The South Durham and Lancashire Union Railway (SD&LUR) built a railway line linking the Stockton and Darlington Railway near Bishop Auckland with the Lancaster and Carlisle Railway (the West Coast Main Line) at Tebay, via Barnard Castle, Stainmore Summit and Kirkby Stephen. The line opened in 1861 and became known as the Stainmore Line.
The Stockton and Darlington absorbed the SD&LUR, and the Stockton and Darlington became a constituent of the North Eastern Railway. The line closed in stages between 1952 and 1962. A short section of the line at Kirkby Stephen East station has been restored by the Stainmore Railway Company.
When the Lancaster and Carlisle Railway (L&CR) was approved in June 1844 there were a number of schemes for a railway over the Pennines. The York & Carlisle Railway proposed a route from the East Coast Main Line (ECML) at Northallerton via Richmond, Barnard Castle, the Tees Valley, Stainmore and the Eden Valley to the L&CR at Clifton. A rival scheme, the Yorkshire & Glasgow Union Railway, left the ECML at Thirsk, crossed the Pennines to Hawes, then Kirkby Stephen, Appleby and so reached Clifton. The Leeds and Carlisle left the Leeds Northern Railway near Headingley and passed through Wharfedale to Hawes and the Eden Valley. [1] These schemes came together as the Northern Counties Union Railway, which was given authority in 1846 for a 69 miles (111 km) line from Thirsk to Clifton and a 50+1⁄4 miles (80.9 km) line from Bishop Auckland to Tebay. However, it would have cost £35,000 to pass through the estate of the Duke of Cleveland between Bishop Auckland and Barnard Castle, and it was a condition of the enabling Act that work on the two lines must be simultaneous. Attempts in 1847 and 1848 to repeal this clause failed and the company failed to raise the necessary finance to start work, its powers lapsed and was wound up. [2] [3]
In summer 1850 Henry Bolckow and John Vaughan discovered a seam of iron ore at Eston, North Yorkshire. They opened a mine and the S&DR started hauling ironstone to their blast furnaces west of Bishop Auckland. By 1851 Derwent Iron had opened a mine in the area and began moving ironstone 54 miles (87 km) to Consett. [4] The iron ore from Cleveland is high in phosphorus and needs to be mixed with purer ores, such as those on the west coast in Cumberland and Lancashire. [5] In the early 1850s this ore was travelling the long way round via Newcastle and Carlisle from the Barrow-in-Furness area, and Durham coke was returning. [6] A railway to serve Barnard Castle was proposed in 1852 that bypassed the Duke of Cleveland's estate, running from junction near North Road station and following the River Tees to Barnard Castle. An application in 1852 failed, but the 15+1⁄4-mile (24.5 km) Darlington and Barnard Castle Railway Act 1854 was given royal assent on 3 July 1854 and the railway opened on 8 July 1856. [7]
Both the South Durham & Lancashire Union Railway (SD&LUR) and the Eden Valley Railway (EVR) companies were formed on 20 September 1856. The SD&LUR route left the Stockton & Darlington Railway Haggerleases branch west of West Auckland, then crossed the Pennines to Tebay via Barnard Castle, Kirkby Stephen. The route was surveyed by Thomas Bouch and the company received permission on 13 July 1857. The EVR had a choice of following the east and west bank of the Eden and the cheaper route on the east bank was chosen even though it was a mile longer. An Act received Royal Assent on 21 May 1858, the line turning south as it joined the main line at Clifton on the insistence of the L&CR so it could not be used to bypass its allies, the London & North Western Railway, to the south. [6]
South Durham & Lancashire Union Railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The ceremonial cutting of the first sod for the SD&LUR was at Kirkby Stephen on 25 August 1857, and that for the EVR was at Appleby on 28 July 1858. Land for two tracks purchased, but a single track line was laid. [8] Bouch had laid out an economical route that followed the contours and avoided tunnels, but there were formidable gradients up to the 1,370 feet (420 m) high Stainmore Summit. Valleys were crossed by viaducts, including three made from wrought-iron that crossed the Tees, Deepdale and Belah rivers and cost a total of £77,400. [9] The viaducts at Tees Valley, Deepdale, Belah and Smardale Gill were built wide enough for two tracks. [8]
Name | Type | Total Length | No. of spans | Height |
---|---|---|---|---|
Gaunless | Iron | 640 ft | 4 | 70–93 ft |
Langleydale | Stone | 411 ft | 9 | 27–76 ft |
Forthburn | Stone | 248 ft | 9 | 16–43 ft |
Percy Beck | Stone | 260 ft | 8 | 20–66 ft |
Tees | Iron | 732 ft | 7 | 65–132 ft |
Deepdale | Iron | 740 ft | 11 | 50–161 ft |
Merry-Gill | Stone | 366 ft | 9 | 40–78 ft |
Belah | Iron | 1070 ft | 16 | 60–196 ft |
Haty-Gill | Stone | 324 ft | 9 | 30–94 ft |
Merry-Gill | Stone | 366 ft | 9 | 40–78 ft |
Pod Gill | Stone | 466 ft | 8 | 84–60 ft |
Smardale | Stone | 553 ft | 6 | 40–90 ft |
source: Walton (1992, p. 76) |
The route between West Auckland and Barnard Castle was changed after negotiations with the Duke of Cleveland, and a southwards facing junction was built at Tebay after protracted negotiations with the L&CR. [10] A new station was built to replace the terminus at Barnard Castle. [11] A mineral train ran between Barnard Castle and Barras on 26 March 1861, and mineral traffic worked through to Tebay from 4 July 1861. After an opening ceremony on 7 August 1861, the SD&LUR was open to passengers the following day. [12]
Stations opened on the line at:
The S&DR worked traffic from the start, and initially two return services a day were provided between Redcar (except one early morning that started from Middlesbrough) and Tebay via Darlington. [12] Two locomotives, No. 160 Brougham and No. 161 Lowther, had been built for the line in 1860 by Stephenson and Co. with a 4-4-0 wheel arrangement and enclosed cab. William Bouch designed four more that were made in 1862; these were similar but without the cabs that were unpopular with the crews. [13] Kirkby Stephen became a junction station when the EVR opened to mineral traffic on 8 April 1862 and passengers began to be carried on 9 June 1862. The line between West Auckland and Barnard Castle opened for minerals in July 1863 and passengers on 1 August 1863. [12]
In 1859 a company had been formed to link the Newcastle & Carlisle Railway with the S&DR via the Derwent Valley; by 1860 this had grown into the Newcastle, Derwent & Weardale Railway, which now bypassed the S&DR and linked with the SD&LUR, and the North British and London & North Western (LNWR) railways were providing two thirds of the capital. The LNWR proposed to build warehouses in Hartlepool and buy shares in the West Hartlepool Railway. [14] The North Eastern Railway (NER), formed in 1854 by amalgamation, at the time was the largest railway company in the country and controlled the East Coast Main Line from Knottingley, south of York, through Darlington to Berwick-upon-Tweed. [15] When they approached the S&DR with a proposal to merge, the S&DR deciding they preferred a merger with the NER than eventually become part of the LNWR, entered negotiations. [16] Opposed by the NER, the Newcastle, Derwent & Weardale Railway bill was approved by the House of Commons in 1861, although the line was eventually rejected by the House of Lords. [17] [18] The SD&LUR and EVR merged with the S&DR on 30 June 1862, and the S&DR and North Eastern Railway merged on 13 July 1863. [19]
Traffic increased rapidly and the line was doubled, starting with the section from Bowes to the summit at Stainmore in 1866, followed by the line from Barnard Castle to the Tees Valley Junction. [20] The NER opened the Tees Valley Railway to Middleton-in-Teesdale in 1868. [21] Doubling of the line to Tebay, except for Belah and Kirkby Stephen and Kirkby Stephen and Sandy Bank had been approved by 1875. The section between Belah to Kirkby Stephen was approved in 1889, and this involved the doubling of the Aitygill, Merrygill and Podgill viaducts. Smardale Gill Viaduct was built wide enough for double track, but single track was laid to ease the curve.
At the end of the 19th century the line would be typically used by twenty freight trains, mostly mineral traffic. Westbound, 'double load' trains of 32 wagons would be assisted on the rising gradient by a locomotive at the rear. [22] At the summit, where there was a reservoir to provide water, trains would be split into two for the descent. Up to 50 empty wagons could be managed on the return journey, the assisting locomotive then running light from the summit to Barnard Castle. [23] Snow could a problem on the line, especially between the summit and Belah, and the line was closed by the weather in 1942, 1947 and 1955. [24]
As a result of the Railways Act 1921 , on 1 January 1923 the North Eastern Railway became part of the London and North Eastern Railway (LNER). [25] Until 1932 there were three passenger trains a day between Darlington and Tebay, with five trains a day between Kirkby Stephen and Penrith, and the line was also used for specials from Newcastle to Blackpool. [19]
The 1947 LNER timetable shows three trains a day between Darlington and Penrith, and another between Darlington and Kirkby Stephen, via the Darlington and Barnard Castle route. There were three trains a day from Darlington to Barnard Castle that continued on the branch to Middleton in Teesdale, and two a day between Kirkby Stephen and Tebay. [26] There were four services a day between Bishop Auckland and Barnard Castle, three of which continued to Middleton in Teesdale. [27]
Britain's railways were nationalised on 1 January 1948 and the lines were placed under the control of British Railways. [25] In the early 1950s control was divided between the North Eastern and London Midland regions with Kirkby Stephen as the boundary. [28] Local passenger trains were withdrawn between Kirkby Stephen and Tebay on 1 December 1952, [21] although steam-hauled summer Saturday services from the north-east to Blackpool continued to use the route until the end of the 1961 holiday season. [29] The 1955 Modernisation Plan, known formally as the "Modernisation and Re-Equipment of the British Railways", was published in December 1954. With the aim of increasing speed and reliability, steam trains were replaced with electric and diesel traction [30] and Diesel Multiple Units took over local passenger services on the line in February 1958. [28]
A proposal to close the line between Barnard Castle and Penrith was published at the end of 1959. [28] Freight was diverted via Newcastle and Carlisle from July 1960 and, despite objections, the last train ran on 20 January 1962. [31] The passenger service was withdrawn on the remaining section of the former SD&LUR between Bishop Auckland and Barnard Castle on 12 June 1962. [32] In 1963 Dr Beeching published his report "The Reshaping of British Railways", which recommended closing the network's least used stations and lines. This listed the route Darlington–Barnard Castle–Middleton-in-Teesdale [33] and the former Darlington and Barnard Castle Railway and Tees Valley Railway to Middleton in Teesdale closed to passengers on 30 November 1964 and completely on 5 April 1965. [21]
The Stainmore Railway Company, based at Kirkby Stephen East station, were formed in 2000. They have re-instated a short section of the former SD&LUR line west of the main station building, which has also been restored by volunteers. Public passenger services were launched in August 2011 as part of a Stainmore 150 gala, which celebrated 150 years since the SD&LUR was opened. [34] As part of this celebration, a replica Stainmore Summit sign was cast and was erected in the position of the original.
Parts of the line have also been preserved as public footpaths by the Northern Viaduct Trust, who also care for Smardale Gill, Podgill and Merrygill viaducts which all survive. [35] Another small section of the line, in close proximity to the current operating limits of the Stainmore Railway Company, has been converted into Waitby Greenriggs Nature Reserve, which is owned and operated by the Cumbria Wildlife Trust. [36]
Barnard Castle is a market town on the north bank of the River Tees, in County Durham, England. The town is named after and built around a medieval castle ruin. The town's Bowes Museum's has an 18th-century Silver Swan automaton exhibit and paintings by Goya and El Greco.
Sir Thomas Bouch was a British railway engineer. He was born in Thursby, near Carlisle, Cumberland, and lived in Edinburgh. As manager of the Edinburgh and Northern Railway he introduced the first roll-on/roll-off train ferry service in the world. Subsequently as a consulting engineer, he helped develop the caisson and popularised the use of lattice girders in railway bridges. He was knighted after the successful completion of the first Tay Railway Bridge, but his reputation was destroyed by the subsequent Tay Bridge disaster, in which 75 people are believed to have died as a result of defects in design, construction and maintenance, for all of which Bouch was held responsible. He died within 18 months of being knighted.
The Stockton and Darlington Railway (S&DR) was a railway company that operated in north-east England from 1825 to 1863. The world's first public railway to use steam locomotives, its first line connected collieries near Shildon with Darlington and Stockton in County Durham, and was officially opened on 27 September 1825. The movement of coal to ships rapidly became a lucrative business, and the line was soon extended to a new port at Middlesbrough. While coal waggons were hauled by steam locomotives from the start, passengers were carried in coaches drawn by horses until carriages hauled by steam locomotives were introduced in 1833.
The Eden Valley Railway (EVR) was a railway in Cumbria, England. It ran between Clifton Junction near Penrith and Kirkby Stephen via Appleby-in-Westmorland.
Tebay is a village and civil parish in Cumbria, England, within the historic borders of Westmorland. It lies in the upper Lune Valley, at the head of the Lune Gorge. The parish had a population of 728 in the 2001 census, increasing to 776 at the Census 2011.
North Road is a railway station on the Tees Valley Line, which runs between Bishop Auckland and Saltburn via Darlington. The station, situated 1 mile 23 chains (2.1 km) north-west of Darlington, serves the market town of Darlington in County Durham, England. It is owned by Network Rail and managed by Northern Trains.
Bowes railway station was situated on the South Durham & Lancashire Union Railway between Barnard Castle and Kirkby Stephen East.
Kirkby Stephen East railway station was situated on the South Durham & Lancashire Union Railway between Barnard Castle and Tebay. It served the town of Kirkby Stephen in England and was a junction station for the Eden Valley Railway.
Barras railway station was situated on the South Durham & Lancashire Union Railway between Barnard Castle and Kirkby Stephen East.
Smardale railway station was a minor station on the South Durham & Lancashire Union Railway between Tebay and Kirkby Stephen East. It served the villages of Smardale and Waitby. The station opened to passenger traffic on 8 August 1861, and closed on 1 December 1952.
Ravenstonedale railway station was situated on the South Durham & Lancashire Union Railway (SD&LUR) between Tebay and Kirkby Stephen East. It served the villages of Ravenstonedale and Newbiggin-on-Lune.
Tebay railway station was situated on the Lancaster and Carlisle Railway (L&CR) between Lancaster and Penrith. It served the village of Tebay, Cumbria, England. The station opened in 1852, and closed on 1 July 1968.
Musgrave railway station was a railway station situated on the Eden Valley Railway and located between Penrith and Kirkby Stephen East, England.
Barnard Castle railway station was situated on the South Durham & Lancashire Union Railway between Bishop Auckland and Kirkby Stephen East. The railway station served the town of Barnard Castle.
The Tees Valley Railway was an 8+3⁄4-mile (14.1 km) branch railway line that ran between Barnard Castle on the South Durham & Lancashire Union Railway line between Bishop Auckland and Kirkby Stephen East, and Middleton-in-Teesdale via three intermediate stations Cotherstone, Romaldkirk and Mickleton.
The NER 901 Class was a class of 2-4-0 steam locomotive of the North Eastern Railway, designed by Edward Fletcher. Between 1872 and 1882 55 of the class were built for the NER.
Waitby is a small village and civil parish in the Eden district of Cumbria, England. The parish contains two small villages, Waitby and Smardale, plus the small hamlets of Riddlesay, Stripes and Leases, all of which are in the farmed and enclosured northern part at an elevation of around 200–300m. The southern half of the parish is mostly heath and unused for agriculture, it rises to Smardale fell; which it includes, at elevations between 300 and 400m. The civil parish of Ravenstonedale forms the boundary to the south. The western border with Crosby Garrett civil parish is formed by Scandal Beck. To the north and east lie Soulby and Kirkby Stephen civil parishes respectively. The population of the civil parish as measured at the 2011 Census was less than 100. Details are included in the parish of Crosby Garrett.
The Durham to Bishop Auckland Line was a railway line originally built by the North Eastern Railway (NER) to provide rail transport access to coal mines in West County Durham. It closed under the Beeching Axe to passenger traffic in May 1964, and freight in 1968. Today it forms the major part of the 9 miles (14 km) Brandon to Bishop Auckland rail trail.
The Belah Viaduct was a railway viaduct on the South Durham and Lancashire Union Railway, crossing the River Belah, in Cumbria, England, about 1 mile (1.6 km) south of the village of Barras and 4 miles (6.4 km) east north east of Kirkby Stephen. It was completed in 1860 and was demolished in 1963.
The Darlington and Barnard Castle Railway, was an east–west railway line that connected Darlington and Barnard Castle in County Durham, England. Besides the main running line, it had two branches that headed south into Yorkshire that were only used for freight. The whole system opened up by July 1856 and was closed completely by 1966. The former Merrybent freight branch is now used as part of the A1(M) road that bypasses to the west of Darlington.