Southern Sydney Freight Line

Last updated

Southern Sydney Freight Line
New South Wales metropolitan rail area, with Sydney Freight network highlighted.svg
New South Wales Metropolitan Rail Area with Sydney Freight network highlighted in black
Overview
Owner Australian Rail Track Corporation
Termini
Website www.ssfl.artc.com.au
Service
TypeFreight
History
Opened21 January 2013
24 June 2012 Sefton Junction to Leightonfield opened
21 January 2013Leightonfield to Macarthur opened
Technical
Line length36 km (22 mi)
Number of tracks1
Map of the Southern Sydney Freight Line corridor
Yellow: Route constructed as part of the SSFL project
Green: Existing relief line incorporated into the project
Grey: Existing Metropolitan Goods railway line SSFL corridor.PNG
Map of the Southern Sydney Freight Line corridor
Yellow: Route constructed as part of the SSFL project
Green: Existing relief line incorporated into the project
Grey: Existing Metropolitan Goods railway line

The Southern Sydney Freight Line (SSFL) is a freight only railway line in the south-western suburbs of Sydney, Australia. The line was built to segregate freight trains from the Sydney Trains network. It forms part of a dedicated freight only corridor between Port Botany and Macarthur. The line is managed by the Australian Rail Track Corporation.

Contents

Route

The SSFL runs from Chullora to Macarthur. It is an unelectrified, bi-directional single track with 1,800 metre long passing loops at Leightonfield and Glenfield. [1] Apart from its end points, the SSFL has no interface with the Transport Asset Holding Entity network.

The line commences at Chullora connecting with the Metropolitan Goods line from Port Botany, passing beneath the Bankstown line from where it parallels the Main South line. Just to the north of Glenfield, the line crosses to the west of the Main South line via a flyover. It joins the Main South line to the south of Macarthur station. [2]

History

Minto station looking north in December 2012 during the final stages of construction Minto Railway Station Southern Sydney Freight Line.jpg
Minto station looking north in December 2012 during the final stages of construction
A Pacific National train on the line passing through Sefton TT104 trailing on a Pacific National Minerals train in Sefton, New South Wales.jpg
A Pacific National train on the line passing through Sefton

Delays to freight services operating to and from Sydney via the Main South line had long been a problem, but it wasn't until the formation of the National Rail Corporation that any plan was devised to resolve it. [3]

In February 1992, the Federal Government allocated $71 million for the construction of a dedicated freight line from Chullora to Macarthur as part of the One Nation infrastructure project. It soon became apparent that to complete the project would cost in the region of $250 million. Instead the funding was used to complete a number of smaller projects, including building a 6.6 kilometre relief line between Glenfield and Ingleburn. This single, non-electrified line was used by both CountryLink passenger and freight services. [3]

Construction

In May 2006, the Australian Rail Track Corporation (ARTC) revived the project. [4] [5] Approval was obtained in October 2008 and construction commenced in early 2009, focusing on the section between Sefton and Cabramatta. [1] By August 2009 construction was under way along the whole corridor. In November 2009, poor planning led to the ARTC suspending the project for 10 months while it relocated utilities. [6] [7]

In September 2010, the ARTC announced the resumption of the project. [8] [9] On 24 June 2012, the Chullora to Leightonfield section opened allowing the connection from the BHP yard at the latter to the RailCorp network to be severed. [10] [11] The rest of the line opened on 21 January 2013. [12] [13]

In 2019, a triangular junction to the Moorebank Intermodal Terminal opened. [14] [15] [16]

Station works

The construction of the new line required modifications to several stations along the route. Sefton, Warwick Farm, Casula and Minto received upgrades. A new concourse was constructed at Cabramatta and the footbridge was extended at Leumeah. [1]

Services

The line is normally only used by freight services, but during engineering possessions on the adjacent Transport Asset Holding Entity tracks, NSW TrainLink XPT services have travelled on it. Freight trains travelling to the Minto Intermodal Terminal continue to travel on Transport Asset Holding Entity tracks.

Future

A further passing loop between Cabramatta and Warwick Farm stations is scheduled to open in 2023. [17] [18]

See also

Related Research Articles

<span class="mw-page-title-main">Rail transport in Australia</span> Transportation system in Australia

Rail transport in Australia is a component of the Australian transport system. It is to a large extent state-based, as each state largely has its own operations, with the interstate network being developed ever since Australia's federation in 1901. As of 2022, the Australian rail network consists of a total of 32,929 kilometres (20,461 mi) of track built to three major track gauges: 18,007 kilometres (11,189 mi) of standard gauge, 2,685 kilometres (1,668 mi) of broad gauge, and 11,914 kilometres (7,403 mi) of narrow gauge lines. Additionally, about 1,400 kilometres (870 mi) of 610 mm / 2 ft gauge lines support the sugar-cane industry. 3,488 kilometres (2,167 mi), around 11 per cent of the Australian heavy railways network route-kilometres are electrified.

<span class="mw-page-title-main">Rail Clearways Program</span> Australian railway infrastructure project

The Rail Clearways Programme was conceived in 2004 with the aim of easing congestion of Sydney's suburban railway network, by reducing the amount of infrastructure shared by multiple services. The disparate projects at pinch points throughout the network were designed to increase passenger capacity and improve reliability. All projects were delivered by the Transport Construction Authority until it was subsumed in November 2011 by Transport for New South Wales. A new timetable was introduced in October 2013 that realised the benefit of many of the projects, and by January 2014—the programme was complete.

<span class="mw-page-title-main">Glenfield railway station, Sydney</span> Railway station in Sydney, New South Wales, Australia

Glenfield railway station is a junction station serving the Sydney suburb of Glenfield in Australia. It is served by Sydney Trains T8 Airport & South, T2 Inner West & Leppington and T5 Cumberland line services, and by limited NSW TrainLink Southern Highlands Line services.

<span class="mw-page-title-main">Ingleburn railway station</span> Railway station in Sydney, New South Wales, Australia

Ingleburn railway station is located on the Main Southern line, serving the Sydney suburb of Ingleburn. It is served by Sydney Trains T8 Airport & South line services.

<span class="mw-page-title-main">Australian Rail Track Corporation</span> Australian railway infrastructure management corporation

The Australian Rail Track Corporation (ARTC) is an Australian Government-owned statutory corporation.

<span class="mw-page-title-main">Dry Creek–Port Adelaide railway line</span> Railway line in Adelaide, South Australia

The Dry Creek–Port Adelaide railway line is an eight-kilometre east–west freight railway line running through Adelaide's north-western suburbs. The line is managed by the Australian Rail Track Corporation (ARTC) and is an important link between Port Adelaide, Pelican Point and the main interstate rail routes which link Adelaide with Melbourne, Perth, Darwin and Sydney. Prior to 1988, a limited local passenger service operated, stopping at five intermediate stations along the line. Since May 1988, the line has been freight-only.

AusLink is a former Government of Australia land transport funding program, that operated between June 2004 and 2009. The former program was administered by the former Department of Transport and Regional Services. In 2009, the program was replaced with the Nation Building Program under the Nation Building Program Act 2009. The Nation Building Program was administered by the Department of Infrastructure and Transport and that program was replaced by The National Land Transport Network, as determined by the Minister for Infrastructure and Regional Development under the National Land Transport Act 2014.

<span class="mw-page-title-main">Sydney Freight Network</span> Railway line in Sydney, New South Wales, Australia

The Sydney Freight Network is a network of dedicated railway lines for freight in Sydney, Australia, linking the state's rural and interstate rail network with the city's main yard at Enfield and Port Botany. Its primary components are the Southern Sydney Freight Line (SSFL) and a line from Sefton to Enfield and Port Botany. The Network has been managed by the Australian Rail Track Corporation (ARTC) since 2012. Prior to the completion of the SSFL, it was managed by RailCorp as the Metropolitan Freight Network.

<span class="mw-page-title-main">Railways in Sydney</span>

Sydney, the largest city in Australia, has an extensive network of passenger and freight railways. The passenger system includes an extensive suburban railway network, operated by Sydney Trains, a metro network and a light rail network. A dedicated freight network also exists. Future expansion of the light rail network includes the Parramatta Light Rail. Existing light rail services are the Inner West Light Rail and the CBD & South East Light Rail.

<span class="mw-page-title-main">Inland Rail</span> Railway line under construction in Australia

Inland Rail is a 1600-kilometre (990 mi) railway line under construction in Australia. Once complete, it will connect the Melbourne and Brisbane along a new route inland through Victoria, New South Wales and Queensland that allows for the use of double-stacked freight trains.

<span class="mw-page-title-main">South West Rail Link</span> Railway line in Sydney, New South Wales, Australia

The South West Rail Link is a railway line serving the developing suburbs of south-western Sydney, Australia between Glenfield and Leppington. Services form part of the Sydney Trains commuter rail network. It opened on 8 February 2015.

<span class="mw-page-title-main">VicTrack</span> Government owned company jn Victoria, Australia

VicTrack, trading as the Victorian Rail Track Corporation, is a Victorian Government state-owned enterprise which owns all railway and tram lines, associated rail lands and other rail-related infrastructure in the state of Victoria, Australia, with the exception of the Emerald Tourist Railway Board's heritage Puffing Billy Railway.

One Nation was an Australian Government program of infrastructure development carried out under the Keating Government from 1991 to 1996. Much of the program was implemented as a means of stimulating the economy in the aftermath of the early 1990s recession.

The Sydney–Melbourne rail corridor is approximately 953-kilometre (592-mile) standard-gauge railway corridor that runs between Sydney and Melbourne (Victoria), the two largest cities in Australia. Freight and passenger services operate along the route, including the NSW TrainLink XPT passenger service.

The Adelaide–Port Augusta railway line is the main route for northbound rail traffic out of Adelaide, South Australia. The line, 315 kilometres long, is part of the Adelaide–Darwin rail corridor and the Sydney–Perth rail corridor.

<span class="mw-page-title-main">Northern Sydney Freight Corridor</span> Rail freight in Sydney, New South Wales

The Northern Sydney Freight Corridor (NSFC) was a project to improve access between Sydney and Newcastle for freight trains. Frequent passenger services operate on the Main Northern line between Strathfield and Broadmeadow. These passenger services take priority, meaning freight trains can be delayed and are subject to a curfew during peak hours. The Northern Sydney Freight Corridor aimed to reduce delays and increase capacity by providing additional train paths. The delivery of the NSFC projects was managed by Transport for NSW, with the exception of the Hexham freight loop which was delivered in June 2012 by the Australian Rail Track Corporation. The final stage was completed in June 2016.

<span class="mw-page-title-main">Inner West & Leppington Line</span> Rail service in Sydney, New South Wales, Australia

The Inner West & Leppington Line is a commuter rail service currently operated by Sydney Trains, serving the inner west and south-western regions of Sydney, Australia. Consisting of 37 stops, the service commences from the City Circle, then heads west to Granville. The line branches at this point; services either head northwest to Parramatta or south to Leppington. A third terminus at Homebush is used when the part-time Parramatta branch isn't operating. The line commenced operations on 26 November 2017, replacing the T2 Airport, Inner West & South Line.

<span class="mw-page-title-main">Western Sydney Freight Line</span> Proposed railway lin Sydney, New South Wales, Australia

The Western Sydney Freight Line (WSFL) is a proposed freight railway line between the Main Western railway line at St Marys and the Southern Sydney Freight Line (SSFL) at Villawood, via a new intermodal terminal near Eastern Creek. The NSW Government committed to establishing a corridor for the future WSFL as part of its Freight & Ports Strategy in 2013. Corridor preservation for the WSFL is also considered a priority under the State Infrastructure Strategy. Constraints analysis and consultation took place between 2015 and 2017, with the line in operation "before 2030". The project is expected to cost in the order of $1 billion.

The Holsworthy railway line was located in South-western Sydney. It was constructed during World War I, mainly using labour from the Holsworthy Internment Camp. Its purpose was to service the Holsworthy army facilities opening on 21 January 1918.

The 2010s saw many developments relating to transport in the Australian city of Sydney, New South Wales. The decade saw a substantial investment in infrastructure, including a new airport, motorway projects, light rail lines, Australia's first metro system, the new Waratah fleet and the demise of the non-air conditioned S sets from the rail network. Planning and branding of public transport services became substantially more centralised.

References

  1. 1 2 3 Tackling Congestion on the Sydney Rail Freight Network Archived 27 February 2012 at the Wayback Machine Minister for Infrastructure and Transport 5 February 2009
  2. Corridor Description Archived 16 February 2011 at the Wayback Machine Australian Rail Track Corporation
  3. 1 2 The Glenfield - Ingleburn Passing Loop Project Railway Digest August 1994 Page 8
  4. Southern Sydney Freight Line Parsons Brinckerhoff April 2006
  5. Southern Sydney Freight Line Submissions Report Parsons Brinckerhoff August 2006
  6. Planning snags halt rail project Sydney Morning Herald 3 November 2009
  7. Southern Sydney Freight Line cost blowout [ dead link ]Rail Express 30 March 2011
  8. Southern Sydney Freight Line Back on Track Archived 18 February 2011 at the Wayback Machine Australian Rail Track Corporation 14 September 2010.
  9. "SSFL Program of Works" (PDF). ARTC. Archived from the original (PDF) on 25 April 2012. Retrieved 28 October 2011.
  10. SAFE Notice 2-1707 [ permanent dead link ] Australian Rail Track Corporation June 2012
  11. Southern Sydney Freight Line and Metropolitan Freight Network Shared Rail Corridor Network Rules & Procedures Australian Rail Track Corporation 2 July 2012
  12. Jacob Saulwick (21 January 2013). "'We wanted to make sure we got it right': new rail line opens ... three years late". Sydney Morning Herald. Fairfax Media. Archived from the original on 23 January 2013. Retrieved 21 January 2013.
  13. New Line to Reduce Congestion on Sydney Rail Network Opens Archived 18 January 2015 at the Wayback Machine Australian Rail Track Corporation 21 January 2013
  14. Qube's Moorebank intermodal hub a major infrastructure boost ABC News 12 June 2015
  15. Moorebank construction finally begins Archived 16 June 2017 at the Wayback Machine Sky News Australia 6 April 2017
  16. Construction begins on Moorebank Logistics Park Archived 13 April 2017 at the Wayback Machine Minister for Infrastructure & Transport 6 April 2017
  17. Cabramatta Loop Project Australian Rail Track Corporation
  18. Botany duplication and Cabramatta loop approved Rail Express 13 August 2020

Commons-logo.svg Media related to Southern Sydney Freight Line at Wikimedia Commons