The Vallibel Wind Farm (also called Willwind Wind Farm and Willpita Wind Farm) is a small 850 Kilowatt (0.85 MW) onshore wind farm built near the village of Bithugalgama, in the Ratnapura District of Sri Lanka. The wind farm is owned and operated by Willwind (Private) Limited. The facility consists of seven wind turbines measuring approximately 121 KW each. [2] [ citation needed ]
Turbine | Coordinates |
---|---|
Turbine 1 | 06°36′40″N80°44′44″E / 6.61111°N 80.74556°E |
Turbine 2 | 06°36′36″N80°44′45″E / 6.61000°N 80.74583°E |
Turbine 3 | 06°36′29″N80°44′43″E / 6.60806°N 80.74528°E |
Turbine 4 | 06°36′25″N80°44′44″E / 6.60694°N 80.74556°E |
Turbine 5 | 06°36′18″N80°44′40″E / 6.60500°N 80.74444°E |
Turbine 6 | 06°36′14″N80°44′37″E / 6.60389°N 80.74361°E |
Turbine 7 | 06°36′11″N80°44′35″E / 6.60306°N 80.74306°E |
A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Wind farms can be either onshore or offshore.
The Ceylon Electricity Board - CEB, was the largest electricity company in Sri Lanka. With a market share of nearly 100%, it controlled all major functions of electricity generation, transmission, distribution and retailing in Sri Lanka. It was one of the only two on-grid electricity companies in the country; the other being Lanka Electricity Company (LECO). The company earned approximately Rs 204.7 billion in 2014, with a total of nearly 5.42 million consumer accounts. It was a government-owned and controlled utility of Sri Lanka that took care of the general energy facilities of the island. The Ministry of Power and Energy was the responsible ministry above the CEB. Ceylon Electricity Board (CEB), established by the CEB Act No. 17 of 1969, was under the legal obligation to develop and maintain an efficient, coordinated and economical system of electricity supply in accordance with any licenses issued. The CEB was dissolved and replaced by 12 successor entities under the 2024 Electricity Act.
The Hambantota Wind Farm was a wind farm in Hambantota, Sri Lanka, owned and operated by the state-run Ceylon Electricity Board. The wind farm, which was located along south-eastern coast of Hambantota was the country's first state owned wind farm, and consisted of five NEG Micon M1500-600 wind turbines of 600 KW each. With a total installed capacity of 3 MW, the wind farm generated up to approximately 4,500 MWh of power a year.
The electricity sector in Sri Lanka has a national grid which is primarily powered by hydroelectric power and thermal power, with sources such as photovoltaics and wind power in early stages of deployment. Although potential sites are being identified, other power sources such as geothermal, nuclear, solar thermal and wave power are not used in the power generation process for the national grid.
The Mampuri Wind Farms are a set of three wind farms located near the Lakvijaya Power Station, on the Kalpitiya peninsula, in Mampuri, Puttalam District, Sri Lanka. The wind farms, referred to as Mampuri-I, Mampuri-II, and Mampuri-III, was built successively, and consists of eighteen Suzlon wind turbines ranging from 1.25 MW to 2.10 MW. Mampuri-I was commissioned on 22 March 2010, and was the first wind farm in the country to reach the 10 MW installed capacity threshold. As the government only allows projects up to 10 MW, the three wind farms are registered under three different company names, namely Senok Wind Power, Senok Wind Energy, and Senok Wind Resource.
The Seguwantivu and Vidatamunai Wind Farms are two legally separate wind farms built together by Seguwantivu Wind Power and Vidatamunai Wind Power, on the south-east shore of the Puttalam Lagoon, in Puttalam, Sri Lanka.
The Uppudaluwa Wind Farm is a 10.5 MW wind farm owned by PowerGen Lanka (Private) Limited in Uppudaluwa, Puttalam, Sri Lanka.
The Nirmalapura Wind Farm is a 10 MW wind farm consisting of seven wind turbines, located on the west coast of Nirmalapura, Puttalam, Sri Lanka. The plant is owned by Nirmalapura Wind Power (Private) Limited, and was commissioned in September 2011.
The Sri Lanka Sustainable Energy Authority is the primary body responsible for the issuance of licenses for sustainable energy developments in Sri Lanka. In addition to being the key licence provider, it is also the organization responsible for promoting renewable energy and sustainable developments in the country.
The Madurankuliya Wind Farm is a 12 MW wind farm located in Narakkaliya, bordering the Lakvijaya Power Station, in Narakkaliya, Puttalam, Sri Lanka. The wind farm is operated by Daily Life Renewable Energy (Pvt) Ltd, a subsidiary of WindForce (Pvt) Ltd, which owns most of the existing wind farms in the country. The facility consists of eight ReGen VENSYS 82 wind turbines of 1.5 MW each. With a hub height of 85 m (279 ft) and a rotor diameter of 82 m (269 ft), these turbines has rated wind speeds of 13 m/s (43 ft/s), despite the site only experiencing about 7.4 m/s (24 ft/s). The wind farm experiences air densities of 1.158 kg/m3 (0.072 lb/cu ft).
The Pawan Danavi Wind Farm is a 10.2 MW onshore wind farm located near Kalpitiya, in the Puttalam District of Sri Lanka. The wind farm utilizes twelve of Gamesa's G58-850 kW wind turbines. Pawan Danavi is a subsidiary company of LTL Holdings.
The Nilambe Dam is a small hydroelectric dam build across the Nilambe River, measuring approximately 70 m (230 ft) in length. Water from the Nilambe Dam is transferred to the 3.2-megawatt Nilambe Power Station through a 2.8 km (1.7 mi) penstock. The power station consists of two 1.6 MW generating units, which were commissioned in July 1988.
The Pollupalai and Vallimunai Wind Farms are two wind farms built together by Joule Power and Beta Power, on the north-eastern shore of the Jaffna Lagoon, in Pachchilaipalli, Sri Lanka. Both wind farms are owned by the parent company WindForce, and have an installed capacity of 12 megawatts each, and an annual production of approximately 60 GWh. The wind farms are the first-ever to be constructed in the Northern Province of Sri Lanka.
The Nala Danavi Wind Farm is a 4.8 megawatt onshore wind farm in Erumbukkudal, on the Kalpitiya Peninsula, Sri Lanka. The wind farm is operated by Nala Danavi (Private) Limited, which is a subsidiary of LTL Holdings. The facility consists of six wind turbines measuring 800 KW each.
The Asia Power Sapugaskanda Power Station is a 51 MW thermal power station in Sapugaskanda, Sri Lanka. Planning for the fuel oil-run power station dated back to 1994, when the Ceylon Electricity Board issued a tender for an IPP project for 50 megawatts. Construction of the plant began in 1996 and was commissioned in June 1998, with a PPA of 20-years. The power station utilizes eight Deutz 16V BVM 640 generating units.
The Thambapavani Wind Farm named after Thambapanni and Pavan meaning wing in Sinhalese. Also called Mannar Island Wind Farm or Mannar Wind Farm) is a 100-megawatt wind farm which was built on the southern coast of the Mannar Island, in Sri Lanka. The project would cost approximately US$200 million, 78% of which will be borne by the Asian Development Bank, while the remaining 22% will be borne by the developers, the Ceylon Electricity Board. Identification of land plots and ownership has already begun. It is currently regarded as the largest wind farm in Sri Lanka and it is also the first wind power plant to be owned by the Ceylon Electricity Board.
The Aitken Spence Power Station is a municipal solid waste-fired thermal power station currently under construction at Muthurajawela, Sri Lanka. It was originally planned to be built at Meethotamulla, the site of a large solid waste landfill which was under international media spotlight after the 2017 Meethotamulla garbage landslide which killed over 30 people. The power station will operate approximately 7500 hours a year, utilizing the 700 metric tons (1,500,000 lb) of fresh waste from the Colombo Municipal Council area, daily. The power station in being built together with the KCHT Power Station.
The Public Utilities Commission of Sri Lanka is the government entity responsible for policy formulation and regulation of the electric power distribution, water supply, petroleum resources, and other public utilities in Sri Lanka.
The 2019 Sri Lanka electricity crisis was a crisis which happened nearly a month from 18 March to 10 April 2019 faced by Sri Lanka caused by a severe drought that depleted water levels at hydroelectric plants. Sri Lanka experienced rolling blackouts for three to five hours per day except on Sundays in all parts of the island nation at different time schedules that started from 24 March 2019 to present. This is regarded as one of the worst blackouts confronted in Sri Lanka since 2016 and the longest ever blackout recorded in history of the country. However it was revealed that the main electricity providing institution Ceylon Electricity Board had restricted the power supply to almost all regions of the country without proper prior notice and implemented a time schedule unofficially from 24 March 2019. However the Ministry of Power and Renewable Energy revealed that it didn't grant and approve permission to CEB to impose power cuts.
{{cite web}}
: CS1 maint: url-status (link)