Cromford and High Peak Railway

Last updated

Cromford and High Peak Railway.svg
Overview
Locale Derbyshire, England
Dates of operation1831 (1831)1967 (1967)
Successor High Peak Trail cycleway
Technical
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Route map
Cromford and
High Peak Railway
BSicon CONTg cerulean.svg
BSicon uWHRF.svg
BSicon STR cerulean.svg
BSicon exldENDE@G.svg
BSicon exdSTR.svg
Whaley Bridge Canal Wharf
BSicon exSTR.svg
BSicon LOCK2d.svg
BSicon CONTg.svg
BSicon exSTR.svg
Buxton line
to Manchester
BSicon HST.svg
BSicon exSTR.svg
Whaley Bridge
BSicon STRl.svg
BSicon exSTR2.svg
BSicon excSTRc3.svg
BSicon cSTRq.svg
BSicon xdKRZu.svg
BSicon CONT2+r.svg
BSicon exSTRc1.svg
BSicon exABZg+4.svg
BSicon exHST.svg
Shallcross
BSicon exSTR.svg
BSicon LOCK2d.svg
BSicon exHST.svg
Fernilee
BSicon dWDOCKS.svg
BSicon exdSTR.svg
BSicon exSTR.svg
BSicon LOCK2d.svg
BSicon exSTR.svg
BSicon LOCK2d.svg
BSicon exTUNNEL1.svg
BSicon exHST.svg
Ladmanlow
BSicon exHST.svg
Old Harpur Gnome-searchtool.svg
BSicon exHST.svg
Harpur Hill
BSicon vSTR+1-.svg
BSicon lCONTf1.svg
BSicon exvSTR-.svg
BSicon eHST.svg
Hindlow Gnome-searchtool.svg
BSicon TUNNEL1.svg
BSicon KBSTaq.svg
BSicon ABZgr.svg
Hindlow Quarry
(Brigg's Sidings)
BSicon eHST.svg
Dowlow Halt
BSicon KBSTxe.svg
Dowlow Works
BSicon exHST.svg
Hurdlow Gnome-searchtool.svg
BSicon exHST.svg
Parsley Hay
BSicon exv-STR3.svg
BSicon exlCONTf3.svg
BSicon exv-STR.svg
BSicon exTUNNEL1.svg
BSicon exBST.svg
Friden Goods Yard
BSicon exvWSLaq.svg
BSicon exd-STR+r.svg
BSicon exdSTRr-.svg
Gotham Curve
BSicon exBST.svg
Minninglow Goods Yard
BSicon exBST.svg
Longcliffe Goods Yard
BSicon exSTR.svg
BSicon LOCK2u.svg
BSicon exTUNNEL1.svg
BSicon exBST.svg
Middleton Top
BSicon exSTR.svg
BSicon LOCK2u.svg
BSicon exSTR.svg
BSicon exKBSTa.svg
Middleton Quarry
BSicon exSTR.svg
BSicon uKHSTa.svg
BSicon exSTR.svg
Recreation Ground
BSicon POINTER2.svg
BSicon exSTR.svg
BSicon uSTR.svg
unopened connection
BSicon lv-HST.svg
BSicon CONTg@Gq.svg
BSicon exSTR.svg
BSicon exLSTRr.svg
BSicon uSTR.svg
Ravenstor
Ecclesbourne Valley Railway BSicon lDAMPF.svg
BSicon uexmHSTa.svg
BSicon uSTR.svg
National Stone Centre
BSicon uxKRWg+l.svg
BSicon POINTERg@f.svg
BSicon uKRWr.svg
Steeple Grange Light Railway
BSicon umKHSTxe.svg
Steeple House
BSicon exBST.svg
Steeplehouse & Wirksworth
BSicon exSTR.svg
BSicon LOCK2u.svg
BSicon exSTR.svg
BSicon LOCK2u.svg
BSicon exBST.svg
Sheep Pasture Bottom
(now High Peak Junction)
BSicon exvSHI2gl-.svg
BSicon CONT1+f cerulean.svg
BSicon exSTR~L.svg
BSicon exSTR.svg
BSicon exlENDE@F.svg
BSicon exdSTR~R.svg
BSicon STR cerulean.svg
BSicon uWHRF.svg
BSicon exSTR.svg
BSicon CONTf cerulean.svg
BSicon xSTR+c2.svg
BSicon CONT3.svg
Derwent Valley line
to Cromford
BSicon vSTR+1-.svg
BSicon exSHI1r.svg
BSicon STRc4.svg
BSicon CONTf@F.svg
Derwent Valley line
to Whatstandwell
Hurdlow Incline
deviation (1869)
BSicon MFADEg.svg
BSicon STR.svg
BSicon KBSTxe.svg
Dowlow Works
BSicon KRW+l grey.svg
BSicon MSTR.svg
BSicon exSTR.svg
BSicon KRWr grey.svg
BSicon STR grey.svg
BSicon LOCK2u.svg
BSicon exSTR.svg
Hurdlow Incline
bypassed
BSicon KRWl grey.svg
BSicon MSTR.svg
BSicon exSTR.svg
BSicon KRW+r grey.svg
BSicon exHST.svg
Hurdlow
BSicon MFADEf.svg
BSicon exSTR.svg

The Cromford and High Peak Railway (C&HPR) was a standard-gauge line between the Cromford Canal wharf at High Peak Junction and the Peak Forest Canal at Whaley Bridge. The railway, which was completed in 1831, was built to carry minerals and goods through the hilly rural terrain of the Peak District within Derbyshire, England. The route was marked by a number of roped worked inclines. Due to falling traffic, the entire railway was closed by 1967.

Contents

The remains of the line, between Dowlow and Cromford, has now become the High Peak Trail, a route on the National Cycle Network.

Background

Bunsall Incline in the Goyt Valley, now converted to a road Cromford And High Peak Railway Former incline near Whaley Bridge.jpg
Bunsall Incline in the Goyt Valley, now converted to a road

The Peak District of Derbyshire has always posed problems for travel, but from 1800 when the Peak Forest Canal was built, an alternative to the long route through the Trent and Mersey Canal was sought, not only for minerals and finished goods to Manchester, but raw cotton for the East Midlands textile industry.

One scheme that had been suggested would pass via Tansley, Matlock and Bakewell. In 1810, a prospectus was published for another route via Grindleford, Hope and Edale, but since it could only promise £6,000 a year, in return for an outlay of £500,000, it was received with little enthusiasm. The problem was not only carrying a canal over a height of around a thousand feet, but supplying it with water on the dry limestone uplands.

Finally Josias Jessop, the son of William Jessop, was asked to survey the route. He, his father and their former partner Benjamin Outram had gained wide experience in building tramways where conditions were unsuitable for canals, and that is what he suggested. Even so, as almost the first long-distance line at 33 miles (53 km), it was a bold venture. Moreover, to its summit at Ladmanlow, it would climb a thousand feet from Cromford, making it one of the highest lines ever built in Britain.

Cromford and High Peak Railway Act 1825
Act of Parliament
Coat of Arms of the United Kingdom (1816-1837).svg
Long title An Act for making and maintaining a Railway or Tram Road from Cromford Canal, at or near to Cromford, in the Parish of Wirksworth, in the County of Derby, to the Peak Forest Canal, at or near to Whaley (otherwise Yardsley-cum-Whaley), in the County Palatine of Chester.
Citation 6 Geo. 4. c. xxx
Dates
Royal assent 2 May 1825

In 1825 the Cromford and High Peak Railway Act 1825 (6 Geo. 4. c. xxx) was obtained for a "railway or tramroad" to be propelled by "stationary or locomotive steam engines," which was remarkably prescient, considering few people considered steam locomotives to be feasible, and George Stephenson's Stockton and Darlington Railway was barely open in far-away County Durham.

Construction

Middleton Incline today Middleton Incline.jpg
Middleton Incline today

The first part of the line from the wharf at High Peak Junction, on the Cromford Canal, to Hurdlow opened in 1830. From the canal it climbed over one thousand feet (305 m) in five miles (8 km), through three inclines ranging from 1 in 14 (7.1%) to 1 in 8 (12.5%): Sheep Pasture incline near Cromford and Middleton and Hopton inclines above Wirksworth. The line then proceeded up the relatively gentle Hurdlow incline at 1 in 16 (6.25%). The second half from Hurdlow to Whaley Bridge opened in 1832 descending through four more inclines, the steepest being 1 in 7 (14.3%). The highest part of the line was at Ladmanlow, a height of 1,266 feet (386 m). For comparison, the present-day highest summit in England is Ais Gill at 1,169 feet (356 m) on the Settle–Carlisle line, although the remaining, freight-only, stub of the CHPR at Dowlow Lime Works reaches a height of 1,250 feet (381 m).

Fishbelly rail laid on stone blocks, a common form of early track construction, had the advantage of providing a continuous soft path between the rails that was suitable for horses Wrought-iron fishbelly rail from the Cromford and High Peak Railway (made about 1831).jpg
Fishbelly rail laid on stone blocks, a common form of early track construction, had the advantage of providing a continuous soft path between the rails that was suitable for horses

The railway was laid using so-called "fishbelly" rails supported on stone blocks, as was common in those days, rather than timber sleepers, since it would be powered by horses on the flat sections. On the nine inclined planes, stationary steam engines would be used, apart from the last incline into Whaley Bridge, which was counterbalanced and worked by a horse-gin. The engines, rails and other ironwork were provided by the Butterley Company. It would take around two days to complete the journey. It was laid to the Stephenson gauge of 4 ft 8+12 in (1,435 mm), rather than Outram's usual 4 ft 2 in (1,270 mm).

While its function was to provide a shorter route for Derbyshire coal than the Trent and Mersey Canal, it figured largely in early East Midlands railway schemes because it was seen as offering a path into Manchester for proposed lines from London. However, the unsuitability of cable railways for passengers became clear within a few years.

Part of the route included the Hopton Incline. This was a very steep section of the railway about a mile north of the small village of Hopton. It was originally worked by a stationary steam engine but was modified later to be adhesion worked by locomotives. At 1 in 14 (7%), it was the steepest in Britain and trains frequently had to be split and pulled up a few wagons at a time.

Dozens of small sidings were added along the length of the railway to accommodate the waggons that worked the line. Towards the Cromford end, between Sheep Pasture Top and Friden there were over 15 sidings, mostly grouped between Sheep Pasture and Longcliffe, primarily serving quarries. One was built in 1883 from Steeplehouse to serve the Middleton Quarry north of Wirksworth. The branch closed in 1967 but the trackbed was later used for the 18 in (457 mm) Steeple Grange Light Railway in 1985.

Towards the Whaley Bridge end of the line, another profusion of sidings lay between Dowlow Halt and Ladmanlow, mostly serving quarries and limeworks. This included some dozen sidings in the short section between Harpur Hill and Old Harpur.

The following table lists the inclines as originally built: [1]

InclineLength Gradient Notes
Cromford 580 yards (530 m)1 in 9 (11.1%)Combined with Sheep Pasture in 1857, [2] combined name "Sheep Pasture Incline"
Sheep Pasture 711 yards (650 m)1 in 8 (12.5%)Combined with Cromford in 1857, [2] combined name "Sheep Pasture Incline"
Middleton 708 yards (647 m)1 in 8+12 (11.8%)
Hopton 457 yards (418 m)1 in 14 (7.1%)Chain-hauled until 1877, adhesion thereafter [3] [4]
Hurdlow 850 yards (777 m)1 in 16 (6.3%)Bypassed and abandoned 1869 [5]
Bunsall Upper 660 yards (604 m)1 in 17+12 (5.7%)Combined with Bunsall Lower in 1857, [2] combined name "Bunsall Incline", abandoned 1892
Bunsall Lower 455 yards (416 m)1 in 7 (14.2%)Combined with Bunsall Upper in 1857, [2] combined name "Bunsall Incline", abandoned 1892
Shallcross 817 yards (747 m)1 in 10+14 (9.8%)Abandoned 1892
Whaley Bridge 180 yards (165 m)1 in 13+12 (7.4%)Abandoned 1952

Expansion

The Ashbourne line in relation to the C&HPR Ashbourne line.jpg
The Ashbourne line in relation to the C&HPR

The line had been built on the canal principle of following contours across the plateau and the many tight curves hampered operations in later years. Not only did the C&HPR have the steepest adhesion worked incline of any line in the country, the 1 in 14 of Hopton, it also had the sharpest curve, 55 yards (50 m) radius through eighty degrees at Gotham. [6]

The line was isolated until 1853 when, in an effort to improve traffic, a connection was made with the Manchester, Buxton, Matlock and Midlands Junction Railway at High Peak Junction a short way south of the terminus at Cromford. In 1857 the northern end was connected to the Stockport, Disley and Whaley Bridge Railway. Around this time, the people of Wirksworth were agitating for a line and an incline was built between the two. However, the Midland Railway began surveying a line from Duffield [7] in 1862 but it was never used. [8]

The C&HPR was leased by the London and North Western Railway in 1862, being taken over fully in 1887. By 1890 permission had been obtained to connect the line directly to Buxton by building a new line from Harpur Hill the two or three miles into the town centre, thus frustrating the Midland Railway's original plans for a route to Manchester.

The old north end of the line from Ladmanlow (a short distance from Harpur Hill) to Whaley Bridge via the Goyt Valley was largely abandoned in 1892, though the track bed is still visible in many places and one incline forms part of a public road.

Then, built by the LNWR, the branch line to Ashbourne was opened in 1899. This used the section of the C&HP line from Buxton as far as Parsley Hay, from where a single line ran south to Ashbourne, where it connected with the North Staffordshire Railway. The formation was constructed to allow for double tracking if necessary, but this never happened.

Operation

Engine shed at top of Sheep Pasture Incline, 1949 Cromford & High Peak Railway- engine-shed at top of Sheep Pasture Incline, 1949 (geograph 4985981).jpg
Engine shed at top of Sheep Pasture Incline, 1949
Workshops and offices at High Peak Junction - the original southern terminus, before extension of the line to the former Midland Railway now the Derwent Valley Line Chpr workshop.jpg
Workshops and offices at High Peak Junction – the original southern terminus, before extension of the line to the former Midland Railway now the Derwent Valley Line

The line was worked by independent contractors until long after other lines, which had taken operations in house upon the introduction of locomotives. The line was initially under-capitalised because many of the subscribers did not meet their dues, and it was mainly funded by the Butterley Company, a major supplier and its main creditor. The final cost was £180,000, more than Jessop's estimate of £155,000, but still much cheaper than a canal. Nevertheless, the line never achieved a profit. Francis Wright, the Chairman, was later to say, in 1862 "We found ourselves getting into difficulties from the third year of our existence," and added it was clear in retrospect that the line "never had a remote chance of paying a dividend on the original shares." [9]

The railway's first steam locomotive arrived in 1841 in the shape of Peak, built by Robert Stephenson and Company. By 1860 the line had six more locomotives gradually displacing the horses. Because the inclines were too steep for adhesion traction by these early locomotives, they were hauled up and down the inclines, along with their trains, by static steam engines. Hemp rope or chain, initially used for hauling trains, was later replaced by steel cables.

Cromford and High Peak Railway Act 1855
Act of Parliament
Royal Coat of Arms of the United Kingdom (variant 1, 1952-2022).svg
Long title An Act to alter and extend the Line of the Cromford and High Peak Railway, and to amend and consolidate the Provisions of the Acts relating thereto.
Citation 18 & 19 Vict. c. lxxv
Dates
Royal assent 26 June 1855
Text of statute as originally enacted

The Cromford and High Peak Railway Act 1855 (18 & 19 Vict. c. lxxv) authorised the carriage of passengers. However the one train per day each way did little to produce extra revenue and, when a passenger was killed in 1877, the service was discontinued. The line's prosperity depended on that of the canals it connected but, by the 1830s, they were in decline. This was, to a degree, offset by the increase in the trade for limestone from the quarries.

There were, in fact, very few accidents. In 1857, the Cromford and Sheep Pasture inclines had been merged into one, and in 1888, a brake van parted from the train near the summit. Gathering speed, it was unable to round the curve into Cromford Wharf. It passed over both the canal and the double track railway line, and landed in a field. A catch pit was therefore installed near the bottom. This can still be seen from the A6 [10] with a (more recent) wrecked wagon still in it.

The most serious accident occurred in 1937. The line was fairly level on the approach to the Hopton Incline and it was the custom to gain speed for the uphill gradient. There was a shallow curve immediately before and on this occasion the locomotive spread the track, rolled over and down the embankment with four wagons. The driver was killed and thereafter a speed limit of 40 mph was strictly enforced.

During World War II, the line was used to transport bombs to the huge underground munitions store at RAF Harpur Hill. The railway line ran directly through the site. [11]

Demise

Traffic – by now almost exclusively from local quarries – was slowly decreasing during the Beeching era, the first section of the line being closed in 1963. This was the rope-worked 1 in 8 Middleton Incline. The Middleton Top-Friden section, including the 1 in 8 Sheep Pasture Incline and the Hopton Incline, closed on 21 April 1967 [12] and Friden to Hindlow closed on 2 October 1967. [13]

Preservation

The High Peak Trail

A cutting on the High Peak Trail. High Peak Trail - geograph.org.uk - 139411.jpg
A cutting on the High Peak Trail.
The summit of the former rope-worked railway incline at Middleton Top, now used as a footpath and cycle way. Middleton Top. - geograph.org.uk - 2524.jpg
The summit of the former rope-worked railway incline at Middleton Top, now used as a footpath and cycle way.

In 1971 the Peak Park Planning Board and Derbyshire County Council bought part of the track bed (from Dowlow, near Buxton, to High Peak Junction, Cromford) and turned it into the High Peak Trail, now a national route of the National Cycle Network and popular with walkers, cyclists and horse riders.

The High Peak Trail and part of the Tissington Trail (see below) are now also designated as part of the Pennine Bridleway, a leisure route that starts at Middleton Top, near Cromford, and includes 73 miles (117 km) through Derbyshire to the South Pennines.

The Middleton Incline Engine House has also been preserved, and the ancient engine once used to haul loaded wagons up is often demonstrated. [14] Another attraction along the route is the Steeple Grange Light Railway, a narrow-gauge railway running along the trackbed of a branch line off the C&HPR.

Near Cromford at the top of the town of Wirksworth the railway passed under Black Rocks, a popular gritstone climbing ground, and gave the name to the 'railway slab', a short tricky 'boulder problem' by the railway track.

The Tissington Trail

At the hamlet of Parsley Hay, about 5 miles (8 km) SW of Bakewell, the C&HPR/High Peak Trail is joined by the Tissington Trail, another route of the National Cycle Network, and formerly the railway line from Buxton to Ashbourne. This 13-mile (21 km) recreational route runs from Parsley Hay to Ashbourne on a gently descending gradient.

Station locations

Passenger services were introduced in stages with there being only one service a day each way between Cromford and Landmanlow in 1856. Stations were included at:

The following additional stations were added in 1874. However, this was short-lived and the line was closed to passengers along with the outlying halts and minor stations in 1876.

When in operation the services offered interchanges with the Derwent Valley Line, Ashbourne Line and Manchester, High Peak and Derbyshire Railway. [15]

Related Research Articles

<span class="mw-page-title-main">High Peak Trail</span> Bridleway in the English Peak District

The High Peak Trail is a 17-mile (27 km) trail for walkers, cyclists and horse riders in the Peak District of England. Running from Dowlow (53.2059°N 1.8349°W), near Buxton, to High Peak Junction, Cromford (53.1004°N 1.5354°W), it follows the trackbed of the former Cromford and High Peak Railway, which was completed in 1831 to carry minerals and goods between the Cromford Canal wharf at High Peak Junction and the Peak Forest Canal at Whaley Bridge.

<span class="mw-page-title-main">Tissington Trail</span> Bridleway in the English Peak District

The Tissington Trail is a bridleway, footpath and cycleway in Derbyshire, England, along part of the trackbed of the former railway line connecting Ashbourne to Buxton. It takes its name from the village of Tissington, which it skirts. Opened in 1971, and now a part of the National Cycle Network, it stretches for 13 miles (21 km) from Parsley Hay (53.1706°N 1.7828°W) in the north to Ashbourne (53.0196°N 1.7397°W) in the south.

<span class="mw-page-title-main">Hopton Incline</span>

The Hopton Incline was the steepest stretch of conventional, adhesion-worked standard gauge railway in the UK. The incline was situated in sparsely populated, exposed limestone uplands in the Peak District of Derbyshire, England.

<span class="mw-page-title-main">Parsley Hay railway station</span> Former railway station in Derbyshire, England

Parsley Hay railway station served Parsley Hay, a hamlet within Hartington Middle Quarter civil parish, about 9.3 miles (15 km) south east of Buxton, Derbyshire, on the LNWR line to Ashbourne. The nearest large settlement is the village of Hartington.

The Ashbourne line was a 33+12 mi (53.9 km) railway from Buxton via Ashbourne to Uttoxeter. It was built by the London and North Western Railway using a section of the Cromford and High Peak Railway (C&HPR) and it joined the North Staffordshire Railway at Ashbourne, proceeding to Uttoxeter with a junction onto the main line at Rocester.

<span class="mw-page-title-main">Higher Buxton railway station</span> Former railway station in Derbyshire, England

Higher Buxton railway station was opened in 1894 to the south east of Buxton, Derbyshire, on the LNWR line to Ashbourne and the south.

<span class="mw-page-title-main">Hindlow railway station</span> Former railway station in Derbyshire, England

Hindlow railway station was opened for goods in 1833 near to Hindlow near King Sterndale to the south east of Buxton, Derbyshire on the Cromford and High Peak Railway and the LNWR line to Ashbourne and the south.

<span class="mw-page-title-main">Dowlow Halt railway station</span> Former railway station in Derbyshire, England

Dowlow Halt was opened in 1920 between Dowlow and Greatlow to the south east of Buxton, Derbyshire on the London and North Western Railway line to Ashbourne and the south.

<span class="mw-page-title-main">Hurdlow railway station</span> Former railway station in Derbyshire, England

Hurdlow railway station was near to the hamlet of Hurdlow within Hartington Middle Quarter civil parish, to the south east of Buxton, Derbyshire on the LNWR line to Ashbourne and the south.

Thorpe Cloud railway station was opened in 1899 between the villages of Thorpe and Fenny Bentley in Derbyshire, south east of Buxton.

<span class="mw-page-title-main">Tissington railway station</span> Former railway station in Derbyshire, England

Tissington railway station is a disused British railway station near Tissington, a village in Derbyshire near Ashbourne. It opened on 4 August 1899 and closed on 7 October 1963.

<span class="mw-page-title-main">Alsop en le Dale railway station</span> Former railway station in Derbyshire, England

Alsop en le Dale railway station was opened in 1899 near Alsop en le Dale and Alstonefield, villages in Derbyshire southeast of Buxton.

<span class="mw-page-title-main">Hartington railway station</span> Former railway station in Derbyshire, England

Hartington railway station is a former railway station which operated from 1899 to 1963. It was built to serve the village of Hartington in Derbyshire, south east of Buxton.

<span class="mw-page-title-main">High Peak Junction</span>

High Peak Junction, near Cromford, Derbyshire, England, is the name now used to describe the site where the former Cromford and High Peak Railway (C&HPR), whose workshops were located here, meets the Cromford Canal. It lies within Derwent Valley Mills World Heritage Site, designated in 2001, and today marks the southern end of the High Peak Trail, a 17 miles (27 km) trail for walkers, cyclists and horse riders. The Derwent Valley Heritage Way also passes this point, and popular walks lead from here along the towpath in both directions.

<span class="mw-page-title-main">Gotham Curve</span>

The Gotham Curve was once the sharpest curve on any standard gauge railway line in the UK. The curve, which was situated in the sparsely populated, exposed limestone uplands in the Peak District of Derbyshire, England, was on the Cromford and High Peak Railway. The single-track main line was inherited by British Railways in 1948. It closed in 1967.

<span class="mw-page-title-main">White Peak Loop Trail</span> Recreational trail in the English Peak District

The White Peak Loop is a 60-mile (97 km) route for walking, cycling and horse riding in the Peak District of England. The trail combines sections of the High Peak Trail and the Monsal Trail with linking sections through the towns of Buxton, Bakewell and Matlock. The White Peak Loop is being developed by Derbyshire County Council and as of 2022 some sections are not yet complete.

Sheep Pasture Incline is a former railway incline in Sheep Pasture, Derbyshire once part of the Cromford and High Peak Railway. The incline was one of six gradients on the entire line from Cromford to Whaley Bridge in High Peak, Derbyshire. The incline was opened in 1830 and was in use until 1967 when the entire line from Whaley Bridge to Middleton was closed, with the section to Cromford closing in 1963. Today, the incline is used as part of the High Peak Trail. Sheep Pasture Incline was also 1 in 9 gradient, like the other slopes on the former railway.

Middleton Incline is a former railway incline in Middleton, Derbyshire once part of the Cromford and High Peak Railway. The incline was one of six gradients along the entire line from Cromford to Whaley Bridge in High Peak, Derbyshire. The incline was opened in 1830 and was in use until 1967 when the entire line from Whaley Bridge to Middleton was closed, with the section to Cromford closing in 1963. Today, the incline is used as part of the High Peak Trail. Middleton Pasture Incline was also 1 in 9 gradient, like the other slopes along the former railway.

Dowlow Works is a quarry in High Peak, Derbyshire near the village of Earl Sterndale. The quarry has been in operation since 1899, and has extracting permissions until 2046. It produces agricultural lime, crushed rock, white limestone and associated asphalt products.

Ladmanlow railway station was a minor railway station located on the Cromford and High Peak Railway near Buxton in Derbyshire. It was located on a line mostly used for mineral and quarry traffic. It opened to passengers in 1855 and closed in 1876 due to relatively but not uncommonly low usage. The goods station then closed in 1967 along with the rest of the line. Today, nothing remains of the station. It was also the terminus of the line originally for passengers until 1874 when it was extended to Buxton/Whaley Bridge. The trackbed now forms an access route to the Health and Safety Executive Science & Research Centre from the A53. Remains of the route towards Whaley bridge can be seen on the nearby A54 where a bridge abutment and an embankment are visible.

References

  1. Marshall 2011, p. 10.
  2. 1 2 3 4 Marshall 2011, p. 28.
  3. Jones & Bentley 2001, p. 17.
  4. Rimmer 1956, p. 17.
  5. Marshall 2011, p. 57.
  6. Kingscott 2007, p. 32.
  7. see Ecclesbourne Valley Railway
  8. Kingscott 2007, p. 27.
  9. Moorsom and the Attempt to Revive the Cromford And High Peak Railway Derbyshire Archaeological Journal 1983
  10. "Geograph:: Runaway crash tunnel on the High Peak... © Andrew Abbott". www.geograph.org.uk. Retrieved 20 February 2023.
  11. Neville, Lea (2002). Return To Buxton - 28 MU RAF Harpur Hill. Woodcote Press. pp. 57, 70.
  12. Modern Railways. July 1967. p. 398.{{cite magazine}}: Missing or empty |title= (help)
  13. "Parsley Hay Station". disused-stations.org.uk. Retrieved 20 February 2023.
  14. "Middleton Top Engine". Archived from the original on 21 October 2005. Retrieved 7 October 2005.
  15. "Disused Stations: Parsley Hay Station".

Sources

53°10′57″N1°48′23″W / 53.1824°N 1.8065°W / 53.1824; -1.8065 (Cromford and High Peak Railway)