Central Corridor Rail Line

Last updated

Central Corridor Rail Line
Central Corridor Rail Line.svg
Overview
StatusDormant proposal
Locale New England
Termini
Stations10 (8 new; 2 serve other routes)
Service
Type Regional rail
Technical
Track gauge 4 ft 8+12 in (1,435 mm)
Route map

Contents

BSicon CONTg.svg
BSicon BHF.svg
0 mi
0 km
Brattleboro
BSicon STR+GRZq.svg
BSicon CONTgq.svg
BSicon xABZgr.svg
Vermonter
BSicon exHST.svg
21 mi
34 km
Millers Falls
BSicon exHST.svg
36 mi
58 km
Amherst
BSicon CONTgq.svg
BSicon xKRZxl.svg
BSicon CONTfq.svg
BSicon exHST.svg
56 mi
90 km
Palmer
BSicon xSTR+GRZq.svg
BSicon exHST.svg
71 mi
114 km
Stafford Springs
BSicon exHST.svg
83 mi
134 km
Storrs-Mansfield
BSicon exHST.svg
91 mi
146 km
Willimantic
BSicon exHST.svg
108 mi
174 km
Norwich
BSicon exHST.svg
111 mi
179 km
Mohegan
BSicon STR+l.svg
BSicon xKRZu.svg
BSicon CONTfq.svg
BSicon STRl.svg
BSicon xABZg+r.svg
BSicon ACC.svg
121 mi
195 km
New London
BSicon CONTf.svg

The Central Corridor Rail Line was a proposed passenger service route between New London, Connecticut, and Brattleboro, Vermont. A primary purpose of the proposed service was to provide a rail link between state flagship schools UConn, UMass Amherst, and UVM. [1]

In 2017 the Massachusetts Department of Transportation completed Central Corridor Passenger Rail Feasibility Study. [2] No further action was taken upon completion of the study.

History

New London Union Station, the proposed southern terminus of the Central Corridor line New London Union Station.JPG
New London Union Station, the proposed southern terminus of the Central Corridor line

Previous service

The New London, Willimantic, and Palmer Railroad opened from New London, Connecticut, to Palmer, Massachusetts, in September 1850. It was extended to Amherst in May 1853 by the NLW&P-leased Amherst and Belchertown Railroad, which failed and was reorganized as the Amherst, Belchertown and Palmer in 1858. The New London Northern Railroad acquired the NLW&P (which had failed in 1859) in 1861, and the AB&P in 1864. In 1867, it extended the line north to Millers Falls. [3]

In 1870, the Rutland Railroad leased an 1849-built Vermont and Massachusetts Railroad line from Millers Falls to Brattleboro, Vermont. Originally the V&M mainline, it became a minor branch when the V&M decided to expand west through the Hoosac Tunnel instead. Soon after, the Rutland was taken over by the Vermont Central Railroad, which then leased the NLN in December 1871. The VC collapsed in 1873 and was taken over by the Central Vermont Railway, which continued to lease the NLN. [3]

The Central Vermont became part of the Grand Trunk Railway in 1899, which in turn was nationalized by the Canadian government in 1922. Passenger service on the line ended on September 27, 1947. The line was sold to RailTex in 1995 and operated as the New England Central Railroad. [3] RailTex was merged into RailAmerica in 2000, which in turn was acquired by the Genesee & Wyoming company in 2012.

Montrealer and Vermonter

Service to Amherst ended on the Vermonter in 2014 Amherst MA.JPG
Service to Amherst ended on the Vermonter in 2014

From its reinstatement in 1989, the overnight Montrealer (the direct predecessor of the Vermonter) ran along the Central Vermont from New London to Brattleboro and beyond. Amherst was at first the only station stop between New London to Brattleboro, which was traversed late at night in both directions; a stop at Willimantic was added in 1991.

After fiscal issues in 1995, the Montrealer was cut back to St. Albans and moved to a daytime schedule as the Vermonter . It was rerouted over the Springfield Line between New Haven and Springfield, and the Boston Subdivision from Springfield to Palmer, Massachusetts. At Palmer the train reversed directions and continued north along the Central Vermont (which was sold to the New England Central Railroad that year).

On December 29, 2014, the Vermonter was rerouted onto the Conn River Line between Springfield and Northfield, Massachusetts, after the line received major upgrades. This eliminated the reverse move at Palmer, which led to faster service, and added stations at Holyoke, Northampton, and Greenfield; however, it ended direct service to Amherst.

Modern planning

Preparing the line for passenger service would require refurbishing the New England Central Railroad tracks, which also carry freight to New London's deepwater port. [4] The northernmost section, in Vermont, has been upgraded to continuously welded rail via a $50 million ARRA grant. New England Central estimates that similar upgrades (which include upgrading the track to standard 286,000 pound car loads) from the Massachusetts / Vermont border to New London would cost $18 million, while the full project including stations and rolling stock would cost $150 million. [1] [5]

During the building of Foxwoods Casino and Mohegan Sun Casino in the 1990s and 2000s, commuter rail service was considered on the New London to Norwich section of the line to reduce traffic impacts on Route 2. [6] However, upgrades to Route 2 were selected instead.

In October 2012, an excursion train was run to raise support for the project, which has been endorsed by a number of the town governments along the line. [5] In November 2012, officials from Mansfield, New London, Norwich, and Windham (all of which will be served by station stops) plus the Southeastern Connecticut Council of Governments signed an agreement to pursue funding for the service. [7]

In January 2014, it was announced that backers of the line would try to seek federal funding in order to get the line funded. Congressman Joe Courtney supported the project, along with Connecticut State Senator Cathy Osten. [8] In September 2014, NECR was awarded a $8.2 million TIGER grant for upgrading 55 miles of track in Connecticut; the $10.5 million project is primarily for freight use but is also a prerequisite for any future passenger service. [9]

In 2021, Connecticut lawmakers allocated $2.3 million for Connecticut Department of Transportation to study [10] the expansion of the Shore Line East service east to Westerly, RI with the possibility of expansion north to Norwich, CT, with additional studies for infill stations along the two railways. The study is expected to be concluded in Fall 2023. [11]

Rolling stock

In 2010 a proposal was put forward to use refurbished Budd Rail Diesel Cars, [12] which are less expensive to operate than conventional locomotive-and-carriage trains on lower-density routes like the Central Corridor. The refurbished RDCs would be capable of operating at speeds up to 80 miles per hour - the FRA limit on track speed on the corridor. [13]

Proposed stations

The historic Union Station building in Palmer, Massachusetts Union Station, Palmer, Mass.jpg
The historic Union Station building in Palmer, Massachusetts
The former Amtrak station platform in Willimantic, Connecticut Former Amtrak platform, Willimantic, CT.JPG
The former Amtrak station platform in Willimantic, Connecticut
StateCityStationNotes
Vermont Brattleboro Brattleboro Vermonter stop; connections to CRT and DVTA
Massachusetts Montague Millers FallsConnection to FRTA
Amherst Amherst Former Vermonter stop; connection to PVTA
Palmer Palmer Connection to PVTA
Connecticut Stafford Stafford Springs
Mansfield Storrs-Mansfield University of Connecticut; Connection to WRTD
Willimantic Willimantic Former Montrealer stop; Connection to WRTD
Norwich NorwichConnection to SEAT
Montville Mohegan Mohegan Sun casino
New London Union Station Connections to Amtrak, Shore Line East, SEAT

Related Research Articles

<span class="mw-page-title-main">Union Station (New Haven)</span> Railroad station in Connecticut

New Haven Union Station is the main railroad passenger station in New Haven, Connecticut. It is the third such station in the city of New Haven, preceded by both an 1848 built station in a different location, and an 1879 built station near the current station's location. Designed by noted American architect Cass Gilbert, the present beaux-arts Union Station was completed and opened in 1920 after the previous Union Station was destroyed by fire. It served the New York, New Haven and Hartford Railroad for the next five decades, but fell into decline following World War II along with the United States railroad industry as a whole.

<i>Vermonter</i> (train) Amtrak passenger train in the northeast United States

The Vermonter is a passenger train operated by Amtrak between St. Albans, Vermont, and Washington, D.C., via New York City. It replaced the overnight Montrealer, which terminated in Montreal until 1995. Amtrak receives funding from the states of Connecticut, Massachusetts, and Vermont for Vermonter operations north of New Haven.

<span class="mw-page-title-main">Springfield Union Station (Massachusetts)</span> Train station in Springfield, Massachusetts, US

Springfield Union Station is a train and bus station in the Metro Center area of Springfield, Massachusetts. Constructed in 1926, Springfield Union Station is the fifth-busiest Amtrak station in the Commonwealth, and the busiest outside of Greater Boston.

The New London Northern Railroad was a part of the Central Vermont Railway from New London, Connecticut, north to Brattleboro, Vermont. After a long period with the Canadian National Railway, it is now operated by the New England Central Railroad. The New London Northern was the only through railroad in Connecticut not to come under the control of the New York, New Haven and Hartford Railroad.

<span class="mw-page-title-main">New Haven–Springfield Line</span> Railroad line in Connecticut and Massachusetts, U.S.

The New Haven–Springfield Line is a railroad line owned by Amtrak from New Haven, Connecticut, north to Springfield, Massachusetts, serving the Knowledge Corridor. As a branch of the Northeast Corridor just north of New Haven State Street station, it is served by approximately seven daily Northeast Regional round trips, some continuing from New Haven to Washington, D.C., along the Corridor and others terminating at New Haven as shuttles. On weekends, there is one train daily to Roanoke, Virginia. It is also served by the daily Vermonter, which starts in Washington, D.C., and continues north from Springfield, finally terminating in St. Albans, Vermont. The line is part of the Inland Route connecting Boston and New York via Hartford, Springfield, and Worcester, in contrast to the "Shore Line" along the Connecticut Shore and through Rhode Island.

<span class="mw-page-title-main">New England Central Railroad</span> Railroad company

The New England Central Railroad is a regional railroad in the New England region of the United States. It began operations in 1995, as the successor of the Central Vermont Railway (CV). The company was originally a subsidiary of holding company RailTex before being purchased by RailAmerica in 2000. In 2012, the company was purchased by Genesee & Wyoming, its current owner.

<span class="mw-page-title-main">Amherst station (Massachusetts)</span> Former railway station in Amherst, Massachusetts, US

Amherst is a former intercity rail station located in Amherst, Massachusetts. The station was built by the Amherst and Belchertown Railroad in 1853; it was served by the Central Vermont Railway until 1947. Amtrak service began in 1989 with the Montrealer; it was replaced by the Vermonter in 1995. The station was closed on December 28, 2014, when the Vermonter was rerouted to the faster Connecticut River Line to the west.

<span class="mw-page-title-main">New London Union Station</span> Railway station in New London, Connecticut, US

New London Union Station is a railroad station on the Northeast Corridor located in downtown New London, Connecticut, United States. Union Station is a station stop for most Amtrak Northeast Regional trains and all CT Rail Shore Line East commuter rail trains, making it the primary railroad station in southeastern Connecticut. It serves as the centerpiece of the Regional Intermodal Transit Center, with connections to local and intercity buses as well as ferries to Long Island and Fishers Island, New York, and Block Island, Rhode Island. The station has one side platform and one island platform serving the two-track Northeast Corridor; the latter platform also serves a siding track that connects to the New England Central Railroad mainline.

<span class="mw-page-title-main">Hartford Line</span> CTrail commuter rail service in the US

The Hartford Line is a commuter rail service between New Haven, Connecticut, and Springfield, Massachusetts, using the Amtrak-owned New Haven–Springfield Line. The project is a joint venture between the states of Connecticut and Massachusetts, with support from the federal government as well. CT Rail-branded trains provide service along the corridor, and riders can use Hartford Line tickets to travel on board most Amtrak trains along the corridor at the same prices. The service launched on June 16, 2018.

<span class="mw-page-title-main">Union Station (Brattleboro, Vermont)</span> Railway station in Brattleboro, Vermont

Union Station is an Amtrak intercity rail station located in downtown Brattleboro, Vermont, United States. It is served by the one daily round trip of the Vermonter service. Most of the 1915-built station is occupied by the 1972-opened Brattleboro Museum and Art Center, while Amtrak uses a waiting room on the lower floor. The building was added to the National Register of Historic Places in 1974.

<span class="mw-page-title-main">Bellows Falls station</span> Railroad station in Bellows Falls, Vermont, US

Bellows Falls station is an Amtrak intercity rail station located in the Bellows Falls village of Rockingham, Vermont, United States. The station is served by the single daily round trip of the Washington, D.C.–St. Albans Vermonter. It has a single side platform adjacent to the single track of the New England Central Railroad mainline.

<span class="mw-page-title-main">Union Station (Palmer, Massachusetts)</span> Former train station in Palmer, Massachusetts

Union Station is a historic former railroad station located in downtown Palmer, Massachusetts. The building, which was designed by American architect H. H. Richardson, opened in June 1884 to consolidate two separate stations nearby. The grounds of the station were originally designed by Frederick Law Olmsted.

<span class="mw-page-title-main">John W. Olver Transit Center</span> Intermodal transit hub in Franklin County, Massachusetts

The John W. Olver Transit Center, also called the JWO Transit Center, is an intermodal transit hub for Franklin County, Massachusetts. Located in Greenfield, it currently serves Franklin Regional Transit Authority (FRTA) local bus routes plus intercity bus service. Amtrak's Greenfield station is also located here, with one daily Vermonter round trip and two daily Valley Flyer round trips, which are extensions of Amtrak-run Hartford Line trains.

<span class="mw-page-title-main">Union Station (Northampton, Massachusetts)</span>

Union Station is a historic building in Northampton, Massachusetts, that served as a train station from 1897 until 1987. Built at the close of the nineteenth century, the structure incorporates many features of the Richardsonian Romanesque architectural style. The buff brick masses of the station are trimmed with red Longmeadow brownstone and hooded by red tile roofs. Steep dormers protrude from the roofline. The interior once featured Italian marble floors, oak woodwork, and a large fireplace.

<i>Montrealer</i> (train) Passenger train operated by Amtrak between New York City and Montreal, Canada

The Montrealer was an overnight passenger train between Washington, D.C., United States, and Montreal, Quebec, Canada. The train was operated from 1924 to 1966, and again under Amtrak from 1972 to 1995, excepting two years in the 1980s. The train was discontinued in 1995 and replaced by the Vermonter, which provides daytime service as far north as St. Albans, Vermont. Current Amtrak service to Montreal is provided by the daytime Adirondack from New York City via Albany.

<span class="mw-page-title-main">Holyoke station</span> Train station in Massachusetts, U.S.

Holyoke station is an Amtrak intercity train station near the corner of Main and Dwight streets in Holyoke, Massachusetts, United States. The station opened on August 27, 2015, eight months after Amtrak's Vermonter service was re-routed to the Connecticut River Line through the Pioneer Valley.

<span class="mw-page-title-main">Connecticut River Line</span> Railway line in the United States of America

The Connecticut River Line is a railroad line owned by the Massachusetts Department of Transportation (MassDOT), running between Springfield and East Northfield, Massachusetts.

<span class="mw-page-title-main">CT Rail</span> Commuter rail in Connecticut, USA

CT Rail, stylized as CTrail, is the brand for commuter rail services overseen by the Connecticut Department of Transportation (CTDOT), in the U.S. state of Connecticut, with services on the Hartford Line extending into Massachusetts. CTDOT oversees two lines: Shore Line East, between New Haven and New London, Connecticut, and the Hartford Line, from New Haven, through Hartford, to Springfield, Massachusetts.

<i>Valley Flyer</i> (Amtrak train)

The Valley Flyer is a train service run by Amtrak between New Haven, Connecticut and Greenfield, Massachusetts along Amtrak's New Haven–Springfield Line and the Massachusetts Department of Transportation's Connecticut River Line.

<span class="mw-page-title-main">East-West Passenger Rail</span> Massachusetts east-to-west rail project

East-West Rail is a proposed intercity passenger rail project that would provide new service between Boston and western Massachusetts, with stops including Worcester, Palmer, Springfield, Pittsfield, and Amtrak's Albany–Rensselaer station in New York. The 171-mile (275 km) route between Boston and Albany would use the former mainline of the Boston and Albany Railroad, which is now owned by the Massachusetts Bay Transit Authority and CSX Transportation.

References

  1. 1 2 "Central Corridor Rail Line" (PDF). Rhode Island Association of Rail Passengers. Archived from the original (PDF) on July 27, 2011. Retrieved February 16, 2011.
  2. HDR (June 2017). Central Corridor Passenger Rail Feasibility Study (Report). Massachusetts Department of Transportation.
  3. 1 2 3 Karr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. pp. 100–104. ISBN   0942147022.
  4. "Our View: Rail would boost economy". Norwich Bulletin . October 8, 2010. Archived from the original on January 31, 2013. Retrieved November 6, 2010.
  5. 1 2 Bessette, Claire (October 4, 2012). "All aboard for the Central Corridor line". The New London Day. Retrieved October 5, 2012.
  6. "Route 2A/2/32 Environmental Impact Statement: EIS alternatives" (PDF). Connecticut Department of Transportation. August 18, 2004. Retrieved January 4, 2012. (abstract)
  7. Johnson, Jeffery A. (November 3, 2012). "Towns sign rail expansion agreement". The New London Day. Retrieved October 5, 2012.
  8. Benson, Adam (February 21, 2014). "Rail line plan to seek federal funding" . Retrieved September 21, 2014.
  9. "TIGER 2014 Awards" (PDF). U.S. Department of Transportation. September 2014. Retrieved September 16, 2014.
  10. Moritz, John (June 28, 2021). "Service to Rhode Island? Broad expansion of CT shoreline rails sees renewed interest". CT Insider. Retrieved January 3, 2023.
  11. "Eastern CT Corridor Rail and Transit Feasibility Study - FAQs". CT.gov - Connecticut's Official State Website. Retrieved January 3, 2023.
  12. Mosher, James (Oct 26, 2010). Central Corridor train plan getting on track. Norwich Bulletin. Accessed November 6, 2010.
  13. "Summary of October 26, 2010 Meeting regarding the Proposed Central Corridor Rail Line" (PDF). Rhode Island Association of Rail Passengers. October 26, 2010. Archived from the original (PDF) on March 20, 2012. Retrieved February 16, 2011.