Calendar Year 2021 Report of State Safety Oversight Activities for Rail Fixed Guideway Public Transportation Systems in California" (PDF). California Public Utilities Commission. March 15, 2022. p. 52.
  38. Kaufmann, Bill (October 28, 2016). "Frustrations emerge for Calgary Transit over new LRT cars". Calgary Herald. Retrieved August 16, 2024.
  39. Logan, Shawn (April 24, 2019). "Calgary Transit vows LRT doors safe after woman dragged under same model of train in San Francisco". Calgary Herald. Retrieved August 14, 2024.