Metro Transit | |
---|---|
Overview | |
Owner | Bi-State Development Agency |
Locale | Greater St. Louis, Missouri–Illinois, U.S. |
Transit type | Bus Light rail Streetcar Paratransit |
Number of lines | 59 bus routes 2 light rail lines 1 streetcar line |
Number of stations | 5,000+ (bus) 38 (light rail) 10 (streetcar) 25 (transit centers) 26 (park and ride lots) |
Daily ridership | 64,600 (weekdays, Q3 2024) [1] |
Annual ridership | 19,528,200 (2023) [2] 12,350 (2024, Loop Trolley) [3] |
Chief executive | Taulby Roach |
Headquarters | One Metropolitan Square 211 North Broadway St. Louis, Missouri, 63102, U.S. |
Website | metrostlouis.org |
Operation | |
Began operation | September 20, 1949 |
Reporting marks | BSDA |
Number of vehicles | 25 Siemens SD-400s 50 Siemens SD-460s 237 Diesel buses 24 Electric buses 123 Call-A-Ride vans 2 Gomaco Brill replica streetcars 1 MMTB W2-class streetcar |
Metro Transit is an enterprise of the Bi-State Development Agency and operates public transportation services in the St. Louis region. In 2023, the system had an annual ridership of 19,528,200, or about 64,600 per weekday as of the third quarter of 2024.
The enterprise now known as Metro Transit was founded in 1963 when the Bi-State Development Agency, using a $22.5 million bond issue, purchased and consolidated 15 privately owned transit operators to sustain efficient and reliable public transportation in the region. [4] [5] These services would operate under the Bi-State name until 2003, when the agency would begin operating as Metro. In 2015, the Bi-State Development name would be resurrected for the parent organization and the public transit enterprise renamed Metro Transit. [6]
In the 1960s, after taking over the private operators, Bi-State consolidated bus lines and in 1966 shut down the St. Louis region's last streetcar service, the Hodiamont line. Its right-of-way was paved over and replaced with buses. [4] In 2018, Great Rivers Greenway began soliciting feedback for turning the 3.5-mile (5.6 km) former transit corridor into a greenway. [7] [8]
In the 1970s, the system became one of the first in the United States to use buses equipped with wheelchair lifts. [4] In June 1973, with a financial crisis approaching, Bi-State threatened to end all bus service at the end of that month. [9] In response, the Missouri General Assembly passed the Transportation Sales Tax Act allowing St. Louis and St. Louis County to levy a half cent sales tax for public transportation. [10] With the additional funding, Bi-State lowered the bus fare from 40 cents to 25 cents. [4] [9]
In the 1980s, Metro Call-A-Ride began demand response service to help people whose physical or cognitive disabilities prevented them from independently using regular fixed-route bus service. In 1986, Arts in Transit, Inc. was founded, which is a 501(c)(3) organization that ensures the integration of local art and design in the transit system. [11] In 1987, the East-West Gateway Council of Governments completed a study that recommended light rail with an integrated bus network as the next step forward for the St. Louis region’s public transit system. [4]
Construction on the region's first light rail line began in 1990 by reusing former railroad rights-of-way including downtown subway tunnels and the Eads Bridge. [4] The first 13.9-mile (22.4 km) segment opened on July 31, 1993, between the North Hanley and 5th & Missouri stations. The remainder of this initial alignment was completed on June 25, 1994, when the extension to Lambert Airport Main opened. Three infill stations have been added to this original alignment. East Riverfront in 1994, Lambert Airport East in 1998, and Cortex in 2018. [12] [13] In 2001, MetroLink doubled in length with a 17.4-mile (28.0 km) extension to Southwestern Illinois College in St. Clair County. Two years later, a 3.5-mile (5.6 km) extension brought service to Shiloh, Illinois. [12] In 2006, Metro opened the 8-mile (13 km) Cross County extension running from the Forest Park-DeBaliviere station to Shrewsbury, Missouri. [14]
After St. Louis County voters defeated Proposition M in 2008, Metro shelved all expansion plans and was forced to cut 24 Missouri bus routes. [15] [16] In 2010, County voters passed Proposition A, a half cent sales tax increase, to restore service cuts and fund system expansion under the banner of Moving Transit Forward. [17] [18] In 2013, the St. Louis County Council authorized loaning Metro $400 million of surplus Proposition A funds to pay off debt related to the Cross County extension. [19] In 2019, the State of Illinois provided the St. Clair County Transit District (SCCTD) $96 million in funding to extend MetroLink from Shiloh-Scott to MidAmerica St. Louis Airport in Mascoutah, Illinois. SCCTD began construction on the extension in 2023; Metro is expected to begin operating it in spring 2026. [20] [21] [22] In 2021, Metro introduced the region's first electric buses: 40-foot and 60-foot articulated models. [23]
In February 2022, Bi-State's board voted in favor of Metro taking over operation of the troubled Loop Trolley. [24] In August 2022, Metro reopened the trolley and received a $1.26 million grant from the East-West Gateway Council of Governments to operate the service on a seasonal schedule for the next several years. [25] [26] [27] In November 2024, Metro announced the Loop Trolley ended that season within budget and with a 44% increase in ridership. [28]
On July 26, 2022, a flash flood shut down MetroLink for nearly 72 hours and caused roughly $40 million in damage. [29] [30] The flood damaged nearly 5 miles (8.0 km) of track bed, two elevators, two communications rooms, three signal houses and destroyed two MetroLink vehicles and a Call-A-Ride van. [31] By that September, normal Red Line service had resumed while restricted service continued on the Blue Line. [32] On July 31, 2023, Metro received $27.7 million in federal emergency disaster relief funding to help cover the cost of restoration. [33] In March 2024, Blue Line platform and speed restrictions were lifted after repairs on the last signal house were completed. [34]
In March 2023, Bi-State's board approved a memorandum of understanding authorizing the Metro team to plan and develop the Green Line MetroLink expansion with the City of St. Louis. [35] That September, Bi-State's board approved a 4-year, $18.9 million contract with the joint venture Northside-Southside Transit Partners to provide consulting services for the design phase of the project. [36] In February 2024, East-West Gateway approved the updated locally preferred alternative along Jefferson. [37] In May 2023, Metro received a $196.2 million federal grant to purchase new light rail vehicles to replace the remaining SD-400 cars. [38] Six months later, Bi-State's board approved a contract with Siemens Mobility worth up to $390.4 million for as many as 55 battery-hybrid S200 light rail vehicles with delivery expected to begin in early 2027. [39] [38] [40]
In September 2024, turnstiles began initial operation at four Illinois stations as part of Metro's Secure Platform Plan. [41] [42] Seven Missouri stations are slated for completion by early 2025 [43] with the remaining stations and an upgraded fare collection system expected to be in place by early 2026. [44] [45] [46]
Since 1963, Metro Transit has continuously provided bus service in the Greater St. Louis region. Metro currently operates 46 fixed bus routes in Missouri and 13 fixed bus routes in Illinois. [47] In September 2019, Metro launched Metro Reimagined, a restructuring of Missouri bus routes that increased frequency on busy routes and discontinued six low-ridership routes. [48] [49] That same year, Metro also removed or relocated more than 360 of the system's 5,400 bus stops. [50] In June 2021, Metro introduced the region's first electric buses including 40-foot and 60-foot articulated models. The 60-foot articulated buses are used exclusively on the #70 Grand bus line, the region's busiest. [23]
In 2020, the onset of the COVID-19 pandemic caused a sharp decline in MetroBus ridership and initiated a labor shortage that had reduced Metro's ability to offer comprehensive service to passengers. [51] [52] [53] In an effort to recruit more drivers, Bi-State's board signed a contract in August 2023 with Amalgamated Transit Union Local 788, which approved salary increases and a signing bonus. [54] By the end of 2024, MetroBus had increased its operator ranks from 556 to 642 [55] allowing it to increase frequency or add service on 35 Missouri and 7 Illinois routes, including the addition of four new routes. [56] [57] [58] [59] [60]
Since 1993, Metro Transit has operated light rail service in the Greater St. Louis region. Today, the system consists of two lines, the Red and Blue lines, with 38 stations and 46 miles (74 km) of track. It runs from St. Louis Lambert International Airport in northwest St. Louis County to Shiloh, Illinois near Scott Air Force Base in southeast St. Clair County. The Cross County extension opened in 2006 and introduced MetroLink service between Forest Park and Shrewsbury, Missouri. A 5.2-mile (8.4 km) extension of the Red Line from Shiloh-Scott to MidAmerica St. Louis Airport in Mascoutah broke ground in 2023 and is expected to be operational by 2026. [61] [21] [22] In Missouri, Metro and local leaders are planning the Green Line, an expansion that would run between North and South St. Louis. [62]
While officially light rail, MetroLink features many characteristics of a light metro or rapid transit service, [63] including a completely independent right of way, a higher top speed, and level boarding at all platforms. [64] [65]
Since 1987, Metro Transit's Call-A-Ride demand response service has provided alternative transportation to residents who have limited access to MetroBus or MetroLink and/or disabled residents who are unable to use those services. [66] In April 2023, in response to operator shortages, Metro announced that it would reduce its service area for Call-A-Ride, primarily in southwest and far north St. Louis County. These reductions in service have led to significant criticism for the transit agency. [67] [68]
Via Metro STL is an app-based, on-demand microtransit service provided by Via Transportation with Metro Transit. The service launched in June 2020 to serve exurban areas of St. Louis County with few bus stops and limited MetroLink service. It provides rides in three service zones; North, South and West. [69] [70] In 2023, the service completed 271,402 rides. [71]
The Loop Trolley is a 2.2-mile (3.5 km) heritage streetcar line that runs from City Hall in University City to the Missouri History Museum and Forest Park in St. Louis. The 10 station line travels along Delmar Boulevard through the Delmar Loop and DeBaliviere Avenue between Delmar and Forest Park. Connections can be made to MetroLink at both the Delmar Loop and Forest Park–DeBaliviere stations.
On February 18, 2022, Bi-State's board voted in favor of Metro Transit taking over operations after several financial setbacks and closures. [24] In August 2022, Metro reopened the trolley and received a $1.26 million grant from the East-West Gateway Council of Governments to operate the service on a seasonal schedule for the next several years. [25] [26] [27] In November 2024, Metro announced the Loop Trolley ended that season within budget and with a 44% increase in ridership. Additionally, at its current service level further funding requests would not be necessary. [28]
Metro Transit uses a proof-of-payment system, requiring riders to carry passes at all times. When boarding MetroBus, riders with valid passes present them to the operator and those without passes are able to pay exact change into the onboard farebox. [72] MetroLink passengers must have a validated pass and present it when asked by security personnel. Beginning in 2024, MetroLink will convert to a paid access system as part of its Secure Platform Plan.
Metro also accepts some fares from Madison County Transit (MCT) on its services. MCT's 2-hour regional pass is accepted as full fare on MetroBus and MetroLink and its senior/ADA passes qualify as reduced fare on Metro services. In addition, Metro's 2-hour pass/transfer is valid for a single bus trip on MCT with no additional charge. [73]
Residents called to jury duty in Metro's service area may travel on MetroBus and MetroLink free of charge. [73]
Metro Transit Fare Structure | ||
---|---|---|
Metro Fare Type | Mode | Current Fare |
Cash Base Fare | Bus | $1.00 |
Cash Base Fare | Rail | $2.50 |
Cash (Reduced Fare)* | Bus | $0.50 |
Cash (Reduced Fare)* | Rail | $1.25 |
2-Hour Pass/Transfer† | Bus/Rail | $3.00 |
2-Hour Pass/Transfer (Reduced Fare)*† | Bus/Rail | $1.50 |
2-Hour Pass (from Lambert Airport)† | Bus/Rail | $4.00 |
(10) 2-Hour Passes† | Bus/Rail | $30.00 |
One-Day Adventure Pass | Bus/Rail | $5.00 |
Weekly Pass | Bus/Rail | $27.00 |
Monthly Pass | Bus/Rail | $78.00 |
Monthly Pass (Reduced Fare)* | Bus/Rail | $39.00 |
Combo Pass | Bus/Rail | $98.00 |
University Semester Pass | Bus/Rail | $175.00 |
Metro Call-A-Ride | Call-A-Ride | $2.00 |
* Reduced fares require a Metro reduced fare permit [73] † Two-hour passes can only be purchased as a mobile fare option on the Transit app [73] |
Metro Transit operates 261 vehicles for MetroBus, including 237 35- and 40-foot low-emission, low-floor diesel buses made by Gillig; 10 electric 40-foot Gillig buses; and 14 electric 60-foot articulated New Flyer XE60 buses. Electric buses are charged overnight at the Brentwood and DeBaliviere garages, while in-service charging is at the North Broadway Transit Center. [74] [75] [76] Each MetroBus vehicle has a two-bike bike rack, available first-come, first-served. [77]
Metro also operates 123 Call-A-Ride vans. [75]
All MetroBus and Call-A-Ride vehicles have an accessible lift or ramp and include priority seating. [78]
At its largest, Metro Transit operated a fleet of 87 Siemens light rail vehicles for MetroLink, including 31 SD-400 cars and 56 SD-460 cars. [79] As of 2023, Metro operated 25 SD-400s and 50 SD-460s. [47] Two SD-460s were destroyed in a July 2022 flash flood. [80] [81] Metro services trains at its Ewing and 29th Street rail yards. All light rail vehicles are accessible and include priority seating and spaces for those using mobility devices. Riders may walk bicycles onto the rear of the first train car and the front and rear of the second car. [82] [83]
In May 2023, Metro received a $196.2 million federal grant to purchase a fleet of new Siemens S200 light rail vehicles to replace the remaining 25 SD-400 cars. [84] Six months later, Bi-State's board approved a contract with Siemens Mobility worth up to $390.4 million for as many as 55 battery-hybrid light rail vehicles to replace aging rolling stock. [85] [86] The onboard traction batteries would allow a train to travel 5 miles (8.0 km) without overhead catenary wire. [86] [87] Delivery of the new vehicles is expected to begin in 2027. [40] [84] Meanwhile, Metro is refurbishing many of the remaining SD-460 cars for continued use.
Metro currently operates three vehicles for the Loop Trolley: two Gomaco-built Brill-replica streetcars that came from Portland, Oregon, and one W2-type streetcar used in Melbourne, Australia, and Seattle. [88] [89] All three vehicles were modified for wheelchair accessibility to meet ADA regulations before entering service. [90]
Metro Transit has a similar livery across all of its services except its battery-electric buses and the Loop Trolley. In 2019, Metro began phasing in a new livery for its vehicles. [91] Previously, MetroLink vehicles had a white base with a red stripe running horizontally beneath the windows that turned into a dashed blue stripe near each operator cab. The front included Metro's "M" logo centered between vertical blue, red, and white lines. MetroBus and Metro Call-A-Ride were similar, except the red stripe continued around the rear of the vehicles.
The new livery is made up of a blue base with white accents. On MetroLink, the stripe was moved further below the windows so the word "metro" could be inlaid within it and the tops of the cars were painted black. Metro Call-A-Ride uses this same design. MetroBus includes two large white circles on either side of the bus. The horizontal stripe has been eliminated, save for a small portion on either side of the word "metro." All three services retained Metro's "M" logo on the front of their vehicles. [91]
Metro's battery-electric buses are a shade of lime green on the front and rear with shades of blue in the center accented by a green leaf pattern. A white stripe runs horizontally near the base with the word "metro" and an image of a power plug inlaid within it. This livery is part of a partnership with Ameren Missouri. [92]
In January 2024, the agency announced that it would cease to sell advertising that covers the exterior of buses and trains, citing aesthetic reasons. The 144 exterior advertisement spaces had generated up to $1.5 million annually through contractor Vector Media but had also drawn complaints. [93]
Metro Transit's executive leadership is made up of President and CEO Taulby Roach and Chief Operating Officer Charles A. Stewart. As an enterprise of the Bi-State Development Agency, Metro's leadership answers to Bi-State's Board of Commissioners. [94] As of 2024, the agency had roughly 2,000 employees. [95]
Security for the Metro system is provided by contracted uniformed police and Metro's own security guards. Known as "bumblebees" for their neon-yellow and black uniforms, [96] Metro security guards enforce fare collection and other rules, patrol trains, and help passengers. The system also has contracts for officers with the St. Louis County Police Department, the St. Louis Metropolitan Police Department, the St. Clair County Sheriff’s Department and the St. Louis City Sheriff’s Department. [97]
Security features in vehicles, stations and transit centers include lights, closed-circuit television monitoring, emergency telephones, police and security patrols, and radio communication between operators and MetroBus and MetroLink control centers. [97]
Kevin Scott is the General Manager of Security for Metro Transit. [94]
Metro's operating budget is funded by sales taxes from the city of St. Louis and St. Louis County and the St. Clair County Transit District. Other funds come through federal and state grants and fare-paying passengers. [98] [99] Metro's operating budget in FY2025 is $328,980,534 in addition to a 3-year capital budget of $1,037,311,983. [100] Combined sales tax appropriations between the three supporting jurisdictions is estimated at $312 million in FY2025 with federal grant revenue estimated at $4.2 million and Missouri state funding estimated at $750,000. [100] [101] [102] Passenger revenue is estimated at $21.8 million. [103]
In 1973, the Missouri General Assembly passed the Transportation Sales Tax Act which allowed St. Louis, St. Louis County and Kansas City to levy up to a half cent sales tax for public transportation. [9] [10] In 1981, the Illinois General Assembly passed the Local Mass Transit District Act allowing counties to levy up to a quarter cent sales tax for public transportation. [9] [104] Additional ballot initiatives are listed in the table below:
Sales tax ballot initiatives | ||||
---|---|---|---|---|
Ballot measure | Year | County | Sales tax | Result |
Transportation Sales Tax Act [10] | 1973 | City of St. Louis | 0.5% | Passed |
1973 | St. Louis | 0.5% | Passed | |
Local Mass Transit District Act [104] | 1981 | St. Clair | 0.25% | Passed |
Proposition M [105] [9] [106] [107] [108] | 1993 | St. Clair | 0.5% | Passed |
1994 | City of St. Louis | 0.25% | Passed | |
1994 | St. Louis | 0.25% | Passed | |
1996 | St. Charles | 0.5% | Failed | |
1996 | St. Charles | 0.5% | Failed | |
1997 | City of St. Louis | 0.25% | Passed† | |
1997 | St. Louis | 0.25% | Failed | |
1997 | Madison | 0.5% | Failed | |
2008 | St. Louis | 0.5% | Failed | |
Proposition A [106] | 2010 | St. Louis | 0.5% | Passed |
Proposition 1 [109] | 2017 | City of St. Louis | 0.5% | Passed |
† [110] |
In 2019, the St. Clair County Transit District was awarded $96 million in Illinois infrastructure funding to build a 5.2-mile (8.4 km) extension of the Red Line from Shiloh-Scott to MidAmerica St. Louis Airport in Mascoutah. [111] This extension will include two 2.6-mile (4.2 km) segments, a double-track and a single-track segment, along with a station at the airport. [112] Construction on the extension began in 2023 with Metro expecting to begin operations in early 2026. [113] [21] [22]
In 2023, Metro began a system-wide rehabilitation program that will last several years. [114] That spring, Metro began rehabilitating the downtown subway tunnels, [115] including the Laclede's Landing, Convention Center, and 8th & Pine stations. [116] [117] Elsewhere, catenary wire, curve tracks, platforms, retaining walls, staircases, and system conduit are to be upgraded or replaced. [118] [114]
Beginning in 2025, Metro will start rehabilitating the Union Station tunnel [119] with rehabilitation of the Cross County tunnels beginning in 2026. [120] The latter will include the renovation of the Skinker and University City–Big Bend subway stations and the construction of a storage siding near the Richmond Heights station. [120] [121] In 2026, Metro expects to complete upgrades to the Supervisory Control Automated Data Acquisition (SCADA) and Public Address/Customer Information (PA/CIS) systems. [122] The upgraded SCADA/PA/CIS will operate as an integrated system that monitors and controls operations and will allow Metro to provide real-time arrival information to passengers, such as live displays at stations. [123]
In 2024, Metro Transit began adding turnstiles at all MetroLink stations as part of its $52 million Secure Platform Plan (SPP). Stations will also receive a new fare collection system, more fences, passenger-assist telephones, and more than 1,800 cameras to be monitored at a center opened in November 2022 at Metro's Central Garage. [45] [124]
The SPP will be implemented in three "packages" with full operation expected to begin in 2026. [46] In September 2023, Bi-State awarded a $6.4 million contract to Millstone Weber LLC for the first package covering four Illinois stations. [125] The gates at these first four stations began operating in September 2024. [42] [41] However, due to delays in implementing a new fare collection system, Metro staff will operate the fare gates manually at first. [46] The second package covers seven Missouri stations and is also slated for completion by early 2025. [43] The remaining stations and the upgraded fare collection system are expected to be operational by early 2026. [44] [45] [46]
MetroLink's proposed North-South light rail line would lack the rapid transit-like characteristics of the Red and Blue lines, resembling instead other U.S. on-street light rail lines, such as those in Houston or Phoenix. The new line has been named the Green Line [126] and would connect to the Red and Blue lines with an infill transfer station. [127] [128]
This 5.6-mile (9.0 km) line would serve about 10 stations between Chippewa Street in South St. Louis and Grand Boulevard in North St. Louis running primarily on Jefferson Avenue. It would provide a fixed rail upgrade to Metro's #11 (Chippewa) and #4 (Natural Bridge) bus routes. [129] In September 2023, Bi-State Development's board approved a 4-year, $18.9 million contract with the joint venture Northside-Southside Transit Partners to provide consulting services for the design phase of the project. [36] In February 2024, the East-West Gateway Council of Governments approved the updated locally preferred alternative along Jefferson. [37] The 2023 design study estimates 5,000 daily boardings, $8-9 million in annual operating costs, and $1.1 billion in capital costs. [37]
An extension of the Green Line into North St. Louis County had been explored. In 2023, four alternatives were proposed that would have continued the line from the Grand/Fairground station along Natural Bridge Avenue toward the county. [130] By 2024, County leadership had rejected all four routes primarily due to the unfunded 3-mile (4.8 km) gap between the Grand/Fairground station and the county line. [131] Additionally, concerns were raised about federal funding, ridership, right-of-way constraints and other factors. [131] Instead, county leaders are exploring alternatives for North County such as light rail branching off the existing Red Line near the University of Missouri–St. Louis, rapid bus service or a hybrid of the four 2023 alternatives. [131]
Many of these services were proposed after the passage of Proposition A in 2010 when Metro Transit released its 30-year plan, Moving Transit Forward. [132] Most are defunct; regional leaders have said their priorities are the proposed MetroLink extensions in the city of St. Louis and North St. Louis County. [133]
Moving Transit Forward identified five potential MetroLink extensions as part of its long-range plan: North-South, Daniel Boone, MetroSouth, MetroNorth, and Madison County. [134] While the first phase of North-South is in design, no others have moved beyond the initial study phase because of uncertainties about funding, ridership potential, community support, and other factors. [135] [136] [137]
Moving Transit Forward also identified five potential bus rapid transit lines. Four would have run along highways that connect downtown St. Louis to its suburbs: I-44 to Eureka, I-64 to Chesterfield, I-55 to South County, and I-70 to St. Charles County. A fifth line would have run along Grand Boulevard in St. Louis. [134]
Initially, two long-distance commuter rail lines were proposed as part of Moving Transit Forward. Both would have run from the Gateway Transportation Center in downtown St. Louis to Alton, Illinois, and the Pacific, Missouri area. [134] Both routes carry existing Amtrak service. Neither has been studied for local commuter rail service.
The Delmar Loop, often referred to by St. Louis residents simply as The Loop, is an entertainment, cultural and restaurant district in University City, Missouri and the adjoining western edge of St. Louis near Washington University in St. Louis and Forest Park. Many of its attractions are located in the streetcar suburb of University City, but the area is expanding eastward into the Skinker DeBaliviere neighborhood of the City of St. Louis. In 2007, the American Planning Association named the Delmar Loop "One of the 10 Great Streets in America."
MetroLink is a light rail system with semi-metro characteristics that serves the Greater St. Louis area. Operated by Metro Transit in a shared fare system with MetroBus, the two-line, 38-station system runs from St. Louis Lambert International Airport and Shrewsbury in Missouri to Scott Air Force Base in Illinois. Intermediate destinations include downtown Clayton, Forest Park, and downtown St. Louis. It is the only U.S. light rail system to cross state lines.
The Metro East is an urban area in Southern Illinois, United States that contains the eastern and northern urban, suburban, and exurban areas on the Mississippi River in Greater St Louis. It encompasses eight Illinois counties and constitutes the second-most populous metropolitan area in Illinois.
Delmar Loop station is a light rail station on the Red Line of the St. Louis MetroLink system. This below-grade station is adjacent to Delmar Boulevard and Des Peres and Hodiamont avenues and serves the popular Delmar Loop area.
Forest Park–DeBaliviere station is a light rail station on the Red and Blue lines of the St. Louis MetroLink system. This below-grade station is located at the northeast corner of Forest Park Parkway and DeBaliviere Avenue in St. Louis and is designated as the primary transfer point between the two lines.
Grand station is a light rail station on the Red and Blue lines of the St. Louis MetroLink system. This at-grade station is situated beneath the Grand Boulevard viaduct and connects to the region's busiest bus line, the #70 Grand, which runs electric, articulated buses.
Transportation in Greater St. Louis, Missouri includes road, rail, ship, and air transportation modes connecting the bi-state St. Louis metropolitan area with surrounding communities throughout the Midwest, national transportation networks, and international locations. The Greater St. Louis region also supports a multi-modal transportation network that includes bus, paratransit, and light rail service in addition to shared-use paths, bike lanes and greenways.
Shrewsbury–Lansdowne I-44 station is a light rail station on the Blue Line of the St. Louis MetroLink system. This station is located on an embankment near Lansdowne Avenue and River Des Peres Boulevard in St. Louis near its boundary with Shrewsbury in St. Louis County. The city limits between the two communities runs through the northern portion of the 800 space park and ride lot.
Emerson Park station is a light rail station on the Red and Blue lines of the St. Louis MetroLink system. This at-grade station is located near 15th Street and Bowman Avenue in East St. Louis, Illinois. It also serves as a transfer for MetroBus and Madison County Transit and features 841 park and ride spaces.
Shiloh–Scott station is a light rail station and current terminus of the Red Line of the St. Louis MetroLink system. This at-grade station is located in Shiloh, Illinois, adjacent to Scott Air Force Base.
The Red Line is the older and longer line of the MetroLink light rail system in Greater St. Louis. It serves 29 stations across three counties and two states.
The Blue Line is the newer and shorter line of the MetroLink light rail service in Greater St. Louis. It serves 25 stations across three counties and two states.
The Loop Trolley is a 2.2-mile (3.5 km), 10-station heritage streetcar line in and near the Delmar Loop area of greater St. Louis, Missouri. It opened for service in 2018, then shut down in 2019 after revenue fell far short of projections. Service resumed in 2022 under the Metro Transit division of the Bi-State Development Agency.
Streetcars in St. Louis, Missouri, operated as part of the transportation network of St. Louis from the middle of the 19th century through the early 1960s.
Metro Call-A-Ride is a paratransit service operated by Metro Transit that serves parts of Greater St. Louis. In 2023, the service had an annual ridership of 278,900, or about 1,400 per weekday as of the third quarter of 2024.
MetroBus is a public bus service operated by Metro Transit that serves the Greater St. Louis area. In 2023, the service had an annual ridership of 12,531,400, or about 41,400 per weekday as of the third quarter of 2024.
The Bi-State Development Agency is an interstate compact established between Missouri and Illinois in 1949. This compact created an organization that has broad powers in seven county-level jurisdictions. Bi-State operates five enterprises, including the Gateway Arch Riverfront, Metro Transit, the St. Louis Downtown Airport, the St. Louis Regional Freightway and the Bi-State Development Research Institute.
The Green Line is a planned expansion of the MetroLink light rail system in St. Louis, Missouri. The north/south running line will be at-grade street running with a dedicated lane and will be the system's third line.
{{cite web}}
: CS1 maint: url-status (link){{cite web}}
: CS1 maint: url-status (link){{cite web}}
: CS1 maint: url-status (link){{cite web}}
: CS1 maint: url-status (link)