200 Amsterdam | |
---|---|
General information | |
Status | Completed |
Type | Residential |
Location | 200 Amsterdam Avenue Manhattan, New York City |
Coordinates | 40°46′36″N73°59′00″W / 40.7768°N 73.9833°W |
Construction started | 2017 |
Completed | 2021 |
Height | |
Roof | 668 feet (204 m) |
Technical details | |
Floor count | 51 |
Floor area | 283,000 square feet (26,300 m2) |
Design and construction | |
Architect(s) | Elkus Manfredi Architects |
Developer | SJP Properties, Mitsui Fudosan America |
200 Amsterdam is a residential skyscraper at the intersection of Amsterdam Avenue and 69th Street on the Upper West Side in Manhattan, New York City. [1] The lot was formerly occupied by the Lincoln Square Synagogue. [2] The tower contains 112 condominiums.
The building stands as the tallest building on the Upper West Side after topping out at 51 stories in August 2019. 50 West 66th Street will be taller if completed as planned. [3] Buildings of comparable size exist within a thousand feet to the south and east, including Tower 67 and the Park Millennium, which stand 49 and 47 stories tall, respectively. [4] [5] However, in February 2020, a state judge ruled that several upper floors would have to be removed due to zoning violations. In March 2021, the ruling was overruled on appeal. The building was completed in 2021. [6]
The site, formerly a synagogue constructed in 1971, was purchased by the developers for $275 million in October 2015. [7] The building's design was officially unveiled in June 2016 [8] and permits for the development were filed two months later in September 2016. [9] Despite the project's initial lot spanning just 10,800 square feet (1,000 m2), the developers expanded the zoning lot to over 100,000 square feet (9,300 m2) by purchasing the development rights from parking lots at the neighboring Lincoln Towers. This allowed the project to aggregate floor area limits and build a much larger project upon the small site. [10]
In May 2017, two community groups began the first organized opposition to the tower's development, claiming that the building's zoning lot was illegal and could not encompass the additional development rights from the Lincoln Towers. [11] Local New York City Council member Helen Rosenthal and Manhattan Borough President Gale Brewer endorsed the effort and a formal challenge was filed with the New York City Department of Buildings on May 15. [12] [13] In June, the Department of Buildings halted new permit issuance for the site until the challenge could be reviewed and ruled on. [14]
At the end of June, the Department of Buildings filed a "Notice to Revoke" against the developers, meaning that the permit would be revoked unless the developers responded and solved issues that the Department had identified. [15] Two weeks later, the Department ruled that the challenge had merit and rescinded the development's permit until the zoning lot was changed to comply with the law. [16] By the end of September, the developers had responded to the Department of Building's concerns and demonstrated conformance with the law without changing the scope of the project. [17]
The development received new construction permits on September 27, allowing the developers to begin excavation and foundation work for the building. [18] However, in November the two community groups filed an appeal with the Board of Standards and Appeals, part of the New York City Office of Administrative Trials and Hearings, again challenging the legality of the development's zoning lot. [19]
In February 2018, the local Community Board 7 noted its displeasure with the building, although legally the board had no power to stop or alter the development. [20] On March 9, the assistant general counsel of the Department of Buildings sent a letter to the Board of Standards and Appeals which acknowledged that the permits issued for the development was "based on an incorrect interpretation of the Zoning Resolution." [21] In July the Board of Standards and Appeals voted 3-1 to uphold the development's permit after which a community group moved to sue the Board in court. [22]
At the end of September, the project's crane was installed. [23] Shortly after installation, the Department of Buildings ordered work to stop at the site until the developer installed sidewalk sheds to protect pedestrians from potential falling debris from the crane. [24] Despite progress on the construction, a lawsuit in the New York Supreme Court was filed by the Municipal Art Society in October to appeal the Board of Standards and Appeals' decision from July. Several prominent local politicians including New York State Assembly members Linda Rosenthal and Richard N. Gottfried as well as Congressman Jerry Nadler supported the lawsuit. [25]
In November, Sumitomo Mitsui Trust Bank provided a $425.8 million loan to finance construction of the development. [26]
The New York Supreme Court ruled in March 2019 that the Board of Standards and Appeals had improperly applied the law and ordered the Board to review the project again. However, the court stopped short of revoking the development's permits which allowed construction to continue. [27] Another motion for a temporary restraining order, which would have stopped work on the site, was denied in early April. [28] A request for a preliminary injunction at the end of April was also denied, allowing construction to progress while the Board of Standards and Appeals reviewed the zoning challenge. [29] By that time, the building had reached roughly 25 stories in height. [30] At the end of June 2019, the Board of Standards and Appeals reaffirmed the building's permits after construction had reached the 40th floor. [31]
At the end of July 2019, the Municipal Art Society filed another lawsuit in Manhattan Supreme Court to appeal the decision and attempt to stop the building's development, again alleging that the Board had improperly applied the zoning law when approving the building's permits. [32] The building topped-out the following month, [33] [34] though work on the crown and facade proceeded through late 2019. [35]
On February 17, 2020, New York Supreme Court Justice W. Franc Perry ruled that the existing permit for 200 Amsterdam had been issued, as reported by Gothamist , "based on a 39-sided 'gerrymandered lot' that abused zoning protocol", and was therefore issued in error by the Department of Buildings, which was ordered to revoke the permit. [36] The ruling necessitates that "potentially 20 or more" newly constructed floors be removed. [36] [37] [38] On March 3, 2021 major media outlets reported the finding of the lower courts had been overruled on appeal with no modifications required. The final ruling was seen as having implications for over twenty other such properties in the city constructed involving similar interpretations of zoning laws.
Manhattan West is a 7-million-square-foot (650,000 m2) mixed-use development by Brookfield Properties, built as part of the Hudson Yards Redevelopment. The project spans 8 acres and features four office towers, one boutique hotel, one residential building, 225,000 square feet (20,900 m2) of retail space and a 2.5-acre public plaza. The project was built on a platform over Penn Station storage tracks along Ninth Avenue between 32nd and 33rd Streets.
432 Park Avenue is a residential skyscraper at 57th Street and Park Avenue in Midtown Manhattan in New York City, overlooking Central Park. The 1,396-foot-tall (425.5 m) tower was developed by CIM Group and Harry B. Macklowe and designed by Rafael Viñoly. A part of Billionaires' Row, 432 Park Avenue has some of the most expensive residences in the city, with the median unit selling for tens of millions of dollars. At the time of its completion in 2015, 432 Park Avenue was the third-tallest building in the United States and the tallest residential building in the world. As of 2023, it is the sixth-tallest building in the United States, the fifth-tallest building in New York City, and the third-tallest residential building in the world.
35 Hudson Yards is a mixed-use skyscraper in Manhattan's West Side composed of apartment units and a hotel. Located near Hell's Kitchen, Chelsea, and the Penn Station area, the building is a part of the Hudson Yards project, a plan to redevelop the Metropolitan Transportation Authority's West Side Yards. As of November 2022, it was the 28th-tallest building in the United States.
111 West 57th Street, also known as Steinway Tower, is a supertall residential skyscraper in the Midtown Manhattan neighborhood of New York City. Developed by JDS Development Group and Property Markets Group, it is situated along Billionaires' Row on the north side of 57th Street near Sixth Avenue. The main portion of the building is an 84-story, 1,428-foot (435-meter) tower designed by SHoP Architects and completed in 2021. Preserved at the base is the 16-story Steinway Building, a former Steinway & Sons store designed by Warren and Wetmore and completed in 1925, which originally carried the address 111 West 57th Street.
Central Park Tower is a residential supertall skyscraper at 225 West 57th Street, along Billionaires' Row, in the Midtown Manhattan neighborhood of New York City, New York, U.S. Designed by Adrian Smith + Gordon Gill Architecture, the building rises 1,550 feet (472.4 m) with 98 above-ground stories and three basement stories, although the top story is numbered 136. Central Park Tower is the second-tallest building in New York City, the United States, and the Western Hemisphere; the 15th tallest building in the world; the tallest primarily residential building in the world; and the tallest building outside Asia by roof height.
520 Park Avenue is a skyscraper on East 60th Street near Park Avenue on the Upper East Side of Manhattan, New York City. It was designed by Robert A.M. Stern Architects and completed in 2018. The building was funded through a US$450 million construction loan from The Children's Investment Fund. At 781 feet tall, it is the 36th tallest building in New York City and the tallest on the Upper East Side. Arthur and William Lie Zeckendorf of Zeckendorf Development developed the building.
520 West 41st Street was a proposed 106-story supertall skyscraper in Hudson Yards, Manhattan, New York City, near Midtown Manhattan. The building would have surpassed all other skyscrapers on the island by floor-count. Upon completion, it would either have been the fifth or sixth tallest building in New York City.
Hill West Architects is a New York City based architecture firm which works on the planning and design of high-rise residential and hospitality buildings, retail structures and multi-use complexes. They have participated in the design of prominent structures in the New York City metropolitan area. The firm was founded in 2009 by Alan Goldstein, L. Stephen Hill and David West.
The Brooklyn Tower is a supertall mixed-use, primarily residential skyscraper in the Downtown Brooklyn neighborhood of New York City. Developed by JDS Development Group, it is situated on the north side of DeKalb Avenue near Flatbush Avenue. The main portion of the skyscraper is a 74-story, 1,066-foot (325 m) residential structure designed by SHoP Architects and built from 2018 to 2022. Preserved at the skyscraper's base is the Dime Savings Bank Building, designed by Mowbray and Uffinger, which dates to the 1900s.
One Willoughby Square, styled as 1WSQ, is an office building under construction in the New York City borough of Brooklyn. The building is being developed by JEMB Realty, and current plans have been drafted by FXCollaborative.
50 West 66th Street is a skyscraper currently under construction for the Upper West Side of Manhattan in New York City. It is being developed by Extell Development Company and designed by Snøhetta. Construction began in 2018.
138 East 50th Street, officially named The Centrale, is a residential building in Midtown Manhattan, New York City. The building consists of 124 condominium residences and 7,500 square feet (700 m2) of ground-floor retail between Third Avenue and Lexington Avenue in Midtown East. The developers planned to sell the condominiums for a total of $535.7 million, or an average of $4.3 million per unit.
Tower Fifth is a skyscraper proposed for Midtown Manhattan in New York City. The developer, Macklowe Properties, has completed other projects including the redevelopment of the General Motors Building and construction of 432 Park Avenue. Plans for the structure were first revealed in January 2019, and the developer continued purchasing buildings to create an assemblage in 2019, closing on a building in March 2020, and continuing to eye buildings in June 2020. Demolition permits were first filed in April 2020.
Skyline Tower, previously known as Court Square City View Tower, is a residential skyscraper in the Long Island City neighborhood of Queens in New York City. The building topped out in October 2019, surpassing One Court Square to become the tallest building in Queens at 762 feet (232 m). For two years, it was also the tallest building on Long Island; in October 2021, the building was surpassed in height when the Brooklyn Tower topped out. It was completed in July 2021.
Sutton 58 is a residential skyscraper in the Sutton Place neighborhood of Midtown East, Manhattan in New York City.
520 Fifth Avenue is a mixed-use supertall building under construction in New York City. The building occupies the former site of three structures. Rabina is developing the building, and architectural firm Kohn Pedersen Fox designed the structure and serves as architect of record. The interior design is by Charles & Co.
262 Fifth Avenue is a residential skyscraper under construction in Manhattan, New York City. Five Points Development is developing the building, which is being designed by architectural firm Meganom. SLCE Architects is the executive architect.