Bay Ridge–95th Street station

Last updated

 Bay Ridge–95 Street
  NYCS-bull-trans-R-Std.svg
MTA NYC logo.svg New York City Subway station (rapid transit)
95th Street - Platform.jpg
Station platform
Station statistics
Address95th Street & Fourth Avenue
Brooklyn, New York
Borough Brooklyn
Locale Fort Hamilton
Coordinates 40°36′58.2″N74°1′52.4″W / 40.616167°N 74.031222°W / 40.616167; -74.031222
Division B (BMT) [1]
Line BMT Fourth Avenue Line
Services    R   NYCS-SSI-alltimes.svg (all times)
TransitAiga bus trans.svg NYCT Bus: B8, B63; B37 (on Third Avenue) [2]
StructureUnderground
Platforms1 island platform
Tracks2
Other information
OpenedOctober 31, 1925(99 years ago) (1925-10-31) [3]
Accessible not ADA-accessible; currently undergoing renovations for ADA access
Opposite-
direction
transfer
N/A
Former/other names95th Street–Fort Hamilton
Traffic
20231,176,225 [4] Increase2.svg 15.2%
Rank266 out of 423 [4]
Services
Preceding station MTA NYC logo.svg New York City Subway Following station
86th Street NYCS-bull-trans-R-Std.svg Terminus
Location
NYCS map blank.svg
Map pointer.svg
USA New York City location map.svg
Map pointer.svg
USA New York location map.svg
Map pointer.svg
Track layout

Contents

BSicon dMFADEg.svg
BSicon udSTR.svg
BSicon dMFADEg.svg
BSicon udSTR.svg
BSicon udSTRf.svg
BSicon udSTRg.svg
BSicon numN350.svg
BSicon udSTR.svg
BSicon udENDEa.svg
BSicon udSTR.svg
BSicon ubvvSTR.svg
BSicon ubvvSTR.svg
BSicon ubvvSTR.svg
BSicon uSHI2g+l.svg
BSicon uSHI2g+r.svg
BSicon uABZg2.svg
BSicon uABZg3.svg
BSicon uABZg+1.svg
BSicon uABZg+4.svg
BSicon udSTR.svg
BSicon dPLT.svg
BSicon udSTR.svg
BSicon udSTR.svg
BSicon dPLT.svg
BSicon udSTR.svg
BSicon udSTR.svg
BSicon dPLT.svg
BSicon udSTR.svg
BSicon udSTR.svg
BSicon dPLT.svg
BSicon udSTR.svg
BSicon uENDEe.svg
BSicon uENDEe.svg
Street map

Bay Ridge-95th Street station

Station service legend
SymbolDescription
NYCS-SSI-alltimes.svg Stops all times

The Bay Ridge–95th Street station (originally 95th Street–Fort Hamilton) is the southern terminal station on the BMT Fourth Avenue Line of the New York City Subway. Despite the name, the station is located in the neighborhood of Fort Hamilton (as its original name implied) at the intersection of 95th Street and Fourth Avenue in southwestern Brooklyn. It is served by the R train at all times. Geographically, this station is the westernmost New York City Subway station.

The station was first planned in 1922 as the first part of an extension to Staten Island through a tunnel under the Narrows. Construction began on December 17, 1923, after the construction contractor submitted, withdrew, and resubmitted its bid. The station opened on October 31, 1925, but the Staten Island extension was never built due to various funding disputes. The platform was lengthened in the 1960s. A renovation is underway to make the station compliant with the Americans with Disabilities Act of 1990.

History

A Forest Hills-bound R train leaving the station Bay Ridge-95th St td (2018-09-19) 03.jpg
A Forest Hills-bound R train leaving the station

Construction and opening

On August 25, 1922, the Transit Commission directed its chief engineer, Robert Ridgeway, to plan an extension of the Fourth Avenue Line from 87th Street to Fort Hamilton. Initially, multiple stations along the extension were considered. This extension was to be the first part of an extension to Staten Island through a tunnel under The Narrows. [5] On September 12, 1922, a meeting was held by the Transit Commission to determine whether a stop at 91st Street should be included as part of the planned extension. Ultimately, no station was built at 91st Street. [6] At the meeting it was decided that money for an additional station in between 86th Street and the new terminal at 95th Street would be better spent on an extensive terminal with entrances at 93rd, 94th, and 95th Streets. [7] Other extensions were also planned in 1922: a branch of the line running via 86th Street to 18th Avenue to connect with the New Utrecht Line to Coney Island, Route 19, and the future subway under Tenth Avenue, as well as a branch of the line at 67th Street heading to Staten Island, Route 20. [8]

On December 28, 1922, the Transit Commission announced that it had awarded the contract for the construction of a half-mile extension of the Fourth Avenue Line, Contract 11B, [9] to T. A. Gillespie Company for $1.5 million (equivalent to $27 million in 2023). However, as the Board of Estimate failed to take action upon it, the contractor withdrew its bid on March 7, 1923. [10] The Transit Commission blamed the Board of Estimate for delays in the awarding of the contract; the Commission said that the city would suffer a substantial loss due to increased construction costs, and because the contract that was given was "highly advantageous to the city." [11] As part of Contract 11B, the extension was built with two tracks, with the exception of a short three-track stretch just north of the terminal at 95th Street. [12] The extension was to be built with a provision to extend the line to Staten Island. [13] As a result of a motion made by Commissioner LeRoy Harkness in front of the Transit Commission, the contract was set to be put back up for bid. [14] On November 2, 1923, the Board of Estimate approved the contract for the line with T. A. Gillespie Company, the same contractor that had bid on the project earlier, but withdrew. The Transit Commission, due to the delay of the project, gave orders on November 3 to speed up the completion of the project. [15] Construction began on December 17, 1923. [16] [17] The final extension to 95th Street, Route 18, opened on October 31, 1925, [3] [16] with the first train leaving at 2 p.m. [3]

Platform extension and elevator installation

The city government took over the BMT's operations on June 1, 1940. [18] [19] In the 1960s, the New York City Transit Authority (NYCTA) started a project to lengthen station platforms on its lines in Southern Brooklyn from 530 feet (160 m) [20] to 615 feet (187 m) to accommodate 10-car trains. [21] On July 14, 1967, the NYCTA awarded a contract to conduct test borings at eleven stations on the Fourth Avenue Line, including 95th Street, to W. M. Walsh Corporation for $6,585 (equivalent to $60,172in 2023) in preparation of the construction of platform extensions. [22] The NYCTA issued an invitation for bids on the project to extend the platforms at stations along the Fourth Avenue Line between 45th Street and this station on May 3, 1968. [23] However, work had already started on the platform extension project in February. The platform at 95th Street was extended by 85 feet (26 m) to the south. [24]

As part of a plan to increase accessibility in the New York City Subway, during the early 1990s, the MTA proposed installing elevators at the Bay Ridge–95th Street station by 2010. [25] The agency instead decided to make the 86th Street station accessible, as that station had transfers to more bus routes. [26] In 2017, the MTA indicated that it was considering installing elevators at the 77th Street and 95th Street stations. [27] [26] Funding for elevators at the 95th Street station was included in the MTA's 2020–2024 Capital Program. [28] In December 2022, the MTA announced that it would award a $146 million contract for the installation of eight elevators across four stations, including Bay Ridge–95th Street. [29] The MTA began installing ADA upgrades to the station in 2023, including ramps to station entrances, two elevators, rebuilt staircases, and tactile platform edges. [30] [31]

Station layout

GroundStreet levelExit/entrance
MezzanineFare control, station agent, MetroCard and OMNY machines
Platform levelTrack 2 NYCS-bull-trans-R-Std.svg toward Forest Hills–71st Avenue (Whitehall Street–South Ferry late nights) (86th Street)
Island platform
Track 1 NYCS-bull-trans-R-Std.svg toward Forest Hills–71st Avenue (Whitehall Street–South Ferry late nights) (86th Street)

This underground station has two tracks and one island platform. [20] The R stops here at all times and is the route's southern terminus; the next station to the north is 86th Street. [32] [33] The tracks end at bumper blocks at the south end of the platform. [34] [35] North of this station, a center layup track forms just north of the diamond crossover, before ending at a bumper block just south of the 86th Street station. [34]

The platform has yellow painted I-beam columns and alternate ones have "95 Street" signs on them. [36] Both platform walls have their original mosaic trim line with name tablets reading "95TH STREET" along the entire station except for a small section at the north end, where the platform was extended in 1970. [37] Here, the wall is bare black. [38] The station was constructed with a signal tower and dispatcher's office. [20]

Exits

Entrance at 95th Street and 4th Avenue 95th Street - NW Corner Stairs.jpg
Entrance at 95th Street and 4th Avenue

The station has two mezzanines above the platform and tracks. Mosaic directional signs indicate they were originally one full-length mezzanine. [39] [40] The closed-off sections are now used for employee-only spaces. [40] The station's larger, full-time mezzanine is at the south end. It has two staircases from the platform, a turnstile bank, [41] a token booth, [42] and two restrooms. [43] [44] In addition, two staircases going up to either western corners of Fourth Avenue and 95th Street. A passageway leads to another staircase on the east side of the intersection, built inside an alcove of 9425 Fifth Avenue. [45] The station's other mezzanine is unstaffed, containing one staircase from the platform, [46] high entry/exit turnstiles, [39] and two staircases going up to either southern corners of 93rd Street and Fourth Avenue. [47] Additional exits were planned at 94th Street, but were never built. [48]

Provisions for proposed extensions

Mosaic directional signs at the unstaffed mezzanine 95th St BMT exits.jpg
Mosaic directional signs at the unstaffed mezzanine

The station is built on the west side of Fourth Avenue due to plans for a possible extension of the express tracks south of 59th Street. [49] This station had been built mainly to facilitate the Staten Island Tunnel or the "Narrows Tunnel", which would have necessitated express service, although the tunnel was never constructed. [50] [51]

South of this station, there is a false wall at the end of the tracks for a planned extension to 100th or 101st Street [52] and into the never-built Staten Island "Narrows Tunnel", connecting the BMT line with the Staten Island Railway (SIRT) Main Line near its Grasmere station. The station would have also connected with the now-defunct South Beach Branch by disconnecting it from the SIRT main line, with the BMT Fourth Avenue Subway taking over service from the SIRT's Fort Wadsworth station to the Wentworth Avenue terminal. At the time it would have been a very different line had this tunnel been built, with through BMT service from Queensboro Plaza to Wentworth Avenue in Staten Island stopping at this station before proceeding to Staten Island, since this station is also the closest point to Staten Island. There were also plans to construct an underground storage yard here. The SIRT had been electrified in preparation for the tunnel, and had purchased subway cars similar to the AB Standards of the BMT. [53]

The tunnel plan was amended in 1919, moving its location north to Shore Road in Bay Ridge. [54] A groundbreaking ceremony was held by New York City Mayor John Hylan on April 14, 1923 in Bay Ridge [55] [56] and in Staten Island on July 19. [57] [58] In 1925, however—the year bids from contractors were to be entertained by the city—the project was halted and the project's engineering staff laid off. [57] Officially, the plan was delayed due to lack of funding, [59] [60] but Hylan and New York City Board of Transportation (BOT) Chairman John Delaney also wanted to secure freight service for the tunnel. [57] [61] These disagreements caused deadlocks between the parties involved. [57]

Later proposals surfaced to connect the station to the Verrazzano-Narrows Bridge, one of the world's longest suspension bridges, which follows the route of the planned tunnel. The bridge was completed in 1964 without provisions for rail traffic. [50] [53] [62]

Related Research Articles

<span class="mw-page-title-main">R (New York City Subway service)</span> Rapid transit service

The R Broadway Local is a rapid transit service in the B Division of the New York City Subway. Its route emblem, or "bullet", is colored yellow since it uses the BMT Broadway Line in Manhattan.

<span class="mw-page-title-main">Borough Hall/Court Street station</span> New York City Subway station in Brooklyn

The Borough Hall/Court Street station is an underground New York City Subway station complex in Brooklyn shared by the BMT Fourth Avenue Line, the IRT Broadway–Seventh Avenue Line and the IRT Eastern Parkway Line. The complex comprises three stations: Borough Hall on the IRT lines and Court Street on the BMT line. The stations are located under Court, Joralemon, and Montague Streets, next to Brooklyn Borough Hall, in the Downtown Brooklyn and Brooklyn Heights neighborhoods of Brooklyn. It is served by the 2, 4, and R trains at all times; the 3 train all times except late nights; the 5 train on weekdays; the N train during late nights; and limited rush-hour W trains.

<span class="mw-page-title-main">DeKalb Avenue station (BMT lines)</span> New York City Subway station in Brooklyn

The DeKalb Avenue station is an interchange station on the BMT Brighton Line and BMT Fourth Avenue Line of the New York City Subway, located at the intersection of DeKalb and Flatbush Avenues in Downtown Brooklyn. It is served by the Q and R trains at all times, the B train on weekdays, and the D and N trains during late nights. During rush hours only, a few W train trips also serve this station.

The BMT Fourth Avenue Line is a rapid transit line of the New York City Subway, mainly running under Fourth Avenue in Brooklyn. The line is served by the D, N, and R at all times; the R typically runs local, while the D and N run express during the day and local at night. During rush hours, select W trains also serve the line. Northbound D and N trains run local along the line after 6:45 p.m. during weekdays as well. The line was originally built by the Brooklyn Rapid Transit Company and is now internally operated as part of the New York City Subway's B Division.

<span class="mw-page-title-main">Union Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The Union Street station is a local station on the BMT Fourth Avenue Line of the New York City Subway. It is located at the corner of Fourth Avenue and Union Street in Brooklyn, New York City, serving the communities of Park Slope, Gowanus and Carroll Gardens. It is served by the R train at all times. The D and N trains also stop here during late nights, and some rush-hour W trains stop here in the peak direction.

<span class="mw-page-title-main">86th Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The 86th Street station is a station on the BMT Fourth Avenue Line of the New York City Subway, located at 86th Street and Fourth Avenue in Bay Ridge, Brooklyn. It is served by the R train at all times.

<span class="mw-page-title-main">59th Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The 59th Street station is an express station on the BMT Fourth Avenue Line of the New York City Subway. Located at 59th Street and Fourth Avenue in Sunset Park, Brooklyn, it is served by the N and R trains at all times. During rush hours, several W trains also serve the station.

<span class="mw-page-title-main">36th Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The 36th Street station is an express station on the BMT Fourth Avenue Line of the New York City Subway, located at 36th Street and Fourth Avenue in Sunset Park, Brooklyn. It is served by the D, N, and R trains at all times. During rush hours, a limited amount of W trains also serve this station.

<span class="mw-page-title-main">Bay Ridge Avenue station</span> New York City Subway station in Brooklyn

The Bay Ridge Avenue station is a station on the BMT Fourth Avenue Line of the New York City Subway, located at the intersection of Bay Ridge Avenue and Fourth Avenue in Bay Ridge, Brooklyn. It is served by the R train at all times.

<span class="mw-page-title-main">45th Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The 45th Street station is a local station on the BMT Fourth Avenue Line of the New York City Subway. Located at 45th Street and Fourth Avenue in Sunset Park, Brooklyn, it is served by the R train at all times. The N train also stops here during late nights, and some rush-hour W trains stop here in the peak direction.

<span class="mw-page-title-main">Prospect Avenue station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The Prospect Avenue station is a local New York City Subway station on the BMT Fourth Avenue Line in Brooklyn. It is located at Prospect Avenue and Fourth Avenue near the convergence of the Gowanus, Greenwood Heights, Park Slope, and South Park Slope neighborhoods. It is served by the R train at all times. The D and N trains also stop here during late nights, and some rush-hour W trains stop here in the peak direction.

<span class="mw-page-title-main">77th Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The 77th Street station is a station on the BMT Fourth Avenue Line of the New York City Subway. Located at 77th Street and Fourth Avenue in Bay Ridge, Brooklyn, it is served by the R train at all times.

<span class="mw-page-title-main">25th Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The 25th Street station is a local station on the BMT Fourth Avenue Line of the New York City Subway. Located at the intersection of 25th Street and Fourth Avenue in Greenwood Heights, Brooklyn, it is served by the R train at all times. The D and N trains also stop here during late nights, and some rush-hour W trains stop here in the peak direction.

<span class="mw-page-title-main">53rd Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The 53rd Street station is a local station on the BMT Fourth Avenue Line of the New York City Subway. Located at 53rd Street and Fourth Avenue in Sunset Park, Brooklyn, it is served by the R train at all times. The N train also stops here during late nights, and some rush-hour W trains stop here in the peak direction.

<span class="mw-page-title-main">Myrtle–Wyckoff Avenues station</span> New York City Subway station

The Myrtle–Wyckoff Avenues station is a New York City Subway station complex formed by the intersecting stations of the BMT Canarsie Line and the BMT Myrtle Avenue Line, served by the L and M trains at all times. It is located at Myrtle Avenue and Wyckoff Avenue in the Bushwick neighborhood of Brooklyn and the Ridgewood neighborhood of Queens. The complex is connected by a set of stairs and several elevators and escalators between the elevated and underground levels. The station was renovated completely from 2004 to 2008.

<span class="mw-page-title-main">Cleveland Street station</span> New York City Subway station in Brooklyn

The Cleveland Street station is a skip-stop station on the BMT Jamaica Line of the New York City Subway in Brooklyn. It is served by the J train at all times. The Z train skips this station when it operates.

<span class="mw-page-title-main">Fourth Avenue/Ninth Street station</span> New York City Subway station in Brooklyn

The Fourth Avenue/Ninth Street station is a New York City Subway station complex shared by the elevated IND Culver Line and the underground BMT Fourth Avenue Line. It is located at the intersection of Ninth Street and Fourth Avenue in Park Slope, Brooklyn and served by the:

<span class="mw-page-title-main">Brooklyn Bridge–City Hall/Chambers Street station</span> New York City Subway station in Manhattan

The Brooklyn Bridge–City Hall/Chambers Street station is a New York City Subway station complex in Lower Manhattan. The complex is served by trains of the IRT Lexington Avenue Line and the BMT Nassau Street Line. The station is served by the 4, 6, and J trains at all times; the 5 train at all times except late nights; the <6> train during weekdays in the peak direction; and the Z train during rush hours in the peak direction. It is the southern terminal for all 6 trains.

<span class="mw-page-title-main">Jay Street–MetroTech station</span> New York City Subway station in Brooklyn

The Jay Street–MetroTech station is a New York City Subway station complex on the IND Fulton Street, IND Culver, and BMT Fourth Avenue lines. The complex is located in the vicinity of MetroTech Center in Downtown Brooklyn. It is served by the A, F, and R trains at all times; the C train at all times except late nights; the N train during late nights only; and a few rush-hour W and <F> trains in the peak direction.

<span class="mw-page-title-main">Staten Island Tunnel</span> Incomplete rail tunnel in New York City

The Staten Island Tunnel is an abandoned, incomplete railway and subway tunnel in Staten Island, New York City. It was intended to connect railways on Staten Island to the BMT Fourth Avenue Line of the New York City Subway, in Brooklyn, via a new crossing under the Narrows. Planned to extend 10,400 feet (3,200 m), the tunnel would have been among the world's longest at the time of its planning, in the late 19th and early 20th centuries.

References

  1. "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  2. "Brooklyn Bus Map" (PDF). Metropolitan Transportation Authority. October 2020. Retrieved December 1, 2020.
  3. 1 2 3 "95th St. Subway Extension Opened At 2 P. M. Today". Brooklyn Daily Eagle . October 31, 1925. Retrieved June 29, 2015 via newspapers.com Open Access logo PLoS transparent.svg .
  4. 1 2 "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
  5. "TO EXTEND SUBWAY TO FORT HAMILTON; Transit Commission Orders Plans for Lengthening the Fourth Avenue Line. WOULD AID STATEN ISLAND Ferry Service May Be Established Until Tunnel Route is Selected" (PDF). The New York Times. August 26, 1922. Retrieved May 4, 2017.
  6. "SUBWAY HEARING TODAY.; Transit Board to Consider Pains for Line to Fort Hamilton" (PDF). The New York Times. September 12, 1922. Retrieved May 4, 2017.
  7. "LOCATES EXTENSION STATION; Transit Board Decides on 93d-95th St., Brooklyn, Site" (PDF). The New York Times. September 13, 2017. Retrieved May 4, 2017.
  8. The City Record: Official Journal. September 27, 1922. p. 6471.
  9. "Public Notices". The Brooklyn Daily Eagle. November 22, 1922. p. 18. Retrieved May 4, 2017.
  10. "One Way To Get Transit". The Brooklyn Daily Eagle. May 16, 1923. p. 6. Retrieved May 4, 2017.
  11. "SUBWAY DELAY LAID TO ESTIMATE BOARD; Transit Commission Blames It for Failure to Push Fort Hamil- ton Line". The New York Times. March 8, 1923. ISSN   0362-4331 . Retrieved May 4, 2017.
  12. "$1,485,151 Bid Wins Contract To Build Ft. Hamilton Tube". The Brooklyn Daily Eagle. December 28, 1922. p. 19. Retrieved May 4, 2017.
  13. "THREE RAPID TRANSIT CONTRACTS ARE LET; They Cover Ft. Hamilton Extension, 14th St.-Eastern Workand 168th St. Elevators" (PDF). The New York Times. December 29, 1922. Retrieved May 4, 2017.
  14. "To Ask New Subway Bids". The New York Times. September 14, 1923. ISSN   0362-4331 . Retrieved May 4, 2017.
  15. "TO RUSH SUBWAY WORK.; Contractor Ready to Begin Work on Fourth Avenue Extension". The New York Times. November 4, 1923. ISSN   0362-4331 . Retrieved May 4, 2017.
  16. 1 2 "OPEN SUBWAY LINE TO FORT HAMILTON; Fourth Avenue Extension Put in Service After Wait of Four Years. HALF-MILE COST $2,000.000 Completion Gives Residents Through Trip Without Recourse to Trolley Cars". The New York Times. November 1, 1925. ISSN   0362-4331 . Retrieved May 4, 2017.
  17. Rogoff, David (May 1961). "New York Division ERA Bulletin May 1961". Google Docs. Retrieved May 8, 2017.
  18. "B.M.T. Lines Pass to City Ownership; $175,000,000 Deal Completed at City Hall Ceremony-- Mayor 'Motorman No. 1'". The New York Times. June 2, 1940. ISSN   0362-4331. Archived from the original on July 19, 2021. Retrieved May 14, 2022.
  19. "City Takes Over B. M. T. System; Mayor Skippers Midnight Train". New York Herald Tribune. June 2, 1940. p. 1. ProQuest   1243059209.
  20. 1 2 3 "Subway Bids Announced: For 95th Street Terminal, Brooklyn, and Corona Yard" (PDF). The New York Times. March 1, 1925. ISSN   0362-4331 . Retrieved June 28, 2015.
  21. New York City Transit Authority Annual Report For The Year June 30, 1960. New York City Transit Authority. 1960. pp. 16–17.
  22. Minutes and Proceedings. New York City Transit Authority. 1967. pp. 379–380.
  23. Engineering News-record. McGraw-Hill. 1968. p. 75.
  24. Rogoff, Dave (February 1969). "BMT Broadway Subway Platform Extensions" (PDF). New York Division Bulletin. 12 (1). Electric Railroaders' Association: 4. Archived from the original (PDF) on September 15, 2020. Retrieved May 22, 2020.
  25. Sachar, Emily (July 16, 1993). "Long Wait". Newsday. p. 2. ISSN   2574-5298. ProQuest   278657263.
  26. 1 2 "Will Bay Ridge Subway Stations Ever Have Elevators?". Hey Ridge. October 30, 2017. Retrieved December 17, 2022.
  27. "New & Improved Bay Ridge Subway Station Still Excludes Disabled New Yorkers". Gothamist. October 14, 2017. Retrieved December 17, 2022.
  28. Duggan, Kevin (September 25, 2019). "MTA to make 21 Brooklyn subway stations wheelchair-accessible in five-year plan". Brooklyn Paper. Retrieved December 17, 2022.
  29. "Capital Program Oversight Committee Meeting December 2022". mta.info. Metropolitan Transportation Authority. December 19, 2022. pp. 107–109. Retrieved July 14, 2022.
  30. Camille, Jada (June 1, 2023). "Long requested upgrades coming to Bay Ridge subway station". Brooklyn Paper. Retrieved January 11, 2024.
  31. DeJesus, Jaime (July 5, 2023). "Elevators going up at 95th Street station". The Brooklyn Home Reporter. Retrieved January 11, 2024.
  32. "RSubway Timetable, Effective June 30, 2024". Metropolitan Transportation Authority . Retrieved December 16, 2024.
  33. "Subway Map" (PDF). Metropolitan Transportation Authority. September 2021. Retrieved September 17, 2021.
  34. 1 2 Dougherty, Peter (2006) [2002]. Tracks of the New York City Subway 2006 (3rd ed.). Dougherty. OCLC   49777633 via Google Books.
  35. Rosenfeld, Robbie (October 15, 2017). "View of the bumper blocks at the south end of the station". nycsubway.org. Retrieved April 19, 2020.
  36. Cox, Jeremiah (June 9, 2009). "Looking down the single, narrow island platform at 95 Street-Bay Ridge". subwaynut.com. Archived from the original on March 6, 2016. Retrieved April 19, 2020.
  37. Cox, Jeremiah (June 9, 2009). "A close-up of 95 Street written in mosaic into the mosaic trim". subwaynut.com. Retrieved April 19, 2020.
  38. Cox, Jeremiah (June 9, 2009). "A R46 R train enters 95th Street, approaching the one part of the platform wall that is untiled". subwaynut.com. Retrieved April 19, 2020.
  39. 1 2 Cox, Jeremiah (June 9, 2009). "A High Entrance/Exit and a High Exit Turnstile lead out to the exit to 93 Streets". subwaynut.com. Retrieved April 19, 2020.
  40. 1 2 Rosenfeld, Robbie (October 15, 2017). "View of mosaic tiling indicating that the station used to have a full-length mezzanine". nycsubway.org. Retrieved April 19, 2020.
  41. Cox, Jeremiah (June 9, 2009). "The turnstiles and decently sized mezzanine from the 95 Street entrance". subwaynut.com. Retrieved April 19, 2020.
  42. Rosenfeld, Robbie (October 15, 2017). "View of the 95th Street mezzanine". nycsubway.org. Retrieved April 19, 2020.
  43. Cox, Jeremiah (June 9, 2009). "The mosaic Men sign and open men's room on the mezzanine level at 95 Street". subwaynut.com. Retrieved April 19, 2020.[ permanent dead link ]
  44. Cox, Jeremiah (June 9, 2009). "The Women's room on the mezzanine level at 95 Street, whose sign says it should be open is locked tight". subwaynut.com. Retrieved April 19, 2020.
  45. Cox, Jeremiah (June 9, 2009). "An unusual subway entrance to 95 Street with an old mosaic sign leading to a now closed shoes repaired while you wait". subwaynut.com. Archived from the original on March 6, 2016. Retrieved April 19, 2020.
  46. Cox, Jeremiah (June 9, 2009). "Approaching the single staircase right at the most northern of the platform at 95 Street to the unstaffed exit to 93 Streets". subwaynut.com. Archived from the original on October 14, 2012. Retrieved April 19, 2020.
  47. "MTA Neighborhood Maps: Bay Ridge" (PDF). mta.info . Metropolitan Transportation Authority. 2015. Retrieved June 29, 2015.
  48. "Locates Extension Station: Transit Board Decides on 93d-95th St,. Brooklyn, Site" (PDF). The New York Times. September 13, 1922. ISSN   0362-4331 . Retrieved June 29, 2015.
  49. "Brooklyn Subway Extension Plan: Fourth Ave. Line to 86th St., Tunnel to Staten Island, and Eventually a Through Route to Coney Island" (PDF). The New York Times. February 16, 1912. ISSN   0362-4331 . Retrieved June 28, 2015.
  50. 1 2 "To Extend Subway to Fort Hamilton" (PDF). The New York Times. August 26, 1922. ISSN   0362-4331 . Retrieved June 27, 2015.
  51. "Three Rapid Transit Contracts are Let" (PDF). The New York Times. December 29, 1922. ISSN   0362-4331 . Retrieved June 28, 2015.
  52. "Discuss Subway Work: Fort Hamilton Taxpayers Want 100th Street Extended" (PDF). The New York Times. September 24, 1911. ISSN   0362-4331 . Retrieved June 28, 2015.
  53. 1 2 Leigh, Irvin; Matus, Paul (January 2002). "State Island Rapid Transit: The Essential History". thethirdrail.net. The Third Rail Online. Archived from the original on May 30, 2015. Retrieved June 27, 2015.
  54. "To Act This Year on the Richmond Tube: Route Approved in 1912 Still Alive-May Soon Be Adopted Anew or Amended" (PDF). The New York Times. February 13, 1919. ISSN   0362-4331 . Retrieved June 27, 2015.
  55. Niebuhr, Robert E. (November 27, 1964). "They Called The 1923 Narrows Tunnel: 'Hope And A Hole In The Ground'". brooklynrail.net . Home Reporter and Sunset News, Brooklyn Historic Railway Association . Retrieved June 27, 2015.
  56. "Staten Island Tube Started by Hylan" (PDF). The New York Times. April 15, 1923. ISSN   0362-4331 . Retrieved June 27, 2015.
  57. 1 2 3 4 Raskin, Joseph B. (2013). The Routes Not Taken: A Trip Through New York City's Unbuilt Subway System. New York, New York: Fordham University Press. p. 148. doi:10.5422/fordham/9780823253692.001.0001. ISBN   978-0-82325-369-2.
  58. "Hylan Swings Pick at Shaft Opening; Formally Starts Work at the Staten Island End of Narrows Tunnel" (PDF). The New York Times . July 20, 1923. Retrieved September 6, 2016.
  59. Pitanza, Marc (2015). Staten Island Rapid Transit Images of Rail. Arcadia Publishing. ISBN   978-1-4671-2338-9.
  60. Leigh, Irvin; Matus, Paul (January 2002). "Staten Island Rapid Transit: The Essential History". thethirdrail.net. The Third Rail Online. Retrieved June 27, 2015.
  61. Young, James C. (May 10, 1925). "Staten Island Waits for Narrows Tunnel" (PDF). The New York Times. ISSN   0362-4331 . Retrieved June 27, 2015.
  62. Martin, Douglas (November 17, 1996). "Subway Planners' Lofty Ambitions Are Buried as Dead-End Curiosities". The New York Times. ISSN   0362-4331 . Retrieved June 27, 2015.