Agricultural railways of Western Australia

Last updated

The agricultural railways in Western Australia were a system of railway lines that were built after the Western Australian 1905 Royal Commission on Immigration, which stated the need for a policy that "all considerable areas of agricultural land must have a 15 mile rail service." [1] The lines were designed and constructed by the Public Works Department, for the Western Australian Government Railways. [2] The railways were identified in the early 1900s as specifically light with 40 lb rails, [3] and required for the agricultural region. [4] The Railway Advisory Board of Western Australia was the administrative body that considered the viability of the proposed lines. [5] [6] [7]

Contents

Royal commissions

The Western Australian 1947 Royal Commission into the Management Workings and Control of the Western Australian Government Railways [8] [9] [10] [11] also placed these railway lines and their construction into context:

In order to carry out the wishes of the Government to construct railway in agricultural areas as cheaply as possible, lines were built with 45 lb rail sections which practically followed the surface of the ground, with (a) earth ballasting (b) half round timber sleepers (c) providing the bare minimum station facilities.

The 1947 commission called these lines spur lines at time of construction, in distinction to loop lines, however the completion of most sections made most lines loop lines.

The 1947 royal commission report also made a distinction between Southern Agricultural Spur Lines, Northern Agricultural Spur Lines, and South West dairy and timber lines; these broadly relate to geographical regions.

In the 2000s the lines were collectively identified as Wheatbelt railway lines of Western Australia.[ citation needed ]

Agricultural spur lines

In many cases of the lines listed here, specific sections of line are named, where they were later joined to complete a longer route. This list is comparable with the list of sections in the second edition of Rails through the Bush, by Gunzburg and Austin, that identifies the builder of the section, and contract and completion dates. [12]

Line sectionLength in milesAgricultural areaYear opened
Narrogin–Darkan 50Southern1906
Wagin–Dumbleying 25Southern1907
Katanning–Kojonup 33Southern1907
Collie–Darkan 40Southern1907
Greenhills–Quairading 31Southern1908 [13]
Donnybrook–Noggerup 23Southern1908
Narrogin–Wickepin 26Southern1909
Noggerup–Boyup Brook 23Southern1909
Katanning–Nyabing 38Southern1912
Dumbleyung–Kukerin 24Southern1912
Boyup–Kojonup 51Southern1912
Tambellup–Gnowangerup 24Southern1912
Gnowangerup–Ongerup 35Southern1913
Quairading–Bruce Rock 49Southern1913 [13]
Merredin–Bruce Rock 31Southern1913
Wickepin–Corrigin 40Southern1914
Corrigin–Bruce Rock 37Southern1914
Yilliminning–Kondinin 73Southern1915
Brookton–Corrigin 56Southern1915
Kukerin–Lake Grace 24Southern1916
Wagin–Bokal 34Southern1917
Kondinin–Narambeen 32Southern1917
Bokal–Bowelling 28Southern1918
Nyabing–Pingrup 22Southern1923
Narrambeen–Merredin 54Southern1925
Lake Grace–Newdegate 39Southern1926
Dwarda–Narrogin 37Southern1926
Goomalling–Dowerin 15Northern1906
Toodyay–Bolgart 24Northern1910
Wokarina–Naraling 26Northern1910
Dowerin–Korrelocking 32Northern1911
Korrelocking–Kununoppin 28Northern1911
Goomalling–Wongan Hills 34Northern1911
Kununoppin–Merredin 37Northern1911
Southern Cross–Bullfinch 22Northern1911
Naraling–Yuna 12Northern1912
Northampton–Ajana 33Northern1913
Wongan Hills–Mullewa 198Northern1915
Wyalkatchem–Bencubbin 52Northern1917
Bolgart–Calingiri 15Northern1917
Calingiri–Piawaning 19Northern1919
Bencubbin–Kalkalling 32Northern1923
Piawaning–Miling 27Northern1925
Amery–Kalannie 61Northern1929
Burakin–Kulja 8Northern1929
Lake Brown–Bullfinch 50Northern1929
Kulja–Bonnie Rock 68Northern1931
Lake Grace–Hyden 58Southern1933

See also

Notes

  1. Western Australia. Royal Commission on Immigration (1905), Report of the Royal Commission on Immigration together with appendices and minutes of evidence, Govt. Printer, retrieved 3 July 2015
  2. The WAGR did not have control over construction of its own railways until after the 1920s; see Gunzburg, Adrian; Austin, Jeff; Rail Heritage WA; Gunzburg, Adrian; Austin, Jeff (2008), Rails through the bush : timber and firewood tramways and railway contractors of Western Australia (2nd ed.), Rail Heritage WA, ISBN   978-0-9803922-2-7 in relation to the contractors, PWD and WAGR relationship.
  3. "Western Australia". The Sydney Morning Herald . No. 22, 894. New South Wales, Australia. 30 May 1911. p. 9. Retrieved 28 July 2024 via National Library of Australia.
  4. "Western Australia". The Sydney Morning Herald . No. 21, 995. New South Wales, Australia. 15 July 1908. p. 9. Retrieved 28 July 2024 via National Library of Australia.
  5. "Agricultural Railways". The West Australian . Vol. XXVII, no. 7, 964. Western Australia. 9 October 1911. p. 5. Retrieved 14 September 2024 via National Library of Australia.
  6. "Kondinin Newdegate Railway". The Narrogin Observer . Vol. XVIII, no. 867. Western Australia. 1 December 1923. p. 6. Retrieved 14 September 2024 via National Library of Australia.
  7. "WHEAT LANDS". The West Australian . Vol. XLI, no. 7, 239. Western Australia. 11 August 1925. p. 4. Retrieved 14 September 2024 via National Library of Australia.
  8. Royal Commission Appointed to Inquire into the Management, workings and control of the Western Australian Government Railways; Gibson, Alexander J; Du Plessis, D. H. C (1947), Report of the Royal Commission appointed to inquire into the Western Australian Government Railways, Govt. Pr, retrieved 3 July 2015
  9. "Railing at the Railways". Westralian Worker . Perth. 4 July 1947. p. 1. Retrieved 3 July 2015 via National Library of Australia.
  10. "Railways Report May Be Late". The Daily News (Home ed.). Perth. 28 November 1947. p. 9. Retrieved 3 July 2015 via National Library of Australia.
  11. "Business Job For Railways". The Daily News (City Final ed.). Perth. 12 December 1947. p. 7. Retrieved 3 July 2015 via National Library of Australia.
  12. The listing is found at pages 208–210 Gunzburg, Adrian; Austin, Jeff (2008), Rails through the bush: timber and firewood tramways and railway contractors of Western Australia (2 ed.), Rail Heritage WA, ISBN   9780980392227
  13. 1 2 Tilley, Allan (1998). To Greenhills and Beyond. Greenwood: Rail Heritage Publications. pp. 35, 50. ISBN   0-646-36007-8.

Related Research Articles

<span class="mw-page-title-main">Southern Cross, Western Australia</span> Town in Western Australia

Southern Cross is a town in Western Australia, 371 kilometres east of state capital Perth on the Great Eastern Highway. It was founded in 1888 after gold prospectors Richard Greaves and Ted Paine during their October 1887 expedition successfully found gold, and gazetted in 1890. It is the major town and administrative centre of the Shire of Yilgarn. At the 2016 census, Southern Cross had a population of 680.

<span class="mw-page-title-main">Newdegate, Western Australia</span> Town in Western Australia

Newdegate is a townsite in the Wheatbelt agricultural region, 399 km south-east of Perth and 52 km east of Lake Grace in Western Australia. The townsite was gazetted in 1925 and honours Sir Francis Newdegate, the Governor of Western Australia from 1920 to 1924. The Department of Agriculture and Food operates one of its 13 research stations in the area of Newdegate.

<span class="mw-page-title-main">Goomalling, Western Australia</span> Town in Western Australia

Goomalling is a townsite in the Wheatbelt region of Western Australia, 45 kilometres north-north-east of Northam, Western Australia.

<span class="mw-page-title-main">Western Australian Government Railways</span> Former government railway commission in Western Australia

Western Australian Government Railways (WAGR) was the state owned operator of railways in the state of Western Australia between October 1890 and June 2003. Owned by the state government, it was renamed a number of times to reflect extra responsibility for tram and ferry operations that it assumed and later relinquished. Westrail was the trading name of the WAGR from September 1975 until December 2000, when the WAGR's freight division and the Westrail brand were privatised. Its remaining passenger operations were transferred to the Public Transport Authority in July 2003.

<span class="mw-page-title-main">Mundaring Weir branch railway</span> Former railway line in Mundaring, Western Australia

The Mundaring Weir branch railway was constructed from Mundaring, Western Australia to the site of the Mundaring Weir, and opened on 1 June 1898.

<span class="mw-page-title-main">Flinders Bay branch railway</span> Former Busselton to Flinders Bay railway line

The Flinders Bay branch railway, also known as the Boyanup to Flinders Bay section ran between Boyanup and Flinders Bay, in South Western Western Australia. The section from Flinders Bay to Busselton has now been converted into a rail trail for bushwalkers and cyclists, called the Wadandi Trail.

<span class="mw-page-title-main">Rail transport in Western Australia</span> Western Australia

Railways in Western Australia were developed in the 19th century both by the Government of Western Australia and a number of private companies. Today passenger rail services are controlled by the Public Transport Authority through Transperth, which operates public transport in Perth, and Transwa, which operates country passenger services. Journey Beyond operates the Indian Pacific.

<span class="mw-page-title-main">South Western Railway, Western Australia</span> Main railway route between Perth and Bunbury in Western Australia

The South Western Railway, also known as the South West Main Line, is the main railway route between Perth and Bunbury in Western Australia.

<span class="mw-page-title-main">Timber railway lines of Western Australia</span> Railway lines used by the timber industry in Western Australia

The network of railway lines in Western Australia associated with the timber and firewood industries is as old as the mainline railway system of the former Western Australian Government Railways system.

<span class="mw-page-title-main">WAGR J class</span> Class of Australian 4-6-0 locomotives

The WAGR J class was a three-member class of 4-6-0 steam locomotives operated by the Western Australian Government Railways (WAGR) between 1892 and 1924 before seeing further use with the State Saw Mills until the early 1930s.

Millars' Karri and Jarrah Company (1902) Limited, commonly known as Millars, was a Western Australian focused timber and timber railway company.

<span class="mw-page-title-main">Bunbury Bridge</span> Former railway bridge in East Perth, Western Australia

Bunbury Bridge was a single-track, timber railway bridge in East Perth in Western Australia. The bridge crossed the Swan River near Claise Brook and was built for passenger and freight traffic to Bunbury on the South Western Railway.

<span class="mw-page-title-main">WAGR Q class</span> Class of Australian 4-6-0 locomotives

The WAGR Q class was a two-member class of 4-6-0 steam locomotives operated by the Public Works Department (PWD) and later Western Australian Government Railways (WAGR) between 1928 and 1953.

<span class="mw-page-title-main">WAGR C class</span> Class of Australian 4-6-0 (later 4-6-2) locomotives

The WAGR C class was a class of light axle load steam locomotives operated by the Western Australian Government Railways (WAGR) between 1902 and 1961. A total of 22 were built in two batches.

<span class="mw-page-title-main">WAGR A class</span> Class of Western Australian 2-6-0 locomotives

The WAGR A class was a class of 2-6-0 steam locomotives designed by Beyer, Peacock & Co and operated by the Western Australian Government Railways (WAGR) between 1881 and 1955.

<span class="mw-page-title-main">Neil McNeil (businessman)</span> Australian railway contractor and businessman

Neil McNeil was a prominent Australian businessman who was significant in the development of railways across Australia along with Western Australia's timber industry.

<span class="mw-page-title-main">Northcliffe branch railway</span> Former railway in Western Australia

The Northcliffe branch, also known as the Northcliffe section or Picton to Northcliffe line, is the railway route between Picton and Northcliffe in Western Australia.

The Wagin to Bowelling railway line was a state government-owned and WAGR-operated railway line in the Wheatbelt region of Western Australia, connecting Wagin via Bokal to Bowelling. The line was 102 kilometres (63 mi) long. At Wagin, the railway line connected to the Great Southern Railway and the Wagin to Newdegate railway line while, at Bowelling, it connected to the Brunswick Junction to Narrogin railway line.

<span class="mw-page-title-main">Hopetoun to Ravensthorpe railway line</span> Former railway line in Western Australia

The Hopetoun to Ravensthorpe railway line was a state government-owned and WAGR-operated railway line in the Goldfields–Esperance region of Western Australia, connecting the coastal town of Hopetoun to Ravensthorpe, located inland. The line, 55 kilometres (34 mi) long, was stand-alone, not connecting to any other railway line in the state.

<span class="mw-page-title-main">Kalgoorlie to Kanowna railway line</span> Former railway line in Western Australia

The Kalgoorlie to Kanowna railway line was a 20-kilometre (12 mi) long state government-owned and WAGR-operated railway line in the Goldfields–Esperance region of Western Australia, connecting Kalgoorlie to Kanowna. At Kalgoorlie, it connected to the Eastern Goldfields Railway.